CN106463940B - Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it - Google Patents
Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it Download PDFInfo
- Publication number
- CN106463940B CN106463940B CN201580030707.XA CN201580030707A CN106463940B CN 106463940 B CN106463940 B CN 106463940B CN 201580030707 A CN201580030707 A CN 201580030707A CN 106463940 B CN106463940 B CN 106463940B
- Authority
- CN
- China
- Prior art keywords
- cross arm
- wires
- wooden cross
- insulators
- switching equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B17/00—Insulators or insulating bodies characterised by their form
- H01B17/14—Supporting insulators
- H01B17/16—Fastening of insulators to support, to conductor, or to adjoining insulator
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/02—Devices for adjusting or maintaining mechanical tension, e.g. take-up device
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/05—Suspension arrangements or devices for electric cables or lines
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
- H02G7/205—Installation of electric cables, extending along a pole
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electric Cable Installation (AREA)
Abstract
Illustrate the invention in relation to controller switching equipment livewire work method.The present invention controller switching equipment livewire work method include:Interim wooden cross arm is installed to the stage of electric pole, is moved up by the stage for the wire rack that the electric wire for being connected to electric pole is moved on interim wooden cross arm, by interim wooden cross arm or wire rack, the stage of new LP insulators is moved to by stage of the electric wire far from the old LP insulators that have been mounted on common cross-arm, with the stage of the old LP insulators of new LP replacing insulators, by stage that interim wooden cross arm or wire rack are moved down to new LP insulators direction and by the electric wire for being connected to wire rack.
Description
Technical field
The present invention is controller switching equipment livewire work auxiliary device and carries out controller switching equipment livewire work method using it
Related content is the controller switching equipment livewire work auxiliary device for replacing the LP insulators of installation on utility poles and utilization
It carries out the relevant content of controller switching equipment livewire work method.
Background technology
The top of electric pole can generally install cross-arm, and cross-arm is insulated by horizontal iron cross arm and 3 on iron cross arm
Son composition.3 phase electric wires are connected respectively to 3 insulators by binder.
When safeguarding mounted electric pole, cross-arm, insulator, old insulator is replaced with new insulator, is replaced with new cross-arm
Old cross-arm is replaced with new electric pole with regard to originals such as the extension angle increases of electric wire caused by the change in location of electric pole or electric pole
Cause has PIN cross-arms replacing with the operations such as interior cross-arm.Also have and set newly setting for electric pole etc. because the extended position change of electric wire etc. is new
The operation of controller switching equipment.
These work are the security risks that the electric wire of electriferous state moves up and down, therefore has certain.So in order to
Security risk is reduced, livewire work is preferably carried out, is just developing various devices and technology.
Related online technique Korean published Patent announce No. 2006-0082713 (2006.7.19. is disclosed,
Denomination of invention:Have the distribution line operation multi-axis robot of 2 dimensions and the comprehensive driving method of 3 dimensions) it is illustrated.
Invention content
It solves the problems, such as
The purpose of the present invention is to provide controller switching equipment livewire work auxiliary device and carry out controller switching equipment electrification using it
The method of operation allows staff easily to install and is applied to controller switching equipment livewire work, and staff utilizes electric power
While the local remote auto far from electric wire moves electric wire, the controller switching equipment electrification for safely carrying out replacing LP insulators is made
Industry.
Solution to the problem
The controller switching equipment livewire work auxiliary device of the present invention:Include interim wooden cross arm, by above-mentioned interim wooden cross arm
Fixed interim wooden cross arm fixed part on utility poles, the 1st lifting moving portion that above-mentioned interim wooden cross arm is moved up and down, installation
In above-mentioned interim wooden cross arm, and support be connected to the electric wire on said wires bar wire rack, will be above and below said wires holder
The 2nd mobile lifting moving portion.
Above-mentioned 1st lifting moving portion preferably include electric pole mounting portion on above-mentioned interim wooden cross arm fixed part,
Mounted on said wires bar mounting portion, the 1st driving of above-mentioned interim wooden cross arm is moved up and down after the power of the 1st driver of receiving
Portion.
Above-mentioned 2nd lifting moving portion preferably includes interim wooden cross arm mounting portion on above-mentioned interim wooden cross arm, peace
Mounted in above-mentioned interim wooden cross arm mounting portion, the 2nd driving of said wires holder is moved up and down after the power of the 2nd driver of receiving
Portion.
The controller switching equipment livewire work method of the present invention includes that interim wooden cross arm is installed to the stage of electric pole, will be connected
Electric wire on to said wires bar is moved to the stage of the wire rack on above-mentioned interim wooden cross arm, by above-mentioned interim wood
Cross-arm or said wires holder move up, and make said wires far from the rank for the old LP insulators being mounted on common cross-arm
Section, with stages of the old LP insulators of new LP replacing insulators, by above-mentioned interim wooden cross arm or said wires holder to above-mentioned new LP
Stage that insulator direction moves down, the rank that the said wires for being connected to said wires holder are moved to new LP insulators
Section.
It is that the 1st lifting moving portion receives the 1st driver by the ideal method that above-mentioned interim wooden cross arm moves up or down
Power after, move up and down above-mentioned interim wooden cross arm.
It is that the 2nd lifting moving portion receives the 2nd driver by the best approach that said wires holder moves up or down
After power, said wires holder is moved up and down.
Invention effect
Controller switching equipment livewire work auxiliary device according to the present invention utilizes the 1st driver or the electricity of the 2nd driver
Power automatically adjusts the height of interim wooden cross arm, the height of each wire rack, the electric wire height being fixed on wire rack, can be light
Pine carries out the replacement operation of LP insulators.
According to the present invention, the 1st driver or the 2nd driver can use electric drill, the electricity for being generally used for replacing controller switching equipment
The electric tools such as dynamic screwdriver, staff can be easily real without the electric device needed for the mobile wire rack of specially preparation
It is existing.
According to the present invention, the height of interim wooden cross arm and wire rack entirety can be not only adjusted with multistage, by only up and down
The sub- extension that electric wire fixing segments are formed in mobile wire rack, you can 3 sections adjust electric wire fixing segments or electric wire height.
According to the present invention, can automatic or manual adjust electric wire fixing segments or electric wire height, adjustment length is up to vertical extension
The length in portion, the length of main extension, the sum of the length of sub- extension adjust interim wooden cross arm and wire rack by multistage
Highly, close to after target fulcrum, by finely tuning sub- extension, electric wire fixing segments are more accurately placed in object height.
According to the present invention, staff is according to operating environment or convenience, the interim wooden cross arm of adjustment of selectivity on one side
Highly, the height of wire rack whole height, sub- extension can be stablized, easily be temporarily placed within electric wire into being about to electric wire on one side
Operation on holder ensures that the operation in space needed for LP insulators will be replaced.
According to the present invention, using the 1st driver or the 2nd driver, staff can be long-range with electric wire remote position
Electric wire is moved to the top of old LP insulators, can more easily control ensure to replace the livewire work space needed for LP insulators, it can
Reducing staff when replacing LP insulators leads to the danger of safety accident with line contacts.
According to the present invention, when checking, repair, replacing the different LP insulators of multiple height, using the 2nd lifting moving portion,
According to the height of LP insulators, wire rack is individually lifted, can easily carry out operation, it is tired using live-wire work tool and utensil
When difficult, it can also up and down adjust using position, operation is made to be more prone to.
According to the present invention, multiple wire racks are mounted in the state of interim wooden cross arm, move up interim wooden cross arm, can
The trouble that wire rack moves up one by one is avoided, all wire racks can be moved up simultaneously with identical displacement.
Description of the drawings
Fig. 1 is the perspective sketch map of the controller switching equipment livewire work auxiliary device of one embodiment of the invention.
Fig. 2 is the interim wooden cross arm fixed part of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion.
Fig. 3 is the lateral concept map of the 1st lifting moving portion internal structure of one embodiment of the invention.
Fig. 4 to illustrate the invention one embodiment the 1st driving portion operation concept map.
Fig. 5 is the wire rack of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion.
Fig. 6 to illustrate the invention one embodiment the 1st lifting moving portion operation concept map.
Fig. 7 to illustrate the invention one embodiment into electric wire fixing segments be inserted into electric wire process concept map.
The flow chart of Fig. 8 controller switching equipment livewire work methods of one embodiment to illustrate the invention.
Fig. 9 is to illustrate interim wooden cross arm being fixed on electricity in the controller switching equipment livewire work method of the 1st embodiment of the invention
The concept map of line bar process.
Figure 10 is to illustrate wire rack to electric wire side in the controller switching equipment livewire work method of 1st embodiment of the invention
To the concept map for the process of moving up.
Figure 11 is to illustrate electric wire being moved to electric wire branch in the controller switching equipment livewire work method of the 1st embodiment of the invention
The concept map of frame process.
Figure 12 is to illustrate to move up wire rack in the controller switching equipment livewire work method of the 1st embodiment of the invention,
Make electric wire far from the concept map of old LP insulation subprocess.
Figure 13 is to illustrate old with new LP replacing insulators in the controller switching equipment livewire work method of the 1st embodiment of the invention
The concept map of LP insulation subprocess.
Figure 14 is to illustrate wire rack is exhausted to new LP in the controller switching equipment livewire work method of the 1st embodiment of the invention
Edge direction moves down the concept map of process.
Figure 15 is to illustrate electric wire to new LP insulators in the controller switching equipment livewire work method of 1st embodiment of the invention
The concept map of moving process.
Figure 16 is to illustrate interim wooden cross arm from electric wire in the controller switching equipment livewire work method of 1st embodiment of the invention
The concept map of bar disassembly process.
Figure 17 is to illustrate interim wooden cross arm being fixed in the controller switching equipment livewire work method of the 2nd embodiment of the invention
The concept map of electric pole process.
Figure 18 is to illustrate wire rack to electric wire side in the controller switching equipment livewire work method of 2nd embodiment of the invention
To the concept map for the process of moving up.
Figure 19 is to illustrate electric wire being moved to electric wire branch in the controller switching equipment livewire work method of the 2nd embodiment of the invention
The concept map of frame process.
Figure 20 is to illustrate to move up wire rack in the controller switching equipment livewire work method of the 2nd embodiment of the invention,
Make electric wire far from the concept map of old LP insulation subprocess.
Figure 21 is to illustrate old with new LP replacing insulators in the controller switching equipment livewire work method of the 2nd embodiment of the invention
The concept map of LP insulation subprocess.
Figure 22 is to illustrate wire rack is exhausted to new LP in the controller switching equipment livewire work method of the 2nd embodiment of the invention
Edge direction moves down the concept map of process.
Figure 23 is to illustrate electric wire to new LP insulators in the controller switching equipment livewire work method of 2nd embodiment of the invention
The concept map of moving process.
Figure 24 is to illustrate interim wooden cross arm from electric wire in the controller switching equipment livewire work method of 2nd embodiment of the invention
The concept map of bar disassembly process.
Specific implementation mode
The particular content to carry out an invention
Hereinafter, with reference to the drawing in attachment, illustrates the controller switching equipment livewire work auxiliary device of the present invention and utilize it
Carry out the embodiment of controller switching equipment livewire work method.During this, clearly demonstrate for convenience, the thickness of the line in drawing or
Size of component etc. may compare exaggeration.
Aftermentioned term is to consider the function in the present invention and the term that defines, according to user, operating personnel purpose or
Convention may be different.Therefore, these terms should be defined based on this detail entire content.
First, illustrate the controller switching equipment livewire work auxiliary device 500 of the present invention.
Fig. 1 is the perspective sketch map of the controller switching equipment livewire work auxiliary device of one embodiment of the invention.
With reference to figure 1, controller switching equipment livewire work of the invention is horizontal by interim wooden cross arm 510, interim wood with auxiliary device 500
Carry on a shoulder pole fixed part 520, the 1st lifting moving portion 530, wire rack 540, the 2nd lifting moving portion 550 composition.
Interim wooden cross arm 510 is fixed on electric pole 10, with wire rack 540 and the electricity being connected on wire rack 540
Line 30 forms the frame that support is born a heavy burden.The interim wooden cross arm 510 of one embodiment of the invention prolongs by horizontal extension portion 511, vertically
Long portion 513, holder 515 form.
Horizontal extension portion 511 is that horizontal direction extends.Therefore, vertical extensions 513 are fixed on electric pole 10
Under state, horizontal extension portion 511 is arranged side by side with the iron cross arm on electric pole 10.In horizontal horizontal extension portion 511
Installation one or more wire rack 540.
Vertical extensions 513 are connected to the bottom in horizontal extension portion 511.Vertical extensions 513 are along electric pole 10 with vertical
Direction extends, and is fixed on electric pole 10 by interim wooden cross arm 520.
Holder 515 is rod shape, and inclination is installed between horizontal extension portion 511 and vertical extensions 513, and connects level
Extension 511 and vertical extensions 513.The top of holder 515 connects with the chaining part 516 mounted on 511 end of horizontal extension portion
It connects, keeps its rotatable, the lower part of holder 515 is connect with vertical extensions 513.By above-mentioned connection structure, holder 515 with
On the basis of the interconnecting piece of vertical extensions 513, support level extension 511.
The method that chaining part 516 is installed to horizontal extension portion 511:Chaining part 516 is inserted into level frame interconnecting piece 521
After end, the bolts fitting such as lifting bolt is run through to the side of chaining part 516, chaining part 516 and horizontal extension portion 511 is tight
It is close to and is connected together.
Fig. 2 is the interim wooden cross arm fixed part of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion;Fig. 3
For the lateral concept map of the 1st lifting moving portion internal structure of one embodiment of the invention;Fig. 4 implementations to illustrate the invention
The concept map of the 1st driving portion operation of example.
Interim wooden cross arm 510 or the 1st lifting moving portion 530 are fixed on electric pole 10 by interim wooden cross arm fixed part 520.Ginseng
Fig. 2 is examined, the interim wooden cross arm fixed part 520 of one embodiment of the invention is connected by interim wooden cross arm interconnecting piece 521 with electric pole
Portion 523 forms.
Interim wooden cross arm interconnecting piece 521 is the part being connect with interim wooden cross arm 510 or the 1st lifting moving portion 530.Temporarily
Wooden cross arm interconnecting piece 521, which possesses, can load and unload interim wooden cross arm 510 or the 1st interconnecting piece 531a in the 1st lifting moving portion 530
2nd interconnecting piece, 522 structure.
In one embodiment of the invention, the 1st interconnecting piece 531a longitudinally (upper and lower) can extend, and lower part is in the opening wider than top
Shape, the 2nd interconnecting piece 522 are the appearance to 530 side of the 1st lifting moving portion outer interconnecting piece outstanding, and the width of end can pass through
The lower part of 1st interconnecting piece 531a, but top can not be passed through.
The 2nd interconnecting piece 522 is inserted into the lower part of 1st interconnecting piece 531a, the lifting of interim wooden cross arm 510 or the 1st is lifted in releasing
The external force of moving portion 530, because of interim wooden cross arm 510 or the weight in the 1st lifting moving portion 530, the 1st interconnecting piece 531a is to moving down
It is dynamic, so that the 2nd interconnecting piece 522 is located at the top of the 1st interconnecting piece 531a.At this point, the end of the 2nd interconnecting piece 522 hangs over the 1st interconnecting piece
The top of 531a.By above-mentioned assembling, interim wooden cross arm 510 or the 1st lifting moving portion 530 can be connected mounted in interim wooden cross arm
On portion 521.
Electric pole interconnecting piece 523 is secured to the part of electric pole 10.Electric pole interconnecting piece 523 is connect with interim wooden cross arm
Portion 521 connects, and possesses the clip structure being loaded and unloaded on electric pole 10.
General clip is the accessory that the 1st accessory is connected to the 2nd accessory, can encase the 2nd accessory " ㄈ " shape or " C "
Shape or band-like, there are the connectors such as bolt or nut in end.Although the electric pole interconnecting piece of one embodiment of the invention
523 be clip structure, but if can electric pole 10, not limit structure and appearance be fixed to interim wooden cross arm 510.
It, will be on interim wooden cross arm 510 in the state that 1st lifting moving portion 530 is to be fixed on interim wooden cross arm fixed part 520
Lower movement.With reference to 2~Fig. 4 of figure, the 1st lifting moving portion 530 of one embodiment of the invention is by electric pole mounting portion 531 and the 1st
Driving portion 533 forms.
In the state that electric pole mounting portion 531 is to be mounted on interim wooden cross arm fixed part 520, formation can be supported including hanging down
The frame of interim wooden cross arm 510 and 30 weight of electric wire including straight extension 513.531 side of electric pole mounting portion has and can face
When wooden cross arm fixed part 520 on the 1st interconnecting piece 531a that loads and unloads.Have and the 1st interconnecting piece 531a on interim wooden cross arm fixed part 520
The 2nd interconnecting piece 522 being spirally connected.It, can be by the 1st lifting moving by being spirally connected for the 1st interconnecting piece 531a and the 2nd interconnecting piece 522
Portion 530 is installed on interim wooden cross arm fixed part 520.By releasing being spirally connected for the 1st interconnecting piece 531a and the 2nd interconnecting piece 522,
1st lifting moving portion 530 and interim wooden cross arm fixed part 520 can be separated.
Vertical extensions 513 are installed so that it can move up and down in the offside of electric pole mounting portion 531.Installation is vertically prolonged
When long portion 513, electric pole mounting portion 531 is run through up and down, so that it is coordinated the movement of the 1st driving portion 533, move up and down.
To prevent from hindering the movement of vertical extensions 513, the electricity connecting with vertical extensions 513 with the friction of electric pole mounting portion 531
Line bar mounting portion 531 is mounted with multiple rollers 532 in a manner of being arranged above and below.When vertical extensions 513 are upward/lower mobile, rolling
Son 532 keeps the state contacted with vertical extensions 513, coordinates the movement of vertical extensions 513, to side or reverse rotation.
1st driving portion 533 is mounted on electric pole mounting portion 531, will interim wood after the power for receiving the 1st driver 41
Cross-arm 510 moves up and down.1st driver 41 can be applicable in electric drill, the electric screw driver etc. replaced and generally used when controller switching equipment
The driving devices such as electric tool or motor.1st driving portion 533 of one embodiment of the invention is by the 1st driving section 534, the 1st beam barrel
537, the 1st transmission belt 538 forms.
1st driving section 534 is to be rotated to drive by the 1st driver 41.In one embodiment of the invention, the 1st driving section 534
It is made of the 1st worm screw 535 and the 1st worm gear 536.
There is the 1st power receiving portion 535a being connect with the 1st driver 41 in the end of 1st worm screw 535, receives the 1st driver
41 rotary powers transmitted.1st worm gear 536 is engaged with the 1st worm screw 535, is separately mounted on the 1st beam barrel 537 and transmission shaft, with
The linkage of 1st worm screw 535 is rotated.Using electric tool as the 1st driver 41 in use, the 1st worm screw 535 with the 1st by swashing
The rotation linkage for encouraging device 41 is rotated, and the 1st worm gear 536 is then rotated in deceleration by the rotation linkage with the 1st worm screw 535,
Increase rotary force simultaneously.
As described above, according to the turbine structure for having the 1st worm screw 535 and the 1st worm gear 536, power can only be from the 1st worm screw
535 transmit to the 1st worm gear 536, can not be transmitted from the 1st worm gear 536 to the 1st worm screw 535.That is, imposing rotation to the 1st worm gear 536
Power, can not be such that the 1st worm screw 535 rotates, and the 1st worm gear 536 will not rotate.
1st worm gear 536 is connect by the 1st beam barrel 537 and the 1st transmission belt 538 with interim wooden cross arm 510, according to above-mentioned
Worm gear arrangement can prevent from making interim wooden cross arm 510 move down because of the weight such as interim wooden cross arm 510 and electric wire 30.
The 1st transmission belt 538 is rolled or unlocked to 1st beam barrel 537, to side or reverse rotation, by the 1st driving section 534.1st
Beam barrel 537 is the cylindrical structure that can batch the 1st transmission belt 538, is connected on transmission shaft with the 1st worm gear 536.
1st transmission belt 538 will be rolled to the 1st beam barrel 537, and end is connected to interim wooden cross arm 510.1st transmission belt 538 can
To be the general transmission belt of flat rectangle or linear section, the linear accessories such as cable, cable wire can also be used.1st transmission belt, 538 end
The connector that end can be connected and be detached by hook, connector (fitting), buckle, spiro connecting piece etc. is carried out with interim wooden cross arm 510
Connection.
1st driver 41 is rotated with the state that its end is connect with the 1st power receiving portion 535a to side, rotary power
It is transferred to the 1st beam barrel 537 by the 1st driving section 534, the 1st beam barrel 537 will while rolling the 1st transmission belt 538 to side rotation
The interim wooden cross arm 510 being connect with 538 end of the 1st transmission belt is pulled upwardly.If making the 1st driver 41 reversely rotate, the 1st axis
Cylinder 537 also reversely rotates, and unlocks interim wooden cross arm 510 while the 1st transmission belt 538 and declines.
The safety position limiter 539 for limiting interim wooden cross arm 510 and moving down can be added in 510 bottom of interim wooden cross arm.This
In invention one embodiment, safety position limiter 539 is the banded structure with certain length, end and interim wooden cross arm 510
Connection.Safety position limiter 539 can be connected with as the 1st transmission belt 538 by hook, connector (fitting), buckle, spiro connecting piece etc.
The connector for connecing and detaching is attached with interim wooden cross arm 510.
With reference to 1~Fig. 4 of figure, the controller switching equipment livewire work of one embodiment of the invention is in auxiliary device 500, interim wood
Cross-arm 510 is attached by the 1st lifting moving portion 530 and interim wooden cross arm fixed part 520.That is, interim wooden cross arm fixed part
520 are fixed to electric pole 10 by the 1st lifting moving portion 530 and interim wooden cross arm fixed part 520.
But controller switching equipment livewire work of the invention is in auxiliary device 500, if the 1st lifting moving portion 530 can only
Interim wooden cross arm 510 is lifted, is not necessarily intended to be mounted between interim wooden cross arm 510 and interim wooden cross arm fixed part 520.That is, facing
When wooden cross arm 510 not by the 1st lifting moving portion 530, but electric pole is directly installed to by interim wooden cross arm fixed part 520
On 10;1st lifting moving portion 530 is mounted to electricity not between interim wooden cross arm 510 and interim wooden cross arm fixed part 520
The other positions of line bar 10 control the lifting of interim wooden cross arm 510.
Fig. 5 is the wire rack of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion;Fig. 6 is to illustrate this
The concept map of the 2nd lifting moving portion operation of invention one embodiment;Fig. 7 one embodiment to illustrate the invention it is solid to electric wire
Determine the concept map that electric wire process is inserted into portion.
Wire rack 540 mounted on the support of the state of interim wooden cross arm 510 to be connected to the electric wire 30 on electric pole 10.Ginseng
Fig. 5 is examined, the wire rack 540 of one embodiment of the invention is made of extension 541 and electric wire fixing segments 545.
Extension 541 is extended structure to pass through the 2nd lifting moving portion 550 mounted on horizontal extension portion 511 up and down
It moves up and down.The extension 541 of one embodiment of the invention is by main extension 542, sub- extension 543,544 groups of fixed part
At.
Main extension 542 is connect with lifting moving portion 550, after the power for receiving the 2nd driver 42, is moved by the 2nd lifting
Dynamic portion 550 moves up and down.Sub- extension 543 includes isolation material, is mounted on the main extension of cylindrical shape in the way to insert
Bottom inside 542 makes it that can be moved to the top of main extension 542.
The sub- extension 543 moved up is fixed on main extension 542 by fixed part 544 and extension 541.It is fixed
Portion 544 can be used rotary fixing device, run through device through sub- extension 543 and main extension 542.
When fixed part 544 is using rotary fixing device, son is prolonged by way of rotating fixed part 544 to side
Long portion 543 is fixed on main extension 542, and the connection of sub- extension 543 and main extension 542 can be released by reversely rotating.Such as
Fruit has fixed part 544, after sub- extension 543 is moved to object height, by with 544 stator extension 543 of fixed part
Process adjust the length of extension 541 manually.
If without fixed part 544, screw bolt and nut is set in the interconnecting piece of sub- extension 543 and main extension 542, is led to
Cross the mode for rotating sub- extension 543 to side, sub- extension 543 be fixed on main extension 542, make its can not on move down
It is dynamic;The connection of sub- extension 543 and main extension 542 can be released by reversely rotating sub- extension 543.
Electric wire fixing segments 545 be install electricity lines 30 part, be mounted on sub- extension 543 top.Electric wire fixing segments 545 will
Electric wire 30 is tightly attached on wire rack 540.With reference to figure 7, the electric wire fixing segments 545 of one embodiment of the invention are by holder
546 and sticking department 548 form.
Holder 546 is attached with extension 541, and have can supply lines 30 by opening 546a.Sticking department 548 with
Holder 546 is attached, switch opening 546a.In one embodiment of the invention, 546a is in 546 top of holder, sticking department for opening
548 are mounted on one end of holder 546, rotatable.
When sticking department 548 is rotated to side, sticking department 548 closes opening 546a while hanging over holder 546.(reference
When Fig. 5) reversely rotating sticking department 548, the other end of the sticking department 548 far from holder 546 opens simultaneously opening 546a.(reference
Fig. 7) as described above, by operate sticking department 546 switch opening 546a while, by electric wire 30 be inserted into electric wire fixing segments 545 into
Row is fixed, or electric wire 30 is removed from electric wire fixing segments 545.
It is mounted with lower roller 547 on holder 546, it can be made to be rotated in specified position, is mounted on sticking department 548
Top roller 549 can be such that it is rotated in specified position.The insertion 546 inside sticking department 548 of holder of electric wire 30 is locked
Under state, the outside of electric wire 30 is contacted with lower roller 547 and top roller 549.That is, electric wire 30 is being inserted into electric wire fixing segments
In the state of 545, electric wire 30 is in rolling contact with electric wire fixing segments 545.
It therefore, can when relative displacement occurring during replacing controller switching equipment, between electric wire fixing segments 545 and electric wire 30
It prevents electric wire 30 from being injured by electric wire fixing segments 545, the connection status for keeping electric wire fixing segments 545 and electric wire 30 can be stablized, simultaneously
It can ensure the smooth movement of electric wire fixing segments 545 or electric wire 30.
2nd lifting moving portion 550 moves up and down wire rack 540.2nd lifting moving portion 550 can individually lift each electric wire
Holder 540.Therefore, the quantity in the 2nd lifting moving portion 550 is determined by the quantity of wire rack 540.With reference to figure 6, the present invention the 2nd
2nd lifting moving portion 550 of embodiment is made of 551 and the 1st driving portion 553 of interim wooden cross arm mounting portion.
Interim wooden cross arm mounting portion 551 is mounted on horizontal extension portion 511.There is folder on interim wooden cross arm mounting portion 551
Minor structure is connected in horizontal extension portion 511, and can be loaded and unloaded.Shelf structure in relation to interim wooden cross arm mounting portion 551 can refer to
523 related description of electric pole interconnecting piece, is not repeated herein.
There is guide wire rack 540 to move up and down to lead on the interim wooden cross arm mounting portion 551 of one embodiment of the invention
Rail 552.It is lifted, is had on guide rail 552 extended hollow up and down with being inserted into the state inside guide rail 552 in order to make wire rack 540
Guide-track groove 552a.
If lifting moving portion 550 can be fixed in horizontal extension portion 511, interim wooden cross arm mounting portion 551 includes suitable
Clip structure on interim wooden cross arm fixed part 520 or the structure different from interim wooden cross arm fixed part 520, are not limited to spy
Fixed structure and shape.
2nd driving portion 553 is mounted on interim wooden cross arm mounting portion 551, will be electric after the power for receiving the 2nd driver 42
Line bracket 540 moves up and down.2nd driver 42 is identical as the 1st driver 41, can use general when replacing controller switching equipment operation
The driving devices such as the electric tools such as the electric screw driver used or motor.2nd driving portion 553 of the 2nd embodiment of the invention is by the 2nd
Driving section 554, the 2nd beam barrel 557, the 1st transmission belt 558 composition.
2nd driving section 554 is to be rotated to drive by the 2nd driver 42.In one embodiment of the invention, the 2nd driving section 554
It is made of the 2nd worm screw 555 and the 2nd worm gear 556, there is the 2nd power receiving portion being connect with the 2nd driver 42 in 555 end of the 2nd worm screw
555a。
1st biography of the 2nd driving section 554, the 2nd beam barrel 557, the 2nd band 558 and the 1st driving portion 533 on the 2nd driving portion 553
Dynamic portion 534, the 1st beam barrel 537, the structure of the 1st transmission belt 538 are identical, omit related description herein.
According to the worm gear arrangement that the 2nd worm screw 555 and the 2nd worm gear 556 form, it can prevent the weight because of electric wire 30 etc. from causing
Wire rack 540 moves down.In the state that the end of 2nd driver 42 is connect with the 2nd power receiving portion 555a, by by
2 drivers 42 pull up or move down wire rack 540 to side or reverse rotation.
Controller switching equipment livewire work auxiliary device 500 according to the present invention is swashed using above-mentioned 1st driver 41 or the 2nd
The power of device 42 is encouraged, the height, the height of wire rack 540, frame of interim wooden cross arm 510 is adjusted on wire rack 540
The height of electric wire 30.
It illustrates further:Using the 1st driver 41, the 1st movement is carried out, makes interim wooden cross arm 510 and mounted on facing
When wooden cross arm 510 on wire rack 540 closer to or far from electric wire 30;Using the 2nd driver 42, the 2nd movement is carried out,
Make wire rack 540 closer to or far from electric wire 30.By adjusting the height of sub- extension 543, fine tuning is connected to sub- extension
The overall length of the height of electric wire fixing segments 545 in portion 543 or scalable adjustment wire rack 540.
According to the present invention, the 1st driver 41 or the 2nd driver 42 can use the electricity for being generally used for replacing controller switching equipment
The electric tools such as brill, electric screw driver, staff is without specially preparing the electric device needed for mobile wire rack 540
Easily realize.
According to the present invention supporting electric wire 30 can be moved up and down using the electric power of the 1st driver 41 or the 2nd driver 42
The wire rack 540 of weight moves up and down electric wire 30 without using pulley etc. by tractive force, and livewire work is made to become more light
Pine.
According to the present invention, the 1st driver 41 and the 1st lifting moving portion 530, the 2nd driver 42 and the 2nd lifting moving are utilized
Portion 550 is accurately put into object height with certain speed movement wire rack 540 or electric wire 30.
In the following, the controller switching equipment livewire work auxiliary device 500 that the present invention for utilizing above structure will be introduced, with new LP
(Line Post) insulator 25 replaces the controller switching equipment band of the present invention for the old LP insulators 22 being mounted on common cross-arm 20
Electric operational method.
Common cross-arm 20 is different from the extended arm that multiple insulators are all installed to 10 side of electric pole, it be insulator with
Centered on electric pole 10, it is evenly distributed on the cross-arm of the new both sides for setting electric pole.The insulator of common cross-arm 20 is with electric pole 10
Centered on be distributed in both sides, between clearance space can meet staff carry out livewire work.
The flow chart of Fig. 8 controller switching equipment livewire work methods of one embodiment to illustrate the invention.
With reference to figure 8, the controller switching equipment livewire work method of the embodiment of the present invention includes to be mounted on interim wooden cross arm 510
The stage S1 of electric wire 10, by interim wooden cross arm 510 or wire rack 540 on interim wooden cross arm 510 to electric pole
Stage S2 that 30 directions of electric wire of 10 connections move up, the stage S3 that electric wire 30 is moved to wire rack 540, will interim wood
Cross-arm 510 or wire rack 540 move up again, by electric wire 30 far from the old LP insulators 22 on common cross-arm 20
Stage S4, the stage S5 that old LP insulators 22 are replaced with new LP insulators 25, by interim wooden cross arm 510 or wire rack 540 to
Stage S6 that new 25 direction of LP insulators moves down, the electric wire 30 for being connected to wire rack 540 is moved to new LP insulators
The 25 stage S7 and stage S8 for removing interim wooden cross arm 510 from electric pole 10.
Fig. 9 is to illustrate interim wooden cross arm being fixed on electricity in the controller switching equipment livewire work method of the 1st embodiment of the invention
The concept map of line bar process;Figure 10 is to illustrate wire rack in the controller switching equipment livewire work method of the 1st embodiment of the invention
The concept map of process is moved up to electric wire direction;In controller switching equipment livewire work methods of the Figure 11 for the 1st embodiment of the invention,
Illustrate the concept map that electric wire is moved to wire rack process.
Figure 12 is to illustrate to move up wire rack in the controller switching equipment livewire work method of the 1st embodiment of the invention,
Make electric wire far from the concept map of old LP insulation subprocess;Figure 13 is the controller switching equipment livewire work method of the 1st embodiment of the invention
In, illustrate the concept map with the old LP insulation subprocess of new LP replacing insulators;Figure 14 is the controller switching equipment of the 1st embodiment of the invention
In livewire work method, illustrate the concept map that wire rack is moved down to process to new LP insulators direction.
Figure 15 is to illustrate electric wire to new LP insulators in the controller switching equipment livewire work method of 1st embodiment of the invention
The concept map of moving process;Figure 16 is in the controller switching equipment livewire work method of the 1st embodiment of the invention, and illustrating will be interim wooden horizontal
Carry on a shoulder pole the concept map from electric pole disassembly process.
With reference to 9~Figure 16 of figure, the controller switching equipment livewire work method of the 1st embodiment of the invention is charged using controller switching equipment
The method that operation replaces Geju City LP insulators 22 with auxiliary device 500 with a new LP insulator 25.
With reference to figure 9, the method for realizing the stage S1 that interim wooden cross arm 510 is fixed on to electric pole 10:By interim wooden cross arm
Fixed part 520 is fixed on electric pole 10, and the 1st lifting moving portion 530 is fixed on interim wooden cross arm fixed part 520, connection the 1st
2nd lifting moving portion 550 and wire rack 540 are fixed on interim wooden cross arm by lifting moving portion 530 and interim wooden cross arm 510
On 510, keep its position corresponding with mounted LP insulators 22.
Sequence when connecting interim wooden cross arm 510 and the 1st lifting moving portion 530 is first to be mounted on vertical extensions 513
1st lifting moving portion 530, behind 513 top of vertical extensions connection horizontal extension portion 511, in horizontal extension portion 511 and vertically
Mounting bracket 515 between extension 513.
The sequence of mounting bracket 515 between horizontal extension portion 511 and vertical extensions 513:Chaining part 516 is mounted on water
After on flat extension, the top of holder 515 is mounted on chaining part 516 so that it can rotate, the lower part peace of holder 515
So that it can by loading and unloading on the fasteners such as the lifting bolt mounted in 513 lower part of vertical extensions.
The sequence 2nd lifting moving portion 550 and wire rack 540 being fixed on interim wooden cross arm 510:First by the 2nd liter
Drop moving portion 550 is fixed on interim wooden cross arm 510, then wire rack 540 is connected in the 2nd lifting moving portion 550.Also may be used
After first wire rack 540 to be connected in the 2nd lifting moving portion 550, it is fixed on temporarily by the 2nd lifting moving portion 550
On wooden cross arm 510.
Also the method that interim wooden cross arm 510 is fixed on to the stage S1 on electric pole 10 can be realized:2nd lifting will be housed to move
The interim wooden cross arm 510 of dynamic portion 550 and wire rack 540 is connected to the 1st lifting moving portion 530 or interim wooden cross arm fixed part
520。
With reference to figure 10, the side for the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30 is realized
Method:Staff is moved up sub- extension 543 to 30 direction of electric wire by way of manual operation.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root
According to operating condition or the convenience of staff, by the 1st driver 41 and the 1st lifting moving portion 530, only by interim wooden cross arm
510 move up;It, only will be on interim wooden cross arm 510 or by the 2nd driver 42 and the 2nd lifting moving portion 550
Wire rack 540 moves up.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root
, can be by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff, it only will interim wood cross
Load 510 moves up, and by the 2nd driver 42 and the 2nd lifting moving portion 550, will only be mounted on interim wooden cross arm 510
Wire rack 540 move up.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root
It, can be by the 1st driver 41 and the 1st lifting moving portion 530, by interim wooden cross arm according to operating condition or the convenience of staff
510 move up with staff through manual operation, and sub- extension 543 is moved up to 30 direction of electric wire.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root
According to operating condition or the convenience of staff, can will be mounted on interim by the 2nd driver 42 and the 2nd lifting moving portion 550
The wire rack 540 of wooden cross arm 510 is moved up with staff by manual operation, by sub- extension 543 to 30 side of electric wire
To movement.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root
It, can be by the 1st driver 41 and the 1st lifting moving portion 530, by interim wooden cross arm according to operating condition or the convenience of staff
510 move up, by the 2nd driver 42 and the 2nd lifting moving portion 550, by the electric wire branch on interim wooden cross arm 510
Frame 540 moves up and staff is by manual operation, and sub- extension 543 is moved to 30 direction of electric wire.
The present invention explanation in, wire rack 540 is moved up or down, include by the main extension 542 of movement,
The mobile wire rack 540 including main extension 542 and sub- extension 543 is whole, or only moves on wire rack 540
The embodiment of the sub- extension in portion 543, the part for the electric wire fixing segments 545 being connect with electric wire 30 in wire rack 540 include
The process of 540 upper height of wire rack is adjusted upward or downward.
That is, in the explanation of the present invention, mobile wire rack 540 includes by 42 grade of the 2nd lifting moving portion of the 2nd driver
The embodiment of the sub- extension of movement in the whole embodiment of 550 movement wire racks 540, wire rack 540 543 comprehensive is moved
The embodiment of dynamic wire rack 540 and mobile sub- 543 process of extension.
Therefore, even if the whole and mobile sub- extension 543 of not specified mobile wire rack 540, explanation of the invention
In to mention mobile wire rack 540 just refer to one of above three embodiments.
In the state of the opening 546a for opening holder 546 top, into be about to interim wooden cross arm 510 or wire rack 540 to
When the stage S2 that 30 direction of electric wire moves up, after completing the stage S2 for moving up wire rack 540 to 30 direction of electric wire,
Electric wire 30 is entered by the 546a that is open inside holder 546.
With reference to figure 11, the method for realizing the stage S3 that electric wire 30 is moved to wire rack 540:Electric wire 30 is connected to electricity
After line bracket 540, the connection of electric wire 30 and old LP insulators 22 is released.
With reference to figure 12, realize the side of stage S4 of the electric wire 30 far from the old LP insulators 22 on common cross-arm 20
Method:Locking electric wire 30 enters internal 546 sticking department 548 of holder through the 546a that is open, that is, with the block opening of sticking department 548 546a.
The method for releasing electric wire 30 and the connection of old LP insulators 22:The binding of cut-out connection electric wire 30 and old LP insulators 22
Component (Binder), or the operation that releasings bundle component such as remove from electric wire by component is bundled.
Although not illustrating in the drawing of the present invention, controller switching equipments are waited for protection electric wire 30, generally outside electric wire 30
Wrap up hot line set, insulator cover isoelectric line set.Before the connection for releasing electric wire 30 and old LP insulators 22, then move up electric wire branch
Frame 540 produces the space released needed for binding component between electric wire 30 and old LP insulators 22.
After electric wire 30 is connected to wire rack 540, before releasing the connection between electric wire 30 and old LP insulators 22, then
Wire rack 540 is moved up, will not be adjacent between electric wire 30 and old LP insulators 22, between electric wire 30 and old LP insulators 22
Space will be will produce, electric wire set is made not encounter old LP insulators 22.It therefore, can be by electric wire according to the convenience of staff
30 are moved along electric wire set, smoothly complete controller switching equipment replacement operation.
At this point, before releasing the connection between electric wire 30 and old LP insulators 22, then move up the side of wire rack 540
Method is, by the 2nd driver 42 and the 2nd lifting moving portion 550, to move up wire rack 540.Certainly, can also swash by the 1st
It encourages device 41 and the 1st lifting moving portion 530 moves the realization of interim wooden cross arm 510.
Interim wooden cross arm 510 or wire rack 540 are moved up, make electric wire 30 far from the stage S4 of old LP insulators 22
It is to ensure that the process that space needed for the operation of old LP insulators 22 is replaced with new LP insulators 25.
With reference to figure 12, realization moves up interim wooden cross arm 510 or wire rack 540, keeps electric wire 30 exhausted far from old LP
The method of the stage S4 of edge 22:Interim wooden cross arm 510 is moved up by the 1st driver 41 and the 1st lifting moving portion 530,
And wire rack 540 is moved up by the 2nd driver 42 and the 2nd lifting moving portion 550.
Also it can realize and move up interim wooden cross arm 510 or wire rack 540, make electric wire 30 far from old LP insulators 22
Stage S4 method:It, can be only by being lifted by the 1st driver 41 and the 1st according to the convenience of operating condition and staff
Moving portion 530 moves interim wooden cross arm 510, or moves wire rack by the 2nd driver 42 and the 2nd lifting moving portion 550
540, or be manually operated by staff and move up sub- extension 543 to 30 direction of electric wire.
Also it can realize and move up interim wooden cross arm 510 or wire rack 540, make electric wire 30 far from old LP insulators 22
Stage S4 method:According to operating condition or the convenience of staff, the 1st driver 41 and the 1st lifting moving can be passed through
Portion 530 moves up interim wooden cross arm 510 with staff by manual operation, by sub- extension 543 to 30 direction of electric wire
It moves up.
Also it can realize and move up interim wooden cross arm 510 or wire rack 540, make electric wire 30 far from old LP insulators 22
Stage S4 method:According to operating condition or the convenience of staff, pass through the 2nd driver 42 and the 2nd lifting moving portion
550, it will be moved up mounted on the wire rack 540 of interim wooden cross arm 510 and staff be by manual operation, it will be sub
Extension 543 is moved up to 30 direction of electric wire.
Also it can realize and move up interim wooden cross arm 510 or wire rack 540, make electric wire 30 far from old LP insulators 22
Stage S4 method:According to operating condition or the convenience of staff, pass through the 1st driver 41 and the 1st lifting moving portion
530, interim wooden cross arm 510 is moved up, and by the 2nd driver 42 and the 2nd lifting moving portion 550, will be mounted on and face
When wooden cross arm 510 on wire rack 540 move up and staff is by manual operation, by sub- extension 543 to electricity
It moves in 30 direction of line.
With reference to figure 13, the method for realizing the stage S5 that old LP insulators 22 are replaced with new LP insulators 25:Using pass through by
Interim wooden cross arm 510 or wire rack 540 move up, the sky for making stage S4 of the electric wire 30 far from old LP insulators 22 ensure
Between, after removing the old LP insulators 22 on iron cross arm 21, new LP insulators 25 are installed.
With reference to figure 14, realizes and to move down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators
The method of stage S6:Interim wooden cross arm 510 is moved down by the 1st driver 41 and the 1st lifting moving portion 530, and is passed through
2nd driver 42 and the 2nd lifting moving portion 550 move down wire rack 540.
Also the stage for moving down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators can be realized
The method of S6:It, can be only by by the 1st driver 41 and the 1st lifting moving portion according to the convenience of operating condition and staff
The 530 interim wooden cross arms 510 of movement, or wire rack 540 is moved by the 2nd driver 42 and the 2nd lifting moving portion 550, or it is logical
Staff's manual operation is crossed to move down sub- extension 543 to 30 direction of electric wire.
Also the stage for moving down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators can be realized
The method of S6:It will by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff
Interim wooden cross arm 510 moves down and staff is by manual operation, and sub- extension 543 is downward to 30 direction of electric wire
It is mobile.
Also the stage for moving down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators can be realized
The method of S6:It will by the 2nd driver 42 and the 2nd lifting moving portion 550 according to operating condition or the convenience of staff
It is moved down mounted on the wire rack 540 of interim wooden cross arm 510 and staff is by manual operation, by sub- extension
543 move down to 30 direction of electric wire.
Also the stage for moving down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators can be realized
The method of S6:It will by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff
Interim wooden cross arm 510 moves down, and by the 2nd driver 42 and the 2nd lifting moving portion 550, it is horizontal will to be mounted on interim wood
Wire rack 540 in load 510 moves down and staff is by manual operation, by sub- extension 543 to 30 side of electric wire
To moving down.
With reference to figure 15, the electric wire 30 for being connected to wire rack 540 is moved to the stage S7's of new LP insulators 25 by realization
Method:Electric wire 30 is adjacent to and fixed to after new LP insulators 25, releases the connection of electric wire 30 and wire rack 540.It will be electric
Line 30 refers to that electric wire 30 is insulated fixed to new LP with connectors such as rubber cable, adhesive tape, buckles fixed to new LP insulators 25
Son 25.
The method for releasing the connection of electric wire 30 and wire rack 540 is that spin locking portion 548 opens opening 546a, passes through
Opening 546a pulls out electric wire 30 to outside holder 546.
With reference to figure 16, the method for realizing the stage S8 for removing interim wooden cross arm 510 from electric pole 10:By the 2nd liter
Drop moving portion 550 and after wire rack 540 removes from interim wooden cross arm 510, by interim wooden cross arm 510 from interim wooden cross arm
It is removed in fixed part 520 or the 1st lifting moving portion 530, the 1st lifting moving portion 530 is torn open from interim wooden cross arm fixed part 520
Get off, then interim wooden cross arm fixed part 520 is removed from electric pole 10.
Also the method that can realize the stage S8 for removing interim wooden cross arm 510 from electric pole 10:2nd lifting will be housed
The interim wooden cross arm 510 of moving portion 550 and wire rack 540 is removed from electric pole 10.
The flow as shown in Fig. 9~Figure 16 is carried out successively, can replace Geju City LP insulation with a new LP insulator 25
Son 22.By the stage S2 that interim wooden cross arm 510 or wire rack 540 are moved up to 30 direction of electric wire will extremely be connected for several times
It is moved to the stage S7 of new LP insulators 25 to the electric wire 30 of wire rack 540, multiple old LP insulators 22 can be replaced successively.
Figure 17 is to illustrate interim wooden cross arm being fixed in the controller switching equipment livewire work method of the 2nd embodiment of the invention
The concept map of electric pole process;Figure 18 is to illustrate electric wire branch in the controller switching equipment livewire work method of the 2nd embodiment of the invention
Frame moves up the concept map of process to electric wire direction;Figure 19 is the controller switching equipment livewire work method of the 2nd embodiment of the invention
In, illustrate the concept map that electric wire is moved to wire rack process.
Figure 20 is to illustrate to move up wire rack in the controller switching equipment livewire work method of the 2nd embodiment of the invention,
Make electric wire far from the concept map of old LP insulation subprocess;Figure 21 is the controller switching equipment livewire work method of the 2nd embodiment of the invention
In, illustrate the concept map with the old LP insulation subprocess of new LP replacing insulators;Figure 22 is the controller switching equipment of the 2nd embodiment of the invention
In livewire work method, illustrate the concept map that wire rack is moved down to process to new LP insulators direction.
Figure 23 is to illustrate electric wire to new LP insulators in the controller switching equipment livewire work method of 2nd embodiment of the invention
The concept map of moving process;Figure 24 is in the controller switching equipment livewire work method of the 2nd embodiment of the invention, and illustrating will be interim wooden horizontal
Carry on a shoulder pole the concept map from electric pole disassembly process.
With reference to 17~Figure 24 of figure, the controller switching equipment livewire work method of the 2nd embodiment of the invention is to utilize controller switching equipment band
The method that electric operation auxiliary device 500 replaces multiple old LP insulators 22 with multiple new LP insulators 25.
It can by the process of a Figure 17~Figure 24 according to the controller switching equipment livewire work method of the 2nd embodiment of the invention
Disposably to replace multiple old LP insulators 22.
According to the controller switching equipment livewire work method of the 2nd embodiment of the invention, interim wooden cross arm 510 is fixed to electric pole
In 10 stage S1, lifting moving portion 550 and wire rack 540 are installed to position corresponding with each Geju City LP insulators 22;
The rank that wire rack 540 on interim wooden cross arm 510 is moved up to 30 direction of electric wire for being connected to electric pole 10
In section S2, multiple wire racks 540 are moved up simultaneously.
Electric wire 30 is moved in the stage S3 of wire rack 540, multiple electric wires 30 are moved to multiple electric wire branch simultaneously
Frame 540, stage later are applied to each Geju City LP insulators 22, new LP insulators 25, electric wire 30 simultaneously, by will once install
Extremely will in the stage S2 that the wire rack 540 of interim wooden cross arm 510 is moved up to 30 direction of electric wire for being connected to electric pole 10
The electric wire 30 for being connected to wire rack 540 is moved to the stage S7 of new LP insulators 25, can be primary by multiple old LP insulators 22
Property is changed to new LP insulators 25.
It is electronic using the 1st driver 41 or the 2nd driver 42 according to the controller switching equipment livewire work method of aforementioned present invention
Power automatically adjusts the height of interim wooden cross arm 510, the height of wire rack 540, the electric wire moved to 540 direction of wire rack
30 height easily realizes the replacement operation of LP insulators.
According to the present invention, the height of 540 entirety of interim wooden cross arm 510 and wire rack can be not only adjusted with multistage, may be used also
543,3 sections of the sub- extension by moving up and down live wire fixed part 545 in wire rack 540 adjust electric wire fixing segments 545 or
The height of electric wire 30.
According to the present invention, staff is according to operating condition or convenience, the selective height for adjusting interim wooden cross arm 510
The whole height of degree, wire rack 540, the height of sub- extension 543, can easily carry out the operation for replacing LP insulators.
According to the present invention, using the 1st driver 41 or the 2nd driver 42, staff can be in the place far from electric wire 30
Electric wire 30 is moved on old LP insulators 22, can easily ensure that the space needed for the livewire work of LP insulators will be replaced,
When simultaneously can be to avoid LP insulators are replaced, it is dangerous that staff is in direct contact safety accident caused by electric wire 30.
According to the present invention, multiple wire racks 540 have been installed in the state of interim wooden cross arm 510, are moved up interim
Wooden cross arm 510, the trouble that can be one by one moved to avoid wire rack 540 keep the displacement that multiple wire racks 540 move up equal
It is identical.
The present invention is the explanation carried out by embodiment in drawing, but this only illustrates, if it is having this
The people of technical field relevant knowledge, it should can understand other implementations of can develop from the present invention various deformation and ad eundem
Example.Therefore, technical protection scope of the invention should be following patent claim.
Claims (6)
1. a kind of controller switching equipment livewire work method,
About use including interim wooden cross arm, above-mentioned interim wooden cross arm is fixed interim wooden cross arm fixed part on utility poles,
Support be mounted on interim wooden cross arm, and be connected to multiple wire racks of electric wire on said wires bar, individually lift it is above-mentioned multiple
The controller switching equipment livewire work side of the controller switching equipment livewire work auxiliary device in multiple 2nd lifting moving portions of wire rack
Method,
It include the stage that above-mentioned interim wooden cross arm is installed to said wires bar;
The said wires for being connected to said wires bar are moved to the rank of the said wires holder mounted on above-mentioned interim wooden cross arm
Section,
Said wires are moved to the stage of said wires holder,
When including to cover mobile in the electric wire for wrapping up said wires, said wires set is avoided to encounter old LP insulators, by upper
It states the 2nd lifting moving portion and receives the power from the 2nd driver, there is the said wires holder of said wires to move up on frame,
Said wires branch is placed on the stage on above-mentioned old LP insulators;
The binding component for releasing connection said wires and above-mentioned old LP insulators, between said wires and above-mentioned old LP insulators
Form space, the stage that said wires set is moved along said wires to above-mentioned wire rack direction.
2. controller switching equipment livewire work method according to claim 1, which is characterized in that
Include after said wires are moved to said wires holder, by above-mentioned interim wooden cross arm or said wires holder to moving up
It is dynamic, by stage of the said wires far from above-mentioned old LP insulators.
3. controller switching equipment livewire work method according to claim 2, which is characterized in that
Include before removing above-mentioned interim wooden cross arm from said wires bar, by by above-mentioned interim wooden cross arm or above-mentioned
Wire rack moves down, the stage that said wires are moved down to new LP insulators direction;
The said wires for being connected to said wires holder are moved to the stage of above-mentioned new LP insulators.
4. controller switching equipment livewire work method according to claim 3, which is characterized in that
Include before moving down said wires to above-mentioned new LP insulators direction, said wires are exhausted far from above-mentioned old LP
In the state of edge, above-mentioned old LP insulators are removed, and the stage of new LP insulators is installed.
5. the controller switching equipment livewire work method according to any claim in Claims 1-4, which is characterized in that
After the power for receiving above-mentioned 2nd driver by above-mentioned 2nd lifting moving portion, said wires holder is moved up and down, it will be upper
Wire rack is stated to move up or down.
6. controller switching equipment livewire work method according to claim 1, which is characterized in that
Above-mentioned controller switching equipment livewire work further comprises the 1st lifting moving for moving up and down above-mentioned interim wooden cross arm with auxiliary device
Portion.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20140006513 | 2014-01-20 | ||
KR1020140069772A KR101473822B1 (en) | 2014-01-20 | 2014-06-09 | Method for hot line work of power distribution equipment |
KR10-2014-0069772 | 2014-06-09 | ||
PCT/KR2015/005796 WO2015190813A1 (en) | 2014-06-09 | 2015-06-09 | Auxiliary device for power distribution facility live-line working, and power distribution facility live-line working method using same |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106463940A CN106463940A (en) | 2017-02-22 |
CN106463940B true CN106463940B (en) | 2018-09-11 |
Family
ID=52679199
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201580030649.0A Active CN106463939B (en) | 2014-01-20 | 2015-06-09 | Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device |
CN201580030633.XA Active CN106463938B (en) | 2014-01-20 | 2015-06-09 | Controller switching equipment livewire work method |
CN201580030710.1A Active CN106463941B (en) | 2014-01-20 | 2015-06-09 | Controller switching equipment livewire work method |
CN201580030707.XA Active CN106463940B (en) | 2014-01-20 | 2015-06-09 | Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201580030649.0A Active CN106463939B (en) | 2014-01-20 | 2015-06-09 | Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device |
CN201580030633.XA Active CN106463938B (en) | 2014-01-20 | 2015-06-09 | Controller switching equipment livewire work method |
CN201580030710.1A Active CN106463941B (en) | 2014-01-20 | 2015-06-09 | Controller switching equipment livewire work method |
Country Status (2)
Country | Link |
---|---|
KR (12) | KR101473821B1 (en) |
CN (4) | CN106463939B (en) |
Families Citing this family (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101631916B1 (en) | 2015-09-14 | 2016-06-20 | 탑이앤지 주식회사 | Method for changing power distribution line in hot line |
KR101616484B1 (en) | 2015-09-21 | 2016-04-28 | (주)우신전기기술사사무소 | Method for changing power distribution line in hot line |
CN106545213A (en) * | 2015-09-23 | 2017-03-29 | 国网辽宁省电力有限公司本溪供电公司 | A kind of adjustable bearing pole girdle ring |
CN107288406A (en) * | 2016-03-30 | 2017-10-24 | 国网辽宁省电力有限公司本溪供电公司 | A kind of adjustable bearing pole girdle ring |
CN105762702B (en) * | 2016-04-01 | 2017-08-04 | 中国南方电网有限责任公司超高压输电公司南宁局 | The method of replacing ± 800kV DC power transmission line L insulator strings |
KR101757195B1 (en) * | 2016-10-11 | 2017-07-11 | 주식회사 성진 | Stationary Auxiliary Arm Apparatus and Method Using In Uninterruptible Power Distribution Work |
CN107437712A (en) * | 2016-12-30 | 2017-12-05 | 广州程科电子科技有限公司 | A kind of durable electric insulation post |
KR101864309B1 (en) | 2017-01-19 | 2018-06-05 | 삼성기술감리 주식회사 | Apparatus for changing power distribution line in hot line |
KR101889080B1 (en) | 2017-02-20 | 2018-08-16 | 주식회사진흥기업 | live jumper wire wirelessly disconnect and connect method |
CN107086488A (en) * | 2017-04-28 | 2017-08-22 | 国网山东省电力公司青岛供电公司 | A kind of charged for replacement overhead transmission line straight line pole cross-arm, insulator arrangement |
CN107039919A (en) * | 2017-05-05 | 2017-08-11 | 国网江苏省电力公司常州供电公司 | A kind of wire-binding device |
CN107504343A (en) * | 2017-08-11 | 2017-12-22 | 国网浙江台州市黄岩区供电公司 | Stand transformer base leveling device |
KR102183734B1 (en) | 2017-10-12 | 2020-11-30 | 가부시끼가이샤 구레하 | Continuous polymerization apparatus and continuous production method of polymer |
CN111492548B (en) * | 2017-12-18 | 2021-07-13 | 株式会社永木精机 | Insulator separation construction method, and direction changing member, hoisting device on pole, insulator support member and fixing member for opposite pole used in the construction method |
CN108321753A (en) * | 2017-12-28 | 2018-07-24 | 青岛九州汇德新能源有限公司 | A kind of solar energy system power supply support device |
CN108155601A (en) * | 2018-01-08 | 2018-06-12 | 国网辽宁省电力有限公司鞍山供电公司 | A kind of method that on-load straight line pole changes tension-resistant rod |
CN108258617A (en) * | 2018-01-16 | 2018-07-06 | 国网新疆电力公司塔城供电公司 | A kind of more changing device that formula overhanging golden tool is twisted for transmission line of electricity aerial condutor |
CN108683122B (en) * | 2018-06-08 | 2020-07-28 | 国网山东省电力公司青岛供电公司 | Auxiliary device and method for sharing straight line rod of corridor in live migration |
KR101955155B1 (en) * | 2018-07-11 | 2019-03-06 | 대원전기 주식회사 | Uninterruptible power method and Indirect live lifting device for Electronic pole for power line |
KR102112471B1 (en) * | 2018-11-30 | 2020-05-19 | 한국전력공사 | Method for hot line work |
KR102321043B1 (en) | 2018-12-12 | 2021-11-03 | 주식회사 중앙백신연구소 | A promoter being expressed in Kluyveromyces marxianus strain and the gene expression system using thereof |
KR102273339B1 (en) * | 2019-06-10 | 2021-07-06 | 한국전력공사 | Wire support device supporting switchgear lead wire or jumper wire |
KR102650799B1 (en) * | 2019-12-18 | 2024-03-26 | 한국전력공사 | Auxiliary apparatus for hot line work of power distribution equipment and method for hot line work of power distribution equipment using thereof |
CN111456520B (en) * | 2020-03-22 | 2021-04-02 | 徐宏坤 | Distribution line building device and installation method |
KR102173375B1 (en) * | 2020-03-30 | 2020-11-03 | 김정호 | Uninterruptible power method and lndirect live lifting device for Electronic polefor power line |
KR102173377B1 (en) * | 2020-06-10 | 2020-11-03 | 김정호 | Uninterruptible power method of utilization electric power line device |
KR102173378B1 (en) * | 2020-06-10 | 2020-11-03 | 김정호 | electric power line device for Uninterruptible power method |
CN111987639A (en) * | 2020-08-04 | 2020-11-24 | 中国电建集团河南工程有限公司 | Construction method for replacing tension porcelain insulator |
CN111910982A (en) * | 2020-08-05 | 2020-11-10 | 国网黑龙江省电力有限公司伊春供电公司 | Transmission line ground clearance promotes cross arm |
KR102240478B1 (en) * | 2020-09-22 | 2021-04-16 | 대원전기 주식회사 | Insulator clip for indirect live wire and LP insulator replacement indirect live wire method using the same |
KR102236410B1 (en) * | 2020-10-14 | 2021-04-05 | 이종학 | Wire installing method |
CN112366603B (en) * | 2020-11-18 | 2022-05-24 | 广东电网有限责任公司 | Electric power supporting equipment |
CN112551258B (en) * | 2020-11-18 | 2023-01-24 | 广东电网有限责任公司 | Cable support device and electric power support equipment |
KR20220085571A (en) | 2020-12-15 | 2022-06-22 | 한국전력공사 | Fixing device for distribution facility and fixing method using the same |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102510029A (en) * | 2011-11-22 | 2012-06-20 | 上海市电力公司 | Ground potential electrified bar cutter device changing method |
CN103510739A (en) * | 2013-10-24 | 2014-01-15 | 国网湖南省电力公司带电作业中心 | Multifunctional combinatorial insulation cross arm |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4188477B2 (en) * | 1999-02-04 | 2008-11-26 | 株式会社中電工 | How to remove an imaginary ground wire |
KR20050103700A (en) * | 2004-04-27 | 2005-11-01 | 양희성 | A |
KR100934083B1 (en) * | 2007-11-05 | 2009-12-24 | 양희성 | Jumper Wire Fixture |
JP5306031B2 (en) * | 2009-04-13 | 2013-10-02 | 中国電力株式会社 | Indirect hot tool support |
FI125939B (en) * | 2010-12-30 | 2016-04-15 | Meclimb Oy | Method and apparatus for transporting tools to a workplace along an elongated piece and use of the apparatus |
KR101218710B1 (en) * | 2011-01-31 | 2013-01-09 | 서광전기통신공사(주) | The cable fixing bar provisionally installation equipment for work power distribution line |
KR101106236B1 (en) * | 2011-06-28 | 2012-01-19 | 주식회사 지이플러스 | Apparatus and method for live wire using trane truck |
KR101243860B1 (en) * | 2012-04-27 | 2013-03-20 | 임용호 | The changing device of lp insualtor for power distribution line |
KR101344289B1 (en) * | 2012-04-27 | 2013-12-23 | 임용호 | The pole fittings changing method use lifting apparatus |
KR101254577B1 (en) * | 2012-11-21 | 2013-04-15 | 서광전기통신공사(주) | The cable fixing bar provisionally installation equipment for work power distribution line |
KR101275111B1 (en) * | 2013-02-13 | 2013-06-17 | 임용호 | Replacement method for power distribution equipment of direct live wire for double insulation |
-
2014
- 2014-06-09 KR KR1020140069763A patent/KR101473821B1/en active IP Right Grant
- 2014-06-09 KR KR1020140069767A patent/KR20150087782A/en not_active Application Discontinuation
- 2014-06-09 KR KR1020140069770A patent/KR20150087785A/en not_active Application Discontinuation
- 2014-06-09 KR KR1020140069758A patent/KR20150087779A/en not_active Application Discontinuation
- 2014-06-09 KR KR1020140069772A patent/KR101473822B1/en active IP Right Grant
- 2014-06-09 KR KR1020140069759A patent/KR20150087780A/en not_active Application Discontinuation
- 2014-06-09 KR KR1020140069766A patent/KR20150087781A/en not_active Application Discontinuation
- 2014-06-09 KR KR1020140069769A patent/KR20150087784A/en not_active Application Discontinuation
- 2014-06-09 KR KR1020140069775A patent/KR101473823B1/en active IP Right Grant
- 2014-06-09 KR KR1020140069771A patent/KR101592964B1/en active IP Right Grant
- 2014-06-09 KR KR1020140069768A patent/KR20150087783A/en not_active Application Discontinuation
- 2014-06-09 KR KR20140069760A patent/KR101473820B1/en active IP Right Grant
-
2015
- 2015-06-09 CN CN201580030649.0A patent/CN106463939B/en active Active
- 2015-06-09 CN CN201580030633.XA patent/CN106463938B/en active Active
- 2015-06-09 CN CN201580030710.1A patent/CN106463941B/en active Active
- 2015-06-09 CN CN201580030707.XA patent/CN106463940B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102510029A (en) * | 2011-11-22 | 2012-06-20 | 上海市电力公司 | Ground potential electrified bar cutter device changing method |
CN103510739A (en) * | 2013-10-24 | 2014-01-15 | 国网湖南省电力公司带电作业中心 | Multifunctional combinatorial insulation cross arm |
Also Published As
Publication number | Publication date |
---|---|
KR20150087784A (en) | 2015-07-30 |
KR101592964B1 (en) | 2016-02-25 |
KR20150087779A (en) | 2015-07-30 |
KR101473822B1 (en) | 2014-12-18 |
KR20150087780A (en) | 2015-07-30 |
CN106463941B (en) | 2018-09-07 |
CN106463938A (en) | 2017-02-22 |
KR20150087783A (en) | 2015-07-30 |
CN106463938B (en) | 2018-09-07 |
KR20150087782A (en) | 2015-07-30 |
KR20150087781A (en) | 2015-07-30 |
CN106463941A (en) | 2017-02-22 |
KR20150087785A (en) | 2015-07-30 |
CN106463940A (en) | 2017-02-22 |
KR101473821B1 (en) | 2014-12-18 |
CN106463939B (en) | 2018-09-11 |
KR101473820B1 (en) | 2014-12-18 |
KR101473823B1 (en) | 2014-12-18 |
CN106463939A (en) | 2017-02-22 |
KR20150087786A (en) | 2015-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106463940B (en) | Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it | |
CN110729674B (en) | Self-traction type wire coating robot wire-feeding and wire-hanging method and coating robot | |
CN105484538B (en) | Stereo circulating garage | |
CN106827603B (en) | A kind of wheel production steel ring automatic grabbing device | |
CN101154797B (en) | Auxiliary means for changing porcelain insulator of telegraph pole | |
WO2011151466A4 (en) | Tower for a wind turbine | |
US10000368B2 (en) | Hoist system for retrofitting small scissor lift to access enclosed areas in building structure | |
CN107370079A (en) | It is a kind of to connect and hook the livewire work method of clip lead | |
US20140305742A1 (en) | Elevator | |
CN106882214B (en) | A kind of novel electric power industry multi-functional operation vehicle | |
CN109742678A (en) | Hot line robot equipment on bar | |
CN108462117A (en) | A kind of skyscraper cable-laying gear and its application method | |
CN107486704A (en) | A kind of GIL conductors Intelligent assembly tool | |
KR102241896B1 (en) | Wire moving apparatus of line post insulator for fixing supporting bar | |
CN106836936B (en) | A kind of electric power tower of mountable 4G antenna | |
CN209516283U (en) | Hot line robot equipment on a kind of bar | |
CN214429187U (en) | Electric power cable suspension device | |
CN207896560U (en) | A kind of skyscraper cable-laying gear | |
CN209419113U (en) | A kind of tunnel cabling lifting device | |
CN109066453B (en) | Special tool for repairing overhead lightning conductor of power transmission line | |
KR20150087593A (en) | Cable Laying Equipment using Belt | |
US20170260745A1 (en) | Hanging Three Dimensional Grid System For Lighting, Data, and Power | |
CN105071307B (en) | A kind of device of auxiliary connection and the method that wiring is carried out using the device | |
CN207986361U (en) | Quickly enter line apparatus | |
CN207150036U (en) | Pinion and-rack split conductor line lifter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |