CN207260375U CN201721208389.4U CN201721208389U CN207260375U CN 207260375 U CN207260375 U CN 207260375U CN 201721208389 U CN201721208389 U CN 201721208389U CN 207260375 U CN207260375 U CN 207260375U
Authority
CN
China
Prior art keywords
steel plate
shear wall
concrete composite
composite shear
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721208389.4U
Other languages
Chinese (zh)
Inventor
崔家春
徐自然
田炜
安东亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Architectural Design and Research Institute Co Ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN201721208389.4U priority Critical patent/CN207260375U/en
Application granted granted Critical
Publication of CN207260375U publication Critical patent/CN207260375U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a kind of steel plate concrete combined shear wall, the steel plate concrete combined shear wall includes:Crack steel plate, and the steel plate that cracks is equipped with some groups of discontinuous perps and some groups of discontinuous circular holes, and the steel plate that cracks is equipped with several pegs;Two symmetrical end reinforced concrete columns, the two end reinforced concrete columns are fixed on the both sides for the steel plate that cracks;First strengthening part, first strengthening part are arranged on the surrounding for the steel plate that cracks;Second strengthening part, second strengthening part are arranged on the surrounding of end reinforced concrete column.The utility model reduces effect of contraction of the steel plate to concrete, enhance the cracking resistance of shear wall in the construction process, strengthen the globality of steel plate both sides distribution bar, improve the ductility of shearing wall member, so that it is readily flowed between the concrete of steel plate both sides, improve the convenience of concreting.

Description

一种钢板-混凝土组合剪力墙A steel plate-concrete composite shear wall

技术领域technical field

本实用新型涉及一种适用于建筑领域的钢板-混凝土组合剪力墙,具体涉及一种适用于高层或超高层建筑结构的钢板-混凝土组合剪力墙。The utility model relates to a steel plate-concrete combined shear wall suitable for the construction field, in particular to a steel plate-concrete combined shear wall suitable for high-rise or super high-rise building structures.

背景技术Background technique

随着中国经济的飞速增长,高层和超高层建筑如雨后春笋般拔地而起。随着建筑高度的增加或抗震烈度的提高,传统的钢筋混凝土剪力墙已难以满足设计需求。在此背景下,钢板-混凝土组合剪力墙应运而生,在提高剪力墙力学性能的同时,尚可减薄墙体厚度,受到结构工程师的欢迎。With the rapid growth of China's economy, high-rise and super high-rise buildings have sprung up like mushrooms after rain. With the increase of building height or the improvement of seismic intensity, the traditional reinforced concrete shear wall has been difficult to meet the design requirements. In this context, the steel plate-concrete composite shear wall came into being. While improving the mechanical properties of the shear wall, it can also reduce the thickness of the wall, and is welcomed by structural engineers.

但是,由于整块钢板对混凝土的约束效应明显,使得剪力墙在施工过程中易于产生裂缝。目前施工单位主要从施工措施方面和混凝土材性方面改善钢板-混凝土组合剪力墙在施工中的开裂问题。在已公开的专利授权或申请中,尚未发现有专门针对改善钢板-混凝土组合剪力墙抗裂性能的构造措施或可替代的组合剪力墙相关专利。However, due to the obvious restraint effect of the whole steel plate on the concrete, the shear wall is prone to cracks during the construction process. At present, the construction unit mainly improves the cracking problem of the steel plate-concrete composite shear wall during construction from the aspects of construction measures and concrete material properties. In the published patent authorizations or applications, no structural measures or alternative composite shear wall related patents specifically aimed at improving the crack resistance of steel plate-concrete composite shear walls have been found.

实用新型内容Utility model content

本实用新型为了解决上述问题,从而提供一种增强了剪力墙在施工过程中的抗裂性能、加强了两侧分布钢筋的整体性、改善了剪力墙构件的延性和提高了混凝土浇筑时的便利性的钢板-混凝土组合剪力墙。In order to solve the above problems, the utility model provides a method that enhances the crack resistance of the shear wall during the construction process, strengthens the integrity of the steel bars distributed on both sides, improves the ductility of the shear wall components and improves the concrete pouring time. The convenience of the steel plate - concrete composite shear wall.

为达到上述目的,本实用新型的技术方案如下:In order to achieve the above object, the technical scheme of the utility model is as follows:

一种钢板-混凝土组合剪力墙,所述钢板-混凝土组合剪力墙包括:A steel plate-concrete composite shear wall, said steel plate-concrete composite shear wall comprising:

开缝钢板,所述开缝钢板上设有若干组间断式竖缝和若干组间断式圆孔,所述开缝钢板上设有若干个栓钉;A slotted steel plate, the slotted steel plate is provided with several groups of intermittent vertical seams and several groups of intermittent round holes, and the slotted steel plate is provided with several studs;

两个相对称的端部钢骨柱,这两个端部钢骨柱固定在开缝钢板的两侧;Two symmetrical end steel bone columns, which are fixed on both sides of the slotted steel plate;

第一加强部件,所述第一加强部件设置在开缝钢板的四周;a first reinforcement component, the first reinforcement component is arranged around the slit steel plate;

第二加强部件,所述第二加强部件设置在端部钢骨柱的四周。The second reinforcement component is arranged around the steel bone column at the end.

在本实用新型的一个优选实施例中,在开缝钢板上位于每组间断式竖缝和每组间断式圆孔的周边设有加厚钢板。In a preferred embodiment of the present invention, a thickened steel plate is provided on the slit steel plate at the periphery of each group of intermittent vertical seams and each group of intermittent round holes.

在本实用新型的一个优选实施例中,所述开缝钢板上设有对角向受力带。In a preferred embodiment of the present utility model, the said slit steel plate is provided with diagonally stressed belts.

在本实用新型的一个优选实施例中,每组间断式竖缝和每组间断式圆孔都不位于对角向受力带上。In a preferred embodiment of the present invention, each group of discontinuous vertical seams and each group of discontinuous round holes are not located on the diagonal stress belt.

在本实用新型的一个优选实施例中,所述开缝钢板上位于对角向受力带上的栓钉的密度大于其他安装部位的密度。In a preferred embodiment of the present utility model, the density of the pegs on the diagonally stressed belt on the slotted steel plate is greater than that of other installation locations.

在本实用新型的一个优选实施例中,所述第一加强部件包括若干个竖向分布钢筋和若干个水平分布钢筋,竖向分布钢筋分别竖向匀距设置在开缝钢板的四周,水平分布钢筋分别水平匀距设置在开缝钢板的四周。In a preferred embodiment of the present invention, the first reinforcing member includes several vertically distributed steel bars and several horizontally distributed steel bars, and the vertically distributed steel bars are respectively vertically and evenly spaced around the slotted steel plate, and horizontally distributed The steel bars are arranged horizontally and equally spaced around the slotted steel plates.

在本实用新型的一个优选实施例中,所述钢板-混凝土组合剪力墙还包括若干个拉筋,拉筋可穿过间断式竖缝或间断式圆孔,并与竖向分布钢筋连接。In a preferred embodiment of the present invention, the steel plate-concrete composite shear wall further includes several tie bars, which can pass through intermittent vertical joints or intermittent round holes and connect with vertically distributed steel bars.

在本实用新型的一个优选实施例中,所述端部钢骨柱为工字形。In a preferred embodiment of the present utility model, the steel bone column at the end is I-shaped.

在本实用新型的一个优选实施例中,所述第二加强部件包括若干个端部纵筋和若干个端部箍筋,这些端部纵筋通过端部箍筋固定在端部钢骨的四周。In a preferred embodiment of the present invention, the second reinforcement component includes several end longitudinal bars and several end stirrups, and these end longitudinal bars are fixed around the end steel frame by the end stirrups .

本实用新型的有益效果是:The beneficial effects of the utility model are:

1、通过在钢板上设置间断式竖缝和圆孔,减少了钢板对混凝土的约束作用,增强了剪力墙在施工过程中的抗裂性能;1. By setting intermittent vertical joints and round holes on the steel plate, the restraint of the steel plate on the concrete is reduced, and the crack resistance of the shear wall during construction is enhanced;

2、通过在钢板上设置间断式竖缝和圆孔,部分拉筋可经间断式竖缝和圆孔中穿过,加强了钢板两侧分布钢筋的整体性;2. By setting intermittent vertical seams and round holes on the steel plate, some tie bars can pass through the intermittent vertical seams and round holes, which strengthens the integrity of the steel bars distributed on both sides of the steel plate;

3、通过在钢板上设置间断式竖缝和圆孔,改善了剪力墙构件的延性。3. By setting intermittent vertical joints and round holes on the steel plate, the ductility of the shear wall components is improved.

4、通过在钢板上设置间断式竖缝和圆孔,使得钢板两侧混凝土之间易于流动,提高了混凝土浇筑的便利性。4. By setting intermittent vertical joints and round holes on the steel plate, the concrete on both sides of the steel plate is easy to flow, and the convenience of concrete pouring is improved.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为本实用新型的俯视图;Fig. 1 is the top view of the utility model;

图2为本实用新型的结构示意图(剥去部分混凝土和分布钢筋);Fig. 2 is the structural representation of the utility model (stripping off part concrete and distribution reinforcement);

图3为开缝钢板中间断式竖缝和圆孔与对角受力带的位置关系的示意图;Fig. 3 is a schematic diagram of the positional relationship between intermittent vertical seams and circular holes and diagonal force belts in the slotted steel plate;

图4为开缝钢板与拉筋的位置关系的示意图。Fig. 4 is a schematic diagram of the positional relationship between the slotted steel plate and the tie bars.

具体实施方式Detailed ways

为了使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本实用新型。In order to make the technical means, creative features, goals and effects achieved by the utility model easy to understand, the utility model will be further elaborated below in conjunction with specific illustrations.

参见图1至图4,本实用新型提供的钢板-混凝土组合剪力墙,其包括开缝钢板100、两个相对称的端部钢骨柱8、第一加强部件和第二加强部件。Referring to Fig. 1 to Fig. 4, the steel plate-concrete composite shear wall provided by the utility model includes a slotted steel plate 100, two symmetrical end steel columns 8, a first reinforcement component and a second reinforcement component.

开缝钢板100,其为矩形状的钢板,在其上面设有若干组间断式竖缝101和若干组间断式圆孔102,通过在钢板上设置间断式竖缝101和间断式圆孔102可减少钢板对混凝土1的约束作用,增强了剪力墙在施工过程中的抗裂性能,改善了剪力墙构件的延性。Slotted steel plate 100, which is a rectangular steel plate, is provided with several groups of discontinuous vertical seams 101 and some groups of discontinuous circular holes 102 on it, by setting discontinuous vertical seams 101 and discontinuous circular holes 102 on the steel plate Reducing the binding effect of the steel plate on the concrete 1 enhances the crack resistance of the shear wall during construction and improves the ductility of the shear wall components.

另外,由于在开缝钢板100上设置竖缝101和圆孔102,在开缝钢板100的竖缝101和圆孔102处,强度较低,容易损坏,本申请在开缝钢板100上位于每组间断式竖缝101和每组间断式圆孔102的周边设有加厚钢板103。In addition, since the vertical seam 101 and the round hole 102 are provided on the slotted steel plate 100, the vertical seam 101 and the round hole 102 of the slotted steel plate 100 have low strength and are easily damaged. A thickened steel plate 103 is provided around the group of discontinuous vertical seams 101 and each group of discontinuous round holes 102 .

在开缝钢板100上还设有对角向受力带104,对角向受力带104可提高开缝钢板100的整体强度。Diagonal stressed belts 104 are also provided on the slotted steel plate 100 , and the diagonal stressed belts 104 can improve the overall strength of the slotted steel plate 100 .

另外,开缝钢板100上的每组间断式竖缝101和每组间断式圆孔102都不位于对角向受力带104上,这样不影响开缝钢板100的强度。In addition, each group of intermittent vertical seams 101 and each group of intermittent round holes 102 on the slotted steel plate 100 are not located on the diagonal stress belt 104 , so that the strength of the slotted steel plate 100 will not be affected.

竖缝101具体为长椭圆状,圆孔102具体为圆形状。The vertical slit 101 is specifically in the shape of an oblong, and the circular hole 102 is specifically in the shape of a circle.

在开缝钢板100上设有若干个栓钉2,并且开缝钢板100上位于对角向受力带104上的栓钉的密度大于其他安装部位的密度,这样可进一步提高开缝钢板100的强度。Several studs 2 are arranged on the slotted steel plate 100, and the density of the studs located on the diagonally stressed belt 104 on the slotted steel plate 100 is greater than the density of other installation positions, which can further improve the strength of the slotted steel plate 100. strength.

第一加强部件,其是用于进一步提高开缝钢板100的整体强度,其包括若干个竖向分布钢筋6和若干个水平分布钢筋5,竖向分布钢筋分别竖向匀距设置在开缝钢板100的四周,水平分布钢筋分别水平匀距设置在开缝钢板100的四周,这样通过竖向分布钢筋5和水平分布钢筋6可将开缝钢板100四周包围,从而对开缝钢板100进行紧固和提高整体式钢组件1的强度。The first reinforcing part is used to further improve the overall strength of the slotted steel plate 100, and it includes several vertically distributed reinforcing bars 6 and several horizontally distributed reinforcing bars 5, and the vertically distributed reinforcing bars are arranged on the slotted steel plate at an even distance vertically. Around 100, the horizontally distributed reinforcing bars are arranged horizontally and evenly around the slotted steel plate 100, so that the slotted steel plate 100 can be surrounded by the vertically distributed reinforcing bars 5 and the horizontally distributed reinforcing bars 6, thereby fastening the slotted steel plate 100 and improve the strength of the monolithic steel component 1 .

另外,本申请还包括若干个拉筋31,每个拉筋31可穿过开缝钢板100上的间断式竖缝101或间断式圆孔102,每个拉筋31通过穿过间断式竖缝101或间断式圆孔102,然后与竖向分布钢筋6对应连接,这样提高第一加强部件与开缝钢板100之间的整体性和连接强度。In addition, the present application also includes several tie bars 31, each tie bar 31 can pass through the intermittent vertical seam 101 or the intermittent round hole 102 on the slotted steel plate 100, and each tie bar 31 can pass through the intermittent vertical seam 101 or discontinuous round holes 102, and then correspondingly connected with the vertically distributed steel bars 6, so as to improve the integrity and connection strength between the first reinforcement member and the slotted steel plate 100.

端部钢骨柱8,其固定设置在开缝钢板100的两端,具体通过焊缝进行焊接固定,其是用于提高开缝钢板100两端的强度。The end steel bone columns 8 are fixedly arranged at both ends of the slotted steel plate 100 , and are specifically welded and fixed by welding seams, which are used to increase the strength of both ends of the slotted steel plate 100 .

为了减少端部钢骨柱2对混凝土8的约束性能,端部钢骨柱2为工字形。In order to reduce the constraint performance of the end steel column 2 on the concrete 8, the end steel column 2 is I-shaped.

另外,在端部钢骨柱2上设有第二加强部件来提高其整体的支撑强度。In addition, a second reinforcement component is provided on the steel bone column 2 at the end to improve its overall supporting strength.

第二加强部件包括若干个端部纵筋9和若干个端部箍筋10,这些端部纵筋9通过端部箍筋10固定在端部钢骨2的四周,从而可将端部钢骨柱2进行紧固。The second reinforcing part includes several end longitudinal bars 9 and some end stirrups 10, and these end longitudinal bars 9 are fixed around the end steel frame 2 by the end stirrups 10, so that the end steel bars can be Column 2 is fastened.

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present utility model and the advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.

Claims (9)

1.一种钢板-混凝土组合剪力墙,其特征在于,所述钢板-混凝土组合剪力墙包括:1. a steel plate-concrete composite shear wall, is characterized in that, described steel plate-concrete composite shear wall comprises: 开缝钢板,所述开缝钢板上设有若干组间断式竖缝和若干组间断式圆孔,所述开缝钢板上设有若干个栓钉;A slotted steel plate, the slotted steel plate is provided with several groups of intermittent vertical seams and several groups of intermittent round holes, and the slotted steel plate is provided with several studs; 两个相对称的端部钢骨柱,这两个端部钢骨柱固定在开缝钢板的两侧;Two symmetrical end steel bone columns, which are fixed on both sides of the slotted steel plate; 第一加强部件,所述第一加强部件设置在开缝钢板的四周;a first reinforcement component, the first reinforcement component is arranged around the slit steel plate; 第二加强部件,所述第二加强部件设置在端部钢骨柱的四周。The second reinforcement component is arranged around the steel bone column at the end. 2.根据权利要求1所述的一种钢板-混凝土组合剪力墙,其特征在于,在开缝钢板上位于每组间断式竖缝和每组间断式圆孔的周边设有加厚钢板。2. A steel plate-concrete composite shear wall according to claim 1, characterized in that a thickened steel plate is provided on the slit steel plate at the periphery of each group of intermittent vertical seams and each group of intermittent round holes. 3.根据权利要求1所述的一种钢板-混凝土组合剪力墙,其特征在于,所述开缝钢板上设有对角向受力带。3. A steel plate-concrete composite shear wall according to claim 1, characterized in that, said slit steel plate is provided with a diagonal stress band. 4.根据权利要求3所述的一种钢板-混凝土组合剪力墙,其特征在于,每组间断式竖缝和每组间断式圆孔都不位于对角向受力带上。4. A steel plate-concrete composite shear wall according to claim 3, characterized in that, each group of intermittent vertical joints and each group of intermittent round holes are not located on the diagonal stress zone. 5.根据权利要求3所述的一种钢板-混凝土组合剪力墙,其特征在于,所述开缝钢板上位于对角向受力带上的栓钉的密度大于其他安装部位的密度。5 . A steel plate-concrete composite shear wall according to claim 3 , characterized in that the density of the studs on the slit steel plate located on the diagonal stress zone is greater than the density of other installation locations. 6 . 6.根据权利要求1所述的一种钢板-混凝土组合剪力墙,其特征在于,所述第一加强部件包括若干个竖向分布钢筋和若干个水平分布钢筋,竖向分布钢筋分别竖向匀距设置在开缝钢板的四周,水平分布钢筋分别水平匀距设置在开缝钢板的四周。6. A steel plate-concrete composite shear wall according to claim 1, characterized in that, said first reinforcing member comprises several vertically distributed reinforcing bars and several horizontally distributed reinforcing bars, and the vertically distributed reinforcing bars are respectively vertically The uniform distance is arranged around the slotted steel plate, and the horizontally distributed steel bars are arranged horizontally and evenly spaced around the slotted steel plate. 7.根据权利要求6所述的一种钢板-混凝土组合剪力墙,其特征在于,所述钢板-混凝土组合剪力墙还包括若干个拉筋,拉筋可穿过间断式竖缝或间断式圆孔,并与竖向分布钢筋连接。7. A kind of steel plate-concrete composite shear wall according to claim 6, characterized in that, said steel plate-concrete composite shear wall also includes several tie bars, and the tie bars can pass through intermittent vertical joints or intermittent round holes, and connected with vertically distributed steel bars. 8.根据权利要求1所述的一种钢板-混凝土组合剪力墙,其特征在于,所述端部钢骨柱为工字形。8. A steel plate-concrete composite shear wall according to claim 1, characterized in that, the end steel column is I-shaped. 9.根据权利要求8所述的一种钢板-混凝土组合剪力墙,其特征在于,所述第二加强部件包括若干个端部纵筋和若干个端部箍筋,这些端部纵筋通过端部箍筋固定在端部钢骨的四周。9. A steel plate-concrete composite shear wall according to claim 8, characterized in that, the second reinforcing member comprises several end longitudinal reinforcements and several end stirrups, and these end longitudinal reinforcements pass through The end stirrups are fixed around the end steel frame.
CN201721208389.4U 2017-09-20 2017-09-20 A kind of steel plate concrete combined shear wall Active CN207260375U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721208389.4U CN207260375U (en) 2017-09-20 2017-09-20 A kind of steel plate concrete combined shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721208389.4U CN207260375U (en) 2017-09-20 2017-09-20 A kind of steel plate concrete combined shear wall

Publications (1)

Publication Number Publication Date
CN207260375U true CN207260375U (en) 2018-04-20

Family

ID=61922023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721208389.4U Active CN207260375U (en) 2017-09-20 2017-09-20 A kind of steel plate concrete combined shear wall

Country Status (1)

Country Link
CN (1) CN207260375U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894361A (en) * 2018-07-10 2018-11-27 西安理工大学 Steel plate concrete combines Coupled Shear Wall structure
CN108979156A (en) * 2018-09-19 2018-12-11 北京城建集团有限责任公司 The construction method of the anti-buckling steel plate concrete combined shear wall Core Walls Structure of basement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894361A (en) * 2018-07-10 2018-11-27 西安理工大学 Steel plate concrete combines Coupled Shear Wall structure
CN108979156A (en) * 2018-09-19 2018-12-11 北京城建集团有限责任公司 The construction method of the anti-buckling steel plate concrete combined shear wall Core Walls Structure of basement

Similar Documents

Publication Publication Date Title
CN103883034B (en) A kind of fabricated shear wall of belt edge confining part and wall-beam syndeton
CN103174098B (en) A kind of reinforcement means of steel reinforced concrete punishment single slab bearing
CN108867943A (en) Prefabricated sandwich wall and prefabricated sandwich wall production method
CN105256891A (en) Prefabricated concrete frame structure with high-strength bottom bars
CN108166652A (en) The two-sided overlapped shear wall and its construction method of band connection lacing wire
CN105821750B (en) A kind of precast prestressed T plate and its application method
CN204983143U (en) End muscle precast concrete frame construction excels in
CN110158447A (en) A kind of combination beam and preparation method thereof
CN205894291U (en) Assemble integral precast prestressed reinforced concrete roof beam and frame support connnection structure
CN107366353B (en) A kind of assembled steel reinforced concrete frame column with variable cross-sections and its construction method
CN207260375U (en) A kind of steel plate concrete combined shear wall
CN109469242A (en) A kind of profiled sheet-regeneration concrete composite floor and its construction method
CN105821962B (en) Assembly integrated precast prestressed steel reinforced concrete beam and frame column connecting structure
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN208280453U (en) Girder with rolled steel section en cased in concrete lacing wire constructing device
CN110952457A (en) Steel plate combined beam bridge support-free cast-in-place concrete device and construction method
CN103437499A (en) Web plate holed profiled steel sheet combination beam with stiffening ribs and installation method
CN109577492A (en) A kind of steel sections package concrete column and reinforced beam node connecting structure
CN202788024U (en) High-rigidity concrete beam structure
CN205712565U (en) A kind of prefabricated two-sided wall
CN105672113B (en) A kind of Wavelike steel webplate lower flange steel reinforced concrete combines cage structure and construction method
CN204357000U (en) A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame
CN105350440A (en) Y-shaped steel member of steel and concrete composite girder
CN207739390U (en) Overlap wall and horizontal member connecting node