CN209721349U - A kind of hanging apparatus of skyscraper air-conditioning waterpipe - Google Patents
A kind of hanging apparatus of skyscraper air-conditioning waterpipe Download PDFInfo
- Publication number
- CN209721349U CN209721349U CN201920280287.6U CN201920280287U CN209721349U CN 209721349 U CN209721349 U CN 209721349U CN 201920280287 U CN201920280287 U CN 201920280287U CN 209721349 U CN209721349 U CN 209721349U
- Authority
- CN
- China
- Prior art keywords
- wirerope
- elevator
- gin wheel
- lifting block
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of hanging apparatus of skyscraper air-conditioning waterpipe, including electrical hoist, the first fixed pulley, the second fixed pulley, lifting block, gin wheel, hanging structure and anti-wave wirerope;Lifting block is hung at the top in elevator by hanging structure, and gin wheel is set to the lower section of lifting block;Electrical hoist is fixedly arranged at first floor elevator hall, it is opposite between electrical hoist and elevator to be equipped with first fixed pulley and the second fixed pulley, there is the first reel and the second reel on electrical hoist, volume is equipped with the first wirerope on first reel, first wirerope enters in elevator around the first fixed pulley, and the top of gin wheel is relatively connected after the guide wheel on lifting block and gin wheel;Volume is equipped with the second wirerope on second reel, and the second wirerope enters in elevator around the second fixed pulley, and connect with gin wheel bottom end.Hanging apparatus described in the utility model can effectively improve the conevying efficiency of air-conditioning waterpipe.
Description
Technical field
The utility model relates to skyscraper air conditioner water Pipe installing equipment technical fields, build more particularly, to a kind of high level
Build the hanging apparatus of air-conditioning waterpipe.
Background technique
Skyscraper needs to be transported to each floor in electromechanical erection stage, a large amount of material, equipment, due to some projects by
It is limited in execution conditions, material, equipment can only be transported by the elevator in building and construction elevator, but for by elevator
The restriction in space, this kind of longer material of air-conditioning waterpipe are difficult to transport inconvenience by elevator traffic.
Utility model content
The purpose of this utility model is to provide a kind of hanging apparatus of skyscraper air-conditioning waterpipe.
To achieve the above object, the utility model provides the following technical solutions:
A kind of hanging apparatus of skyscraper air-conditioning waterpipe, including electrical hoist, the first fixed pulley, the second fixed cunning
Wheel, lifting block, gin wheel, hanging structure and anti-wave wirerope;The lifting block is hung at by hanging structure
Top in elevator, the gin wheel are set in elevator in the lower section of lifting block, and the bottom end of gin wheel is equipped with
Hook, to draw transport air-conditioning waterpipe;The electrical hoist is fixedly arranged at first floor elevator hall, electrical hoist with
It is opposite between elevator to be equipped with first fixed pulley and the second fixed pulley, there is the first reel and second on electrical hoist
Reel, volume is equipped with the first wirerope on the first reel, and the first wirerope enters in elevator around the first fixed pulley, and in elevator
The top of gin wheel is relatively connected after the guide wheel on lifting block and gin wheel, volume is equipped with the second steel on the second reel
Cord, the second wirerope enter in elevator around the second fixed pulley, and connect with gin wheel bottom end, for electrical hoist driving
When first spool turns are to wind the first wirerope, the second reel simultaneously constraint relief, gin wheel is in the first wirerope
Drive under relative to lifting block rise, the second wirerope be servo-actuated gin wheel the free rope stretching of rising, by gin wheel institute
For the air conditioner water pipeline transportation of traction to designated floor, and after air conditioner water pipeline, electrical hoist drives the second reel
When rotation is to wind the second wirerope, the first reel simultaneously constraint relief, gin wheel is under the drive of the second wirerope
Decline relative to lifting block, the first wirerope is servo-actuated the free rope stretching of decline of gin wheel, after transport air-conditioning waterpipe
Gin wheel return;The anti-wirerope that waves shares two, prevents for two waving the two sides that wirerope is relatively arranged on elevator,
When drawing transport air-conditioning waterpipe for gin wheel, traction rope is arranged between wirerope and air-conditioning waterpipe in anti-wave, to
Prevent air-conditioning waterpipe from swinging during drawing transport.
As the further technical solution of the utility model: the hanging structure includes two chain blocks, fixed wirerope
And connecting steel wire ropes, two chain blocks are relatively arranged on the top in elevator, are equipped on each chain block in top
Connection chain and it is equipped with the fixed wirerope in bottom end, chain block is connect by connection chain with elevator, the fixed steel
The connection of one end of cord and connecting steel wire ropes, the other end of connecting steel wire ropes and the top of lifting block connect, by lifting block
Hang the top set to elevator.
As the further technical solution of the utility model: the hanging apparatus includes leading block, and the leading block is set
It is placed in elevator, so that the first wirerope enters in elevator around the first fixed pulley, deviates, rise to lifting block around leading block
To guiding role, in order to which the first steel wire is relatively around lifting block and the guide wheel on gin wheel.
As the further technical solution of the utility model: the first wirerope and the second wirerope use diameter for 17.5mm's
Wirerope.
As the further technical solution of the utility model: fixed wirerope uses diameter for the wirerope of 17.5mm, connects
Wirerope uses diameter for the wirerope of 19.5mm.
Compared with prior art, the utility model has the beneficial effects that the utility model proposes a kind of skyscraper air-conditionings
The hanging apparatus of waterpipe can lift air-conditioning waterpipe by elevator, by air conditioner water pipeline transportation to designated floor,
Effectively improve the conevying efficiency of air-conditioning waterpipe.
Detailed description of the invention
Fig. 1 is the first schematic diagram of the hanging apparatus of skyscraper air-conditioning waterpipe.
Fig. 2 is the second schematic diagram of the hanging apparatus of skyscraper air-conditioning waterpipe.
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with attached drawing.It should be understood that herein
Described specific embodiment is only used for describing and explaining the present invention, the protection model being not intended to limit the utility model
It encloses.
Please refer to Fig. 1, Fig. 2, a kind of hanging apparatus of skyscraper air-conditioning waterpipe, by elevator to air-conditioning waterpipe
It is lifted, by air conditioner water pipeline transportation to designated floor;The hanging apparatus includes electrical hoist 10, the first fixed pulley
20, the second fixed pulley 30, lifting block 40, gin wheel 50, hanging structure 60 and anti-wirerope 70 is waved;The lifting is sliding
Vehicle 40 is hung at the top in elevator by hanging structure 60, and the gin wheel 50 is set in elevator in lifting block
The bottom end of 40 lower section, gin wheel 50 is equipped with hook 51, to draw transport air-conditioning waterpipe;The electrical hoist 10 is solid
Surely it is set to first floor elevator hall, it is opposite fixed equipped with first fixed pulley 20 and second between electrical hoist 10 and elevator
Pulley 30 has the first reel 11 and the second reel 12 on electrical hoist 10, and volume is equipped with the first steel wire on the first reel 11
Rope 111, the first wirerope 111 enters in elevator around the first fixed pulley 20, and in elevator relatively around lifting block 40 with
After guide wheel on gin wheel 50 connect gin wheel 50 top, for electrical hoist 10 drive the first reel 11 rotation with
When winding the first wirerope 111, gin wheel 50 rises under the drive of the first wirerope 111 relative to lifting block 40, from
And the air conditioner water pipeline transportation for being drawn gin wheel 50 is to designated floor;Volume is equipped with the second wirerope on second reel 12
121, the second wirerope 121 enters in elevator around the second fixed pulley 30, and connect with 50 bottom end of gin wheel, for electronic elevator
When machine 10 drives the rotation of the second reel 12 to wind the second wirerope 121, gin wheel 50 is under the drive of the second wirerope 121
Decline relative to lifting block 40, thus by 50 return of gin wheel after transport air-conditioning waterpipe;It is described to prevent waving wirerope
70 share two, prevent for two waving the two sides that wirerope 70 is relatively arranged on elevator, so that gin wheel 50 draws transport sky
It is anti-to wave setting traction rope 71 between wirerope 70 and air-conditioning waterpipe when water transfer pipeline, to prevent air-conditioning waterpipe from leading
It is swung during drawing transport.
Further, the hanging structure 60 includes two chain blocks 61, fixed wirerope 62 and connecting steel wire ropes
63, two chain blocks 61 are relatively arranged on the top in elevator, are equipped with connection chain 64 in top on each chain block 61
And it is equipped with the fixed wirerope 62 in bottom end, chain block 61 is connect by connection chain 64 with elevator, the fixed steel
Cord 62 is connect with one end of connecting steel wire ropes 63, and the other end of connecting steel wire ropes 63 is connect with the top of lifting block 40, from
And lifting block 40 is hung to the top set to elevator.
Further, the hanging apparatus includes leading block 80, and the leading block 80 is set in elevator, for
First wirerope 111 enters in elevator around the first fixed pulley 20, deviates around leading block 80 to lifting block 40, plays guiding and make
With in order to which the first steel wire is relatively around lifting block 40 and the guide wheel on gin wheel 50.
Further, the first wirerope 111, the second wirerope 121 and fixed wirerope 62 preferably use diameter for
The wirerope of 17.5mm, connecting steel wire ropes 63 preferably use diameter for the wirerope of 19.5mm.
A kind of application method of the hanging apparatus of skyscraper air-conditioning waterpipe of the utility model is as follows: to need to lift
Air-conditioning waterpipe is transported to first floor elevator hall by fork truck, carries out department's rope to air-conditioning waterpipe, and air-conditioning waterpipe is hung with dragline
It is suspended on gin wheel 50.Air conditioner water pipe ends bundle traction rope 71, and traction rope 71 is anchored to elevator inner wall with shackle
The anti-of two sides waves wirerope 70.After confirmation air-conditioning waterpipe has been tightened securely, elevator is notified with intercom by lifting commander
Machine operator is in place, and is lifted by crane, and drives the rotation of the first reel 11 to wind the first wirerope by electrical hoist 10
111, gin wheel 50 rises under the drive of the first wirerope 111 relative to lifting block 40, and gin wheel 50 is drawn
Air conditioner water pipeline transportation, allow 12 constraint relief of the second reel at the same time, the second wirerope 121 is servo-actuated the upper of gin wheel 50
Free rope stretching is risen, lifting process will guarantee that air-conditioning waterpipe is steady.Tubing vacantly sling to about 20cm, check Lift-on/Lift-off System whether there is or not
It is abnormal.After without exception, continue raising, after air-conditioning waterpipe will rise to designated floor, by floor lifting commander's use pair
The machine of saying notifies 10 operator's slow-down of electrical hoist, when tubing reaches designated floor, positioned at the lifting of designated floor
With bottle gouard moved by hands, by air-conditioning waterpipe, the elevator shaft mouth into floor is drawn worker, and air-conditioning waterpipe is slowly dropped to manual fork
Che Shang is further continued for hand fork lifter that air conditioner water pipeline transportation is in place to designated position, completion transport.Air conditioner water lifting pipeline is complete
Bi Hou, when driving the rotation of the second reel 12 by electrical hoist 10 to wind the second wirerope 121, gin wheel 50 is second
Decline under the drive of wirerope 121 relative to lifting block 40, thus by 50 return of gin wheel after transport air-conditioning waterpipe,
It allows 11 constraint relief of the first reel at the same time, the first wirerope 111 is allowed to be servo-actuated the free rope stretching of decline of gin wheel 50.It repeats
Above step, air-conditioning waterpipe is capable of hoisting to arrive arbitrary designated floor, and horizontal transport is in place to designated position.
In conclusion a kind of hanging apparatus of skyscraper air-conditioning waterpipe of the utility model can be by elevator to air-conditioning
Waterpipe is lifted, and by air conditioner water pipeline transportation to designated floor, effectively improves the conevying efficiency of air-conditioning waterpipe.
Without departing from the thought that the utility model is created, any group is carried out to the various different embodiments of the utility model
It closes, content disclosed by the utility model should all be considered as;In the range of the technology design of the utility model, technical solution is carried out
Any combination for the thought created without prejudice to the utility model that a variety of simple modifications and different embodiments carry out, should all be at this
Within the protection scope of utility model.
Claims (5)
1. a kind of hanging apparatus of skyscraper air-conditioning waterpipe, including electrical hoist (10), the first fixed pulley (20), second
Fixed pulley (30), lifting block (40), gin wheel (50), hanging structure (60) and anti-wave wirerope (70);Its feature
Be: the lifting block (40) is hung at the top in elevator by hanging structure (60), and the gin wheel (50) sets
It is placed in elevator in the lower section of lifting block (40), the bottom end of gin wheel (50) is equipped with hook (51), to draw transport
Air-conditioning waterpipe;The electrical hoist (10) is fixedly arranged at first floor elevator hall, electrical hoist (10) and elevator it
Between it is opposite be equipped with first fixed pulley (20) and the second fixed pulley (30), there are the first reel (11) on electrical hoist (10)
And second reel (12), volume is equipped with the first wirerope (111) on the first reel (11), and the first wirerope (111) is fixed around first
Pulley (20) enters in elevator, and in relatively connecting after lifting block (40) and the guide wheel on gin wheel (50) in elevator
Connect the top of gin wheel (50), volume is equipped with the second wirerope (121) on the second reel (12), and the second wirerope (121) is around the
Two fixed pulleys (30) enter in elevator, and connect with gin wheel (50) bottom end, so that electrical hoist (10) drive the first volume
When cylinder (11) rotation is to wind the first wirerope (111), the second reel (12) simultaneously constraint relief, gin wheel (50) In
Rise under the drive of first wirerope (111) relative to lifting block (40), the second wirerope (121) is servo-actuated gin wheel (50)
The free rope stretching of rising, the air conditioner water pipeline transportation that gin wheel (50) is drawn to designated floor, and in air-conditioning water pipe
After road conveying, when electrical hoist (10) drives the second reel (12) rotation to wind the second wirerope (121), the first reel
(11) simultaneously constraint relief, gin wheel (50) is under the drive of the second wirerope (121) relative to lifting block (40)
Decline, the first wirerope (111) are servo-actuated the free rope stretching of decline of gin wheel (50), and the lifting after transport air-conditioning waterpipe is sliding
Take turns (50) return;The anti-wirerope (70) that waves shares two, and two are prevented that waving wirerope (70) is relatively arranged on elevator
Two sides, it is anti-to wave between wirerope (70) and air-conditioning waterpipe when drawing transport air-conditioning waterpipe for gin wheel (50)
It is arranged traction rope (71), to prevent air-conditioning waterpipe from swinging during drawing transport.
2. hanging apparatus according to claim 1, it is characterised in that: the hanging structure (60) includes two chain blocks
(61), fixed wirerope (62) and connecting steel wire ropes (63), two chain blocks (61) are relatively arranged on the top in elevator
It holds, be equipped with connection chain (64) in top on each chain block (61) and be equipped with the fixed wirerope (62), hand in bottom end
Cucurbit (61) are drawn to connect by connection chain (64) with elevator, one end of the fixed wirerope (62) and connecting steel wire ropes (63)
Connection, the other end of connecting steel wire ropes (63) connect with the top of lifting block (40), lifting block (40) are hung and is set to elevator
Top in well.
3. hanging apparatus according to claim 1, it is characterised in that: the hanging apparatus includes leading block (80), institute
Leading block (80) is stated to be set in elevator, so that the first wirerope (111) enters in elevator around the first fixed pulley (20), around
Leading block (80) is deviated to lifting block (40), guiding role is played, in order to which the first steel wire is relatively around lifting block
(40) with gin wheel (50) on guide wheel.
4. hanging apparatus according to claim 1, it is characterised in that: first wirerope (111) and the second wirerope
(121) use diameter for the wirerope of 17.5mm.
5. hanging apparatus according to claim 2, it is characterised in that: the fixed wirerope (62) use diameter for
The wirerope of 17.5mm, connecting steel wire ropes (63) use diameter for the wirerope of 19.5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920280287.6U CN209721349U (en) | 2019-03-05 | 2019-03-05 | A kind of hanging apparatus of skyscraper air-conditioning waterpipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920280287.6U CN209721349U (en) | 2019-03-05 | 2019-03-05 | A kind of hanging apparatus of skyscraper air-conditioning waterpipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209721349U true CN209721349U (en) | 2019-12-03 |
Family
ID=68685144
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920280287.6U Active CN209721349U (en) | 2019-03-05 | 2019-03-05 | A kind of hanging apparatus of skyscraper air-conditioning waterpipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209721349U (en) |
-
2019
- 2019-03-05 CN CN201920280287.6U patent/CN209721349U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107089600A (en) | The overhead explosion-proof crane of hanging object anti-rock is played with the flexible wire saws of stretching | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN103708360B (en) | Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method | |
CN109694007A (en) | A kind of super high-rise building hoisting transportation method | |
CN209721349U (en) | A kind of hanging apparatus of skyscraper air-conditioning waterpipe | |
CN102777048A (en) | Vertical transportation device | |
CN105645275B (en) | Cable hoist and its construction method | |
CN101934994A (en) | Building high-altitude vertical hoisting double-guide cable system and assisting method | |
CN206634962U (en) | A kind of removable simple and easy hoisting equipment | |
CN206288882U (en) | A kind of super-high buildings multi-pipeline hoisting transportation dolly | |
CN201999679U (en) | Automatic reciprocating and looping system of electric block | |
CN210855091U (en) | Simple movable heavy object vertical lifting equipment | |
CN206680062U (en) | A kind of prefabricated part hanging instrument | |
CN105151999A (en) | Portable iron core overturning mechanism | |
CN201793342U (en) | Double guide cable system for overhead vertical lifting of building | |
CN205257842U (en) | Lifting device of insulator pillar for electric wire netting | |
CN107190991A (en) | The special-shaped curtain wall vertical lifting system of glass plate | |
CN209161297U (en) | Wind-driven generator lifts pulley blocks | |
CN206088769U (en) | Portal slewing crane's four rope hoists | |
CN202429917U (en) | Gantry crane and anti-rolling lifting device thereof | |
CN207030738U (en) | Claw hook device | |
CN220283436U (en) | Hoisting mechanism, wind power device thereof and full-automatic tower crane | |
CN211081059U (en) | Hoisting device for unit plate of curtain wall with curved outer vertical surface | |
CN216711434U (en) | High-lift hoister | |