CN202518908U - Steel wire rope traction system - Google Patents

Steel wire rope traction system Download PDF

Info

Publication number
CN202518908U
CN202518908U CN2012201907830U CN201220190783U CN202518908U CN 202518908 U CN202518908 U CN 202518908U CN 2012201907830 U CN2012201907830 U CN 2012201907830U CN 201220190783 U CN201220190783 U CN 201220190783U CN 202518908 U CN202518908 U CN 202518908U
Authority
CN
China
Prior art keywords
supporting plate
support plate
steel wire
wire rope
steel rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201907830U
Other languages
Chinese (zh)
Inventor
黄仕安
李文良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha strong mechanical and Electrical Technology Co., Ltd.
Original Assignee
黄仕安
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 黄仕安 filed Critical 黄仕安
Priority to CN2012201907830U priority Critical patent/CN202518908U/en
Application granted granted Critical
Publication of CN202518908U publication Critical patent/CN202518908U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a steel wire rope traction system which comprises a winch device, a steel wire rope drawn by the winch device, a support plate lifted along a stand, and a pulley block arranged on the stand, wherein the steel wire rope is fixed with two ends of the support plate and is guided by the pulley block. The steel wire rope traction device is characterized in that when the steel wire rope draws the support plate and is fixedly connected with two ends of the support plate, no matter which end of the support plate encounters the resistance, the steel wire rope applies the drawing force to the end without acting on the other end of the support plate, as long as the resistance of the end is encountered, the drawing force acts on the other end, and therefore, balance stresses on two ends of the support plate can be always kept, and the support plate can reliably operate during lifting.

Description

A kind of rope traction system
Technical field
The utility model belongs to tractor equipment, is specifically related to a kind of rope traction system.
Background technology
Usually use the rope traction system when promoting object.Fig. 1 shows a kind of rope traction system that is used on the plastering machine; Comprise winding plant 1, steel rope 3 and assembly pulley; Assembly pulley is made up of two pulleys 5,8 that are located at lower sheave 2 and three top sheaves 4,6,7 on the frame and be located on the supporting plate 10 that carries weight; Wherein establish a lower sheave 2 and two top sheaves 4,6 in the same side of frame; Establish a top sheave 7 at the opposite side of frame, pulley 5,8 is established at the two ends of supporting plate 10 respectively, and steel rope 3 is by winding plant 1 traction; Through lower sheave 2, with the pulley 8 of the top sheave 7 of the top sheave 6 of the pulley 5 of the top sheave 4 of lower sheave 2 homonymies, supporting plate one end, another and lower sheave homonymy, opposite side, the supporting plate other end after, its tail end 9 is fixed on the frame.The deficiency of this rope traction system is, if one end meets with obstruction when promoting supporting plate, steel rope acts on the not interrupted other end of supporting plate through the pulley of this end with tractive force, causes the two ends of bearing plate overbalance and is stuck.
The utility model content
The purpose of the utility model provides and a kind ofly can effectively prevent to promote the unbalanced rope traction of object system.
The technical scheme that realizes the employing of the utility model purpose is following:
The rope traction system comprises the supporting plate of the carrying weight of establishing winding plant, going up and down by the steel rope of winding plant traction, along frame and is located at the assembly pulley on the frame; Said steel rope and two ends of bearing plate are fixed, and are led by assembly pulley.
Said assembly pulley comprises the 3rd lower sheave, first top sheave that is located at the upper rack both sides and second top sheave of first lower sheave, second lower sheave and the opposite side that are located at frame bottom one side, and said steel rope passes through said first lower sheave, first top sheave successively, fixes after the other end of second lower sheave, the 3rd lower sheave, second top sheave and supporting plate is fixed with supporting plate one end.
After latching device and the supporting plate of said steel rope through being located at supporting plate one end is fixing, again to the 2nd lower sheave.
The characteristics of the utility model are that steel rope is when the traction supporting plate; Captive joint with the two ends of supporting plate simultaneously, no matter that end of supporting plate meets obstructions, steel rope only can act on this end with tractive force; And can not act on the other end of supporting plate; Have only behind the resistance that overcomes this end just can act on the other end, can remain the force balance of two ends of bearing plate like this, guarantee supporting plate reliability service when going up and down.The jacking system of material and bench board on the utility model tailored powder wall telephone also is fit to various jacking systems simultaneously.
Further specify the technical scheme of the utility model below in conjunction with accompanying drawing.
Description of drawings
Fig. 1 is the scheme drawing of existing rope traction system.
Fig. 2 is the scheme drawing of the utility model.
Fig. 3 is the jacking system scheme drawing that adopts the utility model.
Fig. 4 is the latching device scheme drawing in the utility model.
Fig. 5 is a latching device scheme drawing different in the utility model.
Fig. 6 is the joint scheme drawing of steel rope in the utility model.
The specific embodiment
Referring to Fig. 2, Fig. 3, the rope traction system of the utility model comprises the supporting plate 10 of the winding plant 1 of frame 14 bottoms that are located at jacking system, the carrying weight that goes up and down by the steel rope 3 of winding plant 1 traction, along frame 14 and is located at the assembly pulley on the frame 14; The two ends of supporting plate 10 are enclosed within on the column of frame 14 through sleeve pipe 16,17, and its middle sleeve 16 is provided with the latching device 13 with steel rope locking, and sleeve pipe 17 is provided with and hangs piece 15; Said assembly pulley comprise first lower sheave 2, second lower sheave 11 and the opposite side that are located at frame 14 bottoms one side the 3rd lower sheave 12, be located at first top sheave 4 and second top sheave 7 of both sides, frame 14 top; Said steel rope 3 passes through said first lower sheave 2, first top sheave 4 successively, then through the latching device on the supporting plate 10 1 end sleeve pipes 16 13 and supporting plate 10 fixing backs to second lower sheave 11, fix through the sleeve pipe 17 of the 3rd lower sheave 12, second top sheave 7 back and supporting plate 10 other ends again.
For some jacking system, winding plant not necessarily is located on the frame, can be provided with separately.
Latching device 13 is as shown in Figure 4, comprise the protruding axle 131 that is fixed on the supporting plate sleeve pipe 16 and with protruding axle 16 cooresponding support plates 133, on support plate 133, be provided with binding bolt 134, the end of binding bolt 134 is provided with pressing plate 132.Steel rope 3 twines protruding axle 131 1 circle back formation and knots; Tightening adjusting binding bolt 134 makes pressing plate 132 be pressed in the steel rope 3 on the protruding axle 131; Can supporting plate 10 be fixed on the steel rope 3 locking that knots; Unclamp binding bolt, can loosen steel rope 3, regulate the fixed position of supporting plate 10 on steel rope 3.
Latching device 13 can also adopt other form, and is as shown in Figure 5, comprises the body 135 that is fixed on the supporting plate sleeve pipe 16, is located at the binding bolt 134 on the body 135; Steel rope 3 passes body 135; Tighten adjusting binding bolt 134 bolt is pressed on the steel rope 3, can steel rope 3 be locked on body 135, unclamp binding bolt 134; Can loosen steel rope 3, regulate the fixed position of supporting plate 10 on steel rope 3.
Steel rope 3 and supporting plate sleeve pipe 17 to captive joint mode as shown in Figure 6, the tail end of steel rope 3 is a ring-type joint 301, steel rope 3 is fixed on hanging on the piece 15 on the sleeve pipe 17 through joint 301.
During work, the starting winding plant, with the mainframe box certain altitude of slinging, steel rope is the tension balance automatically, and locking knots again, just can begin descending operation.

Claims (3)

1. rope traction system, the supporting plate of the carrying weight that comprise winding plant, goes up and down and be located at the assembly pulley on the frame by the steel rope of winding plant traction, along frame; It is characterized in that said steel rope and two ends of bearing plate fix, lead by assembly pulley.
2. rope traction according to claim 1 system; It is characterized in that said assembly pulley comprises the 3rd lower sheave, first top sheave that is located at the upper rack both sides and second top sheave of first lower sheave, second lower sheave and the opposite side that are located at frame bottom one side, said steel rope passes through said first lower sheave, first top sheave successively, fixes after the other end of second lower sheave, the 3rd lower sheave, second top sheave and supporting plate is fixed with supporting plate one end.
3. rope traction according to claim 2 system, it is characterized in that latching device and the supporting plate of said steel rope through being located at supporting plate one end is fixing after, again to the 2nd lower sheave.
CN2012201907830U 2012-05-02 2012-05-02 Steel wire rope traction system Expired - Fee Related CN202518908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201907830U CN202518908U (en) 2012-05-02 2012-05-02 Steel wire rope traction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201907830U CN202518908U (en) 2012-05-02 2012-05-02 Steel wire rope traction system

Publications (1)

Publication Number Publication Date
CN202518908U true CN202518908U (en) 2012-11-07

Family

ID=47101869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201907830U Expired - Fee Related CN202518908U (en) 2012-05-02 2012-05-02 Steel wire rope traction system

Country Status (1)

Country Link
CN (1) CN202518908U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111267144A (en) * 2020-03-03 2020-06-12 广东博智林机器人有限公司 Self-balancing transport mechanism and battery replacing robot
CN111749451A (en) * 2020-06-30 2020-10-09 中冶(上海)钢结构科技有限公司 Method for installing lower suspended steel structure by hoisting basket of winch

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111267144A (en) * 2020-03-03 2020-06-12 广东博智林机器人有限公司 Self-balancing transport mechanism and battery replacing robot
CN111749451A (en) * 2020-06-30 2020-10-09 中冶(上海)钢结构科技有限公司 Method for installing lower suspended steel structure by hoisting basket of winch

Similar Documents

Publication Publication Date Title
CN203998697U (en) Movable type gantry mast-up
CN202231327U (en) Heavy component hoisting tool in electrical cabinet
CN202518908U (en) Steel wire rope traction system
CN102992203B (en) Simple hoisting device for steel structure bridge installation
CN204265331U (en) A kind of fuel line hanger
CN106957012A (en) A kind of intelligent weighing Lift-on/Lift-off System
CN202390074U (en) Gantry hook
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN201553586U (en) Forklift auxiliary boom
CN204150945U (en) Track clamper and arc orbit rail clamping device
CN203461720U (en) Simple cantilever hoisting machine
CN202967922U (en) Simple hoisting device for mounting steel structural bridge
CN203529710U (en) Special device for hoisting cable reel
CN201756422U (en) Two-head-suspension tower crane
CN203229308U (en) Ultra-long tubular hanger
CN205023787U (en) Electric power hoist and mount are from locking fixed pulley
CN203306950U (en) Detachable heavy portal frame
CN102992183A (en) Marine 15-ton lifting hook group
CN203451045U (en) Multi-purpose self-balancing lifting beam
CN203033656U (en) Marine 800t lifting hook group
CN202897773U (en) Combined balance beam
CN207658929U (en) A kind of transfer structure for SRC beams hanging device
CN201961955U (en) Dual C-shaped lifting sling for rolling plate
CN204823686U (en) A couple for lifting by crane culvert pipe
CN203021173U (en) Marine 15-ton lifting hook set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHANGSHA SHIQIANG ELECTROMECHANICAL TECHNOLOGY CO.

Free format text: FORMER OWNER: HUANG SHIAN

Effective date: 20121213

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 410000 CHANGSHA, HUNAN PROVINCE TO: 410008 CHANGSHA, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121213

Address after: 410008 Hunan province Changsha Kaifu District, built Hunan Road No. 421 light salt building room 407

Patentee after: Changsha strong mechanical and Electrical Technology Co., Ltd.

Address before: 410000, room 1, 1102 Yuan Yuan Garden, 236 Hengda Road, Hunan, Changsha

Patentee before: Huang Shian

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20160502