CN108412087A - Improve the prefabricated reinforcement structure and loam wall of loam wall globality - Google Patents

Improve the prefabricated reinforcement structure and loam wall of loam wall globality Download PDF

Info

Publication number
CN108412087A
CN108412087A CN201810430715.9A CN201810430715A CN108412087A CN 108412087 A CN108412087 A CN 108412087A CN 201810430715 A CN201810430715 A CN 201810430715A CN 108412087 A CN108412087 A CN 108412087A
Authority
CN
China
Prior art keywords
prefabricated
wall
bolt
foundation
constructional columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810430715.9A
Other languages
Chinese (zh)
Inventor
杨新磊
刘奕男
张建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Chengjian University
Original Assignee
Tianjin Chengjian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Chengjian University filed Critical Tianjin Chengjian University
Priority to CN201810430715.9A priority Critical patent/CN108412087A/en
Publication of CN108412087A publication Critical patent/CN108412087A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • E04B2/66Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete characterised by special cross-section of the elongated members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention relates to the prefabricated reinforcement connection structures and loam wall that improve loam wall globality, including upper surface to be reserved with the foundation of wall of positioning groove, and foundation built-in bolt is reserved with close to end positions in positioning groove;Including two prefabricated constructional columns, two prefabricated constructional column upper ends are respectively welded with a steel joint;The bottom end plate of two prefabricated constructional columns is respectively embedded into the end positions in positioning groove, and is connected by the foundation built-in bolt at both ends and foundation of wall;It is reserved with a bolt mounting hole at interval of a distance on two prefabricated constructional columns, an eye bolt is respectively connected at every place's bolt mounting hole;Include by being connected to taut several wall tie bar being fixed between two prefabricated constructional columns of the eye bolt at both ends;Including prefabricated collar tie beam, prefabricated collar tie beam is set to the top position between two prefabricated constructional columns, and is formed with the steel joint for being located at both ends by the exerted bolt at both ends connected.This structure improves the bearing capacity and shock resistance of loam wall.

Description

Improve the prefabricated reinforcement structure and loam wall of loam wall globality
Technical field
The invention belongs to earthen construction technical field, it is related to rammed earth wall technology more particularly to a kind of raising loam wall is whole The prefabricated reinforcement structure and loam wall of property.
Background technology
Traditional material of raw-soil structure has cheap a, convenient material drawing, and heat preservation is superior with heat-proof quality, process low power consuming and The advantages that pollution-free is typical environmental protection and energy-saving building.But not water-fast since material of raw-soil structure intensity is low, volume stability is not Foot, some self shortcomings such as poor seismic behavior and seriously affected application of the material of raw-soil structure in countryside architecture, limit it and push away It is wide to use.Construction is not arranged in rammed earth wall almost without any anti-seismic construction measure is used for some areas tradition rammed earth wall Column, collar tie beam, longitudinal cross wall junction do not take connection measure, the reconciling spatial scale of wall poor with deformability.Although some areas Provided with wood construction column and wooden collar tie beam, but this will certainly cause the felling of trees and the destruction of ecological environment.
It is directed to the deficiency of traditional rammed earth construction, a kind of modern rammed earth construction system of component, the structural system is needed to protect On the basis of holding existing rammed earth construction advantage, the property in the bearing capacity, brittle break and shock resistance of rammed earth construction etc. is needed It can be improved.
Through the retrieval to related field, do not retrieve and the relevant prior art of this patent.
Invention content
It is an object of the invention in place of overcome the deficiencies in the prior art, provide a kind of to improve the prefabricated of loam wall globality Reinforce connection structure and loam wall, the prefabricated limit lateral capacity reinforced bindiny mechanism and rammed earth wall can be improved, anti-seismic performance is shown Writing improves;The brittle break feature that traditional rammed earth wall can be improved simultaneously prevents wall is broken from collapsing, makes holding for rammed earth wall It carries power and ductility is improved.
The present invention solves its technical problem and following technical scheme is taken to realize:
A kind of prefabricated reinforcement connection structure improving loam wall globality, it is characterised in that:
Including foundation of wall, it is reserved with positioning groove in foundation of wall upper surface, the position by two close end in positioning groove is pre- There are foundation built-in bolts;
Including two prefabricated constructional columns, two prefabricated constructional columns are the pillar construction for being welded with bottom end plate, in bottom end It is reserved with bolt hole on plate, a steel joint is respectively welded in the upper end of two prefabricated constructional columns;The bottom of two prefabricated constructional columns Portion's end plate forms embedded cooperation with the end positions of foundation of wall positioning groove respectively, and passes through the pre-buried spiral shell in basis positioned at both ends Bolt forms a fixed connection with foundation of wall;On two prefabricated constructional columns a spiral shell is reserved at interval of a distance along the vertical direction Bolt mounting hole, bolt mounting hole is horizontally disposed, and the bolt mounting hole on two prefabricated constructional columns is formed in the horizontal direction It corresponds;An eye bolt is respectively connected at every place's bolt mounting hole, eye bolt is set with the direction of connection ring inwardly It sets;
Including several wall tie bar, several wall tie bar is by being connected to the eye bolt at both ends to tighten shape State is fixedly connected between two prefabricated constructional columns, and is sequentially arranged along the vertical direction by spacing;
Including prefabricated collar tie beam, prefabricated collar tie beam is the beam structure that both ends are embedded with exerted bolt, and prefabricated circle beam setting is in two Top position between a prefabricated constructional column, and installed by the exerted bolt at both ends and the steel joint formation positioned at both ends It is fixedly connected.
And, steel joint is using the square frame-shaped joint structure being uprightly arranged;It is embedded in two prefabricated constructional columns Four vertical muscle, four vertical muscle arrange that four vertical muscle are stretched out from the upper end of prefabricated constructional column according to four rectangular corner locations, The upper external part of four vertical muscle is respectively welded in the corner location of inside four of corresponding steel joint.
And, nut pockets are both provided in the outer fix of the often place bolt mounting hole of prefabricated constructional column, The bottom surface of nut pockets is equipped with steel cushion block.
And, the bolt mounting hole being arranged on prefabricated constructional column is the rectangle preformed hole being arranged along the vertical direction or length Round preformed hole.
A kind of loam wall, it is characterised in that:The prefabricated of above-mentioned raising loam wall globality is used in rammed earth main body to add Strong ties structure.
The advantages and positive effects of the present invention are:
1, the present invention by the top of prefabricated collar tie beam end exerted bolt and prefabricated constructional column steel connector be attached, enhancing The globality in rammed earth house, improves the limit lateral capacity of rammed earth wall, prevents wall is broken from collapsing, makes rammed earth wall Bearing capacity and ductility are improved;Simultaneously prefabricated constructional column and collar tie beam it is easy for construction, be not required to live maintenance, save material and Manually.
2, the present invention reserves positioning groove by foundation of wall surface, and constructional column bottom end plate is placed in positioning groove, and It is fixed using foundation built-in bolt, foundation of wall surface irregularity when avoiding building wall facilitates construction, improves wall rammer Build quality.
3, the present invention makes wall tie bar keep tension by adjusting eye bolt, prevents rammed earth wall due to tension Cracking, forms good effect of contraction to wall, improves wall level shear capacity, globality, anti-seismic performance.
4, the present invention passes through pre-buried steel cushion block, eye bolt and billet in the nut pockets on prefabricated constructional column Surface is in direct contact, it is therefore prevented that generation office crushes bad when adjusting goat's horn bolt.
5, the present invention in prefabricated constructional column by being arranged rectangle preformed hole or oblong preformed hole, in building wall, Wall tie bar can uniformly sink in rectangle preformed hole or oblong preformed hole with the building of wall, and it is complete that wall is layered building Cheng Hou makes wall tie bar keep tight state by adjusting eye bolt again, avoids when building tension rib due to loosen It influences it to play a role, improves wall building quality and globality.
Description of the drawings
Fig. 1 is the planar structure schematic diagram of the present invention;
Fig. 2 is the dimensional structure diagram of the present invention;
Fig. 3 is the dimensional structure diagram of prefabricated constructional column of the present invention;
Fig. 4 is the partial structural diagram that prefabricated constructional column of the present invention is connect with foundation of wall;
Fig. 5 is the structural schematic diagram that steel joint of the present invention is connect with prefabricated collar tie beam;
In figure:1, prefabricated collar tie beam;2, steel joint;3, prefabricated constructional column;4, wall tie bar;5, bolt mounting hole; 6、 Nut pockets;7, eye bolt;8, steel cushion block;9, bottom end plate;10, foundation of wall;10-1, positioning groove;11, basic Pre-embedded bolt;12, exerted bolt;13, muscle is indulged.
Specific implementation mode
The invention will be further described below in conjunction with the accompanying drawings and by specific embodiment, and following embodiment is descriptive , it is not restrictive, protection scope of the present invention cannot be limited with this.
It is a kind of improve loam wall globality prefabricated reinforcement connection structure, refer to Fig. 1-5, innovative point is, by with Under several parts constitute:
Including foundation of wall 10, it is reserved with positioning groove 10-1 in foundation of wall upper surface, by two close end in positioning groove Position is reserved with foundation built-in bolt 11.
Including two prefabricated constructional columns 3, two prefabricated constructional columns are the pillar construction for being welded with bottom end plate, in bottom end It is reserved with bolt hole on plate, a steel joint 2 is respectively welded in the upper end of two prefabricated constructional columns.Two prefabricated constructional columns Bottom end plate is respectively embedded in the end positions of foundation of wall positioning groove, forms embedded cooperation, and pass through the basis positioned at both ends Pre-embedded bolt forms a fixed connection with foundation of wall.In this way, can avoid foundation of wall surface irregularity when building wall, facilitates and apply Work improves wall building quality.On two prefabricated constructional columns a bolt is reserved at interval of a distance along the vertical direction Mounting hole 5, bolt mounting hole is horizontally disposed, and the bolt mounting hole on two prefabricated constructional columns is formed in the horizontal direction It corresponds, is installed in this way, forming the multilayer bolt being arranged along the vertical direction according to a determining deviation on two prefabricated constructional columns Hole.An eye bolt 7 is respectively connected at every place's bolt mounting hole, eye bolt is arranged with the direction of connection ring inwardly.
Including several wall tie bar 4, several wall tie bar is connected by being connected to the above-mentioned eye bolt at both ends and fixing It is connected between two prefabricated constructional columns, and several wall tie bar is arranged by spacing successively along the vertical direction, i.e., per pass wall is drawn Tie one layer of bolt mounting hole that muscle corresponds on two prefabricated constructional columns.By adjusting the rotation of the nut coordinated with eye bolt Tight amount, makes wall rubbish muscle keep tensioned state.
Including prefabricated collar tie beam 1, prefabricated collar tie beam is that both ends are embedded with the beam structure of exerted bolt 12, prefabricated circle beam setting in Top position between two prefabricated constructional columns, and worn by the exerted bolt at both ends and the steel joint formation positioned at both ends Dress is fixedly connected, i.e., the exerted bolt at prefabricated collar tie beam both ends is threaded onto in the bolt hole being arranged on steel joint, by screwing It forms a fixed connection in the nut on exerted bolt.
Above-mentioned steel joint is further using the square frame-shaped joint structure being uprightly arranged.Into one in two prefabricated constructional columns Step is embedded with four vertical muscle 13, and four vertical muscle are arranged according to four rectangular corner locations, and four vertical muscle are from prefabricated constructional column Upper end is stretched out, and the upper external part of four vertical muscle is respectively welded in the corner location of inside four of corresponding steel joint.Prefabricated construction Column uses the four vertical muscle stretched out from upper end to be fixedly connected with steel joint, significantly strengthens prefabricated constructional column and is connect with steel The bonding strength of head improves the prefabricated globality for reinforcing connection structure.
The outer fix of the above-mentioned often place bolt mounting hole in prefabricated constructional column is further provided with nut pockets 6, steel cushion block 8 is installed in the bottom surface of nut pockets.Nut pockets are set, the nut being connect with eye bolt is made It is hidden in prefabricated constructional column, constructs convenient for the building of wall;Steel cushion block is installed, nut is made directly to be connect with steel plate washer after screwing Touch, avoid nut contacted with the concrete surface of prefabricated constructional column and the office of causing crush it is bad.
The above-mentioned bolt mounting hole being arranged on prefabricated constructional column is further the rectangle preformed hole being arranged along the vertical direction Or oblong preformed hole.Using rectangular opening or oblong pore structure, in building wall, wall tie bar is in rectangle preformed hole Or can uniformly sink with the building of wall in oblong preformed hole, wall is layered after the completion of building, by adjusting sheep eye spiral shell again Bolt makes wall tie bar keep tight state, so as to avoid when the building tension rib loosen due to influence it and play a role, protect Wall building quality and globality are demonstrate,proved.
A kind of loam wall, referring to Fig. 2, innovative point is:Above-mentioned raising loam wall globality is used in rammed earth main body Prefabricated reinforcement connection structure.
The present invention proposes a kind of modern rammed earth construction system.The system at loam wall both ends by being arranged precast concrete Constructional column, while prefabricated collar tie beam is set between constructional column, and adjustable wall tie bar is set on constructional column, it carries The high limit lateral capacity of rammed earth wall so that energy dissipation capacity is significantly promoted, and anti-seismic performance significantly improves.Improve tradition The brittle break feature of rammed earth wall prevents wall is broken from collapsing, the bearing capacity of rammed earth wall and ductility is made to be improved.Together When prefabricated constructional column, prefabricated collar tie beam and its tension rib are easy for construction, are not required to live maintenance, save material and artificial.The technique Construction method is simple, cheap, is improved to the anti-seismic performance of rammed earth wall notable.

Claims (5)

1. a kind of prefabricated reinforcement connection structure improving loam wall globality, it is characterised in that:
Including foundation of wall, it is reserved with positioning groove in foundation of wall upper surface, the position by two close end in positioning groove is reserved with Foundation built-in bolt;
Including two prefabricated constructional columns, two prefabricated constructional columns are the pillar construction for being welded with bottom end plate, in bottom end plate It is reserved with bolt hole, a steel joint is respectively welded in the upper end of two prefabricated constructional columns;The bottom end of two prefabricated constructional columns Plate forms embedded cooperation with the end positions of foundation of wall positioning groove respectively, and passes through the foundation built-in bolt and wall positioned at both ends Basis forms a fixed connection;A bolt is reserved on two prefabricated constructional columns at interval of a distance along the vertical direction to install Hole, bolt mounting hole is horizontally disposed, and the bolt mounting hole on two prefabricated constructional columns forms an a pair in the horizontal direction It answers;An eye bolt is respectively connected at every place's bolt mounting hole, eye bolt is arranged with the direction of connection ring inwardly;
Including several wall tie bar, several wall tie bar is solid with tensioned state by being connected to the eye bolt at both ends Surely it is connected between two prefabricated constructional columns, and is sequentially arranged along the vertical direction by spacing;
Including prefabricated collar tie beam, prefabricated collar tie beam is the beam structure that both ends are embedded with exerted bolt, and prefabricated circle beam setting is pre- in two Top position between constructional column processed, and fixed company is installed by the exerted bolt at both ends and the steel joint formation positioned at both ends It connects.
2. the prefabricated reinforcement connection structure according to claim 1 for improving loam wall globality, it is characterised in that:Steel connects Head is using the square frame-shaped joint structure being uprightly arranged;Be embedded with four vertical muscle in two prefabricated constructional columns, four vertical muscle according to Rectangular four corner locations arrangement, four vertical muscle are stretched out from the upper end of prefabricated constructional column, the upper external part difference of four reinforcing bars It is welded in the corner location of inside four of corresponding steel joint.
3. the prefabricated reinforcement connection structure according to claim 1 for improving loam wall globality, it is characterised in that:Prefabricated The outer fix of the often place bolt mounting hole of constructional column is both provided with nut pockets, is installed in the bottom surface of nut pockets There is steel cushion block.
4. the prefabricated reinforcement connection structure according to claim 1 for improving loam wall globality, it is characterised in that:Setting exists Bolt mounting hole on prefabricated constructional column is the rectangle preformed hole being arranged along the vertical direction or oblong preformed hole.
5. a kind of loam wall, it is characterised in that:Any raising loam walls of claim 1-4 are used in rammed earth main body The prefabricated reinforcement connection structure of globality.
CN201810430715.9A 2018-05-08 2018-05-08 Improve the prefabricated reinforcement structure and loam wall of loam wall globality Pending CN108412087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810430715.9A CN108412087A (en) 2018-05-08 2018-05-08 Improve the prefabricated reinforcement structure and loam wall of loam wall globality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810430715.9A CN108412087A (en) 2018-05-08 2018-05-08 Improve the prefabricated reinforcement structure and loam wall of loam wall globality

Publications (1)

Publication Number Publication Date
CN108412087A true CN108412087A (en) 2018-08-17

Family

ID=63138057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810430715.9A Pending CN108412087A (en) 2018-05-08 2018-05-08 Improve the prefabricated reinforcement structure and loam wall of loam wall globality

Country Status (1)

Country Link
CN (1) CN108412087A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512616A (en) * 2019-08-26 2019-11-29 中国十七冶集团有限公司 A kind of girder steel connection concrete core cement soil barricade combination supporting system
CN114753523A (en) * 2022-03-31 2022-07-15 西安建筑科技大学 Glued wood frame-rammed earth filled wall and construction process
CN114908900A (en) * 2022-03-31 2022-08-16 西安建筑科技大学 Swing laminated wood frame-rammed earth wall mixed wall and construction process
CN115341689A (en) * 2022-08-19 2022-11-15 哈尔滨工业大学 Raw soil wall frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101278547B1 (en) * 2013-03-06 2013-06-24 덕산콘크리트(주) The precast concrete wall for the water-storage construct
CN104895224A (en) * 2015-06-30 2015-09-09 郑州大学 Prestressed loam wall and construction process thereof
CN106545111A (en) * 2017-01-18 2017-03-29 天津城建大学 For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method
CN107254925A (en) * 2017-07-21 2017-10-17 天津城建大学 Vertical prestressing loam wall and its construction method
CN107356184A (en) * 2017-08-28 2017-11-17 广州市第三建筑工程有限公司 Booth top berm ridge radian mounting and positioning device
CN206956766U (en) * 2017-07-12 2018-02-02 浙江罗力体育设施工程有限公司 One kind strengthens column fixation pre-buried structure
CN208219921U (en) * 2018-05-08 2018-12-11 天津城建大学 Improve the prefabricated reinforcement connection structure and loam wall of loam wall globality

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101278547B1 (en) * 2013-03-06 2013-06-24 덕산콘크리트(주) The precast concrete wall for the water-storage construct
CN104895224A (en) * 2015-06-30 2015-09-09 郑州大学 Prestressed loam wall and construction process thereof
CN106545111A (en) * 2017-01-18 2017-03-29 天津城建大学 For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method
CN206956766U (en) * 2017-07-12 2018-02-02 浙江罗力体育设施工程有限公司 One kind strengthens column fixation pre-buried structure
CN107254925A (en) * 2017-07-21 2017-10-17 天津城建大学 Vertical prestressing loam wall and its construction method
CN107356184A (en) * 2017-08-28 2017-11-17 广州市第三建筑工程有限公司 Booth top berm ridge radian mounting and positioning device
CN208219921U (en) * 2018-05-08 2018-12-11 天津城建大学 Improve the prefabricated reinforcement connection structure and loam wall of loam wall globality

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512616A (en) * 2019-08-26 2019-11-29 中国十七冶集团有限公司 A kind of girder steel connection concrete core cement soil barricade combination supporting system
CN114753523A (en) * 2022-03-31 2022-07-15 西安建筑科技大学 Glued wood frame-rammed earth filled wall and construction process
CN114908900A (en) * 2022-03-31 2022-08-16 西安建筑科技大学 Swing laminated wood frame-rammed earth wall mixed wall and construction process
CN115341689A (en) * 2022-08-19 2022-11-15 哈尔滨工业大学 Raw soil wall frame
CN115341689B (en) * 2022-08-19 2023-09-05 哈尔滨工业大学 Raw soil wall body frame

Similar Documents

Publication Publication Date Title
CN108412087A (en) Improve the prefabricated reinforcement structure and loam wall of loam wall globality
CN107060082B (en) Dry-type assembled ECC protective layer node structure
CN105544593A (en) Wind power generation tower foundation with prefabricated foundation prestressed beams and slab
CN107447901A (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN106545111A (en) For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method
CN209369395U (en) A kind of building strengthening reconstruction structure
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN208219921U (en) Improve the prefabricated reinforcement connection structure and loam wall of loam wall globality
CN206680888U (en) A kind of ruggedized construction of arch bridge spandrel arch circle
CN108560613A (en) Integrated anti-floating method for open prestressed high-strength concrete pipe pile and anti-floating anchor rod
CN205369295U (en) Basis precast prestressed beam slab formula wind power generation column foot plinth
CN205677070U (en) A kind of building frame construction
CN210002942U (en) transformation structure of old building brick column
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN203603525U (en) Reinforcing structure with clamp plate girder and clamp plate column externally arranged for stone structure
CN209523212U (en) Assembled independent foundation
CN104295146B (en) 110kV line project improvement corner tower composition structure
CN107044132B (en) A kind of construction method of quake-resistant safety ground
CN216157302U (en) Wind-resistant reinforced electric power tower
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN201835439U (en) Concrete column with steel pipe
CN108412036A (en) Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node
CN210369025U (en) Floor-free tower crane foundation construction structure with steel structure
CN204311772U (en) Aero-concrete roof boarding ruggedized construction
CN206529937U (en) For the prefabricated constructional column at wall external corner and rammed earth wall construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination