CN106463940B - Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it - Google Patents

Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it Download PDF

Info

Publication number
CN106463940B
CN106463940B CN201580030707.XA CN201580030707A CN106463940B CN 106463940 B CN106463940 B CN 106463940B CN 201580030707 A CN201580030707 A CN 201580030707A CN 106463940 B CN106463940 B CN 106463940B
Authority
CN
China
Prior art keywords
cross arm
wires
wooden cross
insulators
switching equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201580030707.XA
Other languages
Chinese (zh)
Other versions
CN106463940A (en
Inventor
崔敏洙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Turk Su
Dawning Electronic Communication Engineering (strain)
Original Assignee
Turk Su
Dawning Electronic Communication Engineering (strain)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Turk Su, Dawning Electronic Communication Engineering (strain) filed Critical Turk Su
Priority claimed from PCT/KR2015/005796 external-priority patent/WO2015190813A1/en
Publication of CN106463940A publication Critical patent/CN106463940A/en
Application granted granted Critical
Publication of CN106463940B publication Critical patent/CN106463940B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B17/00Insulators or insulating bodies characterised by their form
    • H01B17/14Supporting insulators
    • H01B17/16Fastening of insulators to support, to conductor, or to adjoining insulator
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers
    • H02G7/205Installation of electric cables, extending along a pole

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

Illustrate the invention in relation to controller switching equipment livewire work method.The present invention controller switching equipment livewire work method include:Interim wooden cross arm is installed to the stage of electric pole, is moved up by the stage for the wire rack that the electric wire for being connected to electric pole is moved on interim wooden cross arm, by interim wooden cross arm or wire rack, the stage of new LP insulators is moved to by stage of the electric wire far from the old LP insulators that have been mounted on common cross-arm, with the stage of the old LP insulators of new LP replacing insulators, by stage that interim wooden cross arm or wire rack are moved down to new LP insulators direction and by the electric wire for being connected to wire rack.

Description

Controller switching equipment livewire work auxiliary device and using its carry out controller switching equipment electrification make The method of industry
Technical field
The present invention is controller switching equipment livewire work auxiliary device and carries out controller switching equipment livewire work method using it Related content is the controller switching equipment livewire work auxiliary device for replacing the LP insulators of installation on utility poles and utilization It carries out the relevant content of controller switching equipment livewire work method.
Background technology
The top of electric pole can generally install cross-arm, and cross-arm is insulated by horizontal iron cross arm and 3 on iron cross arm Son composition.3 phase electric wires are connected respectively to 3 insulators by binder.
When safeguarding mounted electric pole, cross-arm, insulator, old insulator is replaced with new insulator, is replaced with new cross-arm Old cross-arm is replaced with new electric pole with regard to originals such as the extension angle increases of electric wire caused by the change in location of electric pole or electric pole Cause has PIN cross-arms replacing with the operations such as interior cross-arm.Also have and set newly setting for electric pole etc. because the extended position change of electric wire etc. is new The operation of controller switching equipment.
These work are the security risks that the electric wire of electriferous state moves up and down, therefore has certain.So in order to Security risk is reduced, livewire work is preferably carried out, is just developing various devices and technology.
Related online technique Korean published Patent announce No. 2006-0082713 (2006.7.19. is disclosed, Denomination of invention:Have the distribution line operation multi-axis robot of 2 dimensions and the comprehensive driving method of 3 dimensions) it is illustrated.
Invention content
It solves the problems, such as
The purpose of the present invention is to provide controller switching equipment livewire work auxiliary device and carry out controller switching equipment electrification using it The method of operation allows staff easily to install and is applied to controller switching equipment livewire work, and staff utilizes electric power While the local remote auto far from electric wire moves electric wire, the controller switching equipment electrification for safely carrying out replacing LP insulators is made Industry.
Solution to the problem
The controller switching equipment livewire work auxiliary device of the present invention:Include interim wooden cross arm, by above-mentioned interim wooden cross arm Fixed interim wooden cross arm fixed part on utility poles, the 1st lifting moving portion that above-mentioned interim wooden cross arm is moved up and down, installation In above-mentioned interim wooden cross arm, and support be connected to the electric wire on said wires bar wire rack, will be above and below said wires holder The 2nd mobile lifting moving portion.
Above-mentioned 1st lifting moving portion preferably include electric pole mounting portion on above-mentioned interim wooden cross arm fixed part, Mounted on said wires bar mounting portion, the 1st driving of above-mentioned interim wooden cross arm is moved up and down after the power of the 1st driver of receiving Portion.
Above-mentioned 2nd lifting moving portion preferably includes interim wooden cross arm mounting portion on above-mentioned interim wooden cross arm, peace Mounted in above-mentioned interim wooden cross arm mounting portion, the 2nd driving of said wires holder is moved up and down after the power of the 2nd driver of receiving Portion.
The controller switching equipment livewire work method of the present invention includes that interim wooden cross arm is installed to the stage of electric pole, will be connected Electric wire on to said wires bar is moved to the stage of the wire rack on above-mentioned interim wooden cross arm, by above-mentioned interim wood Cross-arm or said wires holder move up, and make said wires far from the rank for the old LP insulators being mounted on common cross-arm Section, with stages of the old LP insulators of new LP replacing insulators, by above-mentioned interim wooden cross arm or said wires holder to above-mentioned new LP Stage that insulator direction moves down, the rank that the said wires for being connected to said wires holder are moved to new LP insulators Section.
It is that the 1st lifting moving portion receives the 1st driver by the ideal method that above-mentioned interim wooden cross arm moves up or down Power after, move up and down above-mentioned interim wooden cross arm.
It is that the 2nd lifting moving portion receives the 2nd driver by the best approach that said wires holder moves up or down After power, said wires holder is moved up and down.
Invention effect
Controller switching equipment livewire work auxiliary device according to the present invention utilizes the 1st driver or the electricity of the 2nd driver Power automatically adjusts the height of interim wooden cross arm, the height of each wire rack, the electric wire height being fixed on wire rack, can be light Pine carries out the replacement operation of LP insulators.
According to the present invention, the 1st driver or the 2nd driver can use electric drill, the electricity for being generally used for replacing controller switching equipment The electric tools such as dynamic screwdriver, staff can be easily real without the electric device needed for the mobile wire rack of specially preparation It is existing.
According to the present invention, the height of interim wooden cross arm and wire rack entirety can be not only adjusted with multistage, by only up and down The sub- extension that electric wire fixing segments are formed in mobile wire rack, you can 3 sections adjust electric wire fixing segments or electric wire height.
According to the present invention, can automatic or manual adjust electric wire fixing segments or electric wire height, adjustment length is up to vertical extension The length in portion, the length of main extension, the sum of the length of sub- extension adjust interim wooden cross arm and wire rack by multistage Highly, close to after target fulcrum, by finely tuning sub- extension, electric wire fixing segments are more accurately placed in object height.
According to the present invention, staff is according to operating environment or convenience, the interim wooden cross arm of adjustment of selectivity on one side Highly, the height of wire rack whole height, sub- extension can be stablized, easily be temporarily placed within electric wire into being about to electric wire on one side Operation on holder ensures that the operation in space needed for LP insulators will be replaced.
According to the present invention, using the 1st driver or the 2nd driver, staff can be long-range with electric wire remote position Electric wire is moved to the top of old LP insulators, can more easily control ensure to replace the livewire work space needed for LP insulators, it can Reducing staff when replacing LP insulators leads to the danger of safety accident with line contacts.
According to the present invention, when checking, repair, replacing the different LP insulators of multiple height, using the 2nd lifting moving portion, According to the height of LP insulators, wire rack is individually lifted, can easily carry out operation, it is tired using live-wire work tool and utensil When difficult, it can also up and down adjust using position, operation is made to be more prone to.
According to the present invention, multiple wire racks are mounted in the state of interim wooden cross arm, move up interim wooden cross arm, can The trouble that wire rack moves up one by one is avoided, all wire racks can be moved up simultaneously with identical displacement.
Description of the drawings
Fig. 1 is the perspective sketch map of the controller switching equipment livewire work auxiliary device of one embodiment of the invention.
Fig. 2 is the interim wooden cross arm fixed part of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion.
Fig. 3 is the lateral concept map of the 1st lifting moving portion internal structure of one embodiment of the invention.
Fig. 4 to illustrate the invention one embodiment the 1st driving portion operation concept map.
Fig. 5 is the wire rack of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion.
Fig. 6 to illustrate the invention one embodiment the 1st lifting moving portion operation concept map.
Fig. 7 to illustrate the invention one embodiment into electric wire fixing segments be inserted into electric wire process concept map.
The flow chart of Fig. 8 controller switching equipment livewire work methods of one embodiment to illustrate the invention.
Fig. 9 is to illustrate interim wooden cross arm being fixed on electricity in the controller switching equipment livewire work method of the 1st embodiment of the invention The concept map of line bar process.
Figure 10 is to illustrate wire rack to electric wire side in the controller switching equipment livewire work method of 1st embodiment of the invention To the concept map for the process of moving up.
Figure 11 is to illustrate electric wire being moved to electric wire branch in the controller switching equipment livewire work method of the 1st embodiment of the invention The concept map of frame process.
Figure 12 is to illustrate to move up wire rack in the controller switching equipment livewire work method of the 1st embodiment of the invention, Make electric wire far from the concept map of old LP insulation subprocess.
Figure 13 is to illustrate old with new LP replacing insulators in the controller switching equipment livewire work method of the 1st embodiment of the invention The concept map of LP insulation subprocess.
Figure 14 is to illustrate wire rack is exhausted to new LP in the controller switching equipment livewire work method of the 1st embodiment of the invention Edge direction moves down the concept map of process.
Figure 15 is to illustrate electric wire to new LP insulators in the controller switching equipment livewire work method of 1st embodiment of the invention The concept map of moving process.
Figure 16 is to illustrate interim wooden cross arm from electric wire in the controller switching equipment livewire work method of 1st embodiment of the invention The concept map of bar disassembly process.
Figure 17 is to illustrate interim wooden cross arm being fixed in the controller switching equipment livewire work method of the 2nd embodiment of the invention The concept map of electric pole process.
Figure 18 is to illustrate wire rack to electric wire side in the controller switching equipment livewire work method of 2nd embodiment of the invention To the concept map for the process of moving up.
Figure 19 is to illustrate electric wire being moved to electric wire branch in the controller switching equipment livewire work method of the 2nd embodiment of the invention The concept map of frame process.
Figure 20 is to illustrate to move up wire rack in the controller switching equipment livewire work method of the 2nd embodiment of the invention, Make electric wire far from the concept map of old LP insulation subprocess.
Figure 21 is to illustrate old with new LP replacing insulators in the controller switching equipment livewire work method of the 2nd embodiment of the invention The concept map of LP insulation subprocess.
Figure 22 is to illustrate wire rack is exhausted to new LP in the controller switching equipment livewire work method of the 2nd embodiment of the invention Edge direction moves down the concept map of process.
Figure 23 is to illustrate electric wire to new LP insulators in the controller switching equipment livewire work method of 2nd embodiment of the invention The concept map of moving process.
Figure 24 is to illustrate interim wooden cross arm from electric wire in the controller switching equipment livewire work method of 2nd embodiment of the invention The concept map of bar disassembly process.
Specific implementation mode
The particular content to carry out an invention
Hereinafter, with reference to the drawing in attachment, illustrates the controller switching equipment livewire work auxiliary device of the present invention and utilize it Carry out the embodiment of controller switching equipment livewire work method.During this, clearly demonstrate for convenience, the thickness of the line in drawing or Size of component etc. may compare exaggeration.
Aftermentioned term is to consider the function in the present invention and the term that defines, according to user, operating personnel purpose or Convention may be different.Therefore, these terms should be defined based on this detail entire content.
First, illustrate the controller switching equipment livewire work auxiliary device 500 of the present invention.
Fig. 1 is the perspective sketch map of the controller switching equipment livewire work auxiliary device of one embodiment of the invention.
With reference to figure 1, controller switching equipment livewire work of the invention is horizontal by interim wooden cross arm 510, interim wood with auxiliary device 500 Carry on a shoulder pole fixed part 520, the 1st lifting moving portion 530, wire rack 540, the 2nd lifting moving portion 550 composition.
Interim wooden cross arm 510 is fixed on electric pole 10, with wire rack 540 and the electricity being connected on wire rack 540 Line 30 forms the frame that support is born a heavy burden.The interim wooden cross arm 510 of one embodiment of the invention prolongs by horizontal extension portion 511, vertically Long portion 513, holder 515 form.
Horizontal extension portion 511 is that horizontal direction extends.Therefore, vertical extensions 513 are fixed on electric pole 10 Under state, horizontal extension portion 511 is arranged side by side with the iron cross arm on electric pole 10.In horizontal horizontal extension portion 511 Installation one or more wire rack 540.
Vertical extensions 513 are connected to the bottom in horizontal extension portion 511.Vertical extensions 513 are along electric pole 10 with vertical Direction extends, and is fixed on electric pole 10 by interim wooden cross arm 520.
Holder 515 is rod shape, and inclination is installed between horizontal extension portion 511 and vertical extensions 513, and connects level Extension 511 and vertical extensions 513.The top of holder 515 connects with the chaining part 516 mounted on 511 end of horizontal extension portion It connects, keeps its rotatable, the lower part of holder 515 is connect with vertical extensions 513.By above-mentioned connection structure, holder 515 with On the basis of the interconnecting piece of vertical extensions 513, support level extension 511.
The method that chaining part 516 is installed to horizontal extension portion 511:Chaining part 516 is inserted into level frame interconnecting piece 521 After end, the bolts fitting such as lifting bolt is run through to the side of chaining part 516, chaining part 516 and horizontal extension portion 511 is tight It is close to and is connected together.
Fig. 2 is the interim wooden cross arm fixed part of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion;Fig. 3 For the lateral concept map of the 1st lifting moving portion internal structure of one embodiment of the invention;Fig. 4 implementations to illustrate the invention The concept map of the 1st driving portion operation of example.
Interim wooden cross arm 510 or the 1st lifting moving portion 530 are fixed on electric pole 10 by interim wooden cross arm fixed part 520.Ginseng Fig. 2 is examined, the interim wooden cross arm fixed part 520 of one embodiment of the invention is connected by interim wooden cross arm interconnecting piece 521 with electric pole Portion 523 forms.
Interim wooden cross arm interconnecting piece 521 is the part being connect with interim wooden cross arm 510 or the 1st lifting moving portion 530.Temporarily Wooden cross arm interconnecting piece 521, which possesses, can load and unload interim wooden cross arm 510 or the 1st interconnecting piece 531a in the 1st lifting moving portion 530 2nd interconnecting piece, 522 structure.
In one embodiment of the invention, the 1st interconnecting piece 531a longitudinally (upper and lower) can extend, and lower part is in the opening wider than top Shape, the 2nd interconnecting piece 522 are the appearance to 530 side of the 1st lifting moving portion outer interconnecting piece outstanding, and the width of end can pass through The lower part of 1st interconnecting piece 531a, but top can not be passed through.
The 2nd interconnecting piece 522 is inserted into the lower part of 1st interconnecting piece 531a, the lifting of interim wooden cross arm 510 or the 1st is lifted in releasing The external force of moving portion 530, because of interim wooden cross arm 510 or the weight in the 1st lifting moving portion 530, the 1st interconnecting piece 531a is to moving down It is dynamic, so that the 2nd interconnecting piece 522 is located at the top of the 1st interconnecting piece 531a.At this point, the end of the 2nd interconnecting piece 522 hangs over the 1st interconnecting piece The top of 531a.By above-mentioned assembling, interim wooden cross arm 510 or the 1st lifting moving portion 530 can be connected mounted in interim wooden cross arm On portion 521.
Electric pole interconnecting piece 523 is secured to the part of electric pole 10.Electric pole interconnecting piece 523 is connect with interim wooden cross arm Portion 521 connects, and possesses the clip structure being loaded and unloaded on electric pole 10.
General clip is the accessory that the 1st accessory is connected to the 2nd accessory, can encase the 2nd accessory " ㄈ " shape or " C " Shape or band-like, there are the connectors such as bolt or nut in end.Although the electric pole interconnecting piece of one embodiment of the invention 523 be clip structure, but if can electric pole 10, not limit structure and appearance be fixed to interim wooden cross arm 510.
It, will be on interim wooden cross arm 510 in the state that 1st lifting moving portion 530 is to be fixed on interim wooden cross arm fixed part 520 Lower movement.With reference to 2~Fig. 4 of figure, the 1st lifting moving portion 530 of one embodiment of the invention is by electric pole mounting portion 531 and the 1st Driving portion 533 forms.
In the state that electric pole mounting portion 531 is to be mounted on interim wooden cross arm fixed part 520, formation can be supported including hanging down The frame of interim wooden cross arm 510 and 30 weight of electric wire including straight extension 513.531 side of electric pole mounting portion has and can face When wooden cross arm fixed part 520 on the 1st interconnecting piece 531a that loads and unloads.Have and the 1st interconnecting piece 531a on interim wooden cross arm fixed part 520 The 2nd interconnecting piece 522 being spirally connected.It, can be by the 1st lifting moving by being spirally connected for the 1st interconnecting piece 531a and the 2nd interconnecting piece 522 Portion 530 is installed on interim wooden cross arm fixed part 520.By releasing being spirally connected for the 1st interconnecting piece 531a and the 2nd interconnecting piece 522, 1st lifting moving portion 530 and interim wooden cross arm fixed part 520 can be separated.
Vertical extensions 513 are installed so that it can move up and down in the offside of electric pole mounting portion 531.Installation is vertically prolonged When long portion 513, electric pole mounting portion 531 is run through up and down, so that it is coordinated the movement of the 1st driving portion 533, move up and down. To prevent from hindering the movement of vertical extensions 513, the electricity connecting with vertical extensions 513 with the friction of electric pole mounting portion 531 Line bar mounting portion 531 is mounted with multiple rollers 532 in a manner of being arranged above and below.When vertical extensions 513 are upward/lower mobile, rolling Son 532 keeps the state contacted with vertical extensions 513, coordinates the movement of vertical extensions 513, to side or reverse rotation.
1st driving portion 533 is mounted on electric pole mounting portion 531, will interim wood after the power for receiving the 1st driver 41 Cross-arm 510 moves up and down.1st driver 41 can be applicable in electric drill, the electric screw driver etc. replaced and generally used when controller switching equipment The driving devices such as electric tool or motor.1st driving portion 533 of one embodiment of the invention is by the 1st driving section 534, the 1st beam barrel 537, the 1st transmission belt 538 forms.
1st driving section 534 is to be rotated to drive by the 1st driver 41.In one embodiment of the invention, the 1st driving section 534 It is made of the 1st worm screw 535 and the 1st worm gear 536.
There is the 1st power receiving portion 535a being connect with the 1st driver 41 in the end of 1st worm screw 535, receives the 1st driver 41 rotary powers transmitted.1st worm gear 536 is engaged with the 1st worm screw 535, is separately mounted on the 1st beam barrel 537 and transmission shaft, with The linkage of 1st worm screw 535 is rotated.Using electric tool as the 1st driver 41 in use, the 1st worm screw 535 with the 1st by swashing The rotation linkage for encouraging device 41 is rotated, and the 1st worm gear 536 is then rotated in deceleration by the rotation linkage with the 1st worm screw 535, Increase rotary force simultaneously.
As described above, according to the turbine structure for having the 1st worm screw 535 and the 1st worm gear 536, power can only be from the 1st worm screw 535 transmit to the 1st worm gear 536, can not be transmitted from the 1st worm gear 536 to the 1st worm screw 535.That is, imposing rotation to the 1st worm gear 536 Power, can not be such that the 1st worm screw 535 rotates, and the 1st worm gear 536 will not rotate.
1st worm gear 536 is connect by the 1st beam barrel 537 and the 1st transmission belt 538 with interim wooden cross arm 510, according to above-mentioned Worm gear arrangement can prevent from making interim wooden cross arm 510 move down because of the weight such as interim wooden cross arm 510 and electric wire 30.
The 1st transmission belt 538 is rolled or unlocked to 1st beam barrel 537, to side or reverse rotation, by the 1st driving section 534.1st Beam barrel 537 is the cylindrical structure that can batch the 1st transmission belt 538, is connected on transmission shaft with the 1st worm gear 536.
1st transmission belt 538 will be rolled to the 1st beam barrel 537, and end is connected to interim wooden cross arm 510.1st transmission belt 538 can To be the general transmission belt of flat rectangle or linear section, the linear accessories such as cable, cable wire can also be used.1st transmission belt, 538 end The connector that end can be connected and be detached by hook, connector (fitting), buckle, spiro connecting piece etc. is carried out with interim wooden cross arm 510 Connection.
1st driver 41 is rotated with the state that its end is connect with the 1st power receiving portion 535a to side, rotary power It is transferred to the 1st beam barrel 537 by the 1st driving section 534, the 1st beam barrel 537 will while rolling the 1st transmission belt 538 to side rotation The interim wooden cross arm 510 being connect with 538 end of the 1st transmission belt is pulled upwardly.If making the 1st driver 41 reversely rotate, the 1st axis Cylinder 537 also reversely rotates, and unlocks interim wooden cross arm 510 while the 1st transmission belt 538 and declines.
The safety position limiter 539 for limiting interim wooden cross arm 510 and moving down can be added in 510 bottom of interim wooden cross arm.This In invention one embodiment, safety position limiter 539 is the banded structure with certain length, end and interim wooden cross arm 510 Connection.Safety position limiter 539 can be connected with as the 1st transmission belt 538 by hook, connector (fitting), buckle, spiro connecting piece etc. The connector for connecing and detaching is attached with interim wooden cross arm 510.
With reference to 1~Fig. 4 of figure, the controller switching equipment livewire work of one embodiment of the invention is in auxiliary device 500, interim wood Cross-arm 510 is attached by the 1st lifting moving portion 530 and interim wooden cross arm fixed part 520.That is, interim wooden cross arm fixed part 520 are fixed to electric pole 10 by the 1st lifting moving portion 530 and interim wooden cross arm fixed part 520.
But controller switching equipment livewire work of the invention is in auxiliary device 500, if the 1st lifting moving portion 530 can only Interim wooden cross arm 510 is lifted, is not necessarily intended to be mounted between interim wooden cross arm 510 and interim wooden cross arm fixed part 520.That is, facing When wooden cross arm 510 not by the 1st lifting moving portion 530, but electric pole is directly installed to by interim wooden cross arm fixed part 520 On 10;1st lifting moving portion 530 is mounted to electricity not between interim wooden cross arm 510 and interim wooden cross arm fixed part 520 The other positions of line bar 10 control the lifting of interim wooden cross arm 510.
Fig. 5 is the wire rack of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion;Fig. 6 is to illustrate this The concept map of the 2nd lifting moving portion operation of invention one embodiment;Fig. 7 one embodiment to illustrate the invention it is solid to electric wire Determine the concept map that electric wire process is inserted into portion.
Wire rack 540 mounted on the support of the state of interim wooden cross arm 510 to be connected to the electric wire 30 on electric pole 10.Ginseng Fig. 5 is examined, the wire rack 540 of one embodiment of the invention is made of extension 541 and electric wire fixing segments 545.
Extension 541 is extended structure to pass through the 2nd lifting moving portion 550 mounted on horizontal extension portion 511 up and down It moves up and down.The extension 541 of one embodiment of the invention is by main extension 542, sub- extension 543,544 groups of fixed part At.
Main extension 542 is connect with lifting moving portion 550, after the power for receiving the 2nd driver 42, is moved by the 2nd lifting Dynamic portion 550 moves up and down.Sub- extension 543 includes isolation material, is mounted on the main extension of cylindrical shape in the way to insert Bottom inside 542 makes it that can be moved to the top of main extension 542.
The sub- extension 543 moved up is fixed on main extension 542 by fixed part 544 and extension 541.It is fixed Portion 544 can be used rotary fixing device, run through device through sub- extension 543 and main extension 542.
When fixed part 544 is using rotary fixing device, son is prolonged by way of rotating fixed part 544 to side Long portion 543 is fixed on main extension 542, and the connection of sub- extension 543 and main extension 542 can be released by reversely rotating.Such as Fruit has fixed part 544, after sub- extension 543 is moved to object height, by with 544 stator extension 543 of fixed part Process adjust the length of extension 541 manually.
If without fixed part 544, screw bolt and nut is set in the interconnecting piece of sub- extension 543 and main extension 542, is led to Cross the mode for rotating sub- extension 543 to side, sub- extension 543 be fixed on main extension 542, make its can not on move down It is dynamic;The connection of sub- extension 543 and main extension 542 can be released by reversely rotating sub- extension 543.
Electric wire fixing segments 545 be install electricity lines 30 part, be mounted on sub- extension 543 top.Electric wire fixing segments 545 will Electric wire 30 is tightly attached on wire rack 540.With reference to figure 7, the electric wire fixing segments 545 of one embodiment of the invention are by holder 546 and sticking department 548 form.
Holder 546 is attached with extension 541, and have can supply lines 30 by opening 546a.Sticking department 548 with Holder 546 is attached, switch opening 546a.In one embodiment of the invention, 546a is in 546 top of holder, sticking department for opening 548 are mounted on one end of holder 546, rotatable.
When sticking department 548 is rotated to side, sticking department 548 closes opening 546a while hanging over holder 546.(reference When Fig. 5) reversely rotating sticking department 548, the other end of the sticking department 548 far from holder 546 opens simultaneously opening 546a.(reference Fig. 7) as described above, by operate sticking department 546 switch opening 546a while, by electric wire 30 be inserted into electric wire fixing segments 545 into Row is fixed, or electric wire 30 is removed from electric wire fixing segments 545.
It is mounted with lower roller 547 on holder 546, it can be made to be rotated in specified position, is mounted on sticking department 548 Top roller 549 can be such that it is rotated in specified position.The insertion 546 inside sticking department 548 of holder of electric wire 30 is locked Under state, the outside of electric wire 30 is contacted with lower roller 547 and top roller 549.That is, electric wire 30 is being inserted into electric wire fixing segments In the state of 545, electric wire 30 is in rolling contact with electric wire fixing segments 545.
It therefore, can when relative displacement occurring during replacing controller switching equipment, between electric wire fixing segments 545 and electric wire 30 It prevents electric wire 30 from being injured by electric wire fixing segments 545, the connection status for keeping electric wire fixing segments 545 and electric wire 30 can be stablized, simultaneously It can ensure the smooth movement of electric wire fixing segments 545 or electric wire 30.
2nd lifting moving portion 550 moves up and down wire rack 540.2nd lifting moving portion 550 can individually lift each electric wire Holder 540.Therefore, the quantity in the 2nd lifting moving portion 550 is determined by the quantity of wire rack 540.With reference to figure 6, the present invention the 2nd 2nd lifting moving portion 550 of embodiment is made of 551 and the 1st driving portion 553 of interim wooden cross arm mounting portion.
Interim wooden cross arm mounting portion 551 is mounted on horizontal extension portion 511.There is folder on interim wooden cross arm mounting portion 551 Minor structure is connected in horizontal extension portion 511, and can be loaded and unloaded.Shelf structure in relation to interim wooden cross arm mounting portion 551 can refer to 523 related description of electric pole interconnecting piece, is not repeated herein.
There is guide wire rack 540 to move up and down to lead on the interim wooden cross arm mounting portion 551 of one embodiment of the invention Rail 552.It is lifted, is had on guide rail 552 extended hollow up and down with being inserted into the state inside guide rail 552 in order to make wire rack 540 Guide-track groove 552a.
If lifting moving portion 550 can be fixed in horizontal extension portion 511, interim wooden cross arm mounting portion 551 includes suitable Clip structure on interim wooden cross arm fixed part 520 or the structure different from interim wooden cross arm fixed part 520, are not limited to spy Fixed structure and shape.
2nd driving portion 553 is mounted on interim wooden cross arm mounting portion 551, will be electric after the power for receiving the 2nd driver 42 Line bracket 540 moves up and down.2nd driver 42 is identical as the 1st driver 41, can use general when replacing controller switching equipment operation The driving devices such as the electric tools such as the electric screw driver used or motor.2nd driving portion 553 of the 2nd embodiment of the invention is by the 2nd Driving section 554, the 2nd beam barrel 557, the 1st transmission belt 558 composition.
2nd driving section 554 is to be rotated to drive by the 2nd driver 42.In one embodiment of the invention, the 2nd driving section 554 It is made of the 2nd worm screw 555 and the 2nd worm gear 556, there is the 2nd power receiving portion being connect with the 2nd driver 42 in 555 end of the 2nd worm screw 555a。
1st biography of the 2nd driving section 554, the 2nd beam barrel 557, the 2nd band 558 and the 1st driving portion 533 on the 2nd driving portion 553 Dynamic portion 534, the 1st beam barrel 537, the structure of the 1st transmission belt 538 are identical, omit related description herein.
According to the worm gear arrangement that the 2nd worm screw 555 and the 2nd worm gear 556 form, it can prevent the weight because of electric wire 30 etc. from causing Wire rack 540 moves down.In the state that the end of 2nd driver 42 is connect with the 2nd power receiving portion 555a, by by 2 drivers 42 pull up or move down wire rack 540 to side or reverse rotation.
Controller switching equipment livewire work auxiliary device 500 according to the present invention is swashed using above-mentioned 1st driver 41 or the 2nd The power of device 42 is encouraged, the height, the height of wire rack 540, frame of interim wooden cross arm 510 is adjusted on wire rack 540 The height of electric wire 30.
It illustrates further:Using the 1st driver 41, the 1st movement is carried out, makes interim wooden cross arm 510 and mounted on facing When wooden cross arm 510 on wire rack 540 closer to or far from electric wire 30;Using the 2nd driver 42, the 2nd movement is carried out, Make wire rack 540 closer to or far from electric wire 30.By adjusting the height of sub- extension 543, fine tuning is connected to sub- extension The overall length of the height of electric wire fixing segments 545 in portion 543 or scalable adjustment wire rack 540.
According to the present invention, the 1st driver 41 or the 2nd driver 42 can use the electricity for being generally used for replacing controller switching equipment The electric tools such as brill, electric screw driver, staff is without specially preparing the electric device needed for mobile wire rack 540 Easily realize.
According to the present invention supporting electric wire 30 can be moved up and down using the electric power of the 1st driver 41 or the 2nd driver 42 The wire rack 540 of weight moves up and down electric wire 30 without using pulley etc. by tractive force, and livewire work is made to become more light Pine.
According to the present invention, the 1st driver 41 and the 1st lifting moving portion 530, the 2nd driver 42 and the 2nd lifting moving are utilized Portion 550 is accurately put into object height with certain speed movement wire rack 540 or electric wire 30.
In the following, the controller switching equipment livewire work auxiliary device 500 that the present invention for utilizing above structure will be introduced, with new LP (Line Post) insulator 25 replaces the controller switching equipment band of the present invention for the old LP insulators 22 being mounted on common cross-arm 20 Electric operational method.
Common cross-arm 20 is different from the extended arm that multiple insulators are all installed to 10 side of electric pole, it be insulator with Centered on electric pole 10, it is evenly distributed on the cross-arm of the new both sides for setting electric pole.The insulator of common cross-arm 20 is with electric pole 10 Centered on be distributed in both sides, between clearance space can meet staff carry out livewire work.
The flow chart of Fig. 8 controller switching equipment livewire work methods of one embodiment to illustrate the invention.
With reference to figure 8, the controller switching equipment livewire work method of the embodiment of the present invention includes to be mounted on interim wooden cross arm 510 The stage S1 of electric wire 10, by interim wooden cross arm 510 or wire rack 540 on interim wooden cross arm 510 to electric pole Stage S2 that 30 directions of electric wire of 10 connections move up, the stage S3 that electric wire 30 is moved to wire rack 540, will interim wood Cross-arm 510 or wire rack 540 move up again, by electric wire 30 far from the old LP insulators 22 on common cross-arm 20 Stage S4, the stage S5 that old LP insulators 22 are replaced with new LP insulators 25, by interim wooden cross arm 510 or wire rack 540 to Stage S6 that new 25 direction of LP insulators moves down, the electric wire 30 for being connected to wire rack 540 is moved to new LP insulators The 25 stage S7 and stage S8 for removing interim wooden cross arm 510 from electric pole 10.
Fig. 9 is to illustrate interim wooden cross arm being fixed on electricity in the controller switching equipment livewire work method of the 1st embodiment of the invention The concept map of line bar process;Figure 10 is to illustrate wire rack in the controller switching equipment livewire work method of the 1st embodiment of the invention The concept map of process is moved up to electric wire direction;In controller switching equipment livewire work methods of the Figure 11 for the 1st embodiment of the invention, Illustrate the concept map that electric wire is moved to wire rack process.
Figure 12 is to illustrate to move up wire rack in the controller switching equipment livewire work method of the 1st embodiment of the invention, Make electric wire far from the concept map of old LP insulation subprocess;Figure 13 is the controller switching equipment livewire work method of the 1st embodiment of the invention In, illustrate the concept map with the old LP insulation subprocess of new LP replacing insulators;Figure 14 is the controller switching equipment of the 1st embodiment of the invention In livewire work method, illustrate the concept map that wire rack is moved down to process to new LP insulators direction.
Figure 15 is to illustrate electric wire to new LP insulators in the controller switching equipment livewire work method of 1st embodiment of the invention The concept map of moving process;Figure 16 is in the controller switching equipment livewire work method of the 1st embodiment of the invention, and illustrating will be interim wooden horizontal Carry on a shoulder pole the concept map from electric pole disassembly process.
With reference to 9~Figure 16 of figure, the controller switching equipment livewire work method of the 1st embodiment of the invention is charged using controller switching equipment The method that operation replaces Geju City LP insulators 22 with auxiliary device 500 with a new LP insulator 25.
With reference to figure 9, the method for realizing the stage S1 that interim wooden cross arm 510 is fixed on to electric pole 10:By interim wooden cross arm Fixed part 520 is fixed on electric pole 10, and the 1st lifting moving portion 530 is fixed on interim wooden cross arm fixed part 520, connection the 1st 2nd lifting moving portion 550 and wire rack 540 are fixed on interim wooden cross arm by lifting moving portion 530 and interim wooden cross arm 510 On 510, keep its position corresponding with mounted LP insulators 22.
Sequence when connecting interim wooden cross arm 510 and the 1st lifting moving portion 530 is first to be mounted on vertical extensions 513 1st lifting moving portion 530, behind 513 top of vertical extensions connection horizontal extension portion 511, in horizontal extension portion 511 and vertically Mounting bracket 515 between extension 513.
The sequence of mounting bracket 515 between horizontal extension portion 511 and vertical extensions 513:Chaining part 516 is mounted on water After on flat extension, the top of holder 515 is mounted on chaining part 516 so that it can rotate, the lower part peace of holder 515 So that it can by loading and unloading on the fasteners such as the lifting bolt mounted in 513 lower part of vertical extensions.
The sequence 2nd lifting moving portion 550 and wire rack 540 being fixed on interim wooden cross arm 510:First by the 2nd liter Drop moving portion 550 is fixed on interim wooden cross arm 510, then wire rack 540 is connected in the 2nd lifting moving portion 550.Also may be used After first wire rack 540 to be connected in the 2nd lifting moving portion 550, it is fixed on temporarily by the 2nd lifting moving portion 550 On wooden cross arm 510.
Also the method that interim wooden cross arm 510 is fixed on to the stage S1 on electric pole 10 can be realized:2nd lifting will be housed to move The interim wooden cross arm 510 of dynamic portion 550 and wire rack 540 is connected to the 1st lifting moving portion 530 or interim wooden cross arm fixed part 520。
With reference to figure 10, the side for the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30 is realized Method:Staff is moved up sub- extension 543 to 30 direction of electric wire by way of manual operation.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root According to operating condition or the convenience of staff, by the 1st driver 41 and the 1st lifting moving portion 530, only by interim wooden cross arm 510 move up;It, only will be on interim wooden cross arm 510 or by the 2nd driver 42 and the 2nd lifting moving portion 550 Wire rack 540 moves up.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root , can be by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff, it only will interim wood cross Load 510 moves up, and by the 2nd driver 42 and the 2nd lifting moving portion 550, will only be mounted on interim wooden cross arm 510 Wire rack 540 move up.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root It, can be by the 1st driver 41 and the 1st lifting moving portion 530, by interim wooden cross arm according to operating condition or the convenience of staff 510 move up with staff through manual operation, and sub- extension 543 is moved up to 30 direction of electric wire.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root According to operating condition or the convenience of staff, can will be mounted on interim by the 2nd driver 42 and the 2nd lifting moving portion 550 The wire rack 540 of wooden cross arm 510 is moved up with staff by manual operation, by sub- extension 543 to 30 side of electric wire To movement.
Also the method that can realize the stage S2 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root It, can be by the 1st driver 41 and the 1st lifting moving portion 530, by interim wooden cross arm according to operating condition or the convenience of staff 510 move up, by the 2nd driver 42 and the 2nd lifting moving portion 550, by the electric wire branch on interim wooden cross arm 510 Frame 540 moves up and staff is by manual operation, and sub- extension 543 is moved to 30 direction of electric wire.
The present invention explanation in, wire rack 540 is moved up or down, include by the main extension 542 of movement, The mobile wire rack 540 including main extension 542 and sub- extension 543 is whole, or only moves on wire rack 540 The embodiment of the sub- extension in portion 543, the part for the electric wire fixing segments 545 being connect with electric wire 30 in wire rack 540 include The process of 540 upper height of wire rack is adjusted upward or downward.
That is, in the explanation of the present invention, mobile wire rack 540 includes by 42 grade of the 2nd lifting moving portion of the 2nd driver The embodiment of the sub- extension of movement in the whole embodiment of 550 movement wire racks 540, wire rack 540 543 comprehensive is moved The embodiment of dynamic wire rack 540 and mobile sub- 543 process of extension.
Therefore, even if the whole and mobile sub- extension 543 of not specified mobile wire rack 540, explanation of the invention In to mention mobile wire rack 540 just refer to one of above three embodiments.
In the state of the opening 546a for opening holder 546 top, into be about to interim wooden cross arm 510 or wire rack 540 to When the stage S2 that 30 direction of electric wire moves up, after completing the stage S2 for moving up wire rack 540 to 30 direction of electric wire, Electric wire 30 is entered by the 546a that is open inside holder 546.
With reference to figure 11, the method for realizing the stage S3 that electric wire 30 is moved to wire rack 540:Electric wire 30 is connected to electricity After line bracket 540, the connection of electric wire 30 and old LP insulators 22 is released.
With reference to figure 12, realize the side of stage S4 of the electric wire 30 far from the old LP insulators 22 on common cross-arm 20 Method:Locking electric wire 30 enters internal 546 sticking department 548 of holder through the 546a that is open, that is, with the block opening of sticking department 548 546a.
The method for releasing electric wire 30 and the connection of old LP insulators 22:The binding of cut-out connection electric wire 30 and old LP insulators 22 Component (Binder), or the operation that releasings bundle component such as remove from electric wire by component is bundled.
Although not illustrating in the drawing of the present invention, controller switching equipments are waited for protection electric wire 30, generally outside electric wire 30 Wrap up hot line set, insulator cover isoelectric line set.Before the connection for releasing electric wire 30 and old LP insulators 22, then move up electric wire branch Frame 540 produces the space released needed for binding component between electric wire 30 and old LP insulators 22.
After electric wire 30 is connected to wire rack 540, before releasing the connection between electric wire 30 and old LP insulators 22, then Wire rack 540 is moved up, will not be adjacent between electric wire 30 and old LP insulators 22, between electric wire 30 and old LP insulators 22 Space will be will produce, electric wire set is made not encounter old LP insulators 22.It therefore, can be by electric wire according to the convenience of staff 30 are moved along electric wire set, smoothly complete controller switching equipment replacement operation.
At this point, before releasing the connection between electric wire 30 and old LP insulators 22, then move up the side of wire rack 540 Method is, by the 2nd driver 42 and the 2nd lifting moving portion 550, to move up wire rack 540.Certainly, can also swash by the 1st It encourages device 41 and the 1st lifting moving portion 530 moves the realization of interim wooden cross arm 510.
Interim wooden cross arm 510 or wire rack 540 are moved up, make electric wire 30 far from the stage S4 of old LP insulators 22 It is to ensure that the process that space needed for the operation of old LP insulators 22 is replaced with new LP insulators 25.
With reference to figure 12, realization moves up interim wooden cross arm 510 or wire rack 540, keeps electric wire 30 exhausted far from old LP The method of the stage S4 of edge 22:Interim wooden cross arm 510 is moved up by the 1st driver 41 and the 1st lifting moving portion 530, And wire rack 540 is moved up by the 2nd driver 42 and the 2nd lifting moving portion 550.
Also it can realize and move up interim wooden cross arm 510 or wire rack 540, make electric wire 30 far from old LP insulators 22 Stage S4 method:It, can be only by being lifted by the 1st driver 41 and the 1st according to the convenience of operating condition and staff Moving portion 530 moves interim wooden cross arm 510, or moves wire rack by the 2nd driver 42 and the 2nd lifting moving portion 550 540, or be manually operated by staff and move up sub- extension 543 to 30 direction of electric wire.
Also it can realize and move up interim wooden cross arm 510 or wire rack 540, make electric wire 30 far from old LP insulators 22 Stage S4 method:According to operating condition or the convenience of staff, the 1st driver 41 and the 1st lifting moving can be passed through Portion 530 moves up interim wooden cross arm 510 with staff by manual operation, by sub- extension 543 to 30 direction of electric wire It moves up.
Also it can realize and move up interim wooden cross arm 510 or wire rack 540, make electric wire 30 far from old LP insulators 22 Stage S4 method:According to operating condition or the convenience of staff, pass through the 2nd driver 42 and the 2nd lifting moving portion 550, it will be moved up mounted on the wire rack 540 of interim wooden cross arm 510 and staff be by manual operation, it will be sub Extension 543 is moved up to 30 direction of electric wire.
Also it can realize and move up interim wooden cross arm 510 or wire rack 540, make electric wire 30 far from old LP insulators 22 Stage S4 method:According to operating condition or the convenience of staff, pass through the 1st driver 41 and the 1st lifting moving portion 530, interim wooden cross arm 510 is moved up, and by the 2nd driver 42 and the 2nd lifting moving portion 550, will be mounted on and face When wooden cross arm 510 on wire rack 540 move up and staff is by manual operation, by sub- extension 543 to electricity It moves in 30 direction of line.
With reference to figure 13, the method for realizing the stage S5 that old LP insulators 22 are replaced with new LP insulators 25:Using pass through by Interim wooden cross arm 510 or wire rack 540 move up, the sky for making stage S4 of the electric wire 30 far from old LP insulators 22 ensure Between, after removing the old LP insulators 22 on iron cross arm 21, new LP insulators 25 are installed.
With reference to figure 14, realizes and to move down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators The method of stage S6:Interim wooden cross arm 510 is moved down by the 1st driver 41 and the 1st lifting moving portion 530, and is passed through 2nd driver 42 and the 2nd lifting moving portion 550 move down wire rack 540.
Also the stage for moving down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators can be realized The method of S6:It, can be only by by the 1st driver 41 and the 1st lifting moving portion according to the convenience of operating condition and staff The 530 interim wooden cross arms 510 of movement, or wire rack 540 is moved by the 2nd driver 42 and the 2nd lifting moving portion 550, or it is logical Staff's manual operation is crossed to move down sub- extension 543 to 30 direction of electric wire.
Also the stage for moving down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators can be realized The method of S6:It will by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff Interim wooden cross arm 510 moves down and staff is by manual operation, and sub- extension 543 is downward to 30 direction of electric wire It is mobile.
Also the stage for moving down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators can be realized The method of S6:It will by the 2nd driver 42 and the 2nd lifting moving portion 550 according to operating condition or the convenience of staff It is moved down mounted on the wire rack 540 of interim wooden cross arm 510 and staff is by manual operation, by sub- extension 543 move down to 30 direction of electric wire.
Also the stage for moving down interim wooden cross arm 510 or wire rack 540 to new 25 direction of LP insulators can be realized The method of S6:It will by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff Interim wooden cross arm 510 moves down, and by the 2nd driver 42 and the 2nd lifting moving portion 550, it is horizontal will to be mounted on interim wood Wire rack 540 in load 510 moves down and staff is by manual operation, by sub- extension 543 to 30 side of electric wire To moving down.
With reference to figure 15, the electric wire 30 for being connected to wire rack 540 is moved to the stage S7's of new LP insulators 25 by realization Method:Electric wire 30 is adjacent to and fixed to after new LP insulators 25, releases the connection of electric wire 30 and wire rack 540.It will be electric Line 30 refers to that electric wire 30 is insulated fixed to new LP with connectors such as rubber cable, adhesive tape, buckles fixed to new LP insulators 25 Son 25.
The method for releasing the connection of electric wire 30 and wire rack 540 is that spin locking portion 548 opens opening 546a, passes through Opening 546a pulls out electric wire 30 to outside holder 546.
With reference to figure 16, the method for realizing the stage S8 for removing interim wooden cross arm 510 from electric pole 10:By the 2nd liter Drop moving portion 550 and after wire rack 540 removes from interim wooden cross arm 510, by interim wooden cross arm 510 from interim wooden cross arm It is removed in fixed part 520 or the 1st lifting moving portion 530, the 1st lifting moving portion 530 is torn open from interim wooden cross arm fixed part 520 Get off, then interim wooden cross arm fixed part 520 is removed from electric pole 10.
Also the method that can realize the stage S8 for removing interim wooden cross arm 510 from electric pole 10:2nd lifting will be housed The interim wooden cross arm 510 of moving portion 550 and wire rack 540 is removed from electric pole 10.
The flow as shown in Fig. 9~Figure 16 is carried out successively, can replace Geju City LP insulation with a new LP insulator 25 Son 22.By the stage S2 that interim wooden cross arm 510 or wire rack 540 are moved up to 30 direction of electric wire will extremely be connected for several times It is moved to the stage S7 of new LP insulators 25 to the electric wire 30 of wire rack 540, multiple old LP insulators 22 can be replaced successively.
Figure 17 is to illustrate interim wooden cross arm being fixed in the controller switching equipment livewire work method of the 2nd embodiment of the invention The concept map of electric pole process;Figure 18 is to illustrate electric wire branch in the controller switching equipment livewire work method of the 2nd embodiment of the invention Frame moves up the concept map of process to electric wire direction;Figure 19 is the controller switching equipment livewire work method of the 2nd embodiment of the invention In, illustrate the concept map that electric wire is moved to wire rack process.
Figure 20 is to illustrate to move up wire rack in the controller switching equipment livewire work method of the 2nd embodiment of the invention, Make electric wire far from the concept map of old LP insulation subprocess;Figure 21 is the controller switching equipment livewire work method of the 2nd embodiment of the invention In, illustrate the concept map with the old LP insulation subprocess of new LP replacing insulators;Figure 22 is the controller switching equipment of the 2nd embodiment of the invention In livewire work method, illustrate the concept map that wire rack is moved down to process to new LP insulators direction.
Figure 23 is to illustrate electric wire to new LP insulators in the controller switching equipment livewire work method of 2nd embodiment of the invention The concept map of moving process;Figure 24 is in the controller switching equipment livewire work method of the 2nd embodiment of the invention, and illustrating will be interim wooden horizontal Carry on a shoulder pole the concept map from electric pole disassembly process.
With reference to 17~Figure 24 of figure, the controller switching equipment livewire work method of the 2nd embodiment of the invention is to utilize controller switching equipment band The method that electric operation auxiliary device 500 replaces multiple old LP insulators 22 with multiple new LP insulators 25.
It can by the process of a Figure 17~Figure 24 according to the controller switching equipment livewire work method of the 2nd embodiment of the invention Disposably to replace multiple old LP insulators 22.
According to the controller switching equipment livewire work method of the 2nd embodiment of the invention, interim wooden cross arm 510 is fixed to electric pole In 10 stage S1, lifting moving portion 550 and wire rack 540 are installed to position corresponding with each Geju City LP insulators 22; The rank that wire rack 540 on interim wooden cross arm 510 is moved up to 30 direction of electric wire for being connected to electric pole 10 In section S2, multiple wire racks 540 are moved up simultaneously.
Electric wire 30 is moved in the stage S3 of wire rack 540, multiple electric wires 30 are moved to multiple electric wire branch simultaneously Frame 540, stage later are applied to each Geju City LP insulators 22, new LP insulators 25, electric wire 30 simultaneously, by will once install Extremely will in the stage S2 that the wire rack 540 of interim wooden cross arm 510 is moved up to 30 direction of electric wire for being connected to electric pole 10 The electric wire 30 for being connected to wire rack 540 is moved to the stage S7 of new LP insulators 25, can be primary by multiple old LP insulators 22 Property is changed to new LP insulators 25.
It is electronic using the 1st driver 41 or the 2nd driver 42 according to the controller switching equipment livewire work method of aforementioned present invention Power automatically adjusts the height of interim wooden cross arm 510, the height of wire rack 540, the electric wire moved to 540 direction of wire rack 30 height easily realizes the replacement operation of LP insulators.
According to the present invention, the height of 540 entirety of interim wooden cross arm 510 and wire rack can be not only adjusted with multistage, may be used also 543,3 sections of the sub- extension by moving up and down live wire fixed part 545 in wire rack 540 adjust electric wire fixing segments 545 or The height of electric wire 30.
According to the present invention, staff is according to operating condition or convenience, the selective height for adjusting interim wooden cross arm 510 The whole height of degree, wire rack 540, the height of sub- extension 543, can easily carry out the operation for replacing LP insulators.
According to the present invention, using the 1st driver 41 or the 2nd driver 42, staff can be in the place far from electric wire 30 Electric wire 30 is moved on old LP insulators 22, can easily ensure that the space needed for the livewire work of LP insulators will be replaced, When simultaneously can be to avoid LP insulators are replaced, it is dangerous that staff is in direct contact safety accident caused by electric wire 30.
According to the present invention, multiple wire racks 540 have been installed in the state of interim wooden cross arm 510, are moved up interim Wooden cross arm 510, the trouble that can be one by one moved to avoid wire rack 540 keep the displacement that multiple wire racks 540 move up equal It is identical.
The present invention is the explanation carried out by embodiment in drawing, but this only illustrates, if it is having this The people of technical field relevant knowledge, it should can understand other implementations of can develop from the present invention various deformation and ad eundem Example.Therefore, technical protection scope of the invention should be following patent claim.

Claims (6)

1. a kind of controller switching equipment livewire work method,
About use including interim wooden cross arm, above-mentioned interim wooden cross arm is fixed interim wooden cross arm fixed part on utility poles, Support be mounted on interim wooden cross arm, and be connected to multiple wire racks of electric wire on said wires bar, individually lift it is above-mentioned multiple The controller switching equipment livewire work side of the controller switching equipment livewire work auxiliary device in multiple 2nd lifting moving portions of wire rack Method,
It include the stage that above-mentioned interim wooden cross arm is installed to said wires bar;
The said wires for being connected to said wires bar are moved to the rank of the said wires holder mounted on above-mentioned interim wooden cross arm Section,
Said wires are moved to the stage of said wires holder,
When including to cover mobile in the electric wire for wrapping up said wires, said wires set is avoided to encounter old LP insulators, by upper It states the 2nd lifting moving portion and receives the power from the 2nd driver, there is the said wires holder of said wires to move up on frame, Said wires branch is placed on the stage on above-mentioned old LP insulators;
The binding component for releasing connection said wires and above-mentioned old LP insulators, between said wires and above-mentioned old LP insulators Form space, the stage that said wires set is moved along said wires to above-mentioned wire rack direction.
2. controller switching equipment livewire work method according to claim 1, which is characterized in that
Include after said wires are moved to said wires holder, by above-mentioned interim wooden cross arm or said wires holder to moving up It is dynamic, by stage of the said wires far from above-mentioned old LP insulators.
3. controller switching equipment livewire work method according to claim 2, which is characterized in that
Include before removing above-mentioned interim wooden cross arm from said wires bar, by by above-mentioned interim wooden cross arm or above-mentioned Wire rack moves down, the stage that said wires are moved down to new LP insulators direction;
The said wires for being connected to said wires holder are moved to the stage of above-mentioned new LP insulators.
4. controller switching equipment livewire work method according to claim 3, which is characterized in that
Include before moving down said wires to above-mentioned new LP insulators direction, said wires are exhausted far from above-mentioned old LP In the state of edge, above-mentioned old LP insulators are removed, and the stage of new LP insulators is installed.
5. the controller switching equipment livewire work method according to any claim in Claims 1-4, which is characterized in that
After the power for receiving above-mentioned 2nd driver by above-mentioned 2nd lifting moving portion, said wires holder is moved up and down, it will be upper Wire rack is stated to move up or down.
6. controller switching equipment livewire work method according to claim 1, which is characterized in that
Above-mentioned controller switching equipment livewire work further comprises the 1st lifting moving for moving up and down above-mentioned interim wooden cross arm with auxiliary device Portion.
CN201580030707.XA 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it Active CN106463940B (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR20140006513 2014-01-20
KR1020140069772A KR101473822B1 (en) 2014-01-20 2014-06-09 Method for hot line work of power distribution equipment
KR10-2014-0069772 2014-06-09
PCT/KR2015/005796 WO2015190813A1 (en) 2014-06-09 2015-06-09 Auxiliary device for power distribution facility live-line working, and power distribution facility live-line working method using same

Publications (2)

Publication Number Publication Date
CN106463940A CN106463940A (en) 2017-02-22
CN106463940B true CN106463940B (en) 2018-09-11

Family

ID=52679199

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201580030649.0A Active CN106463939B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device
CN201580030633.XA Active CN106463938B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method
CN201580030710.1A Active CN106463941B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method
CN201580030707.XA Active CN106463940B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201580030649.0A Active CN106463939B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device
CN201580030633.XA Active CN106463938B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method
CN201580030710.1A Active CN106463941B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method

Country Status (2)

Country Link
KR (12) KR101473821B1 (en)
CN (4) CN106463939B (en)

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101631916B1 (en) 2015-09-14 2016-06-20 탑이앤지 주식회사 Method for changing power distribution line in hot line
KR101616484B1 (en) 2015-09-21 2016-04-28 (주)우신전기기술사사무소 Method for changing power distribution line in hot line
CN106545213A (en) * 2015-09-23 2017-03-29 国网辽宁省电力有限公司本溪供电公司 A kind of adjustable bearing pole girdle ring
CN107288406A (en) * 2016-03-30 2017-10-24 国网辽宁省电力有限公司本溪供电公司 A kind of adjustable bearing pole girdle ring
CN105762702B (en) * 2016-04-01 2017-08-04 中国南方电网有限责任公司超高压输电公司南宁局 The method of replacing ± 800kV DC power transmission line L insulator strings
KR101757195B1 (en) * 2016-10-11 2017-07-11 주식회사 성진 Stationary Auxiliary Arm Apparatus and Method Using In Uninterruptible Power Distribution Work
CN107437712A (en) * 2016-12-30 2017-12-05 广州程科电子科技有限公司 A kind of durable electric insulation post
KR101864309B1 (en) 2017-01-19 2018-06-05 삼성기술감리 주식회사 Apparatus for changing power distribution line in hot line
KR101889080B1 (en) 2017-02-20 2018-08-16 주식회사진흥기업 live jumper wire wirelessly disconnect and connect method
CN107086488A (en) * 2017-04-28 2017-08-22 国网山东省电力公司青岛供电公司 A kind of charged for replacement overhead transmission line straight line pole cross-arm, insulator arrangement
CN107039919A (en) * 2017-05-05 2017-08-11 国网江苏省电力公司常州供电公司 A kind of wire-binding device
CN107504343A (en) * 2017-08-11 2017-12-22 国网浙江台州市黄岩区供电公司 Stand transformer base leveling device
KR102183734B1 (en) 2017-10-12 2020-11-30 가부시끼가이샤 구레하 Continuous polymerization apparatus and continuous production method of polymer
CN111492548B (en) * 2017-12-18 2021-07-13 株式会社永木精机 Insulator separation construction method, and direction changing member, hoisting device on pole, insulator support member and fixing member for opposite pole used in the construction method
CN108321753A (en) * 2017-12-28 2018-07-24 青岛九州汇德新能源有限公司 A kind of solar energy system power supply support device
CN108155601A (en) * 2018-01-08 2018-06-12 国网辽宁省电力有限公司鞍山供电公司 A kind of method that on-load straight line pole changes tension-resistant rod
CN108258617A (en) * 2018-01-16 2018-07-06 国网新疆电力公司塔城供电公司 A kind of more changing device that formula overhanging golden tool is twisted for transmission line of electricity aerial condutor
CN108683122B (en) * 2018-06-08 2020-07-28 国网山东省电力公司青岛供电公司 Auxiliary device and method for sharing straight line rod of corridor in live migration
KR101955155B1 (en) * 2018-07-11 2019-03-06 대원전기 주식회사 Uninterruptible power method and Indirect live lifting device for Electronic pole for power line
KR102112471B1 (en) * 2018-11-30 2020-05-19 한국전력공사 Method for hot line work
KR102321043B1 (en) 2018-12-12 2021-11-03 주식회사 중앙백신연구소 A promoter being expressed in Kluyveromyces marxianus strain and the gene expression system using thereof
KR102273339B1 (en) * 2019-06-10 2021-07-06 한국전력공사 Wire support device supporting switchgear lead wire or jumper wire
KR102650799B1 (en) * 2019-12-18 2024-03-26 한국전력공사 Auxiliary apparatus for hot line work of power distribution equipment and method for hot line work of power distribution equipment using thereof
CN111456520B (en) * 2020-03-22 2021-04-02 徐宏坤 Distribution line building device and installation method
KR102173375B1 (en) * 2020-03-30 2020-11-03 김정호 Uninterruptible power method and lndirect live lifting device for Electronic polefor power line
KR102173377B1 (en) * 2020-06-10 2020-11-03 김정호 Uninterruptible power method of utilization electric power line device
KR102173378B1 (en) * 2020-06-10 2020-11-03 김정호 electric power line device for Uninterruptible power method
CN111987639A (en) * 2020-08-04 2020-11-24 中国电建集团河南工程有限公司 Construction method for replacing tension porcelain insulator
CN111910982A (en) * 2020-08-05 2020-11-10 国网黑龙江省电力有限公司伊春供电公司 Transmission line ground clearance promotes cross arm
KR102240478B1 (en) * 2020-09-22 2021-04-16 대원전기 주식회사 Insulator clip for indirect live wire and LP insulator replacement indirect live wire method using the same
KR102236410B1 (en) * 2020-10-14 2021-04-05 이종학 Wire installing method
CN112366603B (en) * 2020-11-18 2022-05-24 广东电网有限责任公司 Electric power supporting equipment
CN112551258B (en) * 2020-11-18 2023-01-24 广东电网有限责任公司 Cable support device and electric power support equipment
KR20220085571A (en) 2020-12-15 2022-06-22 한국전력공사 Fixing device for distribution facility and fixing method using the same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510029A (en) * 2011-11-22 2012-06-20 上海市电力公司 Ground potential electrified bar cutter device changing method
CN103510739A (en) * 2013-10-24 2014-01-15 国网湖南省电力公司带电作业中心 Multifunctional combinatorial insulation cross arm

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4188477B2 (en) * 1999-02-04 2008-11-26 株式会社中電工 How to remove an imaginary ground wire
KR20050103700A (en) * 2004-04-27 2005-11-01 양희성 A
KR100934083B1 (en) * 2007-11-05 2009-12-24 양희성 Jumper Wire Fixture
JP5306031B2 (en) * 2009-04-13 2013-10-02 中国電力株式会社 Indirect hot tool support
FI125939B (en) * 2010-12-30 2016-04-15 Meclimb Oy Method and apparatus for transporting tools to a workplace along an elongated piece and use of the apparatus
KR101218710B1 (en) * 2011-01-31 2013-01-09 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101106236B1 (en) * 2011-06-28 2012-01-19 주식회사 지이플러스 Apparatus and method for live wire using trane truck
KR101243860B1 (en) * 2012-04-27 2013-03-20 임용호 The changing device of lp insualtor for power distribution line
KR101344289B1 (en) * 2012-04-27 2013-12-23 임용호 The pole fittings changing method use lifting apparatus
KR101254577B1 (en) * 2012-11-21 2013-04-15 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101275111B1 (en) * 2013-02-13 2013-06-17 임용호 Replacement method for power distribution equipment of direct live wire for double insulation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510029A (en) * 2011-11-22 2012-06-20 上海市电力公司 Ground potential electrified bar cutter device changing method
CN103510739A (en) * 2013-10-24 2014-01-15 国网湖南省电力公司带电作业中心 Multifunctional combinatorial insulation cross arm

Also Published As

Publication number Publication date
KR20150087784A (en) 2015-07-30
KR101592964B1 (en) 2016-02-25
KR20150087779A (en) 2015-07-30
KR101473822B1 (en) 2014-12-18
KR20150087780A (en) 2015-07-30
CN106463941B (en) 2018-09-07
CN106463938A (en) 2017-02-22
KR20150087783A (en) 2015-07-30
CN106463938B (en) 2018-09-07
KR20150087782A (en) 2015-07-30
KR20150087781A (en) 2015-07-30
CN106463941A (en) 2017-02-22
KR20150087785A (en) 2015-07-30
CN106463940A (en) 2017-02-22
KR101473821B1 (en) 2014-12-18
CN106463939B (en) 2018-09-11
KR101473820B1 (en) 2014-12-18
KR101473823B1 (en) 2014-12-18
CN106463939A (en) 2017-02-22
KR20150087786A (en) 2015-07-30

Similar Documents

Publication Publication Date Title
CN106463940B (en) Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it
CN110729674B (en) Self-traction type wire coating robot wire-feeding and wire-hanging method and coating robot
CN105484538B (en) Stereo circulating garage
CN106827603B (en) A kind of wheel production steel ring automatic grabbing device
CN101154797B (en) Auxiliary means for changing porcelain insulator of telegraph pole
WO2011151466A4 (en) Tower for a wind turbine
US10000368B2 (en) Hoist system for retrofitting small scissor lift to access enclosed areas in building structure
CN107370079A (en) It is a kind of to connect and hook the livewire work method of clip lead
US20140305742A1 (en) Elevator
CN106882214B (en) A kind of novel electric power industry multi-functional operation vehicle
CN109742678A (en) Hot line robot equipment on bar
CN108462117A (en) A kind of skyscraper cable-laying gear and its application method
CN107486704A (en) A kind of GIL conductors Intelligent assembly tool
KR102241896B1 (en) Wire moving apparatus of line post insulator for fixing supporting bar
CN106836936B (en) A kind of electric power tower of mountable 4G antenna
CN209516283U (en) Hot line robot equipment on a kind of bar
CN214429187U (en) Electric power cable suspension device
CN207896560U (en) A kind of skyscraper cable-laying gear
CN209419113U (en) A kind of tunnel cabling lifting device
CN109066453B (en) Special tool for repairing overhead lightning conductor of power transmission line
KR20150087593A (en) Cable Laying Equipment using Belt
US20170260745A1 (en) Hanging Three Dimensional Grid System For Lighting, Data, and Power
CN105071307B (en) A kind of device of auxiliary connection and the method that wiring is carried out using the device
CN207986361U (en) Quickly enter line apparatus
CN207150036U (en) Pinion and-rack split conductor line lifter

Legal Events

Date Code Title Description