CN106495038A - A kind of super-high buildings multi-pipeline hoisting transportation dolly - Google Patents
A kind of super-high buildings multi-pipeline hoisting transportation dolly Download PDFInfo
- Publication number
- CN106495038A CN106495038A CN201610991657.8A CN201610991657A CN106495038A CN 106495038 A CN106495038 A CN 106495038A CN 201610991657 A CN201610991657 A CN 201610991657A CN 106495038 A CN106495038 A CN 106495038A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- packaging cage
- cage
- lifting
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C25/00—Cranes not provided for in groups B66C17/00 - B66C23/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Handcart (AREA)
Abstract
The invention discloses a kind of super-high buildings multi-pipeline hoisting transportation dolly,Including travelling bogie、The wire rope pulley group of lifting travelling bogie and electrical hoist,Travelling bogie includes dolly bracing frame and the pipeline packaging cage being fixed on dolly bracing frame,The bottom of pipeline packaging cage is the steel sole plate being fixedly installed,Lifting hanging belt is provided between pipeline packaging cage and wire rope pulley group,The folding and unfolding hanging belt for being additionally provided with bottle gouard moved by hands between wire rope pulley group and pipeline packaging cage and being connected with bottle gouard moved by hands,Setting by pipeline packaging cage,Pipeline to be transported can be placed in pipeline packaging cage,Because pipeline packaging cage bottom end is steel sole plate,Avoid the risk that pipeline is dropped in transit,Bottle gouard moved by hands can make pipeline packaging cage be located at vertical state in transport,Save taking up room during lifting by crane,And it is easy to worker to carry out pipeline folding and unfolding lifting operation,The hoisting transportation vehicle structure is simple、Construction safety,This is invented for building lifting field.
Description
Technical field
The present invention relates to building lifting field, more particularly to a kind of super-high buildings multi-pipeline hoisting transportation dolly.
Background technology
As Chinese Urbanization develops, industry and civil buildings development speed are swift and violent.Large and medium-sized civilian super-high buildings, work
The electric power of industry, chemical industry, pharmacy etc. are needed for function, are generally provided with the pipeline of multiple difference in functionalitys, and these lifting pipelines are needed
Will be in high-storey or terrace platform hoisting and hanging.Such as:Mechanical floor, office building installed in high-rise building or industrial premises, wine
The all size water pipe in customer room, spool and wire casing, cable channel etc..According to these pipelines of design or wire casing, cable channel, base
This is in high-rise building indoor equipment room or corridor furred ceiling.Build with many floors as the high-rise building interior space is limited
Total height is built up to, the reason for more than m, various cranes cannot be introduced into lifting more than 200.Traditional method is to adopt steel wire rope colligation for one
Bundle, fixes herringbone suspension rod by two steel wire ropes, hangs a wire line hitch in the infall of herringbone suspension rod, assembly pulley is suspended to steel wire
Lifted on sling and using hoist engine.There is high labor intensive in this mode, transport distance is remote, and due to multi-pipeline binding
Easily cause pipeline to be deformed or damage, while during lifting multi-pipeline, due to without circular pipe packaging cage
Protection cannot ensure coming off for pipeline.Also cause due to sliding without castor load-bearing in multi-pipeline lifting and decentralization process
Pipe friction ground surface damage pipeline and floor.Therefore traditional method, has increase labor intensity, damages pipeline and floor, affects
The shortcoming of construction safety.With building trade construct the raising of overall technology level, construction to implement " people-oriented " with
And guaranteeing construction safety and duration, the construction of the various pipelines of job site is in the urgent need to adopting new technology to realize the peace for lifting
Complete reliable, reduction labor intensity and lifting cost are used, improve lifting efficiency.
Content of the invention
For solving the above problems, the present invention provides the super-high buildings multi-pipeline lifting fortune of a kind of simple structure, construction safety
Defeated dolly.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of super-high buildings multi-pipeline hoisting transportation dolly, including travelling bogie, lifting travelling bogie wire rope pulley group and
The electrical hoist of lifting power is provided, travelling bogie includes dolly bracing frame and the pipeline packaging being fixed on dolly bracing frame
Cage, the bottom of pipeline packaging cage is the steel sole plate being fixedly installed, and is provided with lifting hanger between pipeline packaging cage and wire rope pulley group
Dress band, the folding and unfolding hanging belt for being additionally provided with bottle gouard moved by hands between wire rope pulley group and pipeline packaging cage and being connected with bottle gouard moved by hands.
Used as the further improvement of above-mentioned technical proposal, pipeline packaging cage is circular pipeline packaging cage, pipeline packaging cage
Including top and two round steel circles of bottom, the round steel circle of bottom is fixedly connected between steel sole plate, and the circumference along round steel circle is fixed
It is provided with some round steel.
As the further improvement of above-mentioned technical proposal, dolly bracing frame include before and after caster axle and be separately positioned on each
The front truckle and rear truckle at caster axle two ends, is provided with castor fulcrum bearing, also sets up in each castor fulcrum bearing in each caster axle
There is semicircle to strengthen steel plate, each round steel circle is fixedly installed on corresponding semicircle and strengthens on steel plate.
As the further improvement of above-mentioned technical proposal, suspension ring being additionally provided with pipeline packaging cage and strengthening steel plate, suspension ring add
Some suspension ring are provided with strong steel plate, the two ends for lifting hanging belt are connected with each suspension ring and wire rope pulley group respectively.
Used as the further improvement of above-mentioned technical proposal, bottle gouard moved by hands is hung on the suspension hook of wire rope pulley group, and folding and unfolding is hung
One end of dress band is connected with the hook of bottle gouard moved by hands, the pipeline of the other end colligation of folding and unfolding hanging belt placement in the pipeline packaging cage
Outboard Sections.
Used as the further improvement of above-mentioned technical proposal, front truckle and rear truckle are ball bearing nylon castor, the forward foot in a step
Castor diameter of the castor of wheel with diameter greater than rear truckle.
As the further improvement of above-mentioned technical proposal, pipeline packaging cage include by two round steel circles being welded to connect,
One piece of steel sole plate and 20 round steel.
Beneficial effects of the present invention:Pipeline packaging cage of this super-high buildings multi-pipeline hoisting transportation dolly by travelling bogie
Setting, pipeline to be transported can be placed in pipeline packaging cage, because pipeline packaging cage bottom be steel sole plate, therefore avoid
The risk that pipeline is dropped in transit, the setting of bottle gouard moved by hands can make pipeline packaging cage be located at vertical state, section in transport
Taking up room during lifting by crane is saved, and has been easy to worker to carry out pipeline folding and unfolding lifting operation, the hoisting transportation vehicle structure
Simply, construction safety.
Description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the left view of travelling bogie structure;
Fig. 2 is the process schematic of pipeline lifting;
Fig. 3 is the top view of travelling bogie structure;
Fig. 4 is the front view of travelling bogie structure.
Specific embodiment
With reference to Fig. 1~Fig. 4, the present invention is a kind of super-high buildings multi-pipeline hoisting transportation dolly, including travelling bogie, lifting
The wire rope pulley group 15 of travelling bogie and provide the electrical hoist 14 of lifting power, travelling bogie include dolly bracing frame and
The pipeline packaging cage being fixed on dolly bracing frame, the bottom of pipeline packaging cage is the steel sole plate 6 being fixedly installed, pipeline packaging cage
Lifting hanging belt 11 is provided with and between wire rope pulley group 15, is additionally provided with manually between wire rope pulley group 15 and pipeline packaging cage
Calabash 13 and the folding and unfolding hanging belt 10 being connected with bottle gouard moved by hands 13.
By the setting of the pipeline packaging cage of travelling bogie, pipeline 12 to be transported can be placed in pipeline packaging cage,
Because the bottom of pipeline packaging cage is steel sole plate 6, therefore avoid the risk that pipeline 12 is dropped in transit, bottle gouard moved by hands 13 sets
Putting to make pipeline packaging cage be located at vertical state in transport, save taking up room during lifting by crane, and be easy to worker
Pipeline folding and unfolding lifting operation is carried out, the hoisting transportation vehicle structure is simple, construction safety.
Used as preferred embodiment, pipeline packaging cage is circular pipeline packaging cage, pipeline packaging cage include top and
Two round steel circles 7 of bottom, the round steel circle 7 of bottom are fixedly connected between steel sole plate 6, and the circumference along two round steel circles 7 is fixedly installed
There are some round steel 8.
As preferred embodiment, dolly bracing frame include before and after caster axle 1 and be separately positioned on 1 liang of each caster axle
The front truckle 3 and rear truckle 4 at end, is provided with castor fulcrum bearing 2 in each caster axle 1, be additionally provided with half in each castor fulcrum bearing 2
Circle strengthens steel plate 5, and each round steel circle 7 is fixedly installed on corresponding semicircle and strengthens on steel plate 5.
Strengthen steel plate 9 as suspension ring preferred embodiment, are additionally provided with pipeline packaging cage, suspension ring are strengthened on steel plate 9
Some suspension ring are provided with, the two ends for lifting hanging belt 11 are connected with each suspension ring and wire rope pulley group 15 respectively.
Used as preferred embodiment, bottle gouard moved by hands 13 is hung on the suspension hook of wire rope pulley group 15, folding and unfolding hanging belt 10
One end be connected with the hook of bottle gouard moved by hands 13, the pipeline that the other end colligation of folding and unfolding hanging belt 10 is placed in pipeline packaging cage
12 Outboard Sections.
Used as preferred embodiment, front truckle 3 and rear truckle 4 are ball bearing nylon castor, the castor of front truckle 3
Castor diameter with diameter greater than rear truckle 4.
Used as preferred embodiment, pipeline packaging cage includes two round steel circles, 7, the one piece of steel sole plate by being welded to connect
6 and 20 round steel 8.
Used as preferred embodiment, the super-high buildings multi-pipeline hoisting transportation dolly includes travelling bogie, lifting transport
The wire rope pulley group 15 of dolly and the electrical hoist 14 of offer lifting power, travelling bogie include dolly bracing frame and fixation
Pipeline packaging cage on dolly bracing frame, dolly bracing frame include before and after caster axle 1 and be separately positioned on 1 liang of each caster axle
The front truckle 3 and rear truckle 4 at end, is provided with castor fulcrum bearing 2, is provided with semicircle in each castor fulcrum bearing 2 in each caster axle 1
Strengthen steel plate 5, pipeline packaging cage is that circular packaging cage, pipeline packaging cage include two round steel circles 7 of top and bottom, each round steel
Circle 7 is fixedly installed on corresponding semicircle and strengthens on steel plate 5, and the bottom of pipeline packaging cage is the steel sole plate 6 being fixedly installed, bottom
Be fixedly connected between round steel circle 7 and steel sole plate 6,20 round steel 8, pipeline packaging cage is fixedly installed along the circumference of two round steel circles 7
On be additionally provided with suspension ring strengthen steel plate 9, suspension ring strengthen steel plate 9 on be provided with some suspension ring, pipeline packaging cage and wire rope pulley
Lifting hanging belt 11 is provided between group 15, and the two ends for lifting hanging belt 11 are connected with each suspension ring and wire rope pulley group 15 respectively,
Bottle gouard moved by hands 13 is hung on the suspension hook of wire rope pulley group 15, and one end of folding and unfolding hanging belt 10 is connected with the hook of bottle gouard moved by hands 13
Connect, the Outboard Sections of the pipeline 12 that the other end colligation of folding and unfolding hanging belt 10 is placed in pipeline packaging cage, wire rope pulley group
The folding and unfolding hanging belt 10 for being additionally provided with bottle gouard moved by hands 13 between 15 and pipeline packaging cage and being connected with bottle gouard moved by hands 13,3 He of front truckle
Rear truckle 4 is ball bearing nylon castor, the castor diameter of the castor of front truckle 3 with diameter greater than rear truckle 4, and the mechanism consolidates
Fixed connection can be welded to connect, or mode that other are fixedly connected.
According to the various pipelines and material weight, volume, hoisting height of required hoisting transportation, design, making dolly are supported
Frame and circular pipe packaging cage.Outsourcing ball bearing nylon castor, electrical hoist 14, bottle gouard moved by hands 13, wire rope pulley group
15th, steel wire rope, shackle and hanging belt, used as front truckle 3 and rear truckle 4, hanging belt hangs ball bearing nylon castor as folding and unfolding
Dress band and lifting hanging belt.The steel type size for lifting need to be tested when design dolly bracing frame and circular pipe packaging cage
Calculate, it is ensured that the safety of the super-high buildings multi-pipeline hoisting transportation vehicle structure during lifting pipeline.
The making of dolly bracing frame:First make caster axle 1, castor fulcrum bearing 2, semicircle and strengthen steel plate 5.By castor fulcrum bearing
2 panel and semicircle are strengthened after steel plate 5 welds, connect the front truckle 3 and rear truckle 4 of 1, two sets of caster axle respectively with foot in front and back
Wheel shaft 1 is connected to become dolly bracing frame;
The making of circular pipe packaging cage:First make steel sole plate 6, round steel circle 7, round steel 8, suspension ring strengthen steel plate 9, by steel sole plate 6,
Round steel circle 7, round steel 8 are welded into pipeline packaging cage by drawing size, strengthen in the front end welding hanging ring of circular pipe packaging cage
Steel plate 9 and suspension ring;
Dolly bracing frame and circular pipe packaging cage are welded as travelling bogie, each part of travelling bogie is both needed to by design drawing
Made, strictly carried out an acceptance inspection by specification after installation;
The slingers such as folding and unfolding hanging belt 10, lifting hanging belt 11, bottle gouard moved by hands 13, electrical hoist 14, wire rope pulley group 15
Tool is outsourcing equipment, need to be purchased according to the maximum weight of lifting pipeline and safety coefficient, and checks and accepts through stocking up and loading test
To meet Hoisting Security requirement.
During use, shaped steel spandrel girder and hoisting ring are installed first at the top of the vertical hoistway, using shackle by wire rope pulley
Group 15 is connected with spandrel girder hoisting ring, and the steel wire rope of wire rope pulley group 15 is connected with electrical hoist 14, wire rope pulley
Group 15 is put to the bottom of hoistway.Travelling bogie is placed in be needed beside the pipeline of lifting, and the pipeline for needing lifting is loaded circle
In shape pipeline packaging cage, two folding and unfoldings liftings are installed on some suspension ring on the suspension ring reinforcement steel plate 9 of circular pipe packaging cage
Band 10, is arranged on folding and unfolding hanging belt 10 and bottle gouard moved by hands 13 on the suspension ring of wire rope pulley group 15 with shackle.With lifting lifting
With 11 colligations in the front end of tube circular packaging cage, and lifting hanging belt 11 is hung up the suspension hook of bottle gouard moved by hands 13;Then, start
Electrical hoist 14 wire rope pulley group 15 lift by crane vertically, operation bottle gouard moved by hands 13 by pipeline packaging cage and and travelling bogie hang
Dress is tightened to more than 80 °;It is again started up electrical hoist 14 and pipeline packaging cage and travelling bogie is lifted to the building that pipeline is used
Layer, when pipeline packaging cage and travelling bogie are lifted to beside hoistway door opening of the pipeline using floor, by the electronic elevator of floor
The steel wire rope of machine 14 is hung on the suspension hook of bottle gouard moved by hands 13, and pipeline packaging cage and travelling bogie are drawn in floor, operates manual calabash
Reed 13 puts the front truckle 3 of pipeline packaging cage and travelling bogie front end to floor ground;Start floor motor by pipeline packaging
The rear truckle 4 at cage and travelling bogie rear portion is increased to floor ground, starts floor motor by pipeline packaging cage and travelling bogie
It is pulled to pipeline and uses position, now, the transport of multi-pipeline vertical lifting is basically completed.
The high-rise building multi-pipeline hoisting transportation dolly not only can utilize electrical hoist 14 and steel wire by hoistway indoors
Rope pulley 15 is lifted, and also can be carried out lifting outdoor using tower crane, be saved the lifting operating time, reduce work strong
Degree, it is ensured that the safety of lifting construction, can accelerate the construction speed of whole project, and then create more considerable economic benefit.
Certainly, above-mentioned embodiment the invention is not limited in, those of ordinary skill in the art are without prejudice to the present invention
Equivalent variations or replacement can be also made on the premise of spirit, and the deformation of these equivalents or replacement are all contained in the application claim
In limited range.
Claims (7)
1. a kind of super-high buildings multi-pipeline hoisting transportation dolly, it is characterised in that:Including travelling bogie, lift by crane the travelling bogie
Wire rope pulley group(15)With the electrical hoist for providing lifting power(14), the travelling bogie include dolly bracing frame and
The pipeline packaging cage being fixed on the dolly bracing frame, the bottom of the pipeline packaging cage is the steel sole plate being fixedly installed(6),
The pipeline packaging cage and wire rope pulley group(15)Between be provided with lifting hanging belt(11), the wire rope pulley group(15)With
Bottle gouard moved by hands is additionally provided between pipeline packaging cage(13)And with bottle gouard moved by hands(13)The folding and unfolding hanging belt of connection(10).
2. super-high buildings multi-pipeline hoisting transportation dolly according to claim 1, it is characterised in that:The pipeline packaging cage
For circular pipeline packaging cage, the pipeline packaging cage includes two round steel circles of top and bottom(7), the round steel of bottom
Circle(7)With steel sole plate(6)Between be fixedly connected, along round steel circle described in two(7)Circumference be fixedly installed some round steel(8).
3. super-high buildings multi-pipeline hoisting transportation dolly according to claim 2, it is characterised in that:The dolly bracing frame
Including caster axle in front and back(1)Be separately positioned on each caster axle(1)The front truckle at two ends(3)And rear truckle(4), each foot
Wheel shaft(1)On be provided with castor fulcrum bearing(2), each castor fulcrum bearing(2)On be additionally provided with semicircle strengthen steel plate(5),
Each round steel circle(7)It is fixedly installed on corresponding semicircle and strengthens steel plate(5)On.
4. super-high buildings multi-pipeline hoisting transportation dolly according to claim 1, it is characterised in that:The pipeline packaging cage
On be additionally provided with suspension ring strengthen steel plate(9), the suspension ring reinforcement steel plate(9)On be provided with some suspension ring, the lifting hanging belt
(11)Two ends respectively with each suspension ring and wire rope pulley group(15)Connection.
5. super-high buildings multi-pipeline hoisting transportation dolly according to claim 1, it is characterised in that:The bottle gouard moved by hands
(13)Hang over wire rope pulley group(15)Suspension hook on, the folding and unfolding hanging belt(10)One end and bottle gouard moved by hands(13)Hook
Connection, the folding and unfolding hanging belt(10)The pipeline placed in the pipeline packaging cage of other end colligation(12)Outboard Sections.
6. super-high buildings multi-pipeline hoisting transportation dolly according to claim 3, it is characterised in that:The front truckle(3)
And rear truckle(4)It is ball bearing nylon castor, the front truckle(3)Castor with diameter greater than rear truckle(4)Castor straight
Footpath.
7. the super-high buildings multi-pipeline hoisting transportation dolly according to Claims 2 or 3 or 6, it is characterised in that:The pipeline
Packaging cage includes two round steel circles by being welded to connect(7), one piece of steel sole plate(6)With 20 round steel(8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610991657.8A CN106495038A (en) | 2016-11-10 | 2016-11-10 | A kind of super-high buildings multi-pipeline hoisting transportation dolly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610991657.8A CN106495038A (en) | 2016-11-10 | 2016-11-10 | A kind of super-high buildings multi-pipeline hoisting transportation dolly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106495038A true CN106495038A (en) | 2017-03-15 |
Family
ID=58324074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610991657.8A Pending CN106495038A (en) | 2016-11-10 | 2016-11-10 | A kind of super-high buildings multi-pipeline hoisting transportation dolly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106495038A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108483291A (en) * | 2018-05-31 | 2018-09-04 | 丰润建筑安装股份有限公司 | A kind of construction site small freight lifting gear and elevating method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1521712A1 (en) * | 1987-11-16 | 1989-11-15 | Проектно-Конструкторский Технологический Институт Министерства Лесной И Деревообрабатывающей Промышленности Усср | Limiter for gripping and transporting pipes |
CN102020169A (en) * | 2009-09-23 | 2011-04-20 | 湖北蒲旗特种起重机械有限公司 | Suspension cage |
CN202296828U (en) * | 2011-10-26 | 2012-07-04 | 中建工业设备安装有限公司 | Vertical hoisting tool of shaft pipeline |
CN203113754U (en) * | 2013-03-21 | 2013-08-07 | 葛洲坝集团第二工程有限公司 | Lifting basket device applicable to narrow and vertical space |
CN105113761A (en) * | 2015-07-21 | 2015-12-02 | 上海市安装工程集团有限公司 | Construction method and device for pipe in piping shaft of superhigh rise building |
CN206288882U (en) * | 2016-11-10 | 2017-06-30 | 广东省工业设备安装有限公司 | A kind of super-high buildings multi-pipeline hoisting transportation dolly |
-
2016
- 2016-11-10 CN CN201610991657.8A patent/CN106495038A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1521712A1 (en) * | 1987-11-16 | 1989-11-15 | Проектно-Конструкторский Технологический Институт Министерства Лесной И Деревообрабатывающей Промышленности Усср | Limiter for gripping and transporting pipes |
CN102020169A (en) * | 2009-09-23 | 2011-04-20 | 湖北蒲旗特种起重机械有限公司 | Suspension cage |
CN202296828U (en) * | 2011-10-26 | 2012-07-04 | 中建工业设备安装有限公司 | Vertical hoisting tool of shaft pipeline |
CN203113754U (en) * | 2013-03-21 | 2013-08-07 | 葛洲坝集团第二工程有限公司 | Lifting basket device applicable to narrow and vertical space |
CN105113761A (en) * | 2015-07-21 | 2015-12-02 | 上海市安装工程集团有限公司 | Construction method and device for pipe in piping shaft of superhigh rise building |
CN206288882U (en) * | 2016-11-10 | 2017-06-30 | 广东省工业设备安装有限公司 | A kind of super-high buildings multi-pipeline hoisting transportation dolly |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108483291A (en) * | 2018-05-31 | 2018-09-04 | 丰润建筑安装股份有限公司 | A kind of construction site small freight lifting gear and elevating method |
CN108483291B (en) * | 2018-05-31 | 2023-09-26 | 丰润建筑安装股份有限公司 | Lifting device and lifting method for small goods on construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205955236U (en) | Container formula of taking pulley platform of unloading of encorbelmenting | |
CN204310721U (en) | A kind of overhead hoist for the lifting of narrow regions slab | |
CN201276399Y (en) | Apparatus hoisting mechanism for tall building floor non-steel platform | |
CN204454402U (en) | Detachable winch hanging apparatus | |
CN206288882U (en) | A kind of super-high buildings multi-pipeline hoisting transportation dolly | |
CN205873728U (en) | Portable jack -up lifting device of superelevation building platform | |
CN203998713U (en) | A kind of gig and elevator system | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN114835016A (en) | Lifting equipment for transferring large-scale equipment in basement and mounting construction method thereof | |
CN109694007A (en) | A kind of super high-rise building hoisting transportation method | |
CN106495038A (en) | A kind of super-high buildings multi-pipeline hoisting transportation dolly | |
CN206244334U (en) | Beam of a loom lifts car | |
CN103933675A (en) | High-rise escape device | |
CN207078597U (en) | A kind of kerbstone transportation and erection equipment | |
CN206051364U (en) | A kind of curtain wall profiles boom hoisting | |
CN212769534U (en) | Rotatable simple and easy hoist device | |
CN205661838U (en) | A transportation frame for construction steel bar | |
CN110593582A (en) | High-rise curtain wall installation auxiliary assembly with safety facility | |
CN210855091U (en) | Simple movable heavy object vertical lifting equipment | |
CN211295989U (en) | Super high-rise building shaft cable flip-chip laying device | |
CN209721349U (en) | A kind of hanging apparatus of skyscraper air-conditioning waterpipe | |
CN208995014U (en) | A kind of simple and easy hoisting device for existing building external wall construction | |
CN211946002U (en) | Hoisting support for building construction | |
CN221116788U (en) | Elevator well material transportation equipment | |
CN211081059U (en) | Hoisting device for unit plate of curtain wall with curved outer vertical surface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170315 |
|
RJ01 | Rejection of invention patent application after publication |