CN111749451A - Method for installing lower suspended steel structure by hoisting basket of winch - Google Patents

Method for installing lower suspended steel structure by hoisting basket of winch Download PDF

Info

Publication number
CN111749451A
CN111749451A CN202010616683.9A CN202010616683A CN111749451A CN 111749451 A CN111749451 A CN 111749451A CN 202010616683 A CN202010616683 A CN 202010616683A CN 111749451 A CN111749451 A CN 111749451A
Authority
CN
China
Prior art keywords
hanging basket
steel wire
wire rope
pulley block
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010616683.9A
Other languages
Chinese (zh)
Inventor
王军
刘明路
何月峰
邱顶宏
蒋国明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Shanghai Steel Structure Technology Co Ltd
Original Assignee
MCC Shanghai Steel Structure Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shanghai Steel Structure Technology Co Ltd filed Critical MCC Shanghai Steel Structure Technology Co Ltd
Priority to CN202010616683.9A priority Critical patent/CN111749451A/en
Publication of CN111749451A publication Critical patent/CN111749451A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Abstract

The invention relates to a method for installing a lower suspended steel structure by pulling a hanging basket through a winch; comprises a hanging basket (1), a hoisting device (2), a pulley block (3), a traction steel wire rope (4) and hanging basket limiting steel bars (5); the method is characterized by further comprising the following steps: the pulley block (3) is stably and firmly connected with the finished structure, and the hanging basket (1) and the traction steel wire rope (4) are limited through hanging basket limiting steel bars (5); the hanging basket (1) driven by the hoisting equipment (2), driven by the pulley block (3) and pulled by the traction steel wire rope (4) moves, so that the purpose of operating the suspended steel structure is realized. The invention provides an operation mode of an aerial work hanging basket, which utilizes the traction effect of a hoisting device to finish the aerial movement of the aerial work hanging basket, reduces the aerial movement risk of operating personnel, improves the work efficiency of aerial work, saves temporary measures such as construction walkways and the like.

Description

Method for installing lower suspended steel structure by hoisting basket of winch
Technical Field
The invention relates to the field of construction of high-altitude steel structures, in particular to a method for installing a lower suspended steel structure by pulling a hanging basket through a winch.
Background
The operation hanging basket/cage is one of the most common operation platforms in steel structure high altitude, and has the characteristics of simple manufacture, convenient operation, strong practicability and the like. But when needing to adjust the hanging flower basket position among the steel construction installation, carry out high altitude level and vertical adjustment through the human action usually, such mode is wasted time and energy and there is the big problem of high altitude construction safety risk. In addition, the installation work of the lower suspended steel structure, in particular to the overhead corridor structure, the cantilever structure and the hanging structure at the lower part of the main structure of the large-span factory building, relates to a large amount of overhead work. In such cases, the use of baskets is the only but high-risk method.
Disclosure of Invention
The invention aims to overcome the defects and provides a method for performing suspended steel structure construction operation through a hanging basket, which is convenient and safe to operate.
In order to achieve the above object, the present invention is realized by:
a method for installing a lower suspended steel structure by pulling a hanging basket through a winch comprises the hanging basket, a winch device, a pulley block, a pulling steel wire rope, hanging basket limiting steel bars and a standby lifting rope; also comprises the following steps:
step 1, stably and firmly connecting a pulley block with a finished structure, arranging a special person for synchronous switch operation on a hoisting device, and limiting a hanging basket and a traction steel wire rope through hanging basket limiting steel bars;
step 2, arranging a spare lifting rope at the same time of the hanging basket, and firmly binding two ends of the spare lifting rope at two ends of the finished structure;
step 3, adjusting the length of the standby lifting rope, wherein the standby lifting rope is not stressed when the traction steel wire rope works normally, and the standby lifting rope is stressed to play a protective role when the traction steel wire rope is broken due to external force or damage, so that the hanging basket is prevented from falling;
step 4, arranging a life line on the main structure above the hanging basket, and hanging a safety rope when personnel enter the hanging basket for operation so as to form double protection;
and 5, serially connecting the hanging baskets through the hoisting equipment, the pulley block and the traction steel wire rope to form a hanging basket moving mode driven by the hoisting equipment, driven by the pulley block and pulled by the traction steel wire rope, so that the aim of operating the lower suspended steel structure is fulfilled.
The invention provides an operation mode of an aerial work hanging basket, which is characterized in that the traditional hanging basket, a hoisting device and a directional pulley block form a whole, the aerial movement of the work hanging basket is completed by utilizing the traction effect of the hoisting device, the aerial movement risk of operators is reduced, the aerial work efficiency is improved, and temporary measures such as construction walkways and the like are saved.
Drawings
FIG. 1 is a first schematic diagram of the operation of the method.
FIG. 2 is a second schematic diagram of the operation of the present method.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1 and 2, a method for installing a lower suspended steel structure by pulling a basket through a winch comprises a basket 1, a hoisting device 2, a pulley block 3, a pulling steel wire rope 4, basket limiting steel bars 5 and a spare lifting rope 6; also comprises the following steps:
step 1, stably and firmly connecting a pulley block 3 with a finished structure, arranging a specially-assigned person for synchronous switching operation on a hoisting device 2, and limiting a hanging basket 1 and a traction steel wire rope 4 through hanging basket limiting steel bars 5;
step 2, the hanging basket 1 is simultaneously provided with a standby lifting rope 6, and two ends of the standby lifting rope 6 are firmly bound to two ends of the finished structure;
step 3, adjusting the length of the standby lifting rope, wherein the standby lifting rope is not stressed when the traction steel wire rope works normally, and the standby lifting rope is stressed to play a protective role when the traction steel wire rope is broken due to external force or damage, so that the hanging basket 1 is prevented from falling;
step 4, arranging a life line on the main structure above the hanging basket 1, and hanging a safety rope when a person enters the hanging basket 1 for operation so as to form double protection;
and 5, serially connecting the hanging basket 1 through the hoisting equipment 2, the pulley block 3 and the traction steel wire rope 4 to form a mode that the hanging basket 1 driven by the hoisting equipment 2, driven by the pulley block 3 and pulled by the traction steel wire rope 4 moves, thereby realizing the purpose of operating the lower suspended steel structure.
The invention provides an operation mode of an aerial work hanging basket, which is characterized in that the traditional hanging basket, a hoisting device and a directional pulley block form a whole, the aerial movement of the work hanging basket is completed by utilizing the traction effect of the hoisting device, the aerial movement risk of operators is reduced, the aerial work efficiency is improved, and temporary measures such as construction walkways and the like are saved.

Claims (1)

1. A method for installing a lower suspended steel structure by pulling a hanging basket through a winch comprises the hanging basket (1), a hoisting device (2), a pulley block (3), a traction steel wire rope (4), hanging basket limiting steel bars (5) and a standby lifting rope (6); the method is characterized by further comprising the following steps:
step 1, stably and firmly connecting a pulley block (3) with a finished structure, arranging a specially-assigned person for synchronous switching operation on a hoisting device (2), and limiting a hanging basket (1) and a traction steel wire rope (4) through hanging basket limiting steel bars (5);
step 2, arranging a spare lifting rope (6) at the same time on the hanging basket (1), and firmly binding two ends of the spare lifting rope (6) at two ends of the finished structure;
step 3, adjusting the length of the standby lifting rope, wherein the standby lifting rope is not stressed when the traction steel wire rope works normally, and the standby lifting rope is stressed to play a protective role when the traction steel wire rope is broken due to external force or damage, so that the hanging basket (1) is prevented from falling;
step 4, arranging a life line on a main structure above the hanging basket (1), and hanging a safety rope when a person enters the hanging basket (1) for operation so as to form double protection;
and 5, serially connecting the hanging baskets (1) through the hoisting equipment (2), the pulley block (3) and the traction steel wire rope (4), so that the hanging baskets (1) driven by the hoisting equipment (2), transmitted by the pulley block (3) and pulled by the traction steel wire rope (4) move, and the purpose of operating the lower suspended steel structure is achieved.
CN202010616683.9A 2020-06-30 2020-06-30 Method for installing lower suspended steel structure by hoisting basket of winch Pending CN111749451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010616683.9A CN111749451A (en) 2020-06-30 2020-06-30 Method for installing lower suspended steel structure by hoisting basket of winch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010616683.9A CN111749451A (en) 2020-06-30 2020-06-30 Method for installing lower suspended steel structure by hoisting basket of winch

Publications (1)

Publication Number Publication Date
CN111749451A true CN111749451A (en) 2020-10-09

Family

ID=72678328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010616683.9A Pending CN111749451A (en) 2020-06-30 2020-06-30 Method for installing lower suspended steel structure by hoisting basket of winch

Country Status (1)

Country Link
CN (1) CN111749451A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030159884A1 (en) * 2002-02-22 2003-08-28 Cole Michael J. Movable scaffold and method for painting cylindrical tank
CN202518908U (en) * 2012-05-02 2012-11-07 黄仕安 Steel wire rope traction system
CN203755638U (en) * 2014-01-26 2014-08-06 中铁建工集团有限公司 Suspending slippage type high-altitude inverted oblique plane operation hanging basket
CN204301973U (en) * 2014-09-18 2015-04-29 河南省中能建筑工程质量检测有限公司 Cradle safety lock checkout gear
CN105298103A (en) * 2015-10-09 2016-02-03 宁波建乐建筑装潢有限公司 Outwards-inclining hanging basket construction device
CN106836109A (en) * 2017-03-14 2017-06-13 辽宁华三建设工程技术有限公司 A kind of hanging building foot guard repairing treatment suspension platform device
CN109372243A (en) * 2018-11-20 2019-02-22 中国三冶集团有限公司 A kind of hanging basket system for the installation of steel construction metal Roof bottom plate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030159884A1 (en) * 2002-02-22 2003-08-28 Cole Michael J. Movable scaffold and method for painting cylindrical tank
CN202518908U (en) * 2012-05-02 2012-11-07 黄仕安 Steel wire rope traction system
CN203755638U (en) * 2014-01-26 2014-08-06 中铁建工集团有限公司 Suspending slippage type high-altitude inverted oblique plane operation hanging basket
CN204301973U (en) * 2014-09-18 2015-04-29 河南省中能建筑工程质量检测有限公司 Cradle safety lock checkout gear
CN105298103A (en) * 2015-10-09 2016-02-03 宁波建乐建筑装潢有限公司 Outwards-inclining hanging basket construction device
CN106836109A (en) * 2017-03-14 2017-06-13 辽宁华三建设工程技术有限公司 A kind of hanging building foot guard repairing treatment suspension platform device
CN109372243A (en) * 2018-11-20 2019-02-22 中国三冶集团有限公司 A kind of hanging basket system for the installation of steel construction metal Roof bottom plate

Similar Documents

Publication Publication Date Title
CN109173113A (en) Falling proof device and its hanging method based on unmanned plane suspension
CN110228743B (en) Overhead two-to-one suspension ratio construction elevator for elevator shaft traction and operation method thereof
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN101413291B (en) Accumulation mounting method for cable sky dome tower frame raising cable rod
CN209052240U (en) A kind of tool for super high-rise building duplex elevator vertical transport
CN204454140U (en) A kind of Pop-up falling proof device of lifting means
CN201040150Y (en) High building emergency escaping rescue device
CN203699606U (en) Lifter and iron tower
CN105226560B (en) A kind of crossing frame and its construction method
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN104973544A (en) Movable type single lifting basket
CN107724661B (en) Shear force wall well structure construction can hang formula of moving automatic rising platform
CN111749451A (en) Method for installing lower suspended steel structure by hoisting basket of winch
CN201132717Y (en) Single-column and single-cage elevator driven by drawing
CN201460186U (en) Adhesive lifting scaffold
CN203247829U (en) Movable slope construction platform for working at heights
CN101934994A (en) Building high-altitude vertical hoisting double-guide cable system and assisting method
CN201793342U (en) Double guide cable system for overhead vertical lifting of building
CN215331383U (en) Hanging basket structure for high-rise building construction
CN212174337U (en) A safe hanging flower basket for construction of industrial factory building steel construction
CN101672101A (en) One-drive multi-hoisting-point hoisting system
CN202897743U (en) Manual releasing device of building hoist
CN202201605U (en) Escape elevator used in high-rise building
CN208830688U (en) External wall of high-rise building maintenance device
CN208120503U (en) Intelligent easy broken rod goes up and down navigational lighting aid Tower System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201009

RJ01 Rejection of invention patent application after publication