CN106545111A - For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method - Google Patents

For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method Download PDF

Info

Publication number
CN106545111A
CN106545111A CN201710038534.7A CN201710038534A CN106545111A CN 106545111 A CN106545111 A CN 106545111A CN 201710038534 A CN201710038534 A CN 201710038534A CN 106545111 A CN106545111 A CN 106545111A
Authority
CN
China
Prior art keywords
wall
constructional column
prefabricated
prefabricated constructional
foundation ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710038534.7A
Other languages
Chinese (zh)
Inventor
杨新磊
职智菊
张建新
王海良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Chengjian University
Original Assignee
Tianjin Chengjian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Chengjian University filed Critical Tianjin Chengjian University
Priority to CN201710038534.7A priority Critical patent/CN106545111A/en
Publication of CN106545111A publication Critical patent/CN106545111A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • E04B2/66Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete characterised by special cross-section of the elongated members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method, prefabricated constructional column is the prefabricated reinforced concrete structure being made up of L-type columnar part and header portion, two composition sides of L-type columnar part are provided with multiple drawknot ring installing holes, and L-type columnar part is made up of outer casting concrete and built-in framework of steel reinforcement;End plate is welded with the lower end of built-in framework of steel reinforcement, and multiple reserved connecting holes are disposed with end plate;Rammed earth wall construction, it is made up of the body of wall for being embedded in underground foundation ring girder He be arranged on above the ground, the prefabricated constructional column that body of wall includes rammed earth main part and is arranged at body of wall each external corner, is connected with multiple tracks tension rib between the prefabricated constructional column at the same face body of wall two ends;Construction method is:S1 pours prefabricated constructional column in advance;S2 pours foundation ring girder;S3 installs prefabricated constructional column on foundation ring girder;S4 building bodies of wall.Prefabricated constructional column serves protective effect to body of wall external corner, and rammed earth wall construction has preferable globality and durability.

Description

For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method
Technical field
The invention belongs to construction wall construction applications, more particularly to for the prefabricated constructional column at body of wall external corner, adopting should The rammed earth wall construction and the construction method of loam wall of constructional column.
Background technology
One of principal mode as traditional earth building, loam wall structural building is in western China using more wide It is general, with characteristic where distinctness and national characters, it is full of dense regional history and cultural spirit.Loam wall structural building because For draw materials conveniently, it is cheap, get close to nature, energy saving, insulation the advantages of extensively welcome.In order to improve rammed earth The globality of wall and anti-seismic performance it is domestic frequently with method be that pin is set in house corner and longitudinal cross wall junction, in body of wall Horizontal batten or Plant fiber are set, but this anti-seismic performance and durability to raising loam wall is not notable, while this certainly will The destruction of the felling and ecological environment of trees can be caused.
The content of the invention
The present invention provides a kind of prefabricated structure at body of wall external corner to solve technical problem present in known technology Post, rammed earth wall construction and its construction method are made, prefabricated constructional column can be prevented effectively from body of wall external corner and be destroyed, and can improve body of wall external corner The anti-ability of colliding with;Rammed earth wall construction has higher level shear capacity, globality, anti-seismic performance and durability.
The present invention is adopted the technical scheme that by solving technical problem present in known technology:
For the prefabricated constructional column at body of wall external corner, it is characterised in that:Prefabricated constructional column is prefabricated reinforced concrete structure, Which includes L-type columnar part and is arranged on the header portion composition of L-type columnar part lower end, and L-type columnar part is mixed by pouring outward Solidifying native and built-in framework of steel reinforcement is constituted, and the multiple drawings arranged by spacing up and down are equipped with two composition sides of L-type columnar part Knot ring installing hole;Main reinforcement and be fixed on six roots of sensation main reinforcement along the vertical direction that the built-in framework of steel reinforcement is uprightly arranged by the six roots of sensation On multilamellar lateral tie constitute, six roots of sensation main reinforcement is arranged in six corner locations of L-type columnar part;The end plate by Steel plate is made, and end plate is welded with the lower end of built-in framework of steel reinforcement, is disposed with positioned at L-type columnar part periphery multiple pre- on end plate Stay connecting hole.
Preferably:Header portion adopts square plate structure, and the prefabricated connecting hole on end plate is four, four prefabricated connections Pore size distribution is in four corner parts of end plate.
Rammed earth wall construction, it is characterised in that:By being embedded in underground foundation ring girder and be arranged on body of wall above the ground Constitute;The prefabricated constructional column that body of wall includes rammed earth main part and is arranged at body of wall each external corner, the prefabricated constructional column are adopted With above-mentioned prefabricated constructional column structure, two lateral surface of the L-type columnar part of prefabricated constructional column are crossed to form the external corner of body of wall, It is mounted on a drawknot ring in each tension member installing hole on prefabricated constructional column, the same face body of wall be located at two ends two are prefabricated Constructional column forms connection by the multiple tracks tension rib being connected between drawknot ring, and multiple tracks tension rib is in be arranged in parallel up and down;In base On plinth collar tie beam, position corresponding with every place's prefabricated constructional column is embedded with multiple connecting bolts, and multiple connecting bolts are prefabricated with corresponding Multiple reserved connecting hole on the end plate of constructional column forms one by one and installs connection, and makes prefabricated constructional column and base by locking nut Plinth collar tie beam forms a fixed connection.
Loam wall construction method, it is characterised in that including following construction procedure:
S1 pours prefabricated constructional column in advance, and prefabricated constructional column adopts the prefabricated constructional column structure described in claim 1 or 2, The height of prefabricated constructional column is consistent with the setting height of body of wall:
S2 pours foundation ring girder:Foundation pit is first dug, the framework of steel reinforcement structure of foundation ring girder is then arranged in foundation pit, so Supporting foundation ring girder template afterwards, after foundation ring girder template support is good, first in the location arrangements the bolt that is located by connecting of setting, so After-pouring concrete, it is concrete curing after, framework of steel reinforcement and concrete basis of formation collar tie beam, and the position set on foundation ring girder Pre-buried good connecting bolt is put, foundation ring girder template is then removed;
S3 installs prefabricated constructional column on foundation ring girder:A prefabricated construction is arranged in each setting external angle position of body of wall Post, the reserved connecting hole in the header portion of prefabricated constructional column are formed with the connecting bolt of foundation ring girder correspondence position and are installed one by one Connection, and prefabricated constructional column is fixed on foundation ring girder by locking nut.
S4 building bodies of wall:First-selected supporting wall form, after wall form supporting is good, by the way of layering from the bottom to top Building body of wall, then removes wall form successively;During building body of wall, draw in every building to prefabricated constructional column During knot ring position of mounting hole, a drawknot is fixed respectively in the drawknot ring installing hole on multiple prefabricated constructional columns of sustained height Ring, then connects tension rib between the drawknot ring positioned at two ends of the same face body of wall, makes multiple prefabricated constructions by tension rib Post connects into an entirety.
The present invention has the advantages and positive effects that:
1st, this prefabricated constructional column adopts prefabricated reinforced concrete structure, is placed on the external angle position of body of wall, L-type trunk portion Two lateral surface being divided to are crossed to form the external corner of body of wall, compared to existing directly with rammed earth forming external corner, can increase substantially wall The anti-ability of colliding with of body external corner, so as to the external corner that can be prevented effectively from body of wall is destroyed, with preferable durability and corrosion-resistant energy Power.
2nd, pillar structure of this rammed earth wall construction in the external corner setting prefabricated reinforced concrete structure of body of wall, prefabricated construction The multiple tracks tension rib arranged up and down is set between post, so, good effect of contraction is played to loam wall.The rammed earth wall construction phase Than with existing pure rammed earth wall construction, obtain at aspects such as level shear capacity, globality, anti-seismic performance and durability It is greatly improved.
3rd, this loam wall construction method, it is ensured that the construction quality of rammed earth wall construction.
Description of the drawings
Fig. 1 is the structural representation of prefabricated constructional column of the present invention;
Fig. 2 is the connection diagram of the built-in framework of steel reinforcement with header portion of prefabricated constructional column of the present invention;
Fig. 3 is the dimensional structure diagram of rammed earth wall construction of the present invention;
Fig. 4 be Fig. 3 be prefabricated constructional column, drawknot ring and tension rib connection close-up schematic view.
In figure:1st, L-type columnar part;1-1, outer casting concrete;1-1-1, drawknot ring installing hole;1-2, built-in reinforcing bar Frame;1-2-1, main reinforcement;1-2-2, lateral tie;2nd, header portion;2-1, prefabricated connecting hole;1, foundation ring girder;2, body of wall; 2-1, rammed earth main part;2-2, drawknot ring;2-2-1, shank of bolt part;2-2-2, connection ring part;2-3, drawknot Muscle;3, connecting bolt.
Specific embodiment
For the content of the invention, feature and effect of the present invention can be further appreciated that, following examples are hereby enumerated, and coordinates accompanying drawing Describe in detail as follows:
For the prefabricated constructional column at body of wall external corner, Fig. 1-2 is referred to, prefabricated constructional column is tied for prefabricated reinforced concrete Structure, which includes L-type columnar part 1 and is arranged on the header portion 2 of L-type columnar part lower end constituting, and L-type columnar part is by pouring outward Build concrete 1-1 and built-in framework of steel reinforcement 1-2 to constitute, be equipped with up and down by spacing cloth on two composition sides of L-type columnar part The multiple drawknot ring installing hole 1-1-1 for putting.The built-in framework of steel reinforcement is by the upright main reinforcement 1-2-1 for arranging of the six roots of sensation and vertically Direction is fixed on the multilamellar lateral tie 1-2-2 on six roots of sensation main reinforcement and constitutes, and specifically, lateral tie is formed by six sections of reinforcing bars Closed type L-type structure, with a colligation is tied up on main reinforcement, six roots of sensation main reinforcement is arranged in L-type columnar part to lateral tie Six corner locations.The end plate is made up of steel plate, and end plate is welded with the lower end of built-in framework of steel reinforcement, and L-type is located on end plate Columnar part periphery is disposed with multiple reserved connecting hole 2-1.
In above-mentioned prefabricated constructional column, header portion preferably adopts square plate structure, and the prefabricated connecting hole on end plate is four Individual, four prefabricated connecting holes are distributed in four corner parts of end plate.
Rammed earth wall construction, refers to Fig. 3-4, by being embedded in underground foundation ring girder 1, and is arranged on wall above the ground Body 2, is constituted.Body of wall is mainly by rammed earth main part 2-1, and the prefabricated construction being arranged at body of wall each external corner is constituted.It is described Prefabricated constructional column adopts above-mentioned prefabricated constructional column structure, two lateral surface of the L-type columnar part of prefabricated constructional column to be crossed to form wall The external corner of body, is mounted on a drawknot ring 2-2 in each the tension member installing hole on prefabricated constructional column, specifically, drawknot ring By the shank of bolt part 2-2-1 being threaded onto in drawknot ring installing hole, and expose to the connection ring part 2- on the inside of L-type columnar part 2-2, is constituted, and drawknot ring is formed a fixed connection by the nut of shank of bolt part and cooperation and L-type columnar part.The same face body of wall Two prefabricated constructional columns positioned at two ends form connection, multiple tracks drawknot by the multiple tracks tension rib 2-3 being connected between drawknot ring Muscle in be arrangeding in parallel up and down, specifically, the two ends of per pass tension rib connection ring part shape respectively with the drawknot ring positioned at two ends Into being fixedly connected, the end of such as tension rib can be formed a fixed connection with connection ring part by way of winding.In basis circle Liang Shangyu often locates the corresponding position of prefabricated constructional column and is embedded with multiple connecting bolts 3, multiple connecting bolts and corresponding prefabricated structure Make the multiple reserved connecting hole on the end plate of post formed one by one install connection, and by locking nut make prefabricated constructional column with basis Collar tie beam forms a fixed connection, and specifically, the reserved connecting hole of correspondence of the connecting bolt from end plate is passed, and be pressed on end plate The locking nut connection at end, wherein locking nut is not illustrated in the accompanying drawings.
Loam wall construction method, including following construction procedure:
S1 pours prefabricated constructional column in advance, and prefabricated constructional column adopts above-mentioned prefabricated constructional column structure, prefabricated constructional column Height is consistent with the setting height of body of wall:
S2 pours foundation ring girder:Foundation pit is first dug, the framework of steel reinforcement structure of foundation ring girder is then arranged in foundation pit, so Supporting foundation ring girder template afterwards, after foundation ring girder template support is good, first in the location arrangements the bolt that is located by connecting of setting, so After-pouring concrete, it is concrete curing after, framework of steel reinforcement and concrete basis of formation collar tie beam, and the position set on foundation ring girder Pre-buried good connecting bolt is put, foundation ring girder template is then removed;
S3 installs prefabricated constructional column on foundation ring girder:A prefabricated construction is arranged in each setting external angle position of body of wall Post, the reserved connecting hole in the header portion of prefabricated constructional column are formed with the connecting bolt of foundation ring girder correspondence position and are installed one by one Connection, and prefabricated constructional column is fixed on foundation ring girder by locking nut.When fixing prefabricated constructional column on foundation ring girder, The corresponding side surface of the prefabricated constructional column at each face wall two ends for needing to ensure pre- building is in the same plane, to ensure follow-up wall During body building, the flatness of metope.
S4 building bodies of wall:First-selected supporting wall form, after wall form supporting is good, by the way of layering from the bottom to top Building body of wall successively, the concrete building process of body of wall are identical with the building process of existing loam wall, until building setting to body of wall Determine height and position, then remove wall form.During building body of wall, drawknot in every building to prefabricated constructional column During ring position of mounting hole, a drawknot ring is fixed respectively in the drawknot ring installing hole on multiple prefabricated constructional columns of sustained height, Then connect tension rib between the drawknot ring positioned at two ends of the same face body of wall, connect multiple prefabricated constructional columns by tension rib It is connected into an entirety.So, the globality after body of wall building molding can be increased substantially.
This rammed earth wall construction is a kind of composite wall body structure based on rammed earth, and which adopts prefabricated constructional column at external corner Structure, serves protective effect to external corner, is connected by tension rib, wall body structure is greatly improved between prefabricated constructional column The performance of the aspects such as globality, durability.

Claims (4)

1. the prefabricated constructional column being used at body of wall external corner, it is characterised in that:Prefabricated constructional column is prefabricated reinforced concrete structure, its Constitute including L-type columnar part and the header portion for being arranged on L-type columnar part lower end, L-type columnar part is by pouring outward coagulation Native and built-in framework of steel reinforcement is constituted, and the multiple drawknots arranged by spacing up and down are equipped with two composition sides of L-type columnar part Ring installing hole;Main reinforcement and be fixed on six roots of sensation main reinforcement along the vertical direction that the built-in framework of steel reinforcement is uprightly arranged by the six roots of sensation Multilamellar lateral tie constitute, six roots of sensation main reinforcement is arranged in six corner locations of L-type columnar part;The end plate is by steel Plate is made, and end plate is welded with the lower end of built-in framework of steel reinforcement, is disposed with positioned at L-type columnar part periphery multiple reserved on end plate Connecting hole.
2. the prefabricated constructional column at body of wall external corner according to claim 1, it is characterised in that:Header portion employing side Shape steel plate structure, the prefabricated connecting hole on end plate are four, and four prefabricated connecting holes are distributed in four corner parts of end plate.
3. rammed earth wall construction, it is characterised in that:By being embedded in underground foundation ring girder and be arranged on wall body structure above the ground Into;The prefabricated constructional column that body of wall includes rammed earth main part and is arranged at body of wall each external corner, the prefabricated constructional column are adopted Prefabricated constructional column structure described in claim 1 or 2, two lateral surface of the L-type columnar part of prefabricated constructional column are crossed to form wall The external corner of body, is mounted on a drawknot ring in each the tension member installing hole on prefabricated constructional column, and the same face body of wall is located at two Two prefabricated constructional columns at end form connection by the multiple tracks tension rib being connected between drawknot ring, and multiple tracks tension rib is in put down up and down Row is arranged;On foundation ring girder, position corresponding with every place's prefabricated constructional column is embedded with multiple connecting bolts, multiple connection spiral shells Bolt is formed with the multiple reserved connecting hole on the end plate of corresponding prefabricated constructional column one by one and installs connection, and made by locking nut pre- Constructional column processed is formed a fixed connection with foundation ring girder.
4. loam wall construction method, it is characterised in that including following construction procedure:
S1 pours prefabricated constructional column in advance, and prefabricated constructional column is using the prefabricated constructional column structure described in claim 1 or 2, prefabricated The height of constructional column is consistent with the setting height of body of wall:
S2 pours foundation ring girder:Foundation pit is first dug, the framework of steel reinforcement structure of foundation ring girder, Ran Houzhi are then arranged in foundation pit Shield foundation ring girder template, after foundation ring girder template support is good, first in the location arrangements the bolt that is located by connecting of setting, then pours Build concrete, it is concrete curing after, framework of steel reinforcement and concrete basis of formation collar tie beam, and the position set on foundation ring girder is pre- Connecting bolt has been buried, foundation ring girder template has then been removed;
S3 installs prefabricated constructional column on foundation ring girder:A prefabricated constructional column is arranged in each setting external angle position of body of wall, Reserved connecting hole in the header portion of prefabricated constructional column forms the company of installing one by one with the connecting bolt of foundation ring girder correspondence position Connect, and prefabricated constructional column is fixed on foundation ring girder by locking nut;
S4 building bodies of wall:First-selected supporting wall form, after wall form supporting is good, by the way of layering from the bottom to top successively Building body of wall, then removes wall form;During building body of wall, drawknot ring in every building to prefabricated constructional column During position of mounting hole, a drawknot ring is fixed respectively in the drawknot ring installing hole on multiple prefabricated constructional columns of sustained height, so Connect tension rib between the drawknot ring positioned at two ends of the same face body of wall afterwards, multiple prefabricated constructional column connections are made by tension rib Into an entirety.
CN201710038534.7A 2017-01-18 2017-01-18 For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method Pending CN106545111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710038534.7A CN106545111A (en) 2017-01-18 2017-01-18 For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710038534.7A CN106545111A (en) 2017-01-18 2017-01-18 For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method

Publications (1)

Publication Number Publication Date
CN106545111A true CN106545111A (en) 2017-03-29

Family

ID=58398804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710038534.7A Pending CN106545111A (en) 2017-01-18 2017-01-18 For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method

Country Status (1)

Country Link
CN (1) CN106545111A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217755A (en) * 2017-08-09 2017-09-29 新疆凯乐新材料有限公司 Self-insulating brick passive type architectural construction constructing structure and method
CN108005296A (en) * 2017-12-04 2018-05-08 天津城建大学 A kind of building-block structure suitable for loam wall external corner
CN108412087A (en) * 2018-05-08 2018-08-17 天津城建大学 Improve the prefabricated reinforcement structure and loam wall of loam wall globality
CN113622511A (en) * 2021-08-10 2021-11-09 山东永胜建设集团有限公司 Cast-in-place concrete hollow outer wall and construction method thereof
CN114658141A (en) * 2022-03-28 2022-06-24 北京工业大学 Connecting structure and method for T-shaped constructional column and independent foundation of assembled composite wallboard
CN114753525A (en) * 2022-03-28 2022-07-15 北京工业大学 Assembly type composite wall board L-shaped constructional column and independent foundation connecting structure and assembly type composite wall construction method

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR6201612U (en) * 1982-11-25 1984-07-03 Paulo Roberto De Almeida Freit SYSTEM OF CONSTRUCTION OF PREFABRICATED HOUSES THROUGH FITTING MODULATED PLATES AND PUNCHES
CN101769008A (en) * 2010-01-11 2010-07-07 郑州大学 Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN203296264U (en) * 2013-06-18 2013-11-20 烟台金田科技有限公司 Structural column of building
CN104264835A (en) * 2014-09-02 2015-01-07 绿建科技集团新型建材高技术有限公司 Half inside-enclosure laid whole-sandwich combined wall self-insulation system
CN104631665A (en) * 2015-01-19 2015-05-20 昆明理工大学 Construction method for anti-seismic rammed earth wall with reinforced surface skin and core columns
CN104895224A (en) * 2015-06-30 2015-09-09 郑州大学 Prestressed loam wall and construction process thereof
CN204728527U (en) * 2015-06-30 2015-10-28 郑州大学 Prestressing force rammed earth wall
WO2016010477A1 (en) * 2014-07-14 2016-01-21 Buildgreen (Asia) Pte Ltd Interlockable partition wall panel and method of fabrication the same
CN105696733A (en) * 2016-04-11 2016-06-22 天津城建大学 Rammed earth wall with precast concrete constructional columns
CN205369911U (en) * 2016-03-07 2016-07-06 温州市东城建筑工程有限公司 Constructional column steel form
CN105804293A (en) * 2016-05-09 2016-07-27 天津城建大学 Prefabricated concrete-filled steel tube construction column rammed earth wall
CN205577187U (en) * 2016-05-09 2016-09-14 天津城建大学 Prefabricated steel pipe concrete constructional column rammed earth wall
CN106128280A (en) * 2016-08-08 2016-11-16 江苏建筑职业技术学院 Brick masonry wall structural model and manufacture method
CN206529937U (en) * 2017-01-18 2017-09-29 天津城建大学 For the prefabricated constructional column at wall external corner and rammed earth wall construction

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR6201612U (en) * 1982-11-25 1984-07-03 Paulo Roberto De Almeida Freit SYSTEM OF CONSTRUCTION OF PREFABRICATED HOUSES THROUGH FITTING MODULATED PLATES AND PUNCHES
CN101769008A (en) * 2010-01-11 2010-07-07 郑州大学 Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN203296264U (en) * 2013-06-18 2013-11-20 烟台金田科技有限公司 Structural column of building
WO2016010477A1 (en) * 2014-07-14 2016-01-21 Buildgreen (Asia) Pte Ltd Interlockable partition wall panel and method of fabrication the same
CN104264835A (en) * 2014-09-02 2015-01-07 绿建科技集团新型建材高技术有限公司 Half inside-enclosure laid whole-sandwich combined wall self-insulation system
CN104631665A (en) * 2015-01-19 2015-05-20 昆明理工大学 Construction method for anti-seismic rammed earth wall with reinforced surface skin and core columns
CN104895224A (en) * 2015-06-30 2015-09-09 郑州大学 Prestressed loam wall and construction process thereof
CN204728527U (en) * 2015-06-30 2015-10-28 郑州大学 Prestressing force rammed earth wall
CN205369911U (en) * 2016-03-07 2016-07-06 温州市东城建筑工程有限公司 Constructional column steel form
CN105696733A (en) * 2016-04-11 2016-06-22 天津城建大学 Rammed earth wall with precast concrete constructional columns
CN105804293A (en) * 2016-05-09 2016-07-27 天津城建大学 Prefabricated concrete-filled steel tube construction column rammed earth wall
CN205577187U (en) * 2016-05-09 2016-09-14 天津城建大学 Prefabricated steel pipe concrete constructional column rammed earth wall
CN106128280A (en) * 2016-08-08 2016-11-16 江苏建筑职业技术学院 Brick masonry wall structural model and manufacture method
CN206529937U (en) * 2017-01-18 2017-09-29 天津城建大学 For the prefabricated constructional column at wall external corner and rammed earth wall construction

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217755A (en) * 2017-08-09 2017-09-29 新疆凯乐新材料有限公司 Self-insulating brick passive type architectural construction constructing structure and method
CN108005296A (en) * 2017-12-04 2018-05-08 天津城建大学 A kind of building-block structure suitable for loam wall external corner
CN108412087A (en) * 2018-05-08 2018-08-17 天津城建大学 Improve the prefabricated reinforcement structure and loam wall of loam wall globality
CN113622511A (en) * 2021-08-10 2021-11-09 山东永胜建设集团有限公司 Cast-in-place concrete hollow outer wall and construction method thereof
CN113622511B (en) * 2021-08-10 2022-11-29 山东永胜建设集团有限公司 Cast-in-place concrete hollow outer wall and construction method thereof
CN114658141A (en) * 2022-03-28 2022-06-24 北京工业大学 Connecting structure and method for T-shaped constructional column and independent foundation of assembled composite wallboard
CN114753525A (en) * 2022-03-28 2022-07-15 北京工业大学 Assembly type composite wall board L-shaped constructional column and independent foundation connecting structure and assembly type composite wall construction method
CN114753525B (en) * 2022-03-28 2023-12-29 北京工业大学 Connecting structure of L-shaped constructional column and independent foundation of assembled composite wallboard and construction method of assembled composite wall
CN114658141B (en) * 2022-03-28 2023-12-29 北京工业大学 T-shaped constructional column and independent foundation connection structure of assembled composite wallboard and manufacturing method

Similar Documents

Publication Publication Date Title
CN106545111A (en) For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method
CN103669598A (en) Layer added steel framework column base node on top of multi-layer concrete framework structure and construction method thereof
CN203669112U (en) Added-storey steel frame column base joint on top of multilayer concrete frame structure
CN106759448A (en) A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN104372967A (en) Raking prop structure used for natural draft cooling tower and construction method thereof
CN107604924B (en) Construction method for protecting subway by excavation of foundation pit of bridge bearing platform
CN108412087A (en) Improve the prefabricated reinforcement structure and loam wall of loam wall globality
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN103603435A (en) Assembled concrete seismic beam-column frame and construction method thereof
CN110656723B (en) Rail support for sliding construction of cylindrical arch shell roof
CN204357167U (en) A kind of cooling stack inclined strut structure
CN203808249U (en) Column stirrup cage assembly for beam-column joint core region
CN206529937U (en) For the prefabricated constructional column at wall external corner and rammed earth wall construction
CN101761187A (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN201334668Y (en) Moso bamboo row pile
CN204804437U (en) A assembled iron tower basic station for building mountain area
CN207727608U (en) A kind of fixing device of soft soil foundation tower crane
CN207260375U (en) A kind of steel plate concrete combined shear wall
CN201695694U (en) Differently-labeled concrete construction separating device in the same vertical structure of reinforced concrete wall
CN212533950U (en) Ecological bank protection in river course
CN110424762B (en) Cave dwelling reinforcing system
CN204662486U (en) Can for the mutual foundation of size tower crane conversion
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN206971228U (en) A kind of double-row pile foundation pit support structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170329

RJ01 Rejection of invention patent application after publication