CN207032468U - Assembled architecture - Google Patents
Assembled architecture Download PDFInfo
- Publication number
- CN207032468U CN207032468U CN201720652798.7U CN201720652798U CN207032468U CN 207032468 U CN207032468 U CN 207032468U CN 201720652798 U CN201720652798 U CN 201720652798U CN 207032468 U CN207032468 U CN 207032468U
- Authority
- CN
- China
- Prior art keywords
- assembled architecture
- side fascia
- steel
- concrete
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Assembled architecture is the utility model is related to, including mainly has Side fascia, lining, superimposed sheet, balcony, air-conditioning plate, stair, steel joist, steel structure column, steel structure girder and prefabricated components to make and forms;Side fascia is provided with wall board connector and plate stitch handling member, prefabricated components are provided with machinery production concrete reinforcing steel cage, superimposed sheet installation support Side fascia, lining is installed on inside Side fascia, and multiple prefabricated constructions are installed by module, plate stitch processing and room node installation connect into assembled architecture;The building formed using prefabricated component in assemble in site, wall can be dismantled repeatedly, and can reuse will not produce building waste due to demolishing walls, and construction speed is fast, and climate conditionality is small, save labour and can improve construction quality.
Description
Technical field
Building construction technology field is the utility model is related to, more specifically refers to assembled architecture.
Background technology
Existing building construction is that accent is grown to tail steel construction, precast concrete, building cycle, builds site operation and pour mostly
Note is complicated, and manual physical is heavy, many hidden dangers be present, and construction rubbish is more, and construction material construction is blown by weather
Raining, it is big to influence, it is impossible to realizes quick prefabricated fabrication and installation.
Common building is by manually building, and balcony toilet parapet has many vertical and horizontal seams between having boiled water room, because at waterproof
It is improper to manage, the easy leak in house.
Therefore, it is necessary to develop assembled architecture.
The content of the invention
The defects of the purpose of this utility model is to overcome prior art, there is provided assembled architecture, module installation and plate stitch
Processing is linked and packed fast firmly, and to achieve the above object, the utility model uses following technical scheme:
This assembled architecture includes mainly having Side fascia, lining, superimposed sheet, balcony, air-conditioning plate, stair, steel joist, steel
Structural column, steel structure girder and prefabricated components, which make, to be formed;The Side fascia is provided with wall board connector and plate stitch handling member, described pre-
Component processed is provided with machinery production concrete reinforcing steel cage, the superimposed sheet installation support Side fascia, and lining is installed on Side fascia
The inside, the multiple prefabricated construction is installed by module, plate stitch processing and room node installation connect into assembled architecture.
Preferably, the prefabricated components are had by concrete prefabricated components steel mould with different size and shape, are put into advance
The good reinforcing bar of colligation, all kinds of built-in fittings, and prefabricated components are made in casting concrete.
Preferably, the module installation includes shear wall, column template, elevator hoistways inner template, form bracing and sets up, pacifies
The box-like floor of folding and the bench installation of lifting staristep.
Preferably, the plate stitch, which is handled, includes floor piece cracking resistance reinforcement installation, preheating embedding line and surfacing steel bar in floor
Colligation, floorslab concrete pouring connection and vertical and horizontal seam water-proofing treatment.
The vertical and horizontal water-proofing treatment uses outer stopper foamed polyethylene gluing, and inside uses hollow rubber waterstop.
The room node installation leads wall, or whole cast concrete walls and roofing including doing the high armored concrete of 200mm.
The beneficial effect of the utility model compared with prior art is:Built using prefabricated component what assemble in site formed
Build, wall can be dismantled repeatedly, and can reuse will not produce building waste due to demolishing walls, and construction speed is fast, is bullied
It is small to wait conditionality, saves labour and construction quality can be improved.
The utility model is further described with specific embodiment below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the prefabricated buildings structural representation of the utility model specific embodiment;
Fig. 2 has node installation structural representation for the utility model embodiment;
Fig. 3 is the vertical and horizontal seam processing structure schematic diagram of the utility model embodiment.
Reference
1st, Side fascia;2nd, lining;3rd, superimposed sheet;4th, balcony;5th, air-conditioning plate;6th, stair;7th, steel joist;8th, steel construction
Post;9th, steel structure girder;10th, prefabricated components;11st, wall is led;12nd, polyethylene foamed rod;13rd, hollow rubber waterstop.
Embodiment
In order to more fully understand technology contents of the present utility model, with reference to specific embodiment to skill of the present utility model
Art scheme is further described and illustrated, but is not limited to this.
As Figure 1-3, including mainly there are Side fascia 1, lining 2, superimposed sheet 3, balcony 4, air-conditioning plate 5, stair 6, steel
Keel 7, steel structure column 8, steel structure girder 9 and prefabricated components 10, which make, to be formed;Side fascia 1 is provided with wall board connector and plate stitch is handled
Part, prefabricated components 10 are provided with machinery production concrete reinforcing steel cage, the installation support Side fascia 1 of superimposed sheet 3, and lining 2 is installed on
The inside of Side fascia 1, multiple buildings of prefabricated components 10 are installed by module, plate stitch processing and room node installation connect into assembled
Building.
It is good to be put into prior colligation by the steel mold of concrete prefabricated element 10 with different size and shape for prefabricated components 10
Reinforcing bar, all kinds of built-in fittings, by processing factory, Zong Bao, management concealment acceptance after-pouring concrete, prefabricated components 10 are made.
After the type concrete steam of prefabricated components 10 maintenance 6-9 hours, it is stripped when concrete strength is up to 70%.
Module installation includes shear wall, column template, elevator hoistways inner template, form bracing and sets up, installs superposed type building
The 6 sections of bench installations of plate and lifting stair.
Plate stitch, which is handled, includes floor piece cracking resistance reinforcement installation, and preheating embedding line and surfacing steel bar colligation, floor mix in floor
Solidifying soil cast connection and vertical and horizontal seam water-proofing treatment.
As shown in Fig. 2 room node installation is including doing, the high armored concrete of 200mm leads wall 11 and polyethylene foamed rod 12 is beaten
Glue, or whole cast concrete walls and roofing.
As shown in figure 3, vertical and horizontal water-proofing treatment uses the gluing of outer stopper polyethylene foamed rod 12, inside is stopped using hollow rubber
Water band 13.
Using building, finishing integrated design, construction, perfect condition is that finishing can synchronously be carried out with main body construction, design
Standardization and management informationization, component gets over standard, and production efficiency is higher, and corresponding component cost will decline, and coordinates work
The digital management of factory, the cost performance meeting more and more higher of whole assembled architecture, meets the requirement of green building.
Assembled architecture design and construction follow specification《Assembled integral concrete residence System Design code》DG/TJ08-
2071-2010、《Assembled entirety mixed mud structure construction and inspection of quality specification》DGJ08-2117-2012 and《Light section
Structure residence technology code》JGJ209-2010.
The utility model uses the building that is formed in assemble in site of prefabricated component, and wall can be dismantled repeatedly, can be with
Recycling will not produce building waste due to demolishing walls, and construction speed is fast, and climate conditionality is small, and saving labour simultaneously can
Improve construction quality.
It is above-mentioned that technology contents of the present utility model are only further illustrated with embodiment, in order to reader is easier to understand,
But embodiment of the present utility model is not represented is only limitted to this, any technology extension or recreation done according to the utility model,
By protection of the present utility model.The scope of protection of the utility model is defined by claims.
Claims (7)
1. assembled architecture, it is characterised in that:Including mainly have Side fascia, lining, superimposed sheet, balcony, air-conditioning plate, stair,
Steel joist, steel structure column, steel structure girder and prefabricated components, which make, to be formed;The Side fascia is provided with wall board connector and plate stitch is handled
Part, the prefabricated components are provided with machinery production concrete reinforcing steel cage, the superimposed sheet installation support Side fascia, lining installation
Inside Side fascia, the prefabricated construction is installed by module, plate stitch processing and room node installation connect into assembled
Building.
2. assembled architecture according to claim 1, it is characterised in that:The prefabricated components are by with different size and shape
Concrete prefabricated components steel mould has, and is put into the good reinforcing bar of prior colligation, all kinds of built-in fittings, and prefabricated structure is made in casting concrete
Part.
3. assembled architecture according to claim 2, it is characterised in that:The prefabricated components type concrete steam conserves 6-9
After hour, it is stripped when concrete strength is up to 70%.
4. assembled architecture according to claim 1, it is characterised in that:The module installation includes shear wall, post mould
Plate, elevator hoistways inner template, form bracing are set up, install superposed type floor and the bench installation of lifting staristep.
5. assembled architecture according to claim 1, it is characterised in that:The plate stitch processing includes floor piece cracking resistance steel
Muscle is installed, preheating embedding line and surfacing steel bar colligation in floor, floorslab concrete pouring connection and vertical and horizontal seam water-proofing treatment.
6. assembled architecture according to claim 5, it is characterised in that:The vertical and horizontal seam water-proofing treatment is steeped using outer stopper
Foam polyethylene gluing, inside use hollow rubber waterstop.
7. assembled architecture according to claim 1, it is characterised in that:The room node installation includes doing 200mm height
Armored concrete leads wall, or whole cast concrete walls and roofing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720652798.7U CN207032468U (en) | 2017-06-07 | 2017-06-07 | Assembled architecture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720652798.7U CN207032468U (en) | 2017-06-07 | 2017-06-07 | Assembled architecture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207032468U true CN207032468U (en) | 2018-02-23 |
Family
ID=61471154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720652798.7U Active CN207032468U (en) | 2017-06-07 | 2017-06-07 | Assembled architecture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207032468U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610648A (en) * | 2018-12-20 | 2019-04-12 | 五冶集团上海有限公司 | Piece processing method before a kind of assembled architecture concrete members pour |
WO2020258122A1 (en) * | 2019-06-24 | 2020-12-30 | 长沙远大住宅工业集团股份有限公司 | 3c modularization method for building design, fabrication and construction |
WO2020258123A1 (en) * | 2019-06-24 | 2020-12-30 | 长沙远大住宅工业集团股份有限公司 | Modularization method for building design, fabrication and construction |
-
2017
- 2017-06-07 CN CN201720652798.7U patent/CN207032468U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610648A (en) * | 2018-12-20 | 2019-04-12 | 五冶集团上海有限公司 | Piece processing method before a kind of assembled architecture concrete members pour |
WO2020258122A1 (en) * | 2019-06-24 | 2020-12-30 | 长沙远大住宅工业集团股份有限公司 | 3c modularization method for building design, fabrication and construction |
WO2020258123A1 (en) * | 2019-06-24 | 2020-12-30 | 长沙远大住宅工业集团股份有限公司 | Modularization method for building design, fabrication and construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101818527B (en) | Assembled integral shear wall structure system and construction method thereof | |
CN103015565B (en) | Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method | |
CN104947792B (en) | Green light steel assembling house and installation method are built in a kind of letter | |
CN201687102U (en) | Assembled integral type shear wall structure system | |
CN207032468U (en) | Assembled architecture | |
CN108914965A (en) | The continuous construction method of aluminum alloy mould plate for pipe gallery | |
CN105275209A (en) | Special-shaped spatial curved surface water concrete construction method | |
CN204531076U (en) | Light steel latticework cast-in-place foamed concrete combined wall | |
CN104695662B (en) | Stone facing prefabricated outer wall panel and its production method and external wall system | |
CN202787570U (en) | Prefabricated integral reinforced concrete load bearing wall | |
CN204491984U (en) | Stone facing precast wall panel and external wall system | |
CN203834771U (en) | Prefabricated light floor cover plate and industrial building floor plate structure | |
CN101318350A (en) | Concrete cavity die component forming method | |
CN107747378A (en) | The body composite board processing method of Fast Installation heat insulation decorative load-bearing one | |
CN106223460B (en) | The prefabricated construction method of large scale wallboard | |
CN210950229U (en) | Embedded device for gas inlet pipe sleeve in indoor shear wall | |
CN208803614U (en) | Light steel grating concrete folding plate | |
CN101886470B (en) | Construction method of exposed concrete ribbed beams | |
CN106320569A (en) | Assembly-type shear wall embedded steel bar connection process | |
CN206888274U (en) | Composite plate shear wall ring anchor connecting node | |
CN203361332U (en) | Prefabricated assembly type frame structure | |
CN102787717B (en) | Self-supporting combined steel template construction method | |
CN108999326A (en) | Light steel grating concrete folding plate | |
CN205224420U (en) | Anticorrosive industry factory building precast concrete stand | |
CN205444514U (en) | Bearing light insulation intergral template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |