CN202296828U - Vertical hoisting tool of shaft pipeline - Google Patents

Vertical hoisting tool of shaft pipeline Download PDF

Info

Publication number
CN202296828U
CN202296828U CN2011204138949U CN201120413894U CN202296828U CN 202296828 U CN202296828 U CN 202296828U CN 2011204138949 U CN2011204138949 U CN 2011204138949U CN 201120413894 U CN201120413894 U CN 201120413894U CN 202296828 U CN202296828 U CN 202296828U
Authority
CN
China
Prior art keywords
base
pipeline
vertical
hole
locating plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204138949U
Other languages
Chinese (zh)
Inventor
韩宝君
谢上冬
郝冠男
孙庆业
佘峻峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial Equipment Installation Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN2011204138949U priority Critical patent/CN202296828U/en
Application granted granted Critical
Publication of CN202296828U publication Critical patent/CN202296828U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a vertical hoisting tool of a shaft pipeline, belonging to the technical field of pipeline hoisting tools. The technical essentials are as follows: the vertical hoisting tool of the shaft pipeline comprises a base, wherein a positioning plate is arranged above the base; a positioning block which adapts to the inner diameter of the pipeline is arranged at the bottom of the positioning plate; a through hole is formed in the middle of the positioning plate; a connecting rope is arranged between the base and the positioning plate; one end of the connecting rope is fixedly connected with the base; and the other end of the connecting rope passes through the through hole and is connected with external driving equipment. The utility model aims to provide the vertical hoisting tool of the shaft pipeline, which has the advantages of simple structure, convenience for use and good effect; and the vertical hoisting tool is used for vertically hoisting the pipeline.

Description

The vertical hoist tool of vertical shaft pipelines
Technical field
The utility model relates to a kind of pipeline handling accessory equipment, more particularly, relates in particular to the vertical hoist tool of a kind of vertical shaft pipelines.
Background technology
In skyscraper; Often need carry out handling, the mode of vertical handling occur needing to adopt, in vertical handling owing to the space is little through regular meeting to pipeline; Adopt the conventional directly operation of cover steel rope on pipeline; There are many shortcomings, for example destroy the coating layer in the pipeline in the steel rope hoisting process easily, influence the service life of pipeline; Occur having bigger potential safety hazard through regular meeting in the pipeline hoisting process in addition owing to slight the rocking of steel rope causes accidents such as pipeline bump hoistway, pipeline fall.
The utility model content
The purpose of the utility model is the deficiency to above-mentioned prior art, provides a kind of simple in structure, easy to use and effective vertical shaft pipelines vertical hoist tool.
The technical scheme of the utility model is achieved in that the vertical hoist tool of a kind of vertical shaft pipelines; Comprise base, wherein said base top is provided with locating plate, is provided with the locating piece that adapts with internal diameter of the pipeline in the locating plate bottom; In the middle of locating plate, be provided with through hole; Between base and locating plate, be provided with connection cord, connection cord one end is captiveed joint with base, and the other end passes through hole and is connected with external drive equipment.
In the vertical hoist tool of above-mentioned vertical shaft pipelines, described base upper surface is provided with stay bearing plate, and the stay bearing plate middle part is provided with knock hole, and described connection cord is fixed in the knock hole.
In the vertical hoist tool of above-mentioned vertical shaft pipelines, the peripheral base upper edge of described stay bearing plate is circumferentially with some registration masts, and each registration mast cooperates the regional external diameter and the internal diameter of the pipeline that are surrounded to adapt.
In the vertical hoist tool of above-mentioned vertical shaft pipelines, described locating plate upper surface is distributed with crashproof guiding projection, and each crashproof guiding projection is along circumferentially being distributed on the through hole periphery.
After the utility model adopts said structure; Locating piece through the registration mast on base, the base, locating plate and locating plate bottom cooperates, and base plays the effect of supporting pipeline, cooperates with locating piece simultaneously; The fixedly effect of steel rope can be played, the friction of steel rope and pipeline can be prevented; Further, registration mast cooperates with locating piece, plays the purpose that prevents piping displacement.
Description of drawings
Below in conjunction with the embodiment in the accompanying drawing the utility model is done further to specify, but do not constitute any restriction the utility model.
Fig. 1 is the structural representation of the utility model;
Fig. 2 be among Fig. 1 AA to cutaway view;
Fig. 3 is the birds-eye view of Fig. 1;
Fig. 4 is the running condition scheme drawing of the utility model.
Among the figure: base 1, locating plate 2, locating piece 3, through hole 4, connection cord 5, stay bearing plate 6, knock hole 7, registration mast 8, crashproof guiding projection 9.
The specific embodiment
Consult Fig. 1 to shown in Figure 4, the vertical hoist tool of a kind of vertical shaft pipelines of the utility model comprises base 1; Be provided with stay bearing plate 6 at base 1 upper surface, stay bearing plate 6 middle parts are provided with knock hole 7, are circumferentially with some registration masts 8 in stay bearing plate 6 peripheral base 1 upper edges; Each registration mast 8 cooperates the regional external diameter and the internal diameter of the pipeline that are surrounded to adapt; Registration mast 8 is used for fixing pipeline, prevents piping displacement, accident such as fall; Above base 1, be provided with locating plate 2; Be provided with the locating piece 3 that adapts with internal diameter of the pipeline in locating plate 2 bottoms; In the middle of locating plate 2, be provided with through hole 4, between base 1 and locating plate 2, be provided with connection cord 5, the connection cord 5 general steel ropes that adopt; Connection cord 5 one ends are fixed in the knock hole 7, and connection cord 7 other ends pass through hole 4 and are connected with external drive equipment; Further, be distributed with crashproof guiding projection 9 at locating plate 2 upper surfaces, each crashproof guiding projection 9 is along circumferentially being distributed on through hole 4 peripheries, and crashproof guiding projection 9 can prevent that pipeline from bumping with the borehole wall in transportation.
During concrete the use, will treat that the handling pipeline is fixed between base 1 and the locating plate 2, be connected on the elevator unit after then the free end of connection cord 5 being passed some movable pulleys, fixed pulley, can carry out vertical handling to pipeline like a cork through the elevator unit.

Claims (4)

1. the vertical hoist tool of vertical shaft pipelines comprises base (1), it is characterized in that; Described base (1) top is provided with locating plate (2); Be provided with the locating piece (3) that adapts with internal diameter of the pipeline in locating plate (2) bottom, in the middle of locating plate (2), be provided with through hole (4), between base (1) and locating plate (2), be provided with connection cord (5); Connection cord (5) one ends are captiveed joint with base (1), and the other end passes through hole (4) and is connected with external drive equipment.
2. the vertical hoist tool of vertical shaft pipelines according to claim 1 is characterized in that, described base (1) upper surface is provided with stay bearing plate (6), and stay bearing plate (6) middle part is provided with knock hole (7), and described connection cord (5) is fixed in the knock hole (7).
3. the vertical hoist tool of vertical shaft pipelines according to claim 1 and 2 is characterized in that, peripheral base (1) upper edge of described stay bearing plate (6) is circumferentially with some registration masts (8), and each registration mast (8) cooperates the regional external diameter and the internal diameter of the pipeline that are surrounded to adapt.
4. the vertical hoist tool of vertical shaft pipelines according to claim 3 is characterized in that, described locating plate (2) upper surface is distributed with crashproof guiding projection (9), and each crashproof guiding projection (9) is along circumferentially being distributed on through hole (4) periphery.
CN2011204138949U 2011-10-26 2011-10-26 Vertical hoisting tool of shaft pipeline Expired - Fee Related CN202296828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204138949U CN202296828U (en) 2011-10-26 2011-10-26 Vertical hoisting tool of shaft pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204138949U CN202296828U (en) 2011-10-26 2011-10-26 Vertical hoisting tool of shaft pipeline

Publications (1)

Publication Number Publication Date
CN202296828U true CN202296828U (en) 2012-07-04

Family

ID=46365767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204138949U Expired - Fee Related CN202296828U (en) 2011-10-26 2011-10-26 Vertical hoisting tool of shaft pipeline

Country Status (1)

Country Link
CN (1) CN202296828U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105344477A (en) * 2015-11-30 2016-02-24 东方菱日锅炉有限公司 Anode tube bundling hanger of wet electrostatic precipitator
CN106495038A (en) * 2016-11-10 2017-03-15 广东省工业设备安装有限公司 A kind of super-high buildings multi-pipeline hoisting transportation dolly
CN106542435A (en) * 2016-11-24 2017-03-29 安徽新瑞重工股份有限公司 A kind of building water power pipeline transportation auxiliary device
CN108007425A (en) * 2018-01-29 2018-05-08 重庆建工集团股份有限公司 A kind of subway tunnel Two-staged technique measurement structure and measuring method
CN111362118A (en) * 2020-05-11 2020-07-03 成都建工第四建筑工程有限公司 Tool for vertically hoisting and installing pipeline and hoisting method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105344477A (en) * 2015-11-30 2016-02-24 东方菱日锅炉有限公司 Anode tube bundling hanger of wet electrostatic precipitator
CN105344477B (en) * 2015-11-30 2017-12-29 东方菱日锅炉有限公司 Wet cottrell anode tube does up suspension bracket
CN106495038A (en) * 2016-11-10 2017-03-15 广东省工业设备安装有限公司 A kind of super-high buildings multi-pipeline hoisting transportation dolly
CN106542435A (en) * 2016-11-24 2017-03-29 安徽新瑞重工股份有限公司 A kind of building water power pipeline transportation auxiliary device
CN108007425A (en) * 2018-01-29 2018-05-08 重庆建工集团股份有限公司 A kind of subway tunnel Two-staged technique measurement structure and measuring method
CN111362118A (en) * 2020-05-11 2020-07-03 成都建工第四建筑工程有限公司 Tool for vertically hoisting and installing pipeline and hoisting method thereof

Similar Documents

Publication Publication Date Title
CN202296828U (en) Vertical hoisting tool of shaft pipeline
WO2005123566A3 (en) Hoisting crane and offshore vessel
JP2010116231A (en) Renewal method of hydraulic elevator, and rope type elevator renewed by the method
CN102491204A (en) Auxiliary jib lifting device of crawler crane and crane comprising auxiliary jib lifting device
CN102963817B (en) Tailing force-free large equipment hoisting vertical tail removal method
CN206634900U (en) A kind of tracting structure of villa elevator
CN202279654U (en) Pulley system for auxiliary winch of rotary drilling rig
CN202829361U (en) Small-size hoisting machine
CN202429938U (en) Winding drum for bridge crane
CN202245861U (en) Device capable of integrally elevating ultrahigh large-span heavy-duty steel vestibule
CN204265339U (en) A kind of can be spacing revolution ceiling crab
JP4802844B2 (en) Elevator equipment
CN202163576U (en) Antifriction device for pull and placement of multi-strand different-directional steel wire rope set
CN210064874U (en) Mine hoist
CN202575694U (en) Arc surface type equipment hoisting tool
CN202518908U (en) Steel wire rope traction system
CN202369250U (en) Hosting tool for oil barrel
CN201694777U (en) Self hoisting device of hydraulic turbine volute
CN202449728U (en) Double-pulley lifting hook device of gantry crane
CN201914876U (en) Heavy-duty steel wire rope winding drum
CN205035011U (en) Mine winch
CN104909293B (en) A kind of mobile warping winch
CN205684706U (en) Ladle turret lifting structure
CN201354297Y (en) Hanger for hoisting mill housing
CN205222461U (en) Platykurtic plays to rise lifting hook group

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CCEED INDUSTRIAL EQUIPMENT INSTALLATION CO., LTD.

Free format text: FORMER NAME: CHINA CONSTRUCTION INDUSTRIAL EQUIPMENT INSTALLATION CO., LTD.

CP03 Change of name, title or address

Address after: Yaohuamen Yao Jia Lu Qixia District of Nanjing City, Jiangsu Province, No. 9 210046

Patentee after: China Construction Industrial Equipment Installation Co., Ltd.

Address before: 210000 Yao Road, Qixia District, Jiangsu City, Nanjing Province

Patentee before: China Construction Industrial Equipment Installation Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20191026

CF01 Termination of patent right due to non-payment of annual fee