CN207078597U - A kind of kerbstone transportation and erection equipment - Google Patents

A kind of kerbstone transportation and erection equipment Download PDF

Info

Publication number
CN207078597U
CN207078597U CN201720743609.7U CN201720743609U CN207078597U CN 207078597 U CN207078597 U CN 207078597U CN 201720743609 U CN201720743609 U CN 201720743609U CN 207078597 U CN207078597 U CN 207078597U
Authority
CN
China
Prior art keywords
kerbstone
compartment
slide slot
connecting rod
handling apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720743609.7U
Other languages
Chinese (zh)
Inventor
陈进
崔胜超
谭斌
马汉宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201720743609.7U priority Critical patent/CN207078597U/en
Application granted granted Critical
Publication of CN207078597U publication Critical patent/CN207078597U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

It the utility model is related to Municipal Engineering Construction equipment technical field, refer in particular to a kind of kerbstone transportation and erection equipment, including sliding device, conveying arrangement and rotation handling apparatus, the landing device includes sliding steel pipe, support bar and slide slot, the outer end for sliding steel pipe and the slide slot are correspondingly arranged, and one end of the support bar, which is fixed, to be hinged on the slide slot;The conveying arrangement includes compartment, and the compartment is fixedly connected with the inner of the slide slot;The rotation handling apparatus is fixedly connected with the compartment, kerbstone is loaded on conveying arrangement by the landing device, transport to appointed place and then kerbstone is sling by the rotation handling apparatus again and be rotatably moved to specified location and install, with simple to operate, safety coefficient is high, reduces material breakage rate, saves artificial, it is time saving and energy saving to carry, improve engineering construction efficiency the advantages of.

Description

A kind of kerbstone transportation and erection equipment
Technical field
Municipal Engineering Construction equipment technical field is the utility model is related to, refers in particular to a kind of kerbstone transportation and erection equipment.
Background technology
Kerbstone is used for the boundary stone of pavement edge, and driveway, pavement, greenery patches, isolation strip and road are distinguished on road surface The boundary line of other parts, play and ensure pedestrian, the effect that vehicular traffic is safe and guarantee pavement edge is neat.In modern city In construction, kerbstone peace block construction work amount is bigger in town road, and required precision is higher, and unlike material kerbstone is general Weight is 200kg-800kg, and for the general height of kerbstone in heaps at 1.2 meters or so, the superposition number of plies is 3-4 layers, is manually being removed Transport very hard during kerbstone.In order to solve the problems, such as manually to carry, study for a long period of time in the industry, such as Chinese invention patent mandate Notification number CN103600758A discloses a kind of kerbstone floor truck, including is made up of vehicle frame, wheel guard, wheel, fixture; Wheel is arranged on vehicle frame both sides, and wheel guard is located above wheel and is fixed on vehicle frame, and fixture is located at below vehicle frame and passed through A piece axle is lifted on vehicle frame.The device is suitable for short-haul operation, simple to operate, flexible, but has the following disadvantages: First, the device needs operator firmly to push small handlebar and kerbstone can just be clamped and lifted, and needs also exist for consuming very Great strength;2nd, could handle because to push small handlebar always when the device, which picks up kerbstone, needs short-distance movement Kerbstone is picked up, if operator's strength is inadequate, unstable during control handle, kerbstone will be fallen down from small vehicle clamper, It is likely to result in serious security incident;3rd, when the device picks up kerbstone movement, kerbstone is easier to drop, and causes road The spoilage of kerb is higher;4th, the device can only solve short-haul operation, be transported to after required position or need artificial heavy Newly moving kerbstone again could install, and laborious and operating efficiency is very low.
Utility model content
For problem above, the utility model provides a kind of kerbstone transportation and erection equipment, it is therefore an objective to collects kerbstone Landing, colligation, transport, installation integration, reduce frictional force using pulley principle, are easy to kerbstone to be slipped to this from clitter and set In standby;Make kerbstone handling process time saving and energy saving using lever principle;Setting angle is set to reach 360 degree of rotations using axle center principle Turn, be easy to the installation operation of kerbstone;The periphery of the equipment is provided with safety guide rail and buffer unit simultaneously, avoids existing Potential safety hazard, there is simple to operate, safety coefficient height, reduce material breakage rate, manually, it is time saving and energy saving to carry for saving, raising work The advantages of journey efficiency of construction.
To achieve these goals, the technical solution adopted in the utility model is as follows:
A kind of kerbstone transportation and erection equipment, including device is slid, conveying arrangement and rotation handling apparatus, the cunning Dropping control device includes sliding steel pipe, support bar and slide slot, and the outer end for sliding steel pipe and the slide slot is correspondingly arranged, institute One end fixation for stating support bar is hinged on the slide slot;The conveying arrangement includes compartment, and the compartment slides with described The inner of groove is fixedly connected;The rotation handling apparatus is fixedly connected with the compartment.In this way, the landing can be passed through Device is loaded into kerbstone on conveying arrangement, transports to appointed place and then again by the rotation handling apparatus kerbstone Sling and be rotatably moved to specified location and install, there is simple to operate, safety coefficient height, reduction material breakage rate, saving people Work, carry it is time saving and energy saving, improve engineering construction efficiency the advantages of.
According to above technical scheme, the rotation handling apparatus includes steel wire rope, rotary shaft, connecting rod and handle, described One end that connecting rod is close to the slide slot is provided with some fixing hole A, and the slide slot outer end is provided with some fixing hole B, described Steel wire rope one end is arranged in the fixing hole A, and the other end is arranged in the fixing hole B;Described connecting rod one end and the steel Cord is connected, and the connecting rod other end is fixedly connected with the handle;The rotary shaft upper end is provided with the axostylus axostyle for being provided with through hole, described Connecting rod is arranged in the axostylus axostyle and Telescopic movable;The connecting rod is connected to axle center with the axostylus axostyle, and the connecting rod can lead to Crossing adjustment connecting rod and the position that the axostylus axostyle is connected makes the corresponding adjustment position in the axle center;The connecting rod can surround axle center and make 360 degree of rotations.In this way, can be by the steel wire rope that the kerbstone bundled fixed being loaded into the compartment is good, fortune It is defeated to behind appointed place, according to the weight of kerbstone, adjust the ratio of the connecting rod and rotary shaft, using lever principle, sling Kerbstone simultaneously rotates to specified location and put well, then unties steel wire rope again and properly installs, simple to operate, time saving and energy saving, engineering Efficiency of construction is high.
According to above technical scheme, some truckles are fixed with the slide slot, the truckle is uniformly distributed in On the slide slot.In this way, when kerbstone from slide be transferred on steel pipe on slide slot when, passed by the rolling of truckle It is defeated, mobile frictional force is reduced, kerbstone is smoothly moved in compartment, it is time saving and energy saving, greatly reduce kerbstone Breakage rate.
According to above technical scheme, the car bottom is provided with universal fast pulley, and the universal fast pulley is provided with locking knot Structure.In this way, when kerbstone is transferred on slide slot on steel pipe from sliding, then the mistake in compartment is transferred to from slide slot Cheng Dangzhong, universal fast pulley is locked by locking structure, makes compartment fixed, can smoothly load kerbstone.
According to above technical scheme, the compartment is provided with guard rail, and the guard rail is fixed with the compartment to be connected Connect.In this way, can make kerbstone from slide be slipped on steel pipe by slide slot in compartment during avoid kicking down To outside compartment, the safety in utilization of equipment is ensure that, while safety protection function is played among transport kerbstone process, you can Avoid kerbstone from meeting other hard things or hurt sb.'s feelings, the breakage rate of kerbstone can be reduced again.
According to above technical scheme, the compartment is provided with counterweight kerbstone.In this way, the weight in compartment can be made Reach balance, avoid and overturn accident occurs when loading kerbstone and among transportation.
A kind of kerbstone transportation and erection equipment described in the utility model, including slide device, conveying arrangement and rotation Turn handling apparatus, the landing device includes sliding steel pipe, support bar and slide slot, described to slide steel pipe and the slide slot Outer end be correspondingly arranged, one end of the support bar is fixed and is hinged on the slide slot;The conveying arrangement includes compartment, institute The inner that compartment is stated with the slide slot is fixedly connected;The rotation handling apparatus is fixedly connected with the compartment, by described Slide device to be loaded on conveying arrangement kerbstone, transport to appointed place and then again by the rotation handling apparatus road Kerb, which is sling, to be rotatably moved to specified location and installs, and has simple to operate, safety coefficient height, reduction material breakage rate, section About artificial, it is time saving and energy saving to carry, the advantages of improving engineering construction efficiency.
Brief description of the drawings
Fig. 1 is the utility model planar structure schematic diagram;
Fig. 2 is the utility model overlooking the structure diagram.
10th, steel pipe is slided;11st, support bar;12nd, slide slot;13rd, outer end;20th, compartment;14th, it is inner;30th, steel wire rope;31、 Rotary shaft;32nd, connecting rod;33rd, handle;34th, fixing hole A;35th, fixing hole B;4th, truckle;5th, universal fast pulley;6th, guard rail Bar;7th, axostylus axostyle;71st, axle center;8th, counterweight kerbstone;9th, finished product kerbstone.
Embodiment
The technical solution of the utility model is illustrated with embodiment below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, a kind of kerbstone transportation and erection equipment described in the utility model, including device is slid, Conveying arrangement and rotation handling apparatus, the landing device includes sliding steel pipe 10, support bar 11 and slide slot 12, described The outer end 13 for sliding steel pipe 10 and the slide slot 12 is correspondingly arranged, and one end of the support bar 11, which is fixed, is hinged on described slide On groove 12;The conveying arrangement includes compartment 20, and the compartment 20 is fixedly connected with the inner 14 of the slide slot 12;The rotation Turn handling apparatus to be fixedly connected with the compartment 20.So kerbstone 9 can be loaded into by the landing device by transport dress Put, transport to appointed place and then kerbstone 9 is sling be rotatably moved to specified location by the rotation handling apparatus again And install, there is simple to operate, safety coefficient height, reduce material breakage rate, manually, it is time saving and energy saving to carry for saving, raising work The advantages of journey efficiency of construction.
Specifically, the compartment 20 is welded for stainless steel material, there is buffering effect, be the fixed branch of whole equipment Frame, size are 1.5 meters * 2 meters;The support bar 11 has 2 with slide slot 12, is made of small-sized channel-section steel, can be according to road Width between two slide slots of big minor adjustment of kerb 9, glide angle can also be adjusted according to the height of kerbstone 9 to be handled Degree, the outer end 13 of the slide slot 12 is leaned against and fixed on kerbstone 9 in heaps, one end of the support bar 11 is supported in ground On face, the other end has supported slide slot 12 using triangle principle, and the slide slot 12 is easy to along the upper multigroup steel truckle of installation Kerbstone slides, and reduces friction;The steel pipe 10 that slides is made of 2 standard steel pipes, and main serve slides.
As primary object of the present utility model, the rotation handling apparatus includes steel wire rope 30, rotary shaft 31, connecting rod 32 and handle 33, one end that the connecting rod 32 is close to the slide slot 12 be provided with some fixing hole A34, the slide slot 12 Outer end 13 is provided with some fixing hole B35, and described one end of steel wire rope 30 is arranged in the fixing hole A34, and the other end is arranged in institute State in fixing hole B35;Described one end of connecting rod 32 is connected with the steel wire rope 30, and the other end of connecting rod 32 is fixed with the handle 33 Connection;The upper end of rotary shaft 31 is provided with the axostylus axostyle 7 for being provided with through hole, and the connecting rod 32 is arranged in the axostylus axostyle 7 and scalable It is mobile;The connecting rod 32 is connected to axle center 71 with the axostylus axostyle 7, and the connecting rod 32 can be by adjusting connecting rod 32 and the axostylus axostyle 7 positions being connected make the 71 corresponding adjustment position of axle center;The connecting rod 32 can surround axle center 71 and make 360 degree of rotations.So The bundled fixed of kerbstone 9 that can be loaded into by 30, the steel wire rope in the compartment 20 is good, transports to after appointed place, According to the weight of kerbstone 9, the length proportional positions that the connecting rod 32 is connected with rotary shaft 31 are adjusted, using lever principle, are hung Play kerbstone 9 and rotate to specified location and put well, then untie steel wire rope 30 again and properly install, it is simple to operate, it is time saving and energy saving, Engineering construction efficiency high.
The rotary shaft 31 is made of stainless steel material, to rotate the axle center of handling apparatus, can guarantee that the rotating lifting 360 degree of rotations of shipping unit;The rotation handling apparatus is made of stainless-steel pipe welding, using lever principle handling kerbstone 9;The steel wire rope 30 has 2, and one end is fixed on the fixing hole A34 of connecting rod 32, can adjust two according to fixing hole A34 Spacing between steel wire rope 30, the other end of steel wire rope 30 are placed in the fixing hole B35 on the slide slot 12.
Further, some truckles 4 are fixed with the slide slot 12, the truckle 4 is uniformly distributed in described On slide slot 12.When kerbstone 9 from slide be transferred on steel pipe 10 on slide slot 12 when, by the rolling transmission of truckle 4, subtract Few mobile frictional force, allows kerbstone 9 to be smoothly moved in compartment 20, time saving and energy saving, greatly reduces the broken of kerbstone Loss rate.
Further, the bottom of compartment 20 is provided with universal fast pulley 5, and the universal fast pulley 5 is provided with locking structure.When Kerbstone 9 is transferred on slide slot 12 on steel pipe 10 from sliding, then the process being transferred to from slide slot 12 in compartment 20 is worked as In, universal fast pulley 5 is locked by locking structure, makes compartment 20 fixed, can smoothly load kerbstone 9.Described ten thousand There are 4 to fast pulley 5, be whole equipment operation, the fulcrum of load-bearing, direction can arbitrarily be adjusted according to dynamics and locking is fixed.
Further, the compartment 20 is provided with guard rail 6, and the guard rail 6 is fixedly connected with the compartment 20. Can so make kerbstone 9 from slide on steel pipe 10 be slipped to by slide slot 12 in compartment 20 during avoid kicking down to Outside compartment 20, the safety in utilization of equipment is ensure that, while safety protection function is played among the transport process of kerbstone 9, i.e., Kerbstone 9 can be avoided to meet other hard things or hurt sb.'s feelings, the breakage rate of kerbstone 9 can be reduced again.The guard rail 6 uses Fastener for connection, principal security kerbstone 9 avoid kicking down to outside compartment 20 during landing, play safety protection function.
Further, the compartment 20 is provided with counterweight kerbstone 8.The weight in compartment 20 can be so set to reach flat Weighing apparatus, avoids and overturn accident occurs when loading kerbstone 9 and among transportation.The counterweight kerbstone 8 is carrying Kerbstone 9, mainly play counterweight effect, prevent from overturning.
Workflow of the present utility model is as follows:
First, first according to the height of bundled kerbstone 9 and the width of the good support bar 11 of width adjusting and slide slot 12 And angle, the one side of 12 outer end of slide slot 13 is shelved on kerbstone 9, ground is propped up into as support feet in one end of support bar 11 Frame is fixed, and forms firm landing device;
2nd, kerbstone 9 is dialled using crowbar and is poured on minor diameter and slides on steel pipe 10, slided by the rolling for sliding steel pipe 10 OK, kerbstone 9 is led on slide slot 12, due to being covered with steel truckle 4 on support slot 12, therefore kerbstone 9 can be easily Ground is slid to compartment 20, and the surrounding of compartment 20 has been equipped with 6 anti-fall protection of guard rail;
3rd, described one end of steel wire rope 30 is placed in the fixing hole B35 of slide slot 12, and the other end is arranged in rotation handling dress In the fixing hole A34 of connecting rod 32 put, after kerbstone 9 slides into the appropriate location in compartment 20, two steel in slide slot 12 Cord 30 is taken out, and the colligation of kerbstone 9 is firm;
4th, promote compartment 20 that kerbstone 9 is transported installation site, the universal fast pulley 5 of locking, according to the weight of kerbstone 9, Adjust the ratio of connecting rod 32 and rotary shaft 31, using lever principle, make manual operation more laborsaving, hold handle 33 downwards and Direction of rotation makes power, and kerbstone 9 is hoisted to specified location, is survived using artificial fine setting.
A kind of kerbstone transportation and erection equipment described in the utility model, kerbstone 9 is moved by the landing device It is dynamic to be loaded on conveying arrangement, transport to appointed place and then kerbstone 9 is sling by the rotation handling apparatus by rotation again It is moved to specified location and installs, there is simple to operate, safety coefficient height, reduce material breakage rate, saving manually, carries province Shi Shengli, improve engineering construction efficiency the advantages of.
Embodiment of the present utility model is described above in association with accompanying drawing, but the utility model be not limited to it is above-mentioned Embodiment, above-mentioned embodiment is only schematical, rather than restricted, the common skill of this area Art personnel are not departing from the utility model aims and scope of the claimed protection situation under enlightenment of the present utility model Under, many forms can be also made, these are belonged within the scope of protection of the utility model.

Claims (6)

1. a kind of kerbstone transportation and erection equipment, including device is slid, conveying arrangement and rotation handling apparatus, its feature exist In the landing device includes sliding steel pipe (10), support bar (11) and slide slot (12), described to slide steel pipe (10) and institute The outer end (13) for stating slide slot (12) is correspondingly arranged, and one end of the support bar (11), which is fixed, is hinged on the slide slot (12) On;The conveying arrangement includes compartment (20), and the compartment (20) is fixedly connected with the inner (14) of the slide slot (12);Institute Rotation handling apparatus is stated to be fixedly connected with the compartment (20).
2. kerbstone transportation and erection equipment according to claim 1, it is characterised in that the rotation handling apparatus includes Steel wire rope (30), rotary shaft (31), connecting rod (32) and handle (33), the connecting rod (32) are close to the one of the slide slot (12) End is provided with some fixing hole A (34), and slide slot (12) outer end (13) is provided with some fixing hole B (35), the steel wire rope (30) one end is arranged in the fixing hole A (34), and the other end is arranged in the fixing hole B (35);The connecting rod (32) one End is connected with the steel wire rope (30), and connecting rod (32) other end is fixedly connected with the handle (33);The rotary shaft (31) Upper end is provided with the axostylus axostyle (7) for being provided with through hole, and the connecting rod (32) is arranged in the axostylus axostyle (7) and Telescopic movable;The company Bar (32) is connected to axle center (71) with the axostylus axostyle (7), and the connecting rod (32) can be by adjusting connecting rod (32) and the axostylus axostyle (7) position being connected makes the corresponding adjustment position in the axle center (71);The connecting rod (32) can surround axle center (71) and make 360 degree of rotations Turn.
3. kerbstone transportation and erection equipment according to claim 1, it is characterised in that fixed on the slide slot (12) Provided with some truckles (4), the truckle (4) is uniformly distributed on the slide slot (12).
4. kerbstone transportation and erection equipment according to claim 1, it is characterised in that compartment (20) bottom is provided with Universal fast pulley (5), the universal fast pulley (5) are provided with locking structure.
5. kerbstone transportation and erection equipment according to claim 4, it is characterised in that the compartment (20) is provided with anti- Guard rail rod (6), the guard rail (6) are fixedly connected with the compartment (20).
6. kerbstone transportation and erection equipment according to claim 5, it is characterised in that the compartment (20), which is provided with, matches somebody with somebody Weight kerbstone (8).
CN201720743609.7U 2017-06-22 2017-06-22 A kind of kerbstone transportation and erection equipment Expired - Fee Related CN207078597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720743609.7U CN207078597U (en) 2017-06-22 2017-06-22 A kind of kerbstone transportation and erection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720743609.7U CN207078597U (en) 2017-06-22 2017-06-22 A kind of kerbstone transportation and erection equipment

Publications (1)

Publication Number Publication Date
CN207078597U true CN207078597U (en) 2018-03-09

Family

ID=61426278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720743609.7U Expired - Fee Related CN207078597U (en) 2017-06-22 2017-06-22 A kind of kerbstone transportation and erection equipment

Country Status (1)

Country Link
CN (1) CN207078597U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842576A (en) * 2018-08-10 2018-11-20 广州市柯西机械设备有限公司 A kind of crawler type stone material with level correction is mated formation robot
CN109024196A (en) * 2018-08-10 2018-12-18 广州市柯西机械设备有限公司 A kind of stone material method for paving grab, carry, mating formation integrated

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842576A (en) * 2018-08-10 2018-11-20 广州市柯西机械设备有限公司 A kind of crawler type stone material with level correction is mated formation robot
CN109024196A (en) * 2018-08-10 2018-12-18 广州市柯西机械设备有限公司 A kind of stone material method for paving grab, carry, mating formation integrated

Similar Documents

Publication Publication Date Title
CN206511849U (en) A kind of mobile tower crane
CN207078597U (en) A kind of kerbstone transportation and erection equipment
CN107139978A (en) Floor truck with Multi Loading and Unloading Functions
CN104453201B (en) Automatic ascending and descending type material platform
CN104314319A (en) Early warning device for cantilevered discharging platform
CN204124984U (en) Two cage building hoist
CN206266162U (en) A kind of construction lifting device
CN205476167U (en) Carry stair railing perpendicularly
CN107572428A (en) A kind of electronic heavy lift machinery device
KR101261433B1 (en) Disk or Ring type heavy material loading device
CN207130627U (en) The overhead job platform of bridge construction
CN206166549U (en) Lifting type article shelf
CN208732557U (en) Mobile hydraulic elevating device
CN205952002U (en) Express delivery handling transport vehicle using motor
CN204569122U (en) Building tower crane cargo hook gear
CN208022620U (en) A kind of telescopic hoisting platform
CN209353221U (en) A kind of packaged type cantilever job platform for the construction of side guardrail
CN206797216U (en) A kind of double-deck special wagon box hoistable platform of car handling
CN202544409U (en) High-rise building construction material discharging device
CN205472195U (en) Mine winder
CN215592426U (en) Active building material transfer device for zipper opening of tower crane
CN205257820U (en) Lifting device
CN215706456U (en) Transport vechicle in curtain material field
CN216549313U (en) Simple and easy hoisting accessory for building
CN208716651U (en) A kind of elevator material lift device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180309