CN202897743U - Manual releasing device of building hoist - Google Patents

Manual releasing device of building hoist Download PDF

Info

Publication number
CN202897743U
CN202897743U CN2012205380056U CN201220538005U CN202897743U CN 202897743 U CN202897743 U CN 202897743U CN 2012205380056 U CN2012205380056 U CN 2012205380056U CN 201220538005 U CN201220538005 U CN 201220538005U CN 202897743 U CN202897743 U CN 202897743U
Authority
CN
China
Prior art keywords
group
motor
steel rope
sheave
building hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012205380056U
Other languages
Chinese (zh)
Inventor
刘跃进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jinglong Engineering Machinery Co Ltd
Original Assignee
Guangzhou Jinglong Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jinglong Engineering Machinery Co Ltd filed Critical Guangzhou Jinglong Engineering Machinery Co Ltd
Priority to CN2012205380056U priority Critical patent/CN202897743U/en
Application granted granted Critical
Publication of CN202897743U publication Critical patent/CN202897743U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/0087Devices facilitating maintenance, repair or inspection tasks

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Disclosed is a manual releasing device of a building hoist. The building hoist comprises a hanging cage, a transmission trolley and more than one motor, wherein the motors are installed on the transmission trolley which is connected with the hanging cage through a connection rod. A brake device is placed inside each motor and comprises a pulling rod which extends out of each motor. The manual releasing device comprises an upper fixing piece group, a pipe turning group and a rod moving group, wherein the upper fixing piece group is fixed on one side of the transmission trolley, the pipe turning group is installed on the connection rod, and the rod moving group is installed inside the hanging cage. A steel wire rope is placed between and connected with the rod moving group and the pulling rod of the brake device of each motor. The steel wire rope penetrates through the pipe turning group and the upper fixing piece group in sequence. When the hanging cage is broken down, a builder can manually release brake of motor sets of the hanging cage under a safety situation, so that the accidents are reduced.

Description

The building hoist hand release
Technical field
The utility model relates to building hoist, and especially construction lifter motor is in when outage, controls manually in cage that elevator drop to lower one deck or to the hand release on ground.
Background technology
High speed development along with national economy, the vehicle for constructions such as building hoist begin bringing into play huge effect at increasing building field, especially for large-engineering, skyscraper place, the use of the vehicle for constructions such as building hoist seem particularly important. because they can be boosted productivity and economize labor time greatly.Yet. along with more and more extensive, a large amount of use of vehicle for construction, contingency also is accompanied by more frequently and occurs, and the safe in operation problem also more and more receives the concern of each side.
In vehicle for construction such as building hoist, no matter be the building hoist of what type, its driving system all is to unite use (only having the design of separate unit motor fewer and feweri from the angle of safety) by the motor more than at least one (drg) usually, drives elevator craning cage and moves up and down.And vehicle for construction something unexpected happened or accident definitely can hardly be avoided in use, cause the building site to have a power failure such as the damage of building-site electrical generator, perhaps vehicle for construction generation damage of components, perhaps certain electric component has burnt out etc., all may so that the vehicle for construction cut moves, then may hang in the air such as building hoist.The manual releasing function that just need to use electromotor brake by trained professional operating personal this time so to perch or ground, such as building hoist, then needs the slow let-down of goods with the slow let-down of elevator craning cage to perch.
Domestic general vehicle for construction such as several electromotor brakes on the building hoist all are to separate individual components now, need several individuals simultaneously brake to be unclamped, perhaps brake is backed down and is fixed on release position one by one, until last brake slowly discharges decline by operating personal.Here there are several problems, first, operating personal must be climbed to motor (drg) next door and operate, if vehicle for construction is at high empty position, to be the process of a danger so, and in the position operation of high-altitude danger, must increase operator's psychological pressure, cause misoperation to occur easily; The second, operate simultaneously the release brake by several individuals, this situation at first not necessarily by chance has several operating personals through training on the scene at the contingency scene, even if having, usually also do not have enough operational spaces by the motor of vehicle for construction; The 3rd, by an operating personal will brake back down one by one fixing, there is very large potential safety hazard in this method, because at first must guarantee after process is moved for a long time, the separate unit drg still has enough lock torques can brake load, be difficult in addition guarantee that every electromotor brake does not all have fault, if by chance last electromotor brake has fault, then safety misadventure can occur.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of building hoist hand release, behind the cage et out of order, the workmen can be in the situation of safety the brake of manual release cage motor group, the minimizing accident occurs.
For solving the problems of the technologies described above, the technical solution of the utility model is: a kind of building hoist hand release, described building hoist comprises cage, transmission dolly and more than one motor, described motor is installed on the described transmission dolly, described transmission dolly is connected with described cage by pipe link, be provided with drg in the described motor, described drg comprises pull bar, and described pull bar stretches out outside the motor; Described hand release comprises the upper fixing element group that is fixed on described transmission dolly one side, be installed in the tube group on the described pipe link and be installed in moving rod group in the described cage, be provided with steel rope between the pull bar of described moving rod group and the drg of described motor and be connected, described steel rope passes through described tube group and upper fixing element group successively.The utility model principle of work: when building hoist breaks down need to carry out the manual releasing cage time, in cage, move the moving rod group, moving rod rotates the pulling steel rope, steel rope after tube group turnover through the upper fixing element group, steel rope connects motor and discharges pull bar, spur domestic motor afterbody motor and discharge pull bar, motor is discharged move downward.
As improvement, be provided with the adjust bar group between fixed part group and the described tube group, the upper end of described adjust bar group is connected with steel rope, and described upper steel rope is connected with the pull bar of the drg of described motor after through the upper fixing element group; The lower end of described adjust bar group is connected with lower steel rope, and described lower steel rope is connected with moving rod group on the described cage after through the tube group.
As improvement, fixed part group comprises support and the more than one sheave of being located on the support, the corresponding motor of each sheave, described upper steel rope connects with the steel wire that is connected of one or more by the rope plate, and described connection steel wire passes through behind the sheave to be connected with the pull bar of the drg of described motor.
As improvement, described adjust bar group comprises adjust bar and is located at the adjusting ear at described adjust bar two ends that the adjusting ear at two ends is connected with upper and lower steel rope respectively.
As improvement, described tube group comprises erecting frame, is fixed on the first sheave and the second sheave on the described erecting frame, and described the first sheave and described the second sheave are at right angles arranged, and be provided with rubber tire at the place, right angle.
The beneficial effect that the utility model compared with prior art brings is:
Can discharge simultaneously the drg of multiple electric motors by control moving rod group, behind the cage et out of order, the workmen can be in the situation of safety the brake of manual release cage motor group, the minimizing accident occurs;
The adjust bar group can be regulated the degree of tightness amount of steel rope, avoids brake cable relaxation to occur because used life is long.
Description of drawings
Fig. 1 is this cage front view.
Fig. 2 is the cage lateral plan.
Fig. 3 is the A place enlarged drawing of Fig. 2.
The specific embodiment
The utility model is described in further detail below in conjunction with Figure of description.
As shown in Figures 1 to 3, a kind of building hoist hand release, described building hoist comprise cage 1, transmission dolly 2 and two motors 7; Described motor 7 is domestic motor, and it is installed on the described transmission dolly 2, is provided with drg in the described motor 7, and described drg comprises pull bar 71, and described pull bar 71 stretches out outside the motor 7; Described transmission dolly 2 is connected with described cage 1 by pipe link 3.Described hand release comprises the upper fixing element group 4 that is fixed on described transmission dolly 2 one sides, be installed in the tube group 5 on the described pipe link 3 and be installed in moving rod group 11 in the described cage 1.Be provided with adjust bar group 6 between fixed part group 4 and the described tube group 5, described adjust bar group 6 comprises adjust bar and is located at the adjusting ear at described adjust bar two ends, the adjusting ear of described adjust bar group 6 upper ends is connected with steel rope 8, and described upper steel rope 8 is connected with the pull bar 71 of the drg of described motor 7 after through upper fixing element groups 4; The adjusting ear of described adjust bar group 6 lower ends is connected with lower steel rope 9, and described lower steel rope 9 is connected with moving rod group 11 on the described cage 1 after through tube groups 5.Fixed part group 4 comprises the support 41 that is fixed on the transmission dolly 2 and two sheaves 42 being located on the support 41, each sheave 42 corresponding motor 7, described upper steel rope 8 is connected steel wire 10 by rope plate 12 and connects with two, described connection steel wire 10 passes through sheave 42 and transfers after 90 ° and to be connected with the pull bar 71 of the drg of described motor 7.Described tube group 5 comprises the erecting frame 51 that is fixed on the pipe link 3, is fixed on the first sheave 52 and the second sheave 54 on the described erecting frame 51, and described the first sheave 52 is at right angles arranged with described the second sheave 54, and is provided with rubber tire 53 at the place, right angle; Lower steel rope 9 successively through the first sheave 52, rubber tire 53 and the sheave 54 of being connected be after 90 ° of turnovers be installed in cage 1 in moving rod group 11 be connected.
The utility model principle of work: when building hoist breaks down need to carry out manual releasing cage 1 time, in cage 1, move moving rod group 11, moving rod rotates the pulling steel rope, steel rope after tube group 5 turnover through upper fixing element group 4, steel rope connects motor and discharges pull bar 71, spur domestic motor afterbody motor and discharge pull bar 71, motor 7 is discharged move downward.

Claims (5)

1. building hoist hand release, described building hoist comprises cage, transmission dolly and more than one motor, described motor is installed on the described transmission dolly, described transmission dolly is connected with described cage by pipe link, be provided with drg in the described motor, described drg comprises pull bar, and described pull bar stretches out outside the motor; It is characterized in that: described hand release comprises the upper fixing element group that is fixed on described transmission dolly one side, be installed in the tube group on the described pipe link and be installed in moving rod group in the described cage, be provided with steel rope between the pull bar of described moving rod group and the drg of described motor and be connected, described steel rope passes through described tube group and upper fixing element group successively.
2. building hoist hand release according to claim 1, it is characterized in that: be provided with the adjust bar group between fixed part group and the described tube group, the upper end of described adjust bar group is connected with steel rope, and described upper steel rope is connected with the pull bar of the drg of described motor after through the upper fixing element group; The lower end of described adjust bar group is connected with lower steel rope, and described lower steel rope is connected with moving rod group on the described cage after through the tube group.
3. building hoist hand release according to claim 2, it is characterized in that: fixed part group comprises support and the more than one sheave of being located on the support, the corresponding motor of each sheave, described upper steel rope connects with the steel wire that is connected of one or more by the rope plate, and described connection steel wire passes through behind the sheave to be connected with the pull bar of the drg of described motor.
4. building hoist hand release according to claim 2 is characterized in that: described adjust bar group comprises adjust bar and is located at the adjusting ear at described adjust bar two ends that the adjusting ear at two ends is connected with upper and lower steel rope respectively.
5. building hoist hand release according to claim 2, it is characterized in that: described tube group comprises erecting frame, is fixed on the first sheave and the second sheave on the described erecting frame, described the first sheave and described the second sheave are at right angles arranged, and are provided with rubber tire at the place, right angle.
CN2012205380056U 2012-10-22 2012-10-22 Manual releasing device of building hoist Expired - Fee Related CN202897743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012205380056U CN202897743U (en) 2012-10-22 2012-10-22 Manual releasing device of building hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012205380056U CN202897743U (en) 2012-10-22 2012-10-22 Manual releasing device of building hoist

Publications (1)

Publication Number Publication Date
CN202897743U true CN202897743U (en) 2013-04-24

Family

ID=48118437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012205380056U Expired - Fee Related CN202897743U (en) 2012-10-22 2012-10-22 Manual releasing device of building hoist

Country Status (1)

Country Link
CN (1) CN202897743U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103935868A (en) * 2014-04-03 2014-07-23 上海宝达工程机械有限公司 Tower drum hoist
EP3153444A1 (en) * 2015-10-06 2017-04-12 KONE Corporation An elevator installation and a method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103935868A (en) * 2014-04-03 2014-07-23 上海宝达工程机械有限公司 Tower drum hoist
EP3153444A1 (en) * 2015-10-06 2017-04-12 KONE Corporation An elevator installation and a method

Similar Documents

Publication Publication Date Title
CN110228743A (en) Two-to-one suspension is set in elevator traction than building hoist and its operational method
CN104929404B (en) The all the period of time falling proof device of three-dimensional mechanical parking equipment
CN101936080A (en) Hydraulic rear arm lift-sliding type three-dimensional garage
CN201627353U (en) Pulley guide seat type attached lifting scaffold
CN202897743U (en) Manual releasing device of building hoist
CN102359263B (en) Automatic falling preventing device for integral lifting scaffold
CN210558726U (en) Elevator rope breakage detection protection device
CN204728789U (en) The all the period of time falling proof device of three-dimensional mechanical parking equipment
CN201817208U (en) Simple lifting machine
CN204958045U (en) Elevator electromagnetic braking device
CN103803420A (en) Overhead crane with electric hoist
CN203806896U (en) Whole-course safe device against slack rope
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN201882730U (en) Manual releasing and braking device of construction lifter
CN110668294B (en) Machine-room-less elevator dismantling method
CN202831604U (en) Anti-falling and anti-rolling guide unloading support
CN109814469B (en) Electric control device for attached lifting scaffold
CN201821035U (en) Foreign-matter electrical treatment device for four-bundle conductor of transmission line
CN105540440A (en) Monitoring device for hoisting of steel wire rope
CN206735688U (en) Gantry sampling system for coal at railway carriage sampling head elevating mechanism falling proof device
CN102040174B (en) Integral hoisting device and method for large-scale equipment and member
CN204778130U (en) Wire rope protection device that restricts absolutely
CN106129904B (en) Overhead transmission line automatic connection machine
CN202869259U (en) Furnace door falling prevention device
CN104790646B (en) Scaffold multi-spot balancing carrying power set and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20161022