CN104947792B - Green light steel assembling house and installation method are built in a kind of letter - Google Patents

Green light steel assembling house and installation method are built in a kind of letter Download PDF

Info

Publication number
CN104947792B
CN104947792B CN201510341157.5A CN201510341157A CN104947792B CN 104947792 B CN104947792 B CN 104947792B CN 201510341157 A CN201510341157 A CN 201510341157A CN 104947792 B CN104947792 B CN 104947792B
Authority
CN
China
Prior art keywords
wallboard
mainboard
combo box
light steel
box trestle
Prior art date
Application number
CN201510341157.5A
Other languages
Chinese (zh)
Other versions
CN104947792A (en
Inventor
肖中发
赵洋
周黎军
姚春胜
Original Assignee
北京大工简筑科技有限公司
肖中发
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京大工简筑科技有限公司, 肖中发 filed Critical 北京大工简筑科技有限公司
Priority to CN201510341157.5A priority Critical patent/CN104947792B/en
Publication of CN104947792A publication Critical patent/CN104947792A/en
Application granted granted Critical
Publication of CN104947792B publication Critical patent/CN104947792B/en

Links

Abstract

Green light steel assembling house and installation method are built in a kind of letter, and prefabricated buildings include wallboard, mainboard, combo box trestle and main connector;Two wallboards are connected by main connector with self-tapping screw.Combo box trestle is connected with wallboard by main connector with self-tapping screw.Main connector is first close to combo box trestle during connection, being screwed into self-tapping screw to combo box trestle fixes it, then that wallboard is in place, main connector is caught in the side grooves of wallboard.Mainboard is connected with combo box trestle, and then the main column set for the combo box trestle for passing through mainboard top layer is inserted on the tenon post of upper dew, is then fixed with bolt.Full batch production by wallboard, mainboard is prefabricated, greatly improves the prefabricated rate of building main member, so as to be more beneficial for ensureing the structure safety and quality of building, reduces field operation amount, reduces construction environment pollution, shortens the construction period, be cost-effective.

Description

Green light steel assembling house and installation method are built in a kind of letter

Technical field

The present invention relates to green house technical field of buildings, more particularly to a kind of letter build green light steel assembling house and Installation method.

Background technology

Building industrialization is promoted, energy-saving and emission-reduction is advantageously implemented, promotes green safe construction, improve construction quality, improve Human settlement, promote upgrading of industrial structures.Assembled architecture is the inevitable choice for realizing building industrialization.Prefabricated buildings are to adopt With the standardized component of prefabrication, in-site installation is carried out.At present, the use of prefabricated buildings is more and more, however, existing Prefabricated buildings are mostly using steel structure frame with concrete prefabricated board system or using the close rib keel composite construction of the light steel of thin-walled System, assembling degree is relatively low, and concrete material deadweight is larger, and the workload of the light close rib keel composite construction of steel is generally larger, Mounting means is single simultaneously and installation process is complicated.How to found a kind of structural system it is clear, it is easy for installation, more save work Phase, so as to reducing the novel fabricated house of cost and its installation method, be current problem urgently to be resolved hurrily.

The content of the invention

It is an object of the invention to provide a kind of letter to build green light steel assembling house and installation method, makes its structural system clear It is clear, easy for installation, to save the duration, so as to reducing cost.

To achieve the above object, the technical solution adopted by the present invention is as follows, and green light steel assembling house is built in a kind of letter, should House includes wallboard, mainboard, combo box trestle and main connector.

Described wallboard is the composite plate of prefabrication, and wallboard includes light steel section bar, the connector that frame carries Baltimore groove A, insulation material, wallboard LIFT, lightgage steel joist;The section of light steel section bar and lightgage steel joist is M types or shape for hat or c-type shape. It is connected with each other between light steel section bar and lightgage steel joist with self-tapping screw by connector a.Wallboard central filler has insulation material;Wall The outermost of plate is modified cement mortar or the wallboard LIFT of light aggregate concrete material;Insulation material is styrofoam or stalk Plate or glass silk floss or foam cement.

Described mainboard is also the composite plate of prefabrication, in factory process, is led to first by the light steel truss structure beam of surrounding The connector b for crossing mainboard corner is connected with each other with self-tapping screw, afterwards by light steel secondary beam by design interval insertion light steel truss structure beam In montant, fix both ends with self-tapping screw, laying pressure profiled steel decking sheets and bar-mat reinforcement, the top of mainboard are successively on light steel secondary beam Mainboard LIFT, the layer material that pours of mainboard LIFT is light aggregate concrete or other mixed slurries.

Described combo box trestle is prefabricated in the factory part, and combo box trestle includes main column (301), tenon post and surface layer Plate.Main column and tenon post are shaped steel of remaining silent, and both section configurations are rectangle or circle.On the bottom of main column and tenon post It is reserved with bolt hole.The cross sectional shape of tenon post is identical with main column, and is in same central axis, and size is equal proportion Shunk to central axis.The top of tenon post is further shunk, and pyramidal structure is formed, in favor of the grafting up and down of combo box trestle In place.

When being prefabricated in the factory, then one end welded closure for being first connected main column with tenon post with steel plate welds tenon Headpin.For surface layer plate on the outside of combo box trestle to stick production board or pouring plate, production board selects GRC plates or leisure plate or cement Fiberboard or calcium silicate board, pour plate and select modified cement mortar or light aggregate concrete.

Combo box trestle is when building on different position, for do not wait weld together main column of 1-4 radicals amount Coupled column, the tenon post being separated from each other that coupled column top is not waited for corresponding 1-4 radicals amount.

Two described wallboards are connected by main connector with self-tapping screw.Main connector is light steel section bar, its section configuration For 8 fonts or drum type or rectangle or C-type steel shape, in different link positions, the side grooves of its sectional dimension and wallboard are deep Spend identical or be twice as.When main connector is opening-closed sectional material, in its side short side, preformed hole is interval with.Wallboard straight line connects When connecing, main connector is first embedded in the side grooves of first block of wallboard and exposed half, being screwed into self-tapping screw afterwards makes connector Fixed with wallboard, it is then that another block of wallboard is in place, the remaining half of main connector is caught in the side grooves of wallboard.Wallboard hangs down It is direct-connected when connecing, the short side of main connector is first close to wallboard, being screwed into self-tapping screw to wallboard is fixed, then by another piece of wall Plate is in place, main connector is caught in the side grooves of wallboard.

Described combo box trestle is connected with wallboard by main connector with self-tapping screw.First main connector is leaned on during connection Tight combo box trestle, being screwed into self-tapping screw to combo box trestle fixes it, then that wallboard is in place, main connector is caught in wall The side grooves of plate.

Described mainboard is connected with combo box trestle, is to pass through mainboard by the tenon post (302) of compound frame column top The connector b in corner is carried out in place, and then the main column set for the combo box trestle for passing through mainboard top layer is inserted in the tenon post of upper dew On, then it is fixed with bolt.

Described mainboard and wallboard are connected by main connector.Main connector is first close to mainboard during connection, to mainboard Being screwed into self-tapping screw fixes it, and mainboard then is overlapped on into panel tops together with main connector, is caught in main connector The top groove of wallboard.

Described wallboard is flush-mounted between combo box trestle and mainboard, and the peripheral combo box trestle in house is with wallboard same On central axis.

Light steel section bar used by light steel section bar and main connector employed in described wallboard, mainboard and combo box trestle It is cold bending thin wall galvanized steel.

The installation method of green light steel assembling house is built in a kind of letter, is comprised the following steps,

S1 carries out column foundation construction according to construction design drawing, and pre-buried good foundation bolt is suitable by designing by combo box trestle Sequence is arranged on column foundation, and makes tenon post exposed to designed elevation;

S2 lifts mainboard as bottom plate, lifts and is socketed on the tenon post of combo box trestle, tenon post stretches out mainboard angle Portion connector b;

By combo box trestle, inserting has stretched out the tenon post in mainboard corner to S3 by number, is joined with bolts;

Special main connector is separately fixed at the upper surface of the light steel truss structure beam of mainboard and compound by S4 along wall center line The side of frame column;

Lifting is in place successively in order and horizontal side and lower side groove is caught in main connection by prefabricated wallboard by S5 Part;

Special main connector is fixed on the lower surface of the light steel truss structure beam of mainboard by S6 by design attitude;

Main connector lifting of the mainboard together with lower surface is located in the top of wallboard 1 by S7, main connector is caught in wallboard The groove at top, while insert the tenon post of combo box trestle and stretch out the corner connector b of mainboard;

S8 grafting upper strata combo box trestle, is connected with;

S9 installs wallboard as parapet, then carries out roof slope making, waterproof and roofing tile and mats formation.

Compared with prior art, the present invention has advantages below:

1st, the full batch production by wallboard, mainboard is prefabricated, greatly improves the prefabricated rate of building main member, so as to more favourable In the structure safety and quality that ensure building, reduce field operation amount, reduce construction environment pollution, shorten construction period, section About cost.

2nd, by optimizing the connected mode of light steel frame formula structural system and part, greatly reduce construction material consumption and Job site workload, it is truly realized rapid green construction.

3rd, factory-made component selects more green, low-carbon, environmental protection, the material of energy-conservation.

4th, generally robust durable, insulation, and light weight, energy-conserving and environment-protective are built, are adapted to various building constructions, are applicable Property is strong, will bring good economic benefit and social benefit.

Brief description of the drawings

Above-mentioned is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, below With reference to accompanying drawing, the present invention is described in further detail with embodiment.

Fig. 1 is the wallboard, mainboard and combo box trestle mounting structure that green light steel assembling house is built in a kind of letter of the present invention Schematic diagram.

Fig. 2 is the wallboard installing structure schematic diagram of the present invention.

Fig. 3 is the mounting structure schematic diagram of the mainboard of the present invention.

Fig. 4 .1 are the structural representations of the combo box trestle of the present invention.

Fig. 4 .2 are the structural representations of the coupled column of the present invention.

Fig. 5 is the connection relationship diagram between the wallboard of the present invention.

The steel structure frame post that Fig. 6 .1 are the present invention shows with the annexation of wallboard and the combination one of combo box trestle It is intended to.

The steel structure frame post that Fig. 6 .2 are the present invention shows with the annexation of wallboard and the combination two of combo box trestle It is intended to.

The steel structure frame post that Fig. 6 .3 are the present invention shows with the annexation of wallboard and the combination three of combo box trestle It is intended to.

The steel structure frame post that Fig. 6 .4 are the present invention shows with the annexation of wallboard and the combination four of combo box trestle It is intended to.

Fig. 7 is the steel structure frame post of the present invention and the connection relationship diagram of mainboard.

Fig. 8 is the wallboard of the present invention and the connection relationship diagram of mainboard.

In figure:1st, wallboard, 2, mainboard, 3, combo box trestle, 4, main connector, 101, light steel section bar, 102, connector a, 103rd, insulation material, 104, wallboard LIFT, 201, light steel truss structure beam, 202, connector b, 203, light steel secondary beam, 204, die mould Steel board, 205, bar-mat reinforcement, 206, mainboard LIFT, 301, main column, 302, tenon post, 303, surface layer plate, 304, bolt hole, 305th, bolt.

Embodiment

Technical scheme is described in further details with reference to Figure of description and embodiment.

Green light steel assembling house is built in a kind of letter, and the house includes wallboard 1, mainboard 2, combo box trestle 3 and main connection Part 4.

Shown in reference picture 2, described wallboard 1 is the composite plate of prefabrication, and it is light with Baltimore groove that wallboard 1 includes frame Steel profile 101, connector a102, insulation material 103, wallboard LIFT 104, lightgage steel joist;Light steel section bar 101 and lightgage steel joist Section be M types or shape for hat or c-type shape.Pass through connector a102 with self-tapping screw between light steel section bar 101 and lightgage steel joist It is connected with each other.The central filler of wallboard 1 has insulation material 103;The outermost of wallboard 1 is modified cement mortar or light aggregate concrete The wallboard LIFT 104 of material;Insulation material 103 is styrofoam or stalk board or glass silk floss or foam cement.

Shown in reference picture 3, described mainboard 2 is also the composite plate of prefabrication, in factory process, first by surrounding Light steel truss structure beam 201 is connected with each other by the connector b202 in mainboard corner with self-tapping screw, afterwards by light steel secondary beam 203 by setting Montant in meter interval insertion light steel truss structure beam 201, fixes both ends with self-tapping screw, die mould is laid successively on light steel secondary beam 203 Steel board 204 and bar-mat reinforcement 205, the top of mainboard 2 is mainboard LIFT 206, and the layer material that pours of mainboard LIFT 206 is light Aggregate concrete or other mixed slurries.

Shown in reference picture 4.1, described combo box trestle 3 is prefabricated in the factory part, combo box trestle 3 include main column 301, Tenon post 302 and surface layer plate 303.Main column 301 and tenon post 302 are shaped steel of remaining silent, and both section configurations are rectangle or circle Shape.The bottom of main column 301 on tenon post 302 with being reserved with bolt hole 304.The cross sectional shape and main column of tenon post 302 301 it is identical, and be in same central axis, size is that equal proportion is shunk to central axis.The top of tenon post 302 is further Shrink, form pyramidal structure, it is in place in favor of the grafting up and down of combo box trestle 3.

When being prefabricated in the factory, one end welded closure for being first connected main column 301 with tenon post 302 with steel plate, then Weld tenon post 302.Surface layer plate 303 on the outside of combo box trestle to stick production board or pouring plate, production board from GRC plates or Leisure plate or cement fibrolite plate or calcium silicate board, pour plate and select modified cement mortar or light aggregate concrete.

Main column 301 is welded on one by combo box trestle 3 when building on different positions, for what 1-4 radicals amount did not waited It is the tenon post 302 being separated from each other that corresponding 1-4 radicals amount does not wait shown in the coupled column reference picture 4.2 risen, at the top of coupled column.

Shown in reference picture 5, two described wallboards 1 are connected by main connector 4 with self-tapping screw.Main connector 4 is light steel Section bar, its section configuration is 8 fonts or drum type or rectangle or C-type steel shape, in different link positions, its sectional dimension and wall The side grooves depth of plate 1 is identical or is twice as.When main connector 4 is opening-closed sectional material, in its side short side, it is interval with pre- Box out.When the straight line of wallboard 1 connects, main connector 4 is first embedded in the side grooves of first block of wallboard 1 and exposed half, twisted afterwards Entering self-tapping screw makes connector 4 be fixed with wallboard, then that another block of wallboard 1 is in place, is caught in main 4 remaining half of connector The side grooves of wallboard 1.During 1 vertical connection of wallboard, the short side of main connector 4 is first close to wallboard 1, self tapping is screwed into wallboard 1 Screw is fixed, then that another block of wallboard 1 is in place, main connector 4 is caught in the side grooves of wallboard 1.

Shown in reference picture 6.1-6.4, described combo box trestle 3 is connected with wallboard 1 by main connector 4 with self-tapping screw Connect.Main connector 4 is first close to combo box trestle 3 during connection, being screwed into self-tapping screw to combo box trestle 3 fixes it, then Wallboard 1 is in place, main connector 4 is caught in the side grooves of wallboard 1.

Shown in reference picture 7, described mainboard 2 is connected with combo box trestle 3, is the tenon by the top of combo box trestle 3 Post 302 is carried out in place through the connector b202 in the corner of mainboard 2, and then the main column of the combo box trestle 3 by the top layer of mainboard 2 On 301 sets of tenon posts 302 for being inserted in dew, then it is fixed with bolt 305.

Shown in reference picture 8, described mainboard 2 is connected with wallboard 1 by main connector 4.First by main connector 4 during connection Mainboard 2 is close to, being screwed into self-tapping screw to mainboard 2 fixes it, and mainboard 2 then is overlapped on into wallboard 1 together with main connector 4 Top, main connector 4 is set to be caught in the top groove of wallboard 1.

Described wallboard 1 is flush-mounted between combo box trestle 3 and mainboard 2, the combo box trestle 3 and wallboard 1 of house periphery On same central axis.

Light steel used by light steel section bar and main connector 4 employed in described wallboard 1, mainboard 2 and combo box trestle 3 Section bar is cold bending thin wall galvanized steel.

The installation method of green light steel assembling house is built in a kind of letter, is comprised the following steps,

S1 carries out column foundation construction according to construction design drawing, and pre-buried good foundation bolt is suitable by designing by combo box trestle 3 Sequence is arranged on column foundation, and makes tenon post 302 exposed to designed elevation;

S2 lifts mainboard 2 as bottom plate, lifts and is socketed on the tenon post 302 of combo box trestle 3, tenon post 302 is stretched Go out the corner connector b202 of mainboard 2;

By combo box trestle 3, inserting has stretched out the tenon post 302 in the corner of mainboard 2 to S3 by number, is joined with bolts;

S4 special main connector 4 is separately fixed at along wall center line the light steel truss structure beam 201 of mainboard 2 upper surface and The side of combo box trestle 3;

Lifting is in place successively in order and horizontal side and lower side groove is caught in main connection by prefabricated wallboard 1 by S5 Part 4;

Special main connector 4 is fixed on the lower surface of the light steel truss structure beam 201 of mainboard 2 by S6 by design attitude;

Main connector 4 lifting of the mainboard 2 together with lower surface is located in the top of wallboard 1 by S7, main connector 4 is caught in wallboard The groove at 1 top, while insert the tenon post 302 of combo box trestle 3 and stretch out the corner connector b202 of mainboard 2;

S8 grafting upper strata combo box trestle 3, is connected with bolt 305;

S9 installation wallboards 1 are used as parapet, then carry out roof slope making, waterproof and roofing tile and mat formation.

Claims (9)

1. green light steel assembling house is built in a kind of letter, it is characterised in that:The house includes wallboard (1), mainboard (2), combo box Trestle (3) and main connector (4);
Described wallboard (1) be prefabrication composite plate, wallboard (1) include frame with Baltimore groove light steel section bar (101), Connector a (102), insulation material (103), wallboard LIFT (104), lightgage steel joist;Light steel section bar (101) and lightgage steel joist Section is M types or shape for hat or c-type shape;Light steel section bar (101) passes through connector a between lightgage steel joist with self-tapping screw (102) it is connected with each other;Wallboard (1) central filler has insulation material (103);The outermost of wallboard (1) is wallboard LIFT (104);
Described mainboard (2) is also the composite plate of prefabrication, in factory process, first by the light steel truss structure beam of surrounding (201) it is connected with each other by the connector b (202) in mainboard corner with self-tapping screw, afterwards by light steel secondary beam (203) by between design Montant in insertion light steel truss structure beam (201), fixes both ends with self-tapping screw, die mould is laid successively on light steel secondary beam (203) Steel board (204) and bar-mat reinforcement (205), the top of mainboard (2) is mainboard LIFT (206);
Described combo box trestle (3) is prefabricated in the factory part, and combo box trestle (3) includes main column (301), tenon post (302) With surface layer plate (303);The bottom of main column (301) on tenon post (302) with being reserved with bolt hole (304);Tenon post (302) Cross sectional shape it is identical with main column (301), and be in same central axis, size is that equal proportion is shunk to central axis; The top of tenon post (302) is further shunk, and pyramidal structure is formed, so that the grafting up and down of combo box trestle (3) is in place;
When being prefabricated in the factory, one end welded closure for being first connected main column (301) with tenon post (302) with steel plate, then Weld tenon post (302);
Main column (301) is welded on one by combo box trestle (3) when building on different positions, for what 1-4 radicals amount did not waited The coupled column risen, the tenon post (302) being separated from each other that coupled column top is not waited for corresponding 1-4 radicals amount;
Described two wallboards (1) are connected by main connector (4) with self-tapping screw;Main connector (4) is light steel section bar, its section 8 fonts or drum type or rectangle or C-type steel shape are shaped as, in different link positions, its sectional dimension and the side of wallboard (1) Depth of groove is identical or is twice as;When main connector (4) is opening-closed sectional material, in its side short side, preformed hole is interval with;Wall When plate (1) straight line connects, first by the side grooves of the embedded first piece of wallboard (1) of main connector (4) and exposed half, it is screwed into afterwards Self-tapping screw makes connector (4) be fixed with wallboard, then by another piece of wallboard (1) in place, makes main connector (4) remaining half It is caught in the side grooves of wallboard (1);During wallboard (1) vertical connection, the short side of main connector (4) is first close to wallboard (1), to wall Plate (1) is screwed into self-tapping screw and is fixed, and then by another piece of wallboard (1) in place, main connector (4) is caught in wallboard (1) Side grooves;
Described combo box trestle (3) is connected with wallboard (1) by main connector (4) with self-tapping screw;First by main company during connection Fitting (4) is close to combo box trestle (3), and being screwed into self-tapping screw to combo box trestle (3) fixes it, then by wallboard (1) just Position, makes main connector (4) be caught in the side grooves of wallboard (1);
Described mainboard (2) is connected with combo box trestle (3), is passed through by the tenon post (302) at the top of combo box trestle (3) The connector b (202) in mainboard (2) corner is carried out in place, and then the main column of the combo box trestle (3) by mainboard (2) top layer (301) set is inserted on the tenon post (302) of dew, is then fixed with bolt (305);
Described mainboard (2) is connected with wallboard (1) by main connector (4);Main connector (4) is first close to mainboard during connection (2), being screwed into self-tapping screw to mainboard (2) fixes it, and mainboard (2) then is overlapped on into wallboard together with main connector (4) (1) top, makes main connector (4) be caught in the top groove of wallboard (1).
2. green light steel assembling house is built in a kind of letter according to claim 1, it is characterised in that:Wallboard (1) is flush-mounted in Between combo box trestle (3) and mainboard (2), the combo box trestle (3) and wallboard (1) of house periphery are on same central axis.
3. green light steel assembling house is built in a kind of letter according to claim 1, it is characterised in that:Insulation material (103) For styrofoam or stalk board or glass silk floss or foam cement.
4. green light steel assembling house is built in a kind of letter according to claim 1, it is characterised in that:Wallboard LIFT (104) it is modified cement mortar or light aggregate concrete material.
5. green light steel assembling house is built in a kind of letter according to claim 1, it is characterised in that:Mainboard LIFT (206) the layer material that pours is light aggregate concrete or mixed slurry.
6. green light steel assembling house is built in a kind of letter according to claim 1, it is characterised in that:On the outside of combo box trestle Surface layer plate (303) to stick production board or pour plate, production board selects GRC plates or leisure plate or cement fibrolite plate or calcium silicates Plate, pour plate and select modified cement mortar or light aggregate concrete.
7. green light steel assembling house is built in a kind of letter according to claim 1, it is characterised in that:Main column (301) and Tenon post (302) is shaped steel of remaining silent, and both section configurations are rectangle or circle.
8. green light steel assembling house is built in a kind of letter according to claim 1, it is characterised in that:Described wallboard (1), Light steel section bar is that clod wash is thin used by light steel section bar and main connector (4) employed in mainboard (2) and combo box trestle (3) Wall galvanized steel.
9. the installation method of green light steel assembling house is built in a kind of letter, it is characterised in that:This method comprises the following steps,
S1 carries out column foundation construction according to construction design drawing, pre-buried good foundation bolt, combo box trestle (3) is pressed into design sequence On column foundation, and make tenon post (302) exposed to designed elevation;
S2 lifting mainboards (2) are lifted and are socketed on the tenon post (302) of combo box trestle (3), tenon post as bottom plate (302) mainboard (2) corner connector b (202) is stretched out;
By combo box trestle (3), inserting has stretched out the tenon post (302) in mainboard (2) corner to S3 by number, is connected with solid It is fixed;
Special main connector (4) is separately fixed at the upper surface of the light steel truss structure beam (201) of mainboard (2) by S4 along wall center line With the side of combo box trestle (3);
Lifting is in place successively in order and horizontal side and lower side groove is caught in main connector by prefabricated wallboard (1) by S5 (4);
Special main connector (4) is fixed on the lower surface of the light steel truss structure beam (201) of mainboard (2) by S6 by design attitude;
Main connector (4) lifting of the mainboard (2) together with lower surface is located in the top of wallboard 1 by S7, main connector (4) is caught in wall The groove at the top of plate (1), while insert the tenon post (302) of combo box trestle (3) and stretch out the corner connection of mainboard (2) Part b (202);
S8 grafting upper strata combo box trestle (3), connected with bolt (305);
S9 installation wallboards (1) are used as parapet, then carry out roof slope making, waterproof and roofing tile and mat formation.
CN201510341157.5A 2015-06-18 2015-06-18 Green light steel assembling house and installation method are built in a kind of letter CN104947792B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510341157.5A CN104947792B (en) 2015-06-18 2015-06-18 Green light steel assembling house and installation method are built in a kind of letter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510341157.5A CN104947792B (en) 2015-06-18 2015-06-18 Green light steel assembling house and installation method are built in a kind of letter

Publications (2)

Publication Number Publication Date
CN104947792A CN104947792A (en) 2015-09-30
CN104947792B true CN104947792B (en) 2017-11-14

Family

ID=54162805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510341157.5A CN104947792B (en) 2015-06-18 2015-06-18 Green light steel assembling house and installation method are built in a kind of letter

Country Status (1)

Country Link
CN (1) CN104947792B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544799A (en) * 2015-12-08 2016-05-04 智房科技股份有限公司 Fabricated horizontal external wall panel module, wall body, and assembling method
WO2017133257A1 (en) * 2016-02-04 2017-08-10 中清大科技股份有限公司 Prefabricated house
CN107587603A (en) * 2016-07-08 2018-01-16 曹海彦 Structure with assembled lightweight steel and its installation method
CN107587604A (en) * 2016-07-08 2018-01-16 曹海彦 Spigot-and-socket sheet-pile assembling structure and its installation method
CN106368326A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Multilayer stacking type simplified house
CN106436914A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simplified house
CN106368311A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Simplified house
CN106545180A (en) * 2016-10-26 2017-03-29 南宁众创空间科技有限公司 Firm simplified room
CN106545091A (en) * 2016-10-26 2017-03-29 南宁众创空间科技有限公司 A kind of firm simplified room
CN106436915A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simplified building
CN106436892A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Makeshift house
CN106436912A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simple room
CN106368386B (en) * 2016-10-26 2019-04-02 南宁众创空间科技有限公司 Simplified room reinforcing bar slotted-angle shelving
CN106400970A (en) * 2016-10-26 2017-02-15 南宁众创空间科技有限公司 Stacked type simplified house
CN108222270B (en) * 2018-01-11 2019-12-10 张家口绿汇建筑科技有限公司 Assembling construction building method of prefabricated building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101172353A (en) * 2006-10-31 2008-05-07 刘贵堂 Process for producing fireproof, heat-preserving and noise-insulation metal framework structure, and products produced thereby
CN103882977A (en) * 2013-12-16 2014-06-25 清华大学建筑设计研究院有限公司 Frame structure based on three-side-grooved strip precast concrete wallboard assembly and construction method thereof
CN104060853A (en) * 2014-07-02 2014-09-24 河南信宇石油机械制造股份有限公司 Lightweight steel structure modularized residential building

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7712270B2 (en) * 2007-01-16 2010-05-11 Guevremont Clement Building panel
WO2011089273A1 (en) * 2010-01-22 2011-07-28 Tempero 2000 S.L. Energy-collecting building-covering structure
US20110197518A1 (en) * 2010-02-14 2011-08-18 Burnett William S System and Method For Modular Roof Apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101172353A (en) * 2006-10-31 2008-05-07 刘贵堂 Process for producing fireproof, heat-preserving and noise-insulation metal framework structure, and products produced thereby
CN103882977A (en) * 2013-12-16 2014-06-25 清华大学建筑设计研究院有限公司 Frame structure based on three-side-grooved strip precast concrete wallboard assembly and construction method thereof
CN104060853A (en) * 2014-07-02 2014-09-24 河南信宇石油机械制造股份有限公司 Lightweight steel structure modularized residential building

Also Published As

Publication number Publication date
CN104947792A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
US9038339B2 (en) Prefabricated wall panels
US8863445B2 (en) Reinforced concrete dense column structure systems
US20100132271A1 (en) Constructive system
CN102587693B (en) Two-storey modular villa building and construction method thereof
CN2921130Y (en) Dismounting light steel structure movable storied building
CN103015565A (en) Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method
CN101818527A (en) Assembled integral shear wall structure system and construction method thereof
TWI632272B (en) Three-dimensional light steel frame composed of two-way continuous double beams
EP2265777B1 (en) Prefabricated self-supporting construction element
CN106013811B (en) A kind of installation method of assembled architecture
CN1237242C (en) Water-proof heat insulation metal roof
CN106499051A (en) A kind of post insertion prefabricated PC concrete frame frame system and its construction method
CN103821276B (en) A kind of assembled, modular architectural system
CN101016754A (en) Architectural structure system of preformed hollow load-bearing wall panel and construction method
CN104947803B (en) A kind of prefabricated sheet-pile mortise and tenon type connecting node and installation method
CN206308796U (en) A kind of post insertion prefabricated PC concrete frame frame system
EP1971727B1 (en) Construction of buildings
CN203821627U (en) Wall structure system with light steel keels, and wall
CN201217898Y (en) Concrete prefabricated stairs
CN106948472B (en) A kind of Light-weight Steel Structures and its construction method
CN103104094A (en) Construction method of lattice light-gauge steel house
US10808396B2 (en) Building based on large-space structure and freestanding external envelope as well as construction method
CN103993679B (en) Low layer assembling combined wall house bolt connection node structure
CN202706258U (en) Fully-assembled detachable concrete wallboard
CN101476361B (en) Inner partition plate system and its construction method

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171208

Address after: No. 1, Yongning Road, Xu Zhuang Street, Gaogang Hi-tech Zone, Taizhou City, Jiangsu Province

Patentee after: Jiangsu Baoli Automation Technology Co., Ltd.

Address before: 101100 Beijing city Tongzhou District Lu Yuan South Street No. 109 2-778

Co-patentee before: Xiao Zhongfa

Patentee before: BEIJING DAGONG JIANZHU SCIENCE & TECHNOLOGY CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190306

Address after: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee after: Taizhou Baoli Assembled Residential Industry Co., Ltd.

Address before: 225324 No. 1 Yongning Road, Xuzhuang Street, Gaogang High-tech Zone, Taizhou City, Jiangsu Province

Patentee before: Jiangsu Baoli Automation Technology Co., Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee after: Jiangsu Baoli assembly housing industry Co., Ltd

Address before: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee before: Taizhou Baoli Assembled Residential Industry Co., Ltd.

CP01 Change in the name or title of a patent holder