- CN106499192A CN106499192A CN201510563451.0A CN201510563451A CN106499192A CN 106499192 A CN106499192 A CN 106499192A CN 201510563451 A CN201510563451 A CN 201510563451A CN 106499192 A CN106499192 A CN 106499192A
- Authority
- CN
- China
- Prior art keywords
- stair
- installation
- precast stair
- staircase boards
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention relates to the realm of building construction, specifically a kind of installation method of assembled architecture precast stair;It is characterized in that:Comprise the steps:Step 1.1, it is familiar with construction drawing;Step 1.2, according to construction drawing, eject stair and control line be installed, control line and absolute altitude are checked;Step 1.3, with C30 pea gravel concretens seat starch;The hoisting prefabricated staircase boards of step 1.4, level;Step 2, stair bottom support system are installed;Step 3, the lifting of precast stair plate are in place:Step 3.1, slow adjustment staircase boards attitude, in place;After step 3.2, staircase boards coarse positioning, mouth horizontal reinforcement under bench and landing slab, after step 3.3, staristep correction are finished, are reserved horizontal bar splicing colligation by root fine setting, correction, qualified by inspection after, carry out last layer concrete placings.The installation method of this precast stair is simply effective, and which can improve the installation effectiveness of precast stair in the case where the installation quality of precast stair is guaranteed.
Description
Technical field
The present invention relates to the realm of building construction, specifically a kind of installation method of assembled architecture precast stair.
Background technology
Prefabricated assembling type reinforced concrete stair refer to that the stair being put together installed by the component with precast plant's production or field fabrication.Industrialized construction level can be improved using prefabricated assembled stair compared with cast-type reinforced concrete stairs, save template, simplify procedures, greatly the reduction of erection time.But globality, shock resistance due to prefabricated assembling type reinforced concrete stair, not as good as cast-in-situ steel reinforced concrete stair, therefore the mounting process of precast stair is even more important.
Content of the invention
It is an object of the invention to, improve the installation effectiveness and installation quality of precast stair.
In order to achieve the above object, the present invention is realized in:
A kind of installation method of assembled architecture precast stair;It is characterized in that:Comprise the steps:
Step 1, installation prepare;
Step 1.1, it is familiar with construction drawing, checks verification component numbering, determine installation site, and lifting sequence is numbered;
Step 1.2, according to construction drawing, eject stair and control line be installed, control line and absolute altitude are checked;Wherein, the reserved 20mm spaces of stair side identity distance structure wall, are the coat of plaster headspace of follow-up just dress;According to the reserved 100mm spaces of banister installation requirement between bench;
Step 1.3, staristep upper and lower opening ladder Liang Niutuichu with C30 pea gravel concretens seat starch;
Pre-buried to general hanger and staircase boards lifting inner nut is connected with bolt, checks shackle snap ring before lifting, can continue slow lifting after confirming firmly by the hoisting prefabricated staircase boards of step 1.4, level;
Step 2, stair bottom support system are installed;
When precast stair is lifted, the cast-in-place bracket concrete intensity of stair is also not up to design requirement, needs to make temporary support in stair bottom installation support system;Temporary support is set up using steel pipe scaffold, and rod end arranges top bracketing, and top bracketing is connected with jacking piece with 4 M12 bolts, and jacking piece is connected with stair bottom embedded sleeve barrel with the bolt of M16;
Step 3, the lifting of precast stair plate are in place;
Step 3.1, treat that staircase boards are lifted to 500mm in the scope of operation and slightly pause and slowly adjust staircase boards attitude, in place;
After step 3.2 staircase boards coarse positioning, it is finely adjusted according to control line, corrected, it is ensured that the stair sliding seam for having 30mm and cast-in-place structural between suitable for reading;
After step 3.3, staristep correction are finished, mouth horizontal reinforcement under bench and landing slab are reserved horizontal bar splicing colligation, qualified by inspection after, carry out last layer concrete placings.
The installation method of this precast stair is simply effective, and which can improve the installation effectiveness of precast stair in the case where the installation quality of precast stair is guaranteed.
Description of the drawings
Scheme of installations one of the Fig. 1 for precast stair.
Scheme of installations two of the Fig. 2 for precast stair.
Structural representations of the Fig. 3 for supporting construction.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1, Figure 2 and Figure 3, a kind of installation method of assembled architecture precast stair;It is characterized in that:Comprise the steps:
Step 1, installation prepare;
Step 1.1, it is familiar with construction drawing, checks verification component numbering, determine installation site, and lifting sequence is numbered;
Step 1.2, as shown in Figure 1 and Figure 2, ejects stair according to construction drawing and installs control line, control line and absolute altitude are checked;Wherein, the reserved 20mm spaces of stair side identity distance structure wall, are the coat of plaster headspace of follow-up just dress;According to the reserved 100mm spaces of banister installation requirement between bench;
Step 1.3, staristep upper and lower opening ladder Liang Niutuichu with C30 pea gravel concretens seat starch;
Pre-buried to general hanger and staircase boards lifting inner nut is connected with bolt, checks shackle snap ring before lifting, can continue slow lifting after confirming firmly by the hoisting prefabricated staircase boards of step 1.4, level;
Step 2, stair bottom support system are installed;
As shown in figure 3, when precast stair is lifted, the bracket concrete intensity of stair is also not up to design requirement, need to make temporary support in stair bottom installation support system;Temporary support is set up using steel pipe scaffold, and rod end arranges top bracketing, and top bracketing is connected with jacking piece with 4 M12 bolts, and jacking piece is connected with stair bottom embedded sleeve barrel with the bolt of M16;
Step 3, the lifting of precast stair plate are in place;
Step 3.1, treat that staircase boards are lifted to 500mm in the scope of operation and slightly pause and slowly adjust staircase boards attitude, in place;
After step 3.2 staircase boards coarse positioning, it is finely adjusted according to control line, corrected, it is ensured that the stair sliding seam for having 30mm and cast-in-place structural between suitable for reading;
After step 3.3, staristep correction are finished, mouth horizontal reinforcement under bench and landing slab are reserved horizontal bar splicing colligation, qualified by inspection after, carry out last layer concrete placings.
The installation method of this precast stair is simply effective, and which can improve the installation effectiveness of precast stair in the case where the installation quality of precast stair is guaranteed.
Claims (1)
1. a kind of installation method of assembled architecture precast stair;It is characterized in that:Comprise the steps:
Step 1, installation prepare;
Step 1.1, it is familiar with construction drawing, checks verification component numbering, determine installation site, and lifting sequence is numbered;
Step 1.2, according to construction drawing, eject stair and control line be installed, control line and absolute altitude are checked;Wherein, the reserved 20mm spaces of stair side identity distance structure wall, are the coat of plaster headspace of follow-up just dress;According to the reserved 100mm of banister installation requirement between bench
Space;
Step 1.3, staristep upper and lower opening ladder Liang Niutuichu with C30 pea gravel concretens seat starch;
Pre-buried to general hanger and staircase boards lifting inner nut is connected with bolt, checks shackle snap ring before lifting, can continue slow lifting after confirming firmly by the hoisting prefabricated staircase boards of step 1.4, level;
Step 2, stair bottom support system are installed;
When precast stair is lifted, the cast-in-place bracket concrete intensity of stair is also not up to design requirement, needs to make temporary support in stair bottom installation support system;Temporary support is set up using steel pipe scaffold, and rod end arranges top bracketing, and top bracketing is connected with jacking piece with 4 M12 bolts, and jacking piece is connected with stair bottom embedded sleeve barrel with the bolt of M16;
Step 3, the lifting of precast stair plate are in place;
Step 3.1, treat that staircase boards are lifted to 500mm in the scope of operation and slightly pause and slowly adjust staircase boards attitude, in place;
After step 3.2 staircase boards coarse positioning, it is finely adjusted according to control line, corrected, it is ensured that the stair sliding seam for having 30mm and cast-in-place structural between suitable for reading;
After step 3.3, staristep correction are finished, mouth horizontal reinforcement under bench and landing slab are reserved horizontal bar splicing colligation, qualified by inspection after, carry out last layer concrete placings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510563451.0A CN106499192A (en) | 2015-09-08 | 2015-09-08 | The installation method of assembled architecture precast stair |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510563451.0A CN106499192A (en) | 2015-09-08 | 2015-09-08 | The installation method of assembled architecture precast stair |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106499192A true CN106499192A (en) | 2017-03-15 |
Family
ID=58287676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510563451.0A Pending CN106499192A (en) | 2015-09-08 | 2015-09-08 | The installation method of assembled architecture precast stair |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106499192A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107489279A (en) * | 2017-08-31 | 2017-12-19 | 上海建工七建集团有限公司 | Precast stair supporting apparatus and its application construction method |
CN107798470A (en) * | 2017-10-19 | 2018-03-13 | 鲲鹏建设集团有限公司 | Stair complete period lean manages construction method |
CN110409723A (en) * | 2019-04-29 | 2019-11-05 | 中冶天工集团天津有限公司 | A kind of assembled stair mounting bracket and its installation method |
CN110759237A (en) * | 2018-07-27 | 2020-02-07 | 上海公路桥梁(集团)有限公司 | Hoisting method |
CN111456395A (en) * | 2020-04-10 | 2020-07-28 | 吴传江 | Mounting, fixing and construction method for prefabricated member of prefabricated building |
CN112942854A (en) * | 2021-02-02 | 2021-06-11 | 中铁八局集团有限公司 | Hoisting construction method for fabricated structure |
CN113605711A (en) * | 2021-09-09 | 2021-11-05 | 中铁建工集团有限公司 | Construction method of building structure |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3564411B2 (en) * | 2001-03-16 | 2004-09-08 | 株式会社沖工業 | Installation method of inclined structure consisting of PC stairs |
CN202450720U (en) * | 2012-01-17 | 2012-09-26 | 深圳海龙建筑制品有限公司 | Concrete prefabricated stair component |
-
2015
- 2015-09-08 CN CN201510563451.0A patent/CN106499192A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3564411B2 (en) * | 2001-03-16 | 2004-09-08 | 株式会社沖工業 | Installation method of inclined structure consisting of PC stairs |
CN202450720U (en) * | 2012-01-17 | 2012-09-26 | 深圳海龙建筑制品有限公司 | Concrete prefabricated stair component |
Non-Patent Citations (1)
Title |
---|
IAMCHENREN8: "《预制楼梯吊装施工方案》", 《百度文库》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107489279A (en) * | 2017-08-31 | 2017-12-19 | 上海建工七建集团有限公司 | Precast stair supporting apparatus and its application construction method |
CN107798470A (en) * | 2017-10-19 | 2018-03-13 | 鲲鹏建设集团有限公司 | Stair complete period lean manages construction method |
CN107798470B (en) * | 2017-10-19 | 2020-06-19 | 鲲鹏建设集团有限公司 | Stair full-period lean management construction method |
CN110759237A (en) * | 2018-07-27 | 2020-02-07 | 上海公路桥梁(集团)有限公司 | Hoisting method |
CN110759237B (en) * | 2018-07-27 | 2022-05-17 | 上海公路桥梁(集团)有限公司 | Hoisting method |
CN110409723A (en) * | 2019-04-29 | 2019-11-05 | 中冶天工集团天津有限公司 | A kind of assembled stair mounting bracket and its installation method |
CN111456395A (en) * | 2020-04-10 | 2020-07-28 | 吴传江 | Mounting, fixing and construction method for prefabricated member of prefabricated building |
CN112942854A (en) * | 2021-02-02 | 2021-06-11 | 中铁八局集团有限公司 | Hoisting construction method for fabricated structure |
CN113605711A (en) * | 2021-09-09 | 2021-11-05 | 中铁建工集团有限公司 | Construction method of building structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106499192A (en) | The installation method of assembled architecture precast stair | |
CN105019475A (en) | Prefabricated integral concrete comprehensive pipe rack and construction method | |
CN102587659A (en) | Construction method for using concrete columns to support structures on both sides of post-pouring strip | |
CN205205857U (en) | Integral concrete utility tunnel of prefabricated assembly | |
CN102561690A (en) | Construction method for supporting structures on two sides of post-cast strip by use of brick column | |
CN106703367B (en) | A kind of existing building installs the construction method of elevator shaft additional | |
CN105863275A (en) | Construction method for assembly type annular reinforcement buckling concrete shear wall system | |
CN107035064B (en) | Assembled prefabricated outer wall plate structure and construction method | |
CN104594641B (en) | The reinforcing bar localization method that a kind of precast wall body is installed | |
CN105587127B (en) | The exterior wall prefabricated concrete board localization method realized by means of Laser Line Marker | |
CN107476583A (en) | A kind of concrete assembled building builds construction method | |
CN104032969A (en) | Precise positioning and process regulation and control device for vibration isolation support embedded plate | |
CN202370104U (en) | Butted installing device for steel lattice column | |
CN103104090B (en) | Silo concrete whole slip template | |
CN106906747A (en) | A kind of column and bent cap splicing structure | |
CN204225135U (en) | A kind of monolithic cofferdam inner support lifting gear | |
CN207032468U (en) | Assembled architecture | |
CN103321404B (en) | A kind of granulation tower tower wall concrete change section slip-form template adjustment construction method | |
CN104453228A (en) | Construction method of large-span super-large-section steel plate wall beam | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN205000354U (en) | Rim of a cup basis steel column installation elevation control structure | |
CN202831621U (en) | Integrated slipform for silo concrete | |
CN104878926A (en) | Suspended template system construction method and turnover brackets | |
CN105756323A (en) | Civil building kitchen and toilet-based construction method for sunk suspended form mold | |
CN204112602U (en) | A kind of compound rest controlling cast-in-situ floor reinforcement cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170315 |