CN106477726A - A kind of bow lake artificial swamp and its method of construction - Google Patents

A kind of bow lake artificial swamp and its method of construction Download PDF

Info

Publication number
CN106477726A
CN106477726A CN201610931437.6A CN201610931437A CN106477726A CN 106477726 A CN106477726 A CN 106477726A CN 201610931437 A CN201610931437 A CN 201610931437A CN 106477726 A CN106477726 A CN 106477726A
Authority
CN
China
Prior art keywords
boulder
river
herba
artificial swamp
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610931437.6A
Other languages
Chinese (zh)
Inventor
段亮
张承铭
宋永会
付少杰
肖书虎
刘晓玲
田智勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinese Research Academy of Environmental Sciences
Chinese Academy of Environmental Sciences
Original Assignee
Chinese Academy of Environmental Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinese Academy of Environmental Sciences filed Critical Chinese Academy of Environmental Sciences
Priority to CN201610931437.6A priority Critical patent/CN106477726A/en
Publication of CN106477726A publication Critical patent/CN106477726A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • C02F3/322Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae use of algae
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • C02F3/322Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae use of algae
    • C02F3/325Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae use of algae as symbiotic combination of algae and bacteria
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • C02F3/327Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae characterised by animals and plants
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/34Biological treatment of water, waste water, or sewage characterised by the microorganisms used
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/16Nitrogen compounds, e.g. ammonia
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Biotechnology (AREA)
  • Microbiology (AREA)
  • Chemical & Material Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Botany (AREA)
  • Ecology (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of bow lake artificial swamp and its method of construction.The present invention mixes throwing in river course using boulder, boulder and cobble and rubble in artificial swamp pond, build bank protection in wetland scope, and the various different plants of plantation of arranging in pairs or groups, by construction project, in conjunction with phytoremediation technology, form that biological chain is complete, the bow lake wetland of system stability and self-recovery.The artificial swamp of the therefore present invention is compared compared with prior art using sand as the artificial swamp of filler, has advantages below:(1) these stones have compared with Large ratio surface, and biological easily gathering increased the ability of absorption degradation water pollution material, the self-purification capacity of strengthening water body, and water quality is improved;The release of pollutants in sediments can also effectively be suppressed.(2) the wetland water surface is ordorless, and fly mosquito occurs less.(3) landscape effect is good, and preferably, Wetland Biodiversity enriches the benthic environment of animal and plant growth.(4) wetland is stable, and reply flood ability is good.

Description

A kind of bow lake artificial swamp and its method of construction
Technical field
The invention belongs to the pollutant catabolic gene field in the water body basin such as river in environmental and ecological protection technology, specifically relating to And a kind of bow lake artificial swamp and its method of construction.
Background technology
Artificial swamp is a kind of small-sized ecosystem that can process sewage, and the plant of wetland and microorganism can be certain Degree absorbs and the conversion nutrient such as N, P;Possess multiple environment such as aerobic-anaerobic anoxia in wetland, be that material is decomposed and turned Change and provide multiple conditions.The packed bed of artificial swamp plays interception, absorption and fixation.The service condition phase of artificial swamp To simple, and there is Landscape benefit, there is very high economic worth.According to Liaoning Environmental Monitoring Centre to Liaohe River water quality monitoring Situation, Liaohe River water quality had been due to having received the cities and counties such as Tieling, new people effluent sewage on the way in recent years, be from upstream to downstream contamination have added Weight, the nutrient substance carrying in water body is relatively many.Eutrophication meeting serious harm ecosystem, in order to control each tributary Pollutant enter the Liaohe River, and Liaoning provincial government develops planning, and strengthen wet land protection and construction, progressively recover Important Wetland ecosystem Integrity and natural quality, improve Wetland ecological situation and region environment, realize Function of Wetland maximize.
The tributary in the Liaohe River is many, and gather in the network of rivers, many small river, and river channel sedimentation is extremely serious, causes the river course of bending easy Change its course and form substantial amounts of bow lake.Using bow lake region in river course, bend section, alluvial flat broader region, low-lying land and relatively Large-scale eyot, builds wetland, thus improving the overall contaminant degradation in river course and purification of water quality ability.Carry out with low cost The construction of little medium-sized wetland enters wetland for resistance control pollutant important meaning, can produce good ecoscape effect.
Content of the invention
It is an object of the invention to provide a kind of Financial cost is relatively low, builds and safeguard easily, treatment effect and efficiency high, adapt to Scope is wide, beneficial to microbial population breeding, improvement of the ecological environment and the bow lake artificial swamp repaired and method of construction.Using this Artificial swamp, can efficiently control sanitary sewage and part industrial wastewater, effectively stop and remove the pollution in river Thing, purifying water body environment.Present invention may apply to the ecoscape of the point source of water body, pollution of area source, river and wetland is repaiied Again with construction.
The concrete technical scheme of the present invention is as follows:
The bow lake artificial swamp of the present invention, including bow lake and river, wherein, described bow lake artificial swamp also includes Pour water in bow lake region, form the stable ecological water surface, build flooding depth different aquatic, natural pond is raw, humidogene and middle life Environment;Wherein, described aquatic environment is more than water level depth 0.3m, and the raw environment in described natural pond is in water level depth 0-0.3m, described wet , below the flood line absolute altitude of riverbank, described middle raw environment is more than the flood line absolute altitude of riverbank for raw environment;
The bottom of river channel in described river uses the boulder that particle diameter is 15-25cm, boulder and cobble and rubble mixed layer paving, and Build stone plumage mouth bank protection using the boulder for 15-25cm for the particle diameter with boulder and cobble;
Assembled using revetment brick more than the flood line absolute altitude of riverbank and fix, and plant embankment vegetation, in riverbank flood line Absolute altitude boulder used below and boulder and cobble assemble bank protection and fix, and plant hygrophilous vegetation;
Plantation open fire face vegetation in water.
According to the bow lake artificial swamp of the present invention, wherein, the boulder of described bottom of river channel laying, boulder and cobble and rubble Mixed layer thickness is 0.5-0.7m, preferably 0.6m.
According to the bow lake artificial swamp of the present invention, wherein, the side slope of described stone plumage mouth bank protection is than for 1:2.3-2.7, excellent Select 1:2.5.
According to the bow lake artificial swamp of the present invention, wherein, using timber fixation hollow bank protection hexagonal brick, using wire gauze Fixing boulder and boulder and cobble.
According to the bow lake artificial swamp of the present invention, wherein, described revetment brick preferably uses hollow bank protection hexagonal brick, this Brick is hollow, can play the effect of bank protection, and can make planting plants area larger.
The method of construction of the bow lake artificial swamp of the present invention, comprises the following steps:
1) dam in the upper river selected element position in bow lake region or branch to other water systems;
2), on the arroyo after damming, rubber is built in the bend downstream selected element position of the river position easily changed its course in bending Jiao Ba;
3) it is layered on bottom of river channel using the boulder of particle diameter 15cm to 25cm, boulder and cobble and rubble mixed layer, using particle diameter The boulder of 15cm to 25cm builds stone plumage mouth bank protection with boulder and cobble;
4) assembled using revetment brick more than the flood line absolute altitude of riverbank and fix, and plant embankment vegetation, in riverbank flood The boulder of line absolute altitude particle diameter used below 15cm to 25cm and boulder and cobble assemble bank protection and fix, and plant hygrophilous vegetation;
5) cancel and damming, using rubber dam lifting water level, poured water in bow lake region, plant bright after the completion of pouring water in water Water surface vegetation, forms the stable ecological water surface, builds flooding depth different aquatic, the environment of natural pond life, humidogene and middle life.
According to the present invention method of construction, wherein, step 1) select river bend position upstream region river surface Narrow place or the most shallow place of river depth are as a position of damming.The i.e. upstream region of selection river bend position place the narrowest or stream Speed is the most just dammed in order to engineering facilitates and reduces cost.According to embodiments of the invention, select river surface width 5- 15 meters, dam at 0 to 3 meters of river depth.
According to the present invention method of construction, wherein, step 2) the described point position selection building rubber dam is as follows:According to river The river course situation of stream is selected, the flat region of selection physical features (for example, the high low head in region is less than 5 meters), river course length, Shallow (for example, river trickles between 35 meters to 100 meters along straight line, within 0 to 15 meter of the depth of water), angle of bend is more than or equal to 90 ° of isogonisms Spend position that is larger and easily changing its course, according to physical features and the river force and velocity of a current, selected element position is built at 15 to 25 meters of bend downstream If rubber dam.
The present invention highly to control lake surface height by the construction of rubber dam.The more original river surface of height is high 2 to 5 meters.
The present invention utilizes the rubber dam in downstream, serve must water-retention effect, the new water surface being formed is than river before Stream etc. is more stable, and the time of water quantity holding is longer, will not lead to the betrunking of stream because of arid situation in short-term, thus being formed The stable ecological water surface.
According to the method for construction of the present invention, wherein, embankment vegetation and hygrophilous vegetation select to be planted in bank protection and bank protection and water The joining place in face.Vegetation is planted in inside the water surface of formation in open fire face, according to different water level depth plantations, eventually forms wetland Landscape.
Specifically, described different types of plant presses hydraulic gradiant, mainly adopts following several planting patternss:
(1) open fire face vegetation:
Water level is sentenced based on submerged plant and fluitante more than 1m;Being proposed with species is:Lotus, Herba Spirodelae, azolla Plant etc.;It is here formed as aquatic environment;
Water level depth 0.3-1m:Based on emergent aquactic plant, submerged plant and fluitante;Being proposed with species is:Herba Typhae, Caulis Zizaniae caduciflorae, Herba vallisneriae Spiralis, hornwort, Rhizoma Acori Graminei etc.;It is here formed as aquatic environment;
Water level depth is less than 0.3m:Based on plant;Being proposed with species is:Wild soybean, Herba Polygoni hydropiperiss, smartweed, natural pond life Dish, Adenocaulon himalaicum Edgew Maxim, Alisma orientale, samara sedge, dried tuber, Corm Eleocharitiss etc.;It is here formed as natural pond and give birth to environment.
(2) hygrophilous vegetation:The no obvious water surface, soil moisture content is high;Option of species is advised based on local common indigenous species: Phragmites communiss, Herba Polygoni hydropiperiss, smartweed, northern Rhizoma Paridis, Wild soybean, Herba Chelidonii, natural pond Caulis et Folium Lactucae Sativae, Herba Eupatorii Heterophylli, Fructus Adinae, Herba Trifolii lupinasteriss, Flos seu Radix Impatientis nolitangeriss, the Huanghai Sea Chinese bush cherry, drumstickss common violet, Radix primulae maximowiczii, Herba Menthae, Rabdosia japonica, magnificent Herba Stachydis Japonicae, Rubia sylvatica Nakai, Herba speranskiae tuberculatae, Japanese Radix Dipsaci, split melon belong to, Eurasian Flos Inulae, Leontopodium leontopodioides (Willd.) Beauv., spire Medulla Junci etc.;It is here formed as humidogene environment.
(3) embankment vegetation:Using species it is:The tasteless son in north, Wild soybean, Herba delphinii grandiflori, Caulis menispermi, Herba hibisci trioni, Fructus Hippophae, kite Tail, the Hang Zi tip, Radix Sophorae Flavescentiss, purple willow etc.;It is here formed as middle raw environment.
After present invention retention, the region of water-retention includes the new formation after former original bow lake and water-retention of damming Lakeside wetland Region, it is an object of the present invention to entire area battalion is caused the wetland of various plants, so cancelling retention After, except planting those water plants in the range of the new wetland being formed, some dikes are reseeded in the place that also should construct around Bank plant, the destruction of peripheral Construction on Environment is covered and is beautified.
Beneficial effects of the present invention:The present invention using block stone, boulder and cobble and rubble replace Traditional Man wetland sand as The filler of artificial swamp, because having larger space and specific surface area between stone, not only can provide for zoobenthos and dwelling Breath place, simultaneously be beneficial to surface formed one layer of natural biological film, can with adsorbed water body polluter, strengthen water body from net energy Power, substantially reduces COD, the NH in water4 +- N, S, virus and solid suspension matter etc. are so that water quality is improved.River bed paver The release of pollutants in sediments can also effectively be suppressed, also create the benthic environment of appropriate biological growth meanwhile.
Multiple water plants that the present invention introduces a fine variety are the keys of restoration of the ecosystem.To the recovery of wetland plant with bow lake region Based on original autochthonous flora, choose dissimilar plant seeding or shifting according to different flooding depths and the different soil textures Plant, formed stablize in picturesque disorder plant habitat, for wild animals and plants, Fish and birds provide habitat, formed in picturesque disorder, There is the bow lake natural wetland ecosystem of self-recovery function, and make wetland mosquito few, landscape effect is good.
Brief description
Fig. 1 is existing stone-laying shore protection schematic diagram.
Fig. 2 is the shore protection schematic diagram of the present invention.
Fig. 3 is the shore protection scene photo (distant view) of the present invention.
Fig. 4 is the shore protection scene photo (close shot) of the present invention.
Fig. 5 is the gravel layer (distant view) of the internal shop fixtures of artificial swamp of the present invention.
Fig. 6 is the gravel layer (close shot) of the internal shop fixtures of artificial swamp of the present invention.
Specific embodiment
Further describe the present invention below in conjunction with drawings and Examples, but protection scope of the present invention is not subject to accompanying drawing and enforcement The restriction of example.
Embodiment 1
East, west Liaohe Estuary artificial swamp building site trace back 2~3km, demonstration area area about 4.5km from river mouth2, type is Artificial drainage forms bow lake wetland.Plant is chosen so as to based on indigenous species, is equipped with phragmites communiss, Herba Typhae etc., hay grass etc. and has physics resistance The aquatic vegetation of stagnant effect, reduces the settling flux of deposit, and absorbs the nutrient element in water body and deposit in a large number.Project is real During applying, the emergent aquactic plants such as phragmites communiss, Herba Typhae are planted in the waters that the depth of water is less than 0.8m;Riverbed for Liaohe River shale part and river Bank can adopt natural plants measure, configures submerged plant below ordinary water level, increases ecoscape and Function For Purifying Water under water, often Waterline with down to low water level part from shallow to deep plant emergent aquactic plant respectively, swim root plant and fluitante, such as Flos Nelumbinises, Flos nymphaeae (Nymphaea teragona Georgi), Herba Eichhorniae etc.;Normal water line configures hygrophyte such as phragmites communiss to flood level mark;More than flood level mark configure mesad, As Salix babylonica L., Cacumen Platycladi, Fructus Mali pumilae, Fructus Persicae, Fructus Pruni etc., increase river course greening amount, accomplish that Qiao, filling, grass combine, high, medium and low match, shape Become the artificial swamp of stability and high efficiency.Wetland hydraulic detention time is 5d, and water outlet COD is down to below 40mg/L, and ammonia nitrogen is down to 2mg/L Below.
Embodiment 2
Mighty current river rubber dam give birth precious platform rubber monolith bow lake formed very typical, apart from 11km between rubber dam, water Sharp control condition preferably, plan repair by lower interface in this section, revegetation and water conservancy regulate and control construction 36.93km2Large-scale Bow lake natural wetland, forms and has the habitats such as open fire face, profundal zone, phytal zone, humidogene, natural pond life, middle life, by aquatic The recovery guiding fish of vegetation, the recovery of Xia Deng aquatic animal colony, re-form that biological chain is complete, system stability and self-recovery Large-scale bow lake natural wetland.By the fencing to bow lake Wetland Center area for the water conservancy, it is large-scale aquatic animal and birds carry For there is no the good habitat of artificial disturbance so as to freely perch breeding in center, realize bio-diversity, landscape diversity Property and ecology service multiformity.
Embodiment 3
Apricot lump riverine wetland group is located at Liaohe River Shenyang Xinmin City within the border, this region Bei Lin Xinmin City north mound projection, Honey locust, south to Liaozhong County and Xinmin City intersection, including the shelter belt in the range of Liaohe river mainstream 1050 line, beach ground, water Body.There are 4 pieces of large area beach, bow lakes of 8km length in this region, and 4 little bow lakes, area about 6km2Project work Journey content.Construction content includes the water system flowing between lake between wetland island, lake and lake, and planning is built 0.9km2The water surface, and the connection canal of long 1200m, wide 10m.Build together and set 5 swag lakes, 11 small-sized island, formed wet The ground network of rivers.After this engineering construction, annual reduction COD845t, cuts down ammonia nitrogen 156t, can effectively reduce Liaohe River pollutional load.
Embodiment 4
Wryneck tree bow lake wetland is built afterwards:Natural vegetation fencing engineering area 23km2, fence 61km, manually promote sky So Vegetation renewal engineering area 6km2, flood diversion for irrigation build river dredging canal system 21km.Concrete measure:Using nature ditch system, draw flood Irrigate, increase ponding area, be completely cured using trench digging, the measure clear-cutting forestland vegetation such as root is sprouted, stake is sprouted.Plant can be made by absorption Improve water quality with, microbial action and physical action.Through revegetation, pollution resistance control outlet effect reaches COD 30mg/ The IV class water standard of L, ammonia nitrogen 2mg/L.
Non-elaborated part of the present invention belongs to techniques well known.
Certainly, the present invention can also have various embodiments, in the case of without departing substantially from present invention spirit and its essence, is familiar with Those skilled in the art can according to disclosure of the invention make various corresponding change and deform, but these corresponding change and Deformation all should belong to the scope of the claims of the present invention.

Claims (9)

1. a kind of bow lake artificial swamp, including bow lake with river it is characterised in that described bow lake artificial swamp also includes Pour water in bow lake region, form the stable ecological water surface, build flooding depth different aquatic, natural pond is raw, humidogene and middle life Environment;Wherein, described aquatic environment is more than at 0.3m in water level depth, and environment is given birth at water level depth 0-0.3m in described natural pond, institute State humidogene environment below the flood line absolute altitude of riverbank, described middle raw environment is more than the flood line absolute altitude of riverbank;
The bottom of river channel in described river uses the boulder that particle diameter is 15-25cm, boulder and cobble and rubble mixed layer paving, and uses Particle diameter is that the boulder of 15-25cm builds stone plumage mouth bank protection with boulder and cobble;
Assembled using revetment brick more than the flood line absolute altitude on riverbank and fix, and plant embankment vegetation, in the flood mark on riverbank High line particle diameter used below is that the boulder of 15-25cm assembles bank protection fixation with boulder and cobble, and plants hygrophilous vegetation;
Plantation open fire face vegetation in water.
2. bow lake according to claim 1 artificial swamp it is characterised in that described bottom of river channel laying boulder, Boulder and cobble and rubble mixed layer thickness are 0.5-0.7m.
3. bow lake according to claim 1 artificial swamp is it is characterised in that the side slope of described stone plumage mouth bank protection is than for 1: 2.3-2.7.
4. bow lake according to claim 1 artificial swamp is it is characterised in that fix revetment brick using timber, using ferrum The fixing boulder of silk screen and boulder and cobble.
5. the bow lake artificial swamp according to claim 1 or 4 is it is characterised in that described revetment brick is hollow bank protection six Angle brick.
6. a kind of method of construction of claim 1-5 arbitrary described bow lake artificial swamp, comprises the following steps:
1) upper river in bow lake region selects site to dam;
2), on the arroyo after damming, rubber is built in the bend downstream selected element position of the river position easily changed its course in bending Dam;
3) it is layered on bottom of river channel using the boulder for 15-25cm for the particle diameter, boulder and cobble and rubble mixed layer, the use of particle diameter is 15- The boulder of 25cm builds stone plumage mouth bank protection with boulder and cobble;
4) assemble and fix using hollow bank protection hexagonal brick more than the flood line absolute altitude of riverbank, and plant embankment vegetation, on riverbank Flood line absolute altitude particle diameter used below is that the boulder of 15-25cm assembles bank protection with boulder and cobble and fixes, and plants hygrophilous vegetation;
5) cancel and damming, using rubber dam lifting water level, poured water in bow lake region, in water, after the completion of pouring water, plant open fire face Vegetation, forms the stable ecological water surface, builds flooding depth different aquatic, the environment of natural pond life, humidogene and middle life.
7. method of construction according to claim 6 is it is characterised in that step 1) select the upstream region of river bend position The narrowest place of river surface or the most shallow place of river depth as retention point a position.
8. method of construction according to claim 6, wherein, step 2) select river course angle of bend curved more than or equal to 90 ° Road, at 15 to 25 meters of bend downstream, rubber dam is built in selected element position.
9. method of construction according to claim 6 is it is characterised in that described open fire face vegetation includes:
It is more than at 1m in water level depth, including one or more of lotus, Herba Spirodelae and azolla plant;In water level depth 0.3- One or more of Herba Typhae, Caulis Zizaniae caduciflorae, Herba vallisneriae Spiralis, hornwort and Rhizoma Acori Graminei is included at 1m;It is less than at 0.3m in water level depth and include open country One or more of Semen sojae atricolor, Herba Polygoni hydropiperiss, smartweed, natural pond Caulis et Folium Lactucae Sativae, Adenocaulon himalaicum Edgew Maxim, Alisma orientale, samara sedge, dried tuber and Corm Eleocharitiss;
Wherein, water level depth 0.3m aquatic environment formed above;It is less than at 0.3m in water level depth and form natural pond life environment;
Described hygrophilous vegetation includes phragmites communiss, Herba Polygoni hydropiperiss, smartweed, northern Rhizoma Paridis, Wild soybean, Herba Chelidonii, natural pond Caulis et Folium Lactucae Sativae, Herba Eupatorii Heterophylli, bigcatkin willow Prunus mume (sieb.) sieb.et zucc., Herba Trifolii lupinasteriss, Flos seu Radix Impatientis nolitangeriss, hypericum ascyron, drumstickss common violet, Radix primulae maximowiczii, Herba Menthae, Rabdosia japonica, magnificent Herba Stachydis Japonicae, Rubia sylvatica Nakai, Herba speranskiae tuberculatae, Japanese Radix Dipsaci, split one or more of melon genus, Inula britannica, Leontopodium leontopodioides (Willd.) Beauv. and spire Medulla Junci;Described hygrophilous vegetation is in river Below bank flood line absolute altitude, it is here formed as humidogene environment;
Described embankment vegetation includes the tasteless son in north, Wild soybean, Herba delphinii grandiflori, Caulis menispermi, Herba hibisci trioni, Fructus Hippophae, Rhizoma Iridis Tectori, the Hang Zi tip, hardship One or more of ginseng and purple willow;Described embankment vegetation, more than the flood line absolute altitude of riverbank, is here formed as middle raw environment.
CN201610931437.6A 2016-10-31 2016-10-31 A kind of bow lake artificial swamp and its method of construction Pending CN106477726A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610931437.6A CN106477726A (en) 2016-10-31 2016-10-31 A kind of bow lake artificial swamp and its method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610931437.6A CN106477726A (en) 2016-10-31 2016-10-31 A kind of bow lake artificial swamp and its method of construction

Publications (1)

Publication Number Publication Date
CN106477726A true CN106477726A (en) 2017-03-08

Family

ID=58272872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610931437.6A Pending CN106477726A (en) 2016-10-31 2016-10-31 A kind of bow lake artificial swamp and its method of construction

Country Status (1)

Country Link
CN (1) CN106477726A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440900A (en) * 2018-09-03 2019-03-08 深圳地大水务工程有限公司 A kind of counter-slope formula grass type shuts off trench system
CN109942087A (en) * 2019-04-23 2019-06-28 天津农学院 A kind of synthesis facultative lagoon of efficient process country sewage
CN110100611A (en) * 2019-04-27 2019-08-09 南京河海环境研究院有限公司 A kind of urban river water ecology water plant planting unit
CN112493202A (en) * 2020-11-25 2021-03-16 山东黄河三角洲国家级自然保护区管理委员会 Construction method for protecting biodiversity of coastal estuary wetland

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李忠国,等: "《辽河保护区治理与保护技术》", 31 May 2013, 中国环境出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440900A (en) * 2018-09-03 2019-03-08 深圳地大水务工程有限公司 A kind of counter-slope formula grass type shuts off trench system
CN109942087A (en) * 2019-04-23 2019-06-28 天津农学院 A kind of synthesis facultative lagoon of efficient process country sewage
CN110100611A (en) * 2019-04-27 2019-08-09 南京河海环境研究院有限公司 A kind of urban river water ecology water plant planting unit
CN112493202A (en) * 2020-11-25 2021-03-16 山东黄河三角洲国家级自然保护区管理委员会 Construction method for protecting biodiversity of coastal estuary wetland

Similar Documents

Publication Publication Date Title
US9994467B2 (en) Unpowered water purification system for a riverfront landscape constructed wetland
CN103803760B (en) Wet land purification system with serially-connected rice field drainage ditches in irrigated area
CN110700186B (en) Hydro-fluctuation belt ecological slope protection system coping with hydrological changes
CN106192938A (en) A kind of ecological canal system for farmland water-break pollution prevention and construction method
CN105347494A (en) Ecological restoration method for municipal eutrophicated river
CN105297671A (en) Ecological comprehensive treatment system of northern mountain river channel and construction method thereof
CN103882828A (en) Ecological restoration method for city watercourse
CN104594288B (en) A kind of Taihu Lake bank planting restoration of the ecosystem technique
CN206477311U (en) A kind of multi-step formula ecological revetment system
CN106049347A (en) Constructing method for fish shelter under stress of high silt concentration flood
CN106477726A (en) A kind of bow lake artificial swamp and its method of construction
CN110761241B (en) City river course ecology defense
CN104047262A (en) Composite curtain wall for efficiently intercepting pollutants in farmland surface source
CN213294863U (en) Water flow purification system for waterfront road
CN108316243A (en) Mountain bridge river technology
CN111005345A (en) Ecological water system restoration construction method
CN102557269A (en) Landscape park type surface runoff treatment system
CN203080471U (en) Fan-shaped multi-step type ecological buffering type bank protection system
CN105254021B (en) The method that a kind of utilization country fair area ditch pool ecosystem purifies the multiple sewage in country fair area
CN106517522A (en) Pit-pond constructed wetland and construction method thereof
CN104805802A (en) Permeable T-shaped river dam for planting artificial seaweeds and construction method thereof
CN104891666B (en) Ecological water pollutant interception method for urban river bank greenbelts
CN104261627B (en) A kind of groundwater pollution control of eutrophication water
CN113565064A (en) Riverbank zone structure for urban river ecological restoration and restoration method thereof
CN211057724U (en) Hydro-fluctuation belt ecological slope protection system coping with hydrological changes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170308

WD01 Invention patent application deemed withdrawn after publication