CN106463939B - Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device - Google Patents

Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device Download PDF

Info

Publication number
CN106463939B
CN106463939B CN201580030649.0A CN201580030649A CN106463939B CN 106463939 B CN106463939 B CN 106463939B CN 201580030649 A CN201580030649 A CN 201580030649A CN 106463939 B CN106463939 B CN 106463939B
Authority
CN
China
Prior art keywords
wire
electric wire
insulators
electric
wire support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201580030649.0A
Other languages
Chinese (zh)
Other versions
CN106463939A (en
Inventor
崔敏洙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Turk Su
Dawning Electronic Communication Engineering (strain)
Original Assignee
Turk Su
Dawning Electronic Communication Engineering (strain)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to KR20140006513 priority Critical
Priority to KR10-2014-0069760 priority
Priority to KR20140069760A priority patent/KR101473820B1/en
Application filed by Turk Su, Dawning Electronic Communication Engineering (strain) filed Critical Turk Su
Priority to PCT/KR2015/005794 priority patent/WO2015190811A1/en
Publication of CN106463939A publication Critical patent/CN106463939A/en
Application granted granted Critical
Publication of CN106463939B publication Critical patent/CN106463939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • HELECTRICITY
    • H01BASIC ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B17/00Insulators or insulating bodies characterised by their form
    • H01B17/14Supporting insulators
    • H01B17/16Fastening of insulators to support, to conductor, or to adjoining insulator
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts, or towers
    • H02G7/205Installation of electric cables, extending along a pole

Abstract

The present invention provides a kind of controller switching equipment livewire work method.Controller switching equipment livewire work method according to the present invention is characterised by comprising:Bendable wood is fixed into the stage on utility poles;The stage electric wire connected on electric pole being moved in the Wire support part installed on bendable wood;Rise bendable wood or Wire support part, it is at least one in multiple Wire support parts of supporting electric wire to be moved to the stage far from electric pole by electric wire far from mounted LP insulators on bolt cross-arm;The LP insulators of installation installed on bolt cross-arm are removed, the stage for newly setting LP insulators is installed on bolt cross-arm;At least one of the multiple Wire support parts that will be far from electric pole are moved to electric pole, close to the stage for newly setting LP insulators;And electric wire is moved to the new stage set on LP insulators from Wire support part.

Description

Controller switching equipment livewire work auxiliary device and the controller switching equipment electrification for utilizing this device Operational method
Technical field
The present invention is related generally to controller switching equipment livewire work auxiliary device and is made using the controller switching equipment electrification of this device Industry method, more particularly, to the controller switching equipment livewire work auxiliary device of LP insulators installed on a kind of replacement electric pole and Utilize the controller switching equipment livewire work method of this device.
Background technology
In general, the upper end of electric pole is equipped with pole attachments, and pole attachments is by horizontal cross-arm and is mounted on cross-arm On 3 insulators constitute.Three-phase wire is connected to according to the color of binding component on 3 insulators.
In terms of managing mounted electric pole, pole attachments, insulator, typically it is by mounted replacing insulator New insulator, mounted pole attachments are changed to new pole attachments, and mounted electric pole is changed to new electric pole.Or After electric pole changes position, bolt pole attachments is changed to interior pole attachments for extending angle of increase electric wire etc..In addition, Further include newly setting electric pole, changes the controller switching equipments such as the extended position of electric wire and be newly provided as industry.
All it is that electric wire is carried out up and down or moved left and right and is completed under the electriferous state of energization when being engaged in such operation , livewire work frequently results in generation safety accident.Therefore, it to reduce the incidence of such safety accident, more safely executes Livewire work is continually developing various devices and construction method in industry.
(2006.7.19. is public for the related loaded republic of Korea Public Patent of look-ahead technique the 2006-0082713rd It opens, denomination of invention:Have the distribution line operation multi-axis robot of two dimension and three-dimensional composite drive means) in.
Invention content
Solve project
The present invention provides a kind of controller switching equipment livewire work auxiliary device and the controller switching equipment electrification work using this device Industry method, it is therefore intended that simply installed for operating personnel, may be used at after installation in controller switching equipment livewire work, utilize electric power It realizes that operating personnel automatically moves electric wire in the place far from electric wire, safely executes the controller switching equipment electrification for replacing LP insulators Operation.
Project solution
One of embodiment of the present invention provides a kind of controller switching equipment livewire work auxiliary device, which is characterized in that including:It can Curved wood;The bendable wood is fixed into bendable wood fixing piece on utility poles;Move up and down the lifter of the bendable wood;Installation On the bendable wood, the Wire support part that electric wire is connected on the electric pole is supported;And move up and down the Wire support The lifting moving part of part.Work of at least one in multiple Wire support parts and the lifting moving part in sliding moving member It is moved left and right under, the sliding moving member is responsible for moving left and right the bendable wood.
In the present invention, the lifter includes the electric wire rod installation part being mounted on the bendable wood fixing piece;And peace On the electric wire rod installation part, after the power for receiving the 1st transmission device, the lifting driving of the bendable wood is moved up and down Part.
In the present invention, the Wire support part includes that the master moved up and down under the action of the lifting moving part prolongs Long part;And the prominent sub- extension device in the main extension device upper end.
Another embodiment of the presently claimed invention provides a kind of controller switching equipment livewire work auxiliary device, which is characterized in that Including:Bendable wood;The bendable wood is fixed into bendable wood fixing piece on utility poles;Move up and down the lifting of the bendable wood Device;On the bendable wood, the Wire support part that electric wire is connected on the electric pole is supported;And move up and down the electricity The lifting moving part of line support element.At least one lifting moving part driven in revolving part in multiple Wire support parts Under the action of rotation, it is approximately rotated to the direction of the electric pole, or the direction far from the electric pole.
One of embodiment of the present invention provides a kind of controller switching equipment livewire work method, which is characterized in that including:By bendable wood The fixed stage on utility poles;The electric wire connected on the electric pole is moved to the Wire support installed on the bendable wood Stage in part;Rise the bendable wood or the Wire support part, by the electric wire far from mounted LP on bolt cross-arm Insulator supports at least one stage for being moved to the separate electric pole in multiple Wire support parts of the electric wire; Remove installed on the bolt cross-arm described and LP insulators be installed, on the bolt cross-arm installation newly set LP insulators Stage;At least one of the multiple Wire support parts that will be far from the electric pole are moved to the electric pole, close to institute State the new stage for setting LP insulators;And the electric wire is moved to from the Wire support part and described is newly set on LP insulators Stage.
In the present invention, at least one direction for being moved to the separate electric pole in multiple Wire support parts, or Person is moved to close to the direction of the electric pole, this is the sliding moving member installed by order to move left and right the bendable wood Mobile realization.
Another embodiment of the presently claimed invention provides a kind of controller switching equipment livewire work method, which is characterized in that including:It will Bendable wood fixes the stage on utility poles;The electric wire connected on the electric pole is moved to the electricity installed on the bendable wood Stage in line support element;Rise bendable wood or the Wire support part, by the electric wire far from having pacified on bolt cross-arm The LP insulators of dress support at least one in multiple Wire support parts of the electric wire rotate to the separate electric pole Stage;It removes installed on the bolt cross-arm described and LP insulators has been installed, install that newly to set LP exhausted on the bolt cross-arm The stage of edge;At least one of multiple described Wire support parts of the electric pole are will be far to rotate to the electric pole, Close to the new stage for setting LP insulators;And the electric wire is moved to from the Wire support part to described new to set LP exhausted Stage on edge.
In the present invention, at least one in multiple Wire support parts to rotate to the direction far from the electric pole, or Person rotates to close to the direction of the electric pole, this is that the lifting installed by order to move up and down the Wire support part moves What the rotation of moving part was realized.
Invention effect
Using controller switching equipment livewire work auxiliary device provided by the invention, filled using the 1st transmission device or the 2nd transmission The power set, the electric wire that the height of bendable wood or the height of each Wire support part can be automatically adjusted, be placed on Wire support part Height, facilitate the execution of LP replacing insulator operations.
In addition, according to the present invention, the 1st transmission device or the 2nd transmission device can be used in controller switching equipment replacement operation generally The electric tools such as the electric drill, the electric screw driver that use, without individually preparing the electric device of mobile Wire support part, convenient working Personnel execute operation.
In addition, according to the present invention, it not only can be with the height of sectional-regulated bendable wood and Wire support part entirety, additionally it is possible to only The sub- extension device of electric wire crimp is formed in Wire support part by moving up and down, it will be able to adjust electric wire crimp in three stages Or the height of electric wire.
In this regard, according to the present invention, length that the height of electric wire crimp or electric wire can be according to vertical extension part, main extension device Length, sub- extension device length automatic or manual adjust, the height of sectional-regulated bendable wood and Wire support part, close to target Behind place, finely tune sub- extension device accurately can be put into target location by electric wire crimp.
Therefore, through the invention, operating personnel can adjust the height of bendable wood, electricity according to operating condition and convenient free love Height, the height of sub- extension device of line support element entirety are stablized, are conveniently carried out and hang over electric wire on Wire support part temporarily Operation, and to replace the operation that LP insulators obtain requisite space.
In addition, according to the present invention, using the 1st transmission device or the 2nd transmission device, operating personnel can be in the position far from electric wire It sets, remotely executes the operation for removing electric wire from the top for having installed LP insulators, more easily obtain and replace LP insulation The required livewire work space of son, when reducing replacement LP insulators, operating personnel and the danger that safety accident occurs after line contacts Danger.
In addition, according to the present invention, the multiple LP insulators different to mounting height are checked, are repaired, replacement operation when, It is single to lift Wire support part using lifting moving part according to the height of corresponding LP insulators, can convenient working execution, even if Be difficult to that the tool or utensil used in livewire work is installed, can up and down adjustment installation site, smoothly execute operation.
In addition, according to the present invention, in the state that multiple Wire support parts are mounted on bendable wood, can be not necessarily to can by rising Curved wood rises the cumbersome operation of each Wire support part respectively, but it is identical that multiple Wire support parts can rise overally simultaneously Displacement.
In addition, the electric wire close to each other installed on pole attachments partially, especially central electric wire and outermost electric wire, LP insulators are replaced in the state of more than width is installed originally.Therefore, according to the present invention, it can reduce and replace LP insulators When, the incidence of the safety accidents such as electric shock accidents that operating personnel's trolley wire may occur.
Description of the drawings
Fig. 1 is the skeleton diagram according to the controller switching equipment livewire work auxiliary device of the 1st embodiment of the invention;
Fig. 2 is according to the bendable wood fixing piece of the 1st embodiment of the invention and the skeleton diagram of lifter;
Fig. 3 is the internal structure side view according to the lifter of the 1st embodiment of the invention;
Fig. 4 is to illustrate concept map according to the operation of the lifting actuator of the 1st embodiment of the invention;
Fig. 5 is according to the Wire support part of the 1st embodiment of the invention and the skeleton diagram of lifting moving part;
Fig. 6 is to illustrate concept map according to the operation of the lifting moving part of the 1st embodiment of the invention;
Fig. 7 is the concept map being inserted into electric wire according to the explanation of the 1st embodiment of the invention in electric wire crimp;
Fig. 8 is the Wire support part, lifting moving part and the skeleton diagram for sliding moving member according to the 1st embodiment of the invention;
Fig. 9 is the controller switching equipment livewire work method definition graph according to the 1st embodiment of the invention;
Figure 10 is that bendable wood is fixed on electric wire in the controller switching equipment livewire work method according to the 1st embodiment of the invention Procedure declaration concept map on bar;
Figure 11 is to rise the 3rd Wire support part in the controller switching equipment livewire work method according to the 1st embodiment of the invention Procedure declaration concept map at electric wire;
Figure 12 is that electric wire is moved to the 3rd electric wire in the controller switching equipment livewire work method according to the 1st embodiment of the invention The procedure declaration concept map of support element;
Figure 13 is to rise the 3rd Wire support part in the controller switching equipment livewire work method according to the 1st embodiment of the invention And far from electric pole direction, by electric wire far from the procedure declaration concept map for having installed LP insulators;
Figure 14 is in the controller switching equipment livewire work method according to 1st embodiment of the invention, and electric wire is moved to the 1st or the The procedure declaration concept map of 2 Wire support parts;
Figure 15 is to rise the 1st or the 2nd electric wire branch in the controller switching equipment livewire work method according to the 1st embodiment of the invention Support member, by electric wire far from the procedure declaration concept map for having installed LP insulators;
Figure 16 is will to have installed LP insulators more in the controller switching equipment livewire work method according to the 1st embodiment of the invention It is changed to the new procedure declaration concept map for setting LP insulators;
Figure 17 is in the controller switching equipment livewire work method according to the 1st embodiment of the invention, by the 1st or the 2nd Wire support Part drops to the new procedure declaration concept map set at LP insulators;
Figure 18 is in the controller switching equipment livewire work method according to 1st embodiment of the invention, by electric wire from the 1st or the 2nd electricity Line support element is moved to the new procedure declaration concept map for setting LP insulators;
Figure 19 is in the controller switching equipment livewire work method according to 1st embodiment of the invention, by the 3rd Wire support part towards electricity The direction of line bar declines, close to the procedure declaration concept map for newly setting LP insulators;
Figure 20 is in the controller switching equipment livewire work method according to 1st embodiment of the invention, by electric wire from the 3rd Wire support Part is moved to the new procedure declaration concept map for setting LP insulators;
Figure 21 is in the controller switching equipment livewire work method according to the 1st embodiment of the invention, by bendable wood from electric pole The procedure declaration concept map removed;
Figure 22 is according to the Wire support part of the 2nd embodiment of the invention and the skeleton diagram of lifting moving part;
Figure 23 is to illustrate concept map according to the operation of the lifting moving part of the 2nd embodiment of the invention;
Figure 24 is the procedure declaration concept map that electric wire is inserted into electric wire crimp according to the 2nd embodiment of the invention;
Figure 25 is the declaration order figure according to the controller switching equipment livewire work method of the 2nd embodiment of the invention.
Figure 26 is that bendable wood is fixed on electric wire in the controller switching equipment livewire work method according to the 2nd embodiment of the invention Procedure declaration concept map on bar;
Figure 27 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, and the 3rd Wire support part is upward The procedure declaration concept map being moved at electric wire;
Figure 28 is that electric wire is moved to the 3rd electric wire in the controller switching equipment livewire work method according to the 2nd embodiment of the invention Procedure declaration concept map at support element;
Figure 29 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, and the 3rd Wire support part is upward Mobile and single direction rotation, by electric wire far from the procedure declaration concept map for having installed LP insulators;
Figure 30 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, and electric wire is moved to the 1st or the Procedure declaration concept map at 2 Wire support parts;
Figure 31 is in the controller switching equipment livewire work method according to the 2nd embodiment of the invention, by the 1st or the 2nd Wire support Part moves up, electric wire far from the procedure declaration concept map for having installed LP insulators;
Figure 32 is will to have installed LP insulators more in the controller switching equipment livewire work method according to the 2nd embodiment of the invention It is changed to the new procedure declaration concept map for setting LP insulators;
Figure 33 is in the controller switching equipment livewire work method according to the 2nd embodiment of the invention, by the 1st or the 2nd Wire support Part, which declines, is moved to the new procedure declaration concept map set at LP insulators;
Figure 34 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, by electric wire from the 1st or the 2nd electricity Line support element is moved to the new procedure declaration concept map set at LP insulators;
Figure 35 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, and the 3rd Wire support part is reversed It rotates and declines and be moved to the new procedure declaration concept map set at LP insulators;
Figure 36 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, by electric wire from the 3rd Wire support Part is moved to the new procedure declaration concept map set at LP insulators;
Figure 37 is in the controller switching equipment livewire work method according to the 2nd embodiment of the invention, by bendable wood from electric pole The procedure declaration concept map of dismounting.
Specific implementation mode
The particular content to carry out an invention
Below with reference to attached drawing, to according to the present invention controller switching equipment livewire work auxiliary device and matching using this device Electric equipment livewire work embodiment of the method is illustrated.In the process, the thickness or inscape of the lines in attached drawing Size etc. is exaggerated to clear and facilitate explanation.
In addition, following terms is based on the definition for considering function of the invention and making, this definition can be according to user With fortune user or convention difference and change.Therefore, entire contents of the present specification should be based on for the definition of such term And it makes.
First, the controller switching equipment livewire work provided the 1st embodiment of the present invention is illustrated with auxiliary device.Fig. 1 It is the skeleton diagram according to the controller switching equipment livewire work auxiliary device of the 1st embodiment of the invention.
With reference to figure 1, controller switching equipment livewire work auxiliary device according to the present embodiment includes bendable wood 510, bendable wood Fixing piece 520, lifter 530, Wire support part 540, lifting moving part 550.Bendable wood 510 is to be fixed on electric pole 10 State, the frame to be born a heavy burden by electric wire 30 on Wire support part 540 and supporting electric wire support element 540 are constituted.Implement according to the present invention The bendable wood 510 of example includes horizontal extension part 511, vertical extension part 513, support element 515.
Horizontal extension part 511 extends to be formed along horizontal direction.It is fixed on the state of electric pole 10 in vertical extension part 513 Under, horizontal extension part 511 is set up in parallel with the bolt cross-arm 21 on electric pole 10.Form horizontal horizontal extension part One or several Wire support parts 540 are installed on 511.
Vertical extension part 513 is connected with the lower end of horizontal extension part 511.Vertical extension part 513 is along electric pole 10 in vertical Histogram is fixed on to extension, and by bendable wood fixing piece 520 on electric pole 10.
Support element 515 is in rod-shaped, is tiltedly mounted between horizontal extension part 511 and vertical extension part 513, connection level is prolonged Long part 511 and vertical extension part 513.The connecting elements that the upper end of support element 515 can be installed in 511 end of horizontal extension part It is rotated on 516, the lower end of support element 515 is connected with vertical extension part 513.According to the connecting structure, support element 515 with hang down On the basis of the coupling part of straight extension device 513, support level extension device 511.
It is to pass through that connecting elements 516, which is mounted on horizontal extension part 511, and connecting elements 516 is inserted into horizontal platform connector Behind 521 ends, it will be attached behind 516 side of the bolt components such as eyebolt perforation connecting elements, make connecting elements 516 and water Flat extension device 511 fits closely to be realized together.
Fig. 2 is according to the bendable wood fixing piece of the 1st embodiment of the invention and the skeleton diagram of lifter;Fig. 3 is according to this hair The internal structure side view of the lifter of bright 1st embodiment;Fig. 4 is the fortune according to the lifting actuator of the 1st embodiment of the invention Row illustrates concept map.
Bendable wood 510 or lifter 530 are fixed on electric pole 10 by bendable wood fixing piece 520.With reference to figure 2, according to this The bendable wood fixing piece 520 of one of inventive embodiments includes bendable wood connector 521 and electric wire joint element for bar 523.
Bendable wood connector 521 is the part being connect with bendable wood 510 or lifter 530.Bendable wood connector 521 includes The 1st connector 531a on bendable wood 510 or lifter 530 can be carried out to the 2nd connector 522 of installing and dismounting.
In one of the embodiment of the present invention, the 1st connector 531a or more extends, and compared with upper end, the width of lower end is more Width, whole is in jag shape, and the 2nd connector 522 has the shape of the prominent engaging member in 530 side of lifter, the width of end Degree is, can be by the lower end of the 1st connector 531a, but can not pass through upper end.
The lower end of 1st connector 531a is inserted into the 2nd connector 522, releasing lifts bendable wood 510 or lifter 530 External force, bendable wood 510 or lifter 530 Gravitative Loads under, the 1st connector 531a is moved down, the 2nd connector 522 Positioned at the upper end of the 1st connector 531a.At this moment, the end of the 2nd connector 522 is in the shape for hanging over the 1st upper ends connector 531a State.According to the assembling, bendable wood 510 or lifter 530 can be dismantled and be installed from bendable wood connector 521.
Electric wire joint element for bar 523 is integrally fixed at the part on electric pole 10.Electric wire joint element for bar 523 and bendable wood connector 521 be connected, have can on electric pole 10 installing and dismounting fixture structure.
Under normal circumstances, fixture is the component used when the 1st component is bundled on the 2nd component, in order to wrap up the 2nd component And have " Xi " or " C " shape or band-like, end be provided with the connectors such as bolt or nut.In one of the embodiment of the present invention In, electric wire joint element for bar 523 has the construction of fixture, as long as but bendable wood 510 can be fixed on electric pole 10, structure It makes and is not limited with shape.
Lifter 530 moves up and down bendable wood 510 with the state being fixed on bendable wood fixing piece 520.Referring to figs. 2 to figure 4, the lifter 530 of one of embodiment according to the present invention includes electric wire rod installation part 531 and lifting actuator 533.
Electric wire rod installation part 531 is made of frame, and the frame is in the state of being installed on bendable wood fixing piece 520, branch Support includes the heavy burden of the heavy burden and electric wire 30 of the bendable wood 510 of vertical extension part 513.The side of electric wire rod installation part 531 is arranged Have can on bendable wood fixing piece 520 installing and dismounting the 1st connector 531a.The 1st connection is provided on bendable wood fixing piece 520 Part 531a and the 2nd connector 522 being connected with bolt and nut.1st connector 531a and the 2nd connector 522 pass through bolt and nut Combination lifter 530 is fixed on bendable wood fixing piece 520.In addition, unscrewing the 1st connector 531a and the 2nd connector 522 Bolt and nut after, lifter 530 can be removed from bendable wood fixing piece 520.
The vertical extension part 513 of the other side of electric wire rod installation part 531 can move up and down.Vertical extension part 513 penetrates through Above and below electric wire rod installation part 531, the operation with lifting actuator 533 moves up and down after linking.It is connect with vertical extension part 513 Electric wire rod installation part 531 on be provided in multiple rolling members 532 for being arranged above and below, prevent and electric wire rod installation part 531 CONTACT WITH FRICTION leads to the mobile restricted of vertical extension part 513.When vertical extension part 513 moves up or down, rolling member 532 In the state of being contacted with vertical extension part 513, moving and turn to side or the other side with vertical extension part 513.
Lift actuator 533 be mounted on electric wire rod installation part 531 on, obtain the 1st transmission device 41 power after on move down Dynamic bendable wood 510.Herein, electric drill, the electric screw driver replaced and generally used when controller switching equipment can be used in the 1st transmission device 41 The equal driving devices such as electric tools or motor.The lifting actuator 533 of one of embodiment is passed including lifting drive according to the present invention Pass part 534, lifting beam barrel 537, lifting conveyer belt 538.
Lifting drive transferring member 534 rotates driving under the action of the 1st transmission device 41.In one of the embodiment of the present invention In, lifting drive transferring member 534 includes elevating endless screw 535 and elevating endless screw wheel 536.
The end of elevating endless screw 535 forms the lifting drive being engaged with the 1st transmission device 41 and enters part 535a, is passed from the 1st Dynamic device 41 obtains rotary force.Elevating endless screw wheel 536 and elevating endless screw 535 realize engagement, are mounted on lifting beam barrel 537 and moving axis On, it is rotated under the operation of elevating endless screw 535.When using electric tool as 1 transmission device 41, elevating endless screw 535 with The rotation of 1st transmission device 41 and rotate, elevating endless screw wheel 536 links with the rotation of elevating endless screw 535, as it is rotated in deceleration And increase rotary force.
The worm gear construction for having elevating endless screw 535 and elevating endless screw wheel 536 according to described in, can only be from elevating endless screw 535 Rotation rotary force is transmitted to elevating endless screw wheel 536,536 can not be taken turns from elevating endless screw and transmits rotation rotary force to elevating endless screw 535.That is, Apply rotary force to elevating endless screw wheel 536, then elevating endless screw 535 can not be made to rotate, also can not just make 536 rotation of elevating endless screw wheel Turn.
Elevating endless screw wheel 536 is connected by lifting beam barrel 537 and lifting conveyer belt 538 with bendable wood 510, according to the snail Wheel construction can prevent under the Gravitative Loads of bendable wood 510 and electric wire 30 etc., and bendable wood 510 moves down.
Lifting beam barrel 537 rotates to side or the other side under the action of lifting drive transferring member 534, will lift conveyer belt 538 roll or stretch.Lifting beam barrel 537 has epidermis, cylindrical, can be rolled up lifting conveyer belt 538, be connected to liter It drops on worm screw wheel 536 and moving axis.
Conveyer belt volume 538 is lifted on lifting beam barrel 537, end is connected with Wire support part 540.Herein, lifting passes Send band 538 that flat type square or the linear structures such as linear common conveyer belt or steel wire, rope can be used.Lift conveyer belt 538 The end installation component that can install and dismantle by draw ring, iron plug (fitting), clip, bolt and nut connector etc. with Bendable wood 510 connects.
The 1st transmission device 41 is revolved with entering the state that part 535a is engaged with lifting drive the end of 1st transmission device 41 Side is gone to, rotary force is transmitted to lifting beam barrel 537 by lifting drive transferring member 534, and lifting beam barrel 537 rotates to side Afterwards, lifting conveyer belt 538 be wound into lifting beam barrel 537 on when, with lifting conveyer belt 538 end be connected bendable wood 510 quilts Move upper end to.In addition, after the 1st transmission device 41 is rotated to the other side, lifting beam barrel 537 rotates to the other side, lifting transmission Band 538, which trails, to lower bendable wood 510.
The lower end of bendable wood 510, which adds to be equipped with, can limit the safety catch 539 that bendable wood 510 moves down.According to this One of embodiment of invention, safety catch 539 are the band-like or bars for having certain length, and end is connected with bendable wood 510. Safety catch 539 passes through draw ring, iron plug (fitting), clip, bolt and nut connector etc. as lifting conveyer belt 538 The installation component that can be installed and dismantle is connect with bendable wood 510.
Referring to figs. 1 to Fig. 4, the controller switching equipment livewire work auxiliary device of one of embodiment, bendable are wooden according to the present invention 510 are connected for medium with bendable wood fixing piece 520 with lifter 530.That is, bendable wood fixing piece 520 have can be by lifter 530 The construction being fixed on electric pole 10.
But controller switching equipment livewire work auxiliary device according to the present invention, as long as lifter 530 can lift bendable Wood 510 is not limited to the construction being mounted between bendable wood 510 and bendable wood fixing piece 520.That is, bendable wood 510 can not be with lifting Device 530 is medium, is directly installed on electric pole 10 by bendable wood fixing piece 520, lifter 530 can not reside at bendable It between wood 510 and bendable wood fixing piece 520, and is mounted on other positions, with the state liter on electric pole 10 Bendable wood 510 drops.
Fig. 5 is according to the Wire support part of the 1st embodiment of the invention and the skeleton diagram of lifting moving part;Fig. 6 is according to this The operation for inventing the lifting moving part of the 1st embodiment illustrates concept map;Fig. 7 is will be electric according to the explanation of the 1st embodiment of the invention Line is inserted into the concept map in electric wire crimp;Fig. 8 be according to the Wire support part of 1st embodiment of the invention, lifting moving part and Slide the skeleton diagram of moving member.Wire support part 540 is mounted in the state of bendable wood 510, receives to move on electric pole 10 The electric wire 30 to come over, and support the part of the electric wire.With reference to figure 5, the Wire support part 540 of embodiment includes according to the present invention Extension device 541 and electric wire crimp 545.
Extension device 541 has upper and lower extended shape, is mounted on horizontal extension part 511, in the work of lifting moving part 550 It is moved up and down under.The extension device 541 of embodiment includes main extension device 542, sub- extension device 543, fixing piece according to the present invention 544。
Main extension device 542 is connected with lifting moving part 550, and the liter of operation is realized by receiving 42 power of the 2nd transmission device Drop moving member 550 moves up and down.Sub- extension device 543 is provided with insulating materials, and cylindric main extension device 542 is inserted into lower end Inside is moved to the upper end of main extension device 542 after installing by this method.That is, sub- extension device 543 can protrude from main extension device 542 Upper end.
The sub- extension device 543 moved up is fixed on main extension device 542 by fixing piece 544.Rotation can be used in fixing piece 544 The perforation utensil etc. of rotatable fixed appliance, perforation sub- extension device 543 and main extension device 542.
If the revolving fixed appliance of the use of fixing piece 544, can be incited somebody to action by the operation for rotating fixing piece 544 to side Sub- extension device 543 is fixed on main extension device 542, and the operation by being rotated to the other side, then can be by sub- extension device 543 from master It is removed on extension device 542.If having fixing piece 544, sub- extension device 543 can be moved to the height of needs, using admittedly Determine part 544 sub- extension device 543 is fixed on required position, the length of manually adjustable extension device 541.
In addition, other fixing pieces 544 can be not necessarily to, the coupling part difference between sub- extension device 543 and main extension device 542 Sub- connecting member and female connector are set, by rotating sub- extension device 543 to side, sub- extension device 543 is fixed on main extension On part 542, it must not move up and down.Sub- extension device 543 is rotated to the other side, then it can be by sub- extension device 543 from main extension device 542 Upper dismounting.
Electric wire crimp 545 is to hang the part of electric wire 30, is located at the upper end of sub- extension device 543.Electric wire crimp 545 fetters Electric wire 30 can not be detached from from Wire support part 540.With reference to figure 7, in the present embodiment, electric wire crimp 545 includes holder 546 With locking piece 548.
Holder 546 is connect with extension device 541, formed allow electric wire 30 by open piece 546a.Locking piece 548 and branch Frame 546 is connected, and is responsible for folding open piece 546a.In an embodiment of the present invention, open piece 546a is located at the upper end of holder 546, Locking piece 548 is connected to the side of holder 546, rotatable.
When locking piece 548 is rotated to side, locking piece 548 is suspended to the other side of holder 546, closes open piece 546a (with reference to figure 5).When locking piece 548 is rotated to reverse side, other side of the locking piece 548 far from holder 546 opens open piece 546a (with reference to figure 7).As described above, can open piece 546a be carried out switching action by operating locking piece 548, electric wire 30 is inserted Enter electric wire crimp 545 to be fettered, or electric wire 30 is detached from electric wire crimp 545.
Lower end roller bearing 547 is mounted on the middle position of holder 546, rotatable.Upper end roller bearing 549 is mounted on locking piece 548 middle position, it is rotatable.According to this construction, electric wire 30 is inserted into the inside of holder 546, after locking locking piece 548, electricity The epidermis of line 30 is contacted with lower end roller bearing 547, upper end roller bearing 549.That is, after electric wire 30 is inserted into electric wire crimp 545, electric wire 30 with Electric wire crimp 545 forms the state of cloud contact.
According to this construction, during replacing controller switching equipment, Relative Displacement occurs for electric wire crimp 545 and electric wire 30 When, it can prevent electric wire 30 from being damaged by electric wire crimp 545, keep electric wire crimp 545 and electric wire 30 steady in contacting with each other Determine state, while can ensure that electric wire crimp 545 or electric wire 30 are smoothly mobile.
Lifting moving part 550 moves up and down Wire support part 540.Lifting moving part 550 can be moved independently Wire support part 540.According to this construction, lifting moving part 550 proportionally determines peace according to the number of Wire support part 540 Fill number.
3 Wire support parts 540 and lifting moving part 550 are installed in the present embodiment, wherein most apart from electric pole 10 Close Wire support part 540 and lifting moving part 550 is known as the 1st Wire support part and the 1st lifting moving part;Mounted on central position The Wire support part 540 and lifting moving part 550 set are known as the 2nd Wire support part and the 2nd lifting moving part;In electric pole 10 In, it is known as the 3rd Wire support part and the 3rd lifting moving part apart from farthest Wire support part 540 and lifting moving part 550.1st Wire support part, the 2nd Wire support part, the 3rd Wire support part and the 1st lifting moving part, the 2nd lifting moving part, the 3rd lifting Respectively forming for moving member is all identical with operation logic etc..But the 1st Wire support part and the 1st lifting moving part and the 2nd Wire support part and the 2nd lifting moving part are mounted on horizontal extension part 511, the 3rd Wire support part and the 3rd lifting moving part peace , can be on the sliding moving member 560 of horizontal (or left and right) sliding mounted on horizontal extension part 511, this is difference.
With reference to figure 6, lifting moving part 550 according to the present embodiment includes bendable wood installation part 551 and actuator 553.
Bendable wood installation part 551 is mounted on horizontal extension part 511.Bendable wood installation part 551 has fixture structure, can be Horizontal extension part 511 is installed and is removed.About the fixture structure on bendable wood installation part 551, in electric wire joint element for bar 523 Part is illustrated, therefore omits repeated explanation.
The guiding that bootable Wire support part 540 moves up and down is formed on bendable wood installation part 551 according to the present embodiment Part 552.It is formed with extended hollow guiding orifice 552a up and down on guide part 552, allows Wire support part 540 to be inserted in it Internal state lifting moving.
Then include suitable as long as lifting moving part 550 can be fixed on horizontal extension part 511 by bendable wood installation part 551 With the fixture structure on bendable wood fixing piece 520, or the construction different with bendable wood fixing piece 520, it is not limited to specific structure It makes and shape.
Actuator 553 is mounted on bendable wood installation part 551, and electricity is moved up and down after obtaining the power of the 2nd transmission device 42 Line support element 540.Herein, the 2nd transmission device 42 is identical as the 1st transmission device 41, when replacement controller switching equipment operation can be used The driving devices such as the electric tools such as the electric drill generally used or motor.Actuator 553 according to the present invention includes power transmission part 554, beam barrel 557, conveyer belt 558.
Power transmission part 554 is rotated by the 2nd transmission device 42 to be driven.In an embodiment of the present invention, power transmission part 554 include worm screw 555 and worm screw wheel 556.The end of worm screw 555 forms the power being mutually twisted with the 2nd transmission device 42 and introduces Part 555a.
Power transmission part 554, beam barrel 557, the conveyer belt 558 having in actuator 553 have respectively to be driven with lifting The lifting drive transferring member 534 that has in part 533, lifting beam barrel 537, lifting 538 identical construction of conveyer belt, are omitted herein Repeated explanation.
According to the worm gear construction for including worm screw 555 and worm screw wheel 556, Wire support part 540 can be prevented in electric wire 30 etc. It is moved down under Gravitative Loads.In addition, the end of the 2nd transmission device 42 with power lead-through 555a in the state of being mutually twisted 2nd transmission device 42 is rotated into side or the other side, Wire support part 540 to is moved in top with this or is moved to lower section.
Using controller switching equipment livewire work auxiliary device according to the present invention, the 1st transmission device as described above is utilized The power of 41 or the 2nd transmission device 42 can automatically adjust the height of bendable wood 510 or the height of each Wire support part 540, hang The height of electric wire 30 on Wire support part 540.
It more specifically, can be by bendable wood 510 and the electric wire branch on bendable wood 510 using the 1st transmission device 41 Support member 540 carries out 1 movement, close to or away from electric wire 30.Wire support part 540 can be carried out 2 times using the 2nd transmission device 42 It is mobile, close to or away from electric wire 30.In addition, carrying out 3 adjustment to the height of sub- extension device 543, fine tuning is connected to sub- extension device The height of the electric wire crimp 545 of 543 upper ends, or the flexible entire length for adjusting Wire support part 540.
In addition, according to the present invention, the 1st transmission device 41 or the 2nd transmission device 42 can be used and replace in controller switching equipment operation The electric tools such as the electric drill, the electric screw driver that generally use move Wire support part 540 without other electric device, can Convenient working personnel execute operation.
In addition, according to the present invention, support is moved up and down using the power of the 1st transmission device 41 or the 2nd transmission device 42 The Wire support part 540 of 30 weight of electric wire moves up and down the cumbersome operation such as electric wire 30 without operating personnel using pulley, it is ensured that Staff is more smoothly performed livewire work.
In addition, according to the present invention, utilizing the 1st transmission device 41 and lifter 530, the 2nd transmission device 42 and lifting moving Part 550 moves Wire support part 540 or electric wire 30 by certain speed, can it be accurately placed on purpose height and position.
With reference to figure 8, sliding moving member 560 includes the sliding guide piece 563 for surrounding horizontal extension part 511;Setting is being slided 563 top of guide part, is equipped with the sliding extension device 561 of bendable wood installation part 551;Connection sliding guide piece 563 and sliding are prolonged Long part 561 realizes integrated sliding connector 562;The sliding position fixing piece 564 that limit slippage guide part 563 slides.
Sliding guide piece 563 can have Contraband to ensure to slide moving member 560 along the horizontal sliding of horizontal extension part 511 The various shapes such as shape, U-shaped, the degree of lip-rounding, the outer surface (with reference to figure 11) of package level extension device 511, while with horizontal extension part The part of 511 occlusions is provided with swing roller 563a, can reduce frictional force when being contacted with horizontal extension part 511.Horizontal extension The end of part 511 is provided with sliding stop tip 511a, and the movement of limit slippage guide part 563 prevents sliding guide piece 563 from water It is detached from flat extension device 511.
It slides extension device 561 and is mounted on 563 top of sliding guide piece, prolong with level when preventing sliding guide piece 563 from sliding Long part 511 contacts.Like this, the sliding extension device 561 far from the setting of sliding guide piece 563 is mutual by sliding connector 562 It links together, and is moved together when sliding guide piece 563 moves.In the present embodiment, sliding connector 562 is with plank Shape illustrate, but the invention is not restricted to this, as long as sliding guide piece 563 and sliding extension device 561 can be mutual It links together, can also have other instead of shape.
The bendable wood installation part 551 of 3rd lifting moving part 550 is installed on sliding extension device 561.Accordingly, the 3rd lifting moves Moving part 550 and the 3rd Wire support part 540 are connect with sliding moving member 560, and sliding moving member 560 is slided in horizontal extension part 511 When, it is moved to same direction.
Sliding position fixing piece 564 can fix the position of sliding guide piece 563 in horizontal extension part 511.Operating personnel It is anti-by operating sliding position fixing piece 564 after sliding guide piece 563 is moved to required position on horizontal extension part 511 On-slip lower moving guide 563 continues to slide in horizontal extension part 511.For example, sliding position fixing piece 564 passes through eyebolt reality When now fixing, sliding position fixing piece 564 penetrates through sliding guide piece 563 by rotation process, makes its forward or backward, and pass through The contact area of the direction of rotation of sliding position fixing piece 564, increase and decrease sliding position fixing piece 564 and horizontal extension part 511 and Contact, or the two can be detached.If the direction rotation that sliding position fixing piece 564 marches forward, sliding position Frictional force between fixing piece 564 and horizontal extension part 511 increases, and sliding guide piece 563 is fixed on horizontal extension part 511 On, make it that can not slide.In addition, installation position mounting hole (not shown) on horizontal extension part 511, sliding position fixing piece 564 After the mounting hole of insertion position, the binding force between sliding position fixing piece 564 and horizontal extension part 511 is can further improve, more Add the sliding of limit slippage guide part 563.In addition, solid if multiple positions are arranged on horizontal extension part 511 at certain intervals Determine hole, then can speculate sliding guide piece 563 by displacement distance of the sliding position fixing piece 564 in multiple position mounting holes Sliding distance, can more accurately confirm the displacement distance of sliding guide piece 563.On the one hand, the position mounting hole can The other shapes such as position fixing groove are deformed into, can be combined together with sliding position fixing piece 564.Like this, by sliding position Behind the position for setting the fixation sliding guide piece 563 of fixing piece 564, the 3rd lifting moving part of the movement that links with sliding guide piece 563 The position of 550 and the 3rd Wire support part 540 is also fixed.Accordingly, it can avoid the 3rd Wire support part of supporting electric wire 30 540 etc. move in unexpected situations, prevent the generation of electric shock accidents.
In the following, using the controller switching equipment livewire work auxiliary device for the 1st embodiment of the present invention for having the construction, needle It is changed to the new present invention the 1st for setting LP insulators 25 in fact to LP (Line Post) insulator 22 will have been installed on bolt cross-arm 21 The controller switching equipment livewire work method applied in example illustrates.
Herein, inclined pole attachments is all to construct multiple insulators mounted on the pole attachments of 10 side of electric pole. In contrast to this, for the insulator in common pole attachments centered on electric pole 10, dispersion is mounted on side and the other side.Make Industry personnel centered on electric pole 10, can will be weighted towards the LP of the installation insulators 22 of side or set LP insulators 25 positioned at newly Between the LP of installation insulators 22 be changed to and newly set LP insulators 25.
Fig. 9 is the definition graph according to the controller switching equipment livewire work method of the 1st embodiment of the invention.
With reference to figure 9, the controller switching equipment livewire work method of the 1st embodiment includes according to the present invention:Bendable wood 510 is fixed Stage S1 on electric pole 10;The 3rd Wire support part 540 installed on bendable wood 510 is moved upwards up on electric pole 10 Stage S2 at electric wire 30;Electric wire 30 is moved to the stage S3 at the 3rd Wire support part 540;By the 3rd electricity of supporting electric wire 30 Line support element 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from having installed LP on bolt cross-arm 21 The stage S4 of insulator 22;Electric wire 30 is moved to the stage S5 at the 1st or the 2nd Wire support part 540;By supporting electric wire 30 1st or the 2nd Wire support part 540 moves up, by electric wire 30 far from the stage for having installed LP insulators 22 on bolt cross-arm 21 S6;The LP of the installation insulators 22 on bolt cross-arm 21 are removed, rank of the LP insulators 25 on bolt cross-arm 21 will be newly set Section S7;1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped into the new stage S8 set at LP insulators 25;By electric wire It is moved to the new stage S9 for setting LP insulators 25 from the 1st or the 2nd Wire support part 540;By the 3rd Wire support of supporting electric wire 30 Part 540 is moved to the direction of electric pole and lower section, close to the stage S10 for newly setting LP insulators 25;By electric wire from the 3rd Wire support Part 540 is moved to the new stage S11 for setting LP insulators 25;The stage S12 that bendable wood 510 is removed from electric pole 10.
The controller switching equipment livewire work method of 1st embodiment of the invention provide it is a kind of using controller switching equipment livewire work with auxiliary Device is helped, multiple LP insulators 22 of having installed are changed to multiple new methods for setting LP insulators 25.
Figure 10 is that bendable wood is fixed on electric wire in the controller switching equipment livewire work method according to the 1st embodiment of the invention Procedure declaration concept map on bar;Figure 11 is in the controller switching equipment livewire work method according to the 1st embodiment of the invention, by the 3rd Wire support part rises to the procedure declaration concept map at electric wire;Figure 12 is the controller switching equipment band according to the 1st embodiment of the invention In electric operational method, electric wire is moved to the procedure declaration concept map of the 3rd Wire support part;Figure 13 is real according to the present invention the 1st In the controller switching equipment livewire work method for applying example, the 3rd Wire support part is risen simultaneously far from electric pole direction, by electric wire far from The procedure declaration concept map of LP insulators is installed;Figure 14 is the controller switching equipment livewire work method according to the 1st embodiment of the invention In, electric wire is moved to the procedure declaration concept map of the 1st or the 2nd Wire support part;Figure 15 is according to the 1st embodiment of the invention In controller switching equipment livewire work method, rise the 1st or the 2nd Wire support part, by electric wire far from the process for having installed LP insulators Illustrate concept map;Figure 16 is will to have installed LP insulators in the controller switching equipment livewire work method according to the 1st embodiment of the invention It is changed to the new procedure declaration concept map for setting LP insulators.
Figure 17 is in the controller switching equipment livewire work method according to the 1st embodiment of the invention, by the 1st or the 2nd Wire support Part drops to the new procedure declaration concept map set at LP insulators;Figure 18 is the controller switching equipment band according to the 1st embodiment of the invention In electric operational method, electric wire is moved to the new procedure declaration concept map for setting LP insulators from the 1st or the 2nd Wire support part;Figure 19 are in the controller switching equipment livewire work method according to 1st embodiment of the invention, by the 3rd Wire support part towards the direction of electric pole Decline, close to the procedure declaration concept map for newly setting LP insulators;Figure 20 is the controller switching equipment electrification according to the 1st embodiment of the invention In operational method, electric wire is moved to the new procedure declaration concept map for setting LP insulators from the 3rd Wire support part;Figure 21 is basis In the controller switching equipment livewire work method of 1st embodiment of the invention, procedure declaration concept that bendable wood is removed from electric pole Figure.
With reference to figure 10, the realization process by the stage S1 that bendable wood 510 is fixed on electric pole 10 includes consolidating bendable wood Determine part 520 to be fixed on electric pole 10;Lifter 530 is fixed on bendable wood fixing piece 520;Connect lifter 530 and can Curved wooden 510;Lifting moving part 550 on fixed bendable wood 510 and Wire support part 540;With the position for having installed LP insulators 22 It sets corresponding.
When connecting bendable wood 510 with lifter 530, erection sequence is that vertical extension part 513 is mounted on lifting first On device 530;Horizontal extension part 511 is mounted on to the upper end of vertical extension part 513;In horizontal extension part 511 and vertical extension part Support element 515 is installed between 513.
Operation process support element 515 being mounted between horizontal extension part 511 and vertical extension part 513 includes that will connect Connection member 516 is mounted on horizontal extension part 511;The upper end of support element 515 is connected with connecting elements 516, and can rotate;Branch The connectors such as the eyebolt that the lower end of support member 515 prepares with 513 lower end of vertical extension part are connected, it is ensured that can installing and dismounting.
Include by the operation process that the 3rd lifting moving part 550 and the 3rd Wire support part 540 are fixed on bendable wood 510, Sliding moving member 560 is fixed on bendable wood 510 first;3rd lifting moving part 550 and the 3rd Wire support part 540 are installed On sliding moving member 560.In addition, the 3rd lifting moving part 550 and the 3rd Wire support part 540 are mounted on sliding moving member 560 After upper, sliding moving member 560 is fixed on bendable wood 510.
Bendable wood 510 is fixed on the stage S1 on electric pole 10 can also be by lifting moving part 550 and Wire support Part 540 will have been installed the process that bendable wood 510 is mounted on lifter 530 or bendable wood fixing piece 520 and realized.
With reference to figure 11, the 3rd Wire support part 540 installed on bendable wood 510 is moved upwards up to electric wire on electric pole 10 Stage S2 operation process at 30 includes that operating personnel's manual operation rises to sub- extension device 543 at electric wire 30.
In addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10, it can be according to work The convenience of industry condition or operating personnel only retain and move up bendable wood 510 by the 1st transmission device 41 and lifter 530 Process, or by the 2nd transmission device 42 and lifting moving part 550, move up the Wire support installed on bendable wood 510 The process of part 540.
It can be according to operation in addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10 The convenience of condition or operating personnel will move up the process of bendable wood 510 by the 1st transmission device 41 and lifter 530, And by the 2nd transmission device 42 and lifting moving part 550, the Wire support part 540 installed on bendable wood 510 is moved up Process combines realization.
It can be according to operation in addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10 The convenience of condition or operating personnel, by the 1st transmission device 41 and lifter 530 move up bendable wood 510 process and Operating personnel is manually operated, and the process that sub- extension device 543 rises at electric wire 30 is combined realization.
It can be according to operation in addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10 The convenience of condition or operating personnel will be moved up by the 2nd transmission device 42 and lifting moving part 550 on bendable wood 510 The process of the Wire support part 540 of installation and operating personnel's manual operation, the process at electric wire 30 is risen to by sub- extension device 543 Combine realization.
It can be according to operation in addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10 The convenience of condition or operating personnel, by the 1st transmission device 41 and lifter 530 move up bendable wood 510 process and By the 2nd transmission device 42 and lifting moving part 550, the mistake for the Wire support part 540 installed on bendable wood 510 is moved up Journey and operating personnel's manual operation, combine realization by the process that sub- extension device 543 rises at electric wire 30.
That is, in the explanation of the present invention, the operation of mobile Wire support part 540 includes passing through the 2nd transmission device 42 and the son that moves in the embodiment of entire Wire support part 540, and mobile Wire support part 540 of lifting moving part 550 prolong The embodiment of long part 543, by the operation process of mobile Wire support part 540 whole operation process and mobile sub- extension device 543 The whole embodiments such as the embodiment combined.
Therefore, in the explanation of the present invention, about the operation of mobile Wire support part 540, even if not mentioning shifting individually Dynamic Wire support part 540 is whole, and mobile sub- extension device 543, also means the one kind being applicable in the multiple embodiment.
In the explanation of the present invention, the operation for moving up or down the 3rd Wire support part 540 includes being led by mobile Extension device 542 moves the entire 3rd Wire support part 540 including main extension device 542 and sub- extension device 543, or only moves The embodiment of the sub- extension device 543 of dynamic 3rd Wire support part, 540 upper end setting, forms and connects electricity in the 3rd Wire support part 540 The part of the electric wire crimp 545 of line 30, that is, mean up-regulation or lower the whole of 540 upper end level of the 3rd Wire support part and make Industry.
It is executed in the state that the open piece 546a being arranged above holder 546 is opened by the 3rd Wire support part 540 to moving up It moves to the stage S2 at electric wire 30, after this stage, electric wire 30 is entered by open piece 546a inside holder 546.
With reference to figure 12, include by the stage S3 operation process that electric wire 30 is moved at the 3rd Wire support part 540, by electric wire 30 are moved at the 3rd Wire support part 540;It disconnects electric wire 30 and the connection status of LP insulators 22 has been installed.
At this moment, include that electric wire 30 passes through open piece by the operation process that electric wire 30 is moved at the 3rd Wire support part 540 546a enters, and the locking piece 548 on holder 546 is locked.That is, open piece 546a is closed by locking piece 548.
It includes dismantling to connect electric wire 30 and to disconnect electric wire 30 and installed the operation process of 22 connection status of LP insulators The binding component of LP insulators 22 is installed, or binding component is removed from electric wire, binding component is removed.
Although not making diagram on the drawing of the present invention, under normal circumstances, in order to protect the controller switching equipments such as electric wire 30, Spool, insulator cover isoelectric line crust are used all on electric wire 30.By electric wire 30 and before the disconnection of LP insulators 22 has been installed, after It is continuous to move up the 3rd Wire support part 540, then when removing binding component, electric wire 30 and meeting between LP insulators 22 is installed Generate interval.
After electric wire 30 is moved at the 3rd Wire support part 540, disconnect electric wire 30 and installed LP insulators 22 it Before, continue to move up the 3rd Wire support part 540, then electric wire 30 and has installed no longer mutually close between LP insulators 22 Fitting, electric wire 30 and has installed and will produce interval between LP insulators 22, and wire outer skin, which is no longer hung over, has installed LP insulators 22 On.Later, operating personnel can move wire outer skin along electric wire 30 according to facility, smoothly execute controller switching equipment replacement operation.
At this moment, before disconnecting electric wire 30 and LP insulators 22 being installed, continue to move up the 3rd Wire support part 540, The 2nd transmission device 42 and lifting moving part 550 are then utilized, the process by moving up Wire support part 540 is realized.Certainly, The 1st transmission device 41 and lifter 530 can also be utilized, is realized by the process of mobile bendable wood 510.
3rd Wire support part 540 of supporting electric wire 30 is moved up and is moved to the direction far from electric pole, by electric wire 30 are one far from the stage S4 for having installed LP insulators 22 on bolt cross-arm 21 will install LP insulators 22 and has been changed to and newly set LP insulators 25 and the process for obtaining working space.
It moves up with reference to the 13, the 3rd Wire support part 540 of figure and is moved to the direction far from electric pole, electric wire 30 is remote Include that being moved up by the 1st transmission device 41 and lifter 530 can from the stage S4 operation process of LP insulators 22 has been installed Curved wooden 510;The 3rd Wire support part 540 is moved up by the 2nd transmission device 42 and the 3rd lifting moving part 550.
3rd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from having installed LP The stage S4 of insulator 22 can be only carried out using the 1st transmission device 41 and rise according to operating condition or the convenience of operating personnel The process that device 530 moves bendable wood 510 is dropped, or the 3rd electric wire is moved using the 2nd transmission device 42 and the 3rd lifting moving part 550 The process of support element 540 or operating personnel's manual operation, the process at electric wire 30 is risen to by sub- extension device 543.
In addition, the 3rd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from Install LP insulators 22 stage S4 can according to operating condition or the convenience of operating personnel, will by the 1st transmission device 41 and Lifter 530 moves up process and the operating personnel's manual operation of bendable wood 510, and sub- extension device 543 is risen to electric wire 30 The process at place combines realization.
In addition, the 3rd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from Install LP insulators 22 stage S4 can according to operating condition or the convenience of operating personnel, will utilize the 2nd transmission device 42 and 3rd lifting moving part 550 move up the 3rd Wire support part 540 installed on bendable wood 510 process and operating personnel it is manual Operation, combines realization by the process that sub- extension device 543 rises at electric wire 30.
In addition, the 3rd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from Install the stage of LP insulators 22 by the 1st transmission device 41 and can will rise according to operating condition or the convenience of operating personnel Drop device 530 moves up the process of bendable wood 510, and being moved up by the 2nd transmission device 42 and the 3rd lifting moving part 550 can The process for the 3rd Wire support part 540 installed on curved wooden 510, operating personnel's manual operation, electricity is risen to by sub- extension device 543 Process at line 30 combines realization.
It moves up in the 3rd Wire support part 540 and is moved to the direction far from electric pole, by electric wire 30 far from having installed In the stage S4 of LP insulators 22, the operation process for moving up the 3rd Wire support part 540 includes that operating personnel is far from electricity On the position of line 30, using the 2nd transmission device 42 and the 3rd lifting moving part 550, automatically and remotely by the 3rd Wire support part 540 Main extension device 542 move up.
In addition, move up the 3rd Wire support part 540 operation can according to operating condition or the convenience of operating personnel, It is realized by only moving up sub- extension device 543.In addition, the operation for moving up the 3rd Wire support part 540 can be by by 3 Wire support part 540 is whole, that is, by moving up the process of main extension device 542 and moving up the mistake of sub- extension device 543 Journey is realized.
It moves up in the 3rd Wire support part 540 and is moved to the direction far from electric pole, by electric wire 30 far from having installed In the stage S4 of LP insulators 22, the 3rd operation of the Wire support part 540 far from electric pole 10 can be operated into cunning by operating personnel Dynamic position fixing piece 564, sliding guide piece 563 can be in the state of mobile on horizontal extension part 511, by sliding guide piece 563 realize far from electric pole 10.At this moment, the 3rd Wire support part 540 is that medium is moved with sliding with bendable wood installation part 551 Part 560 is connected, so, the 3rd Wire support part 540 is identical far from electric pole 10 according to the displacement distance of sliding moving member 560 Distance.After 3rd Wire support part 540 is arranged on required position, operating personnel operates sliding position fixing piece 564, Sliding guide piece 563 is fastened on horizontal extension part 511, its movement is prevented.
With reference to figure 14, the operation process by the stage S5 that electric wire 30 is moved at the 1st or the 2nd Wire support part 540 includes, Electric wire 30 is moved at the 1st or the 2nd Wire support part 540;It disconnects electric wire 30 and the connection of LP insulators 22 has been installed.Separately Outside, if the 1st or the 2nd Wire support part 540 by electric wire 30 before being moved to the stage S5 at the 1st or the 2nd Wire support part 540 On bendable wood 510, then will not sequentially it go wrong.It therefore, can be according to operating condition or operating personnel just 1st or the 2nd Wire support part 540 is installed to the time on bendable wood 510 by profit, adjustment.
Include by the operation process that electric wire 30 is moved at the 1st or the 2nd Wire support part 540, electric wire 30 passes through open piece 546a enters, and the locking piece 548 on holder 546 is locked.That is, open piece 546a is closed by locking piece 548.
The operation process for disconnecting electric wire 30 and having installed the connection of LP insulators 22 includes dismantling connection electric wire 30 and having pacified The binding component of LP insulators 22 is filled, or binding component is removed from electric wire, binding component is removed.
Although not making diagram on the drawing of the present invention, under normal circumstances, in order to protect the controller switching equipments such as electric wire 30, Spool, insulator cover isoelectric line crust are used all on electric wire 30.By electric wire 30 and before the disconnection of LP insulators 22 has been installed, after It is continuous to move up the 1st or the 2nd Wire support part 540, then when removing binding component, electric wire 30 and installed LP insulators 22 it Between will produce interval.
After electric wire 30 is moved at the 1st or the 2nd Wire support part 540, disconnects electric wire 30 and LP insulators 22 have been installed Before, continue to move up the 1st or the 2nd Wire support part 540, then electric wire 30 and no longer phase has been installed between LP insulators 22 It mutually fits closely, electric wire 30 and has installed and will produce interval between LP insulators 22, wire outer skin no longer hangs over that have installed LP exhausted On edge 22.Later, operating personnel can move wire outer skin along electric wire 30 according to facility, smoothly execute controller switching equipment more Change operation.
At this moment, before disconnecting electric wire 30 and LP insulators 22 being installed, continue to move up the 3rd Wire support part 540, The 2nd transmission device 42 and lifting moving part 550 are then utilized, the process by moving up Wire support part 540 is realized.Certainly, The 1st transmission device 41 and lifter 530 can also be utilized, is realized by the process of mobile bendable wood 510.
1st or the 2nd Wire support part 540 of supporting electric wire 30 is moved up and is moved to the direction far from electric pole, LP insulators 22 will have been installed and has replaced by being one far from the stage S6 for having installed LP insulators 22 on bolt cross-arm 21 by electric wire 30 Newly to set the process that LP insulators 25 obtain working space.
With reference to figure 15, the 1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, it will be electric Line 30 is one far from the stage S6 for having installed LP insulators 22 will install LP insulators 22 and has been changed to and newly set LP insulators 25 And obtain the process of working space.
1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, electric wire 30 is separate The stage S6 operation process for having installed LP insulators 22 includes moving up bendable by the 1st transmission device 41 and lifter 530 Wood 510;The the 1st or the 2nd Wire support part 540 is moved up by the 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550.
1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, electric wire 30 is separate The stage S6 for having installed LP insulators 22 can be only carried out and filled using the 1st transmission according to operating condition or the convenience of operating personnel The process of 41 and the movement bendable of lifter 530 wood 510 is set, or utilizes the 2nd transmission device 42 and the 1st or the 2nd lifting moving part The process of 550 the 1st or the 2nd Wire support parts 540 of movement or operating personnel's manual operation, electricity is risen to by sub- extension device 543 Process at line 30.
In addition, the 1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 It can will be filled by the 1st transmission according to operating condition or the convenience of operating personnel far from the stage S6 for having installed LP insulators 22 It sets 41 and lifter 530 moves up the process of bendable wood 510 and operating personnel is manually operated, sub- extension device 543 is risen to Process at electric wire 30 combines realization.
In addition, the 1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 The 2nd transmission can will be utilized to fill according to operating condition or the convenience of operating personnel far from the stage S6 for having installed LP insulators 22 Set the mistake that the 42 and the 1st or the 2nd lifting moving part 550 moves up the 1st or the 2nd Wire support part 540 installed on bendable wood 510 Journey and operating personnel's manual operation, combine realization by the process that sub- extension device 543 rises at electric wire 30.
In addition, the 1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 It can will be filled by the 1st transmission according to operating condition or the convenience of operating personnel far from the stage S6 for having installed LP insulators 22 Set 41 and lifter 530 move up the process of bendable wood 510, utilize the 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550 move up the process for the 1st or the 2nd Wire support part 540 installed on bendable wood 510 and operating personnel's manual operation, The process that sub- extension device 543 rises at electric wire 30 is combined into realization.
Electric wire 30 is moved to stage S5 at the 1st or the 2nd Wire support part 540 and by the 1st or the 2nd Wire support part 540 move up and are moved to the direction far from electric pole, can be far from the stage S6 for having installed LP insulators 22 by electric wire 30 After electric wire is moved to the operation S5 of the 1st Wire support part 540 and moves up operation S6 wholes, electric wire is moved to by execution The operation S5 of 2nd Wire support part 540 and move up operation S6.Conversely, electric wire is moved at the 2nd Wire support part 540 Operation S5 and after the completion of moving up operation S6, it is executable by electric wire be moved to operation S5 at the 1st Wire support part 540 and Move up operation S6.Furthermore it is also possible to which electric wire is moved at the 1st Wire support part 540 and the 2nd Wire support part 540 It is executable to move up operation for the 1st Wire support part 540 and the 2nd Wire support part 540 after operation S5 is fully completed S6.Like this, by operation S5 that electric wire is moved at the 1st or the 2nd Wire support part 540 and move up operation S6 can be according to work Industry condition or the convenience adjustment sequence of operating personnel.
With reference to figure 16, the LP of the installation insulators 22 on bolt cross-arm 21 are removed, by the new LP insulators 25 that set mounted on slotting The operation process of stage S7 on pin cross-arm 21 includes, using moving up Wire support part 540, by electric wire 30 far from having installed The working space that the stage (S4, S6) of LP insulators 22 is obtained, will install LP insulators 22 and has been removed from bolt cross-arm 21, Installation newly sets LP insulators 25.
With reference to figure 17, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to and is newly set at LP insulators 25 The operation process of stage S8 includes declining bendable wood 510 by the 1st transmission device 41 and lifter 530;It is filled by the 2nd transmission It sets the 42 and the 1st or the 2nd lifting moving part 550 and declines the 1st or the 2nd Wire support part 540.
In addition, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage set at LP insulators 25 S8 can be only carried out according to operating condition or the convenience of operating personnel and move bendable using the 1st transmission device 41 and lifter 530 The process of wood 510, or the 1st or the 2nd Wire support is moved by the 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550 The process of part 540 or operating personnel's manual operation, drop to the process at electric wire 30 by sub- extension device 543.
In addition, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage set at LP insulators 25 S8 can will decline bendable wood according to operating condition or the convenience of operating personnel by the 1st transmission device 41 and lifter 530 510 process and operating personnel's manual operation, combine realization by the process that sub- extension device 543 drops at electric wire 30.
In addition, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage set at LP insulators 25 S8 can will pass through the 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550 according to operating condition or the convenience of operating personnel Process and the operating personnel's manual operation for declining the 1st or the 2nd Wire support part 540 installed on bendable wood 510, son is prolonged The process that long part 543 drops at electric wire 30 combines realization.
In addition, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage set at LP insulators 25 S8 can will decline bendable wood according to operating condition or the convenience of operating personnel by the 1st transmission device 41 and lifter 530 510 process, by the 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550 decline the 1st installed on bendable wood 510 or Sub- extension device 543 is dropped to the process at electric wire 30 and combined by the process of the 2nd Wire support part 540, operating personnel's manual operation Get up to realize.
With reference to figure 18, electric wire is moved to the new stage S9's for setting LP insulators 25 from the 1st or the 2nd Wire support part 540 Operation process includes being bundled and being installed in electric wire 30 and new set in the state that LP insulators 25 fit closely;Disconnect electric wire The combination of 30 and the 1st or the 2nd Wire support part 540.Herein, electric wire 30 is bundled in and is newly set on LP insulators 25, mean profit Component is bundled with foreskin steel wire, adhesive tape, clip etc., electric wire 30 is fixed on and is newly set on LP insulators 25.
The operation process for disconnecting the combination of electric wire 30 and the 1st or the 2nd Wire support part 540 includes rotating locking piece 548, Open open piece 546a;Electric wire 30 is moved to outside holder 546 by open piece 546a.
1st or the 2nd Wire support part 540 is dropped into the new stage S8 set at LP insulators 25 and by electric wire from the 1st or 2nd Wire support part 540 is moved to the new stage S9 for setting LP insulators 25 can be in the operation for declining the 1st Wire support part 540 After S8 and mobile electric wire operation S9 is fully completed, the operation S8 for declining the 2nd Wire support part 540 and mobile electric wire operation are executed S9.Conversely, can also be after the operation S8 and mobile electric wire operation S9 for declining the 2nd Wire support part 540 are fully completed, then execute Decline the operation S8 and mobile electric wire operation S9 of the 1st Wire support part 540.Furthermore it is also possible to completing the 1st Wire support part After 540 are fully completed with the operation S8 for declining the 2nd Wire support part 540, then execute and electric wire is moved to the 1st Wire support part Operation S9 at 540 and the 2nd Wire support part 540.Like this, decline operation S8 and the shifting of the 1st or the 2nd Wire support part 540 Dynamic electric wire operation S9 can adjust the sequence of operation according to operating condition or the convenience of operating personnel.
With reference to figure 19, the 3rd Wire support part 540 of supporting electric wire 30 is moved to the direction of electric pole and lower section, is approached It newly sets in the stage S10 of LP insulators 25, includes by the operation process that the 3rd Wire support part 540 is moved to 10 direction of electric pole, Operating personnel operates sliding position fixing piece 564, and sliding guide piece 563 can slide on horizontal extension part 511;By slide-and-guide Part 563 is moved to the direction of electric pole 10.At this moment, the 3rd Wire support part 540 is medium and sliding with bendable wood installation part 551 Moving member 560 is connected, and the 3rd Wire support part 540 is moved according to the displacement distance of sliding moving member 560 to the direction of electric pole 10 Move identical distance.After 3rd Wire support part 540 is moved to required position, operating personnel operates sliding position fixing piece 564, Sliding guide piece 563 is fixed on horizontal extension part 511, its movement is prevented.
3rd Wire support part 540 is moved to the direction of electric pole and lower section, close to the stage for newly setting LP insulators 25 In S10, the operation that the 3rd Wire support part 540 is moved down can will pass through according to operating condition or the convenience of operating personnel 2nd transmission device 42 and the 3rd lifting moving part 550 decline the 3rd Wire support part 540 on bendable wood 510 Mobile process and operating personnel's manual operation, combine realization by the process that sub- extension device 543 drops at electric wire 30.
In addition, the operation that the 3rd Wire support part 540 is moved down can be according to operating condition or the facility of operating personnel Property, the process of bendable wood 510 will be declined by the 1st transmission device 41 and lifter 530, pass through the 2nd transmission device 42 and the 3rd liter Moving member 550 is dropped, the 3rd Wire support part 540 on bendable wood 510 is carried out to decline mobile process, operating personnel Manual operation, combines realization by the process that sub- extension device 543 drops at electric wire 30.
With reference to figure 20, electric wire is moved to the operation of the new stage S11 for setting LP insulators 25 from the 3rd Wire support part 540 Process includes being bundled and being installed in electric wire 30 and new set in the state that LP insulators 25 fit closely;Release 30 He of electric wire The combination of 3rd Wire support part 540.Herein, by electric wire 30 be bundled in it is new set meant on LP insulators 25 using foreskin steel wire, Adhesive tape, clip etc. bundle component, and electric wire 30 is fixed on and is newly set on LP insulators 25.Release electric wire 30 and the 3rd Wire support part 540 operation process combined include rotating locking piece 548, open open piece 546a;Electric wire 30 is moved to by open piece 546a Outside holder 546.
With reference to figure 21, the operation process by the stage S12 that bendable wood 510 is removed from electric pole 10 includes, by electric wire branch Support member 540 and lifting moving part 550 and sliding moving member 560 are removed from bendable wood 510;Bendable wood 510 is consolidated from bendable wood Determine to remove on part 520 or lifter 530;Lifter 530 is removed from bendable wood fixing piece 520;By bendable wood fixing piece 520 It is removed from electric pole 10.
In addition, the stage S12 that bendable wood 510 is removed from electric pole 10 can also be by 540 He of Wire support part Lifting moving part 550 and sliding moving member 560 are in the state of installation, and bendable wood 510 is removed reality from electric pole 10 It is existing.
Figure 10 is disposably executed to Figure 21 illustrated process, multiple LP insulators 22 of having installed can be disposably changed to Newly set LP insulators 25.
In addition, executing Figure 10 in order to Figure 21 illustrated process, multiple LP insulators 22 of having installed can be changed to respectively Newly set LP insulators 25.That is, execute Figure 10 to Figure 21 process can by it is multiple installed in LP insulators 22 any one more Be changed to and newly set LP insulators 25, after the completion again by residue installed LP insulators 22 be changed to it is new set LP insulators 25 when, can be again The secondary process for executing Figure 10 to Figure 21.At this moment, it is newly set in order to which the LP of installation insulators 22 farthest on electric pole 10 to be changed to LP insulators 25, should execute during Figure 10 to Figure 21 with 540 relevant process of the 3rd Wire support part.In order to will be apart from electricity The nearest LP of the installation insulators 22 of line bar 10, which are changed to, newly sets LP insulators 25, should execute Figure 10 to Figure 21 in the process with the 1st 540 relevant process of Wire support part.
Above to the 1st embodiment according to the present invention, using controller switching equipment livewire work auxiliary device by bolt cross-arm Multiple LP insulators 22 of having installed on 21 are changed to multiple new controller switching equipment livewire work methods progress for setting LP insulators 25 Explanation.Below with reference to Figure 10 to Figure 21, for the centre position of LP insulators 22 will have been installed on bolt cross-arm 21 Installation LP insulators 22 are changed to the new controller switching equipment livewire work method for setting LP insulators 25 and illustrate.
With reference to figure 10, the realization process by the stage S1 that bendable wood 510 is fixed on electric pole 10 includes consolidating bendable wood Determine part 520 to be fixed on electric pole 10;Lifter 530 is fixed on bendable wood fixing piece 520;Connect lifter 530 and can Curved wooden 510;Lifting moving part 550 on fixed bendable wood 510 and Wire support part 540;With the position for having installed LP insulators 22 It sets corresponding.
When connecting bendable wood 510 with lifter 530, erection sequence is that vertical extension part 513 is mounted on lifting first On device 530;Horizontal extension part 511 is mounted on to the upper end of vertical extension part 513;In horizontal extension part 511 and vertical extension part Support element 515 is installed between 513.
Operation process support element 515 being mounted between horizontal extension part 511 and vertical extension part 513 includes that will connect Connection member 516 is mounted on horizontal extension part 511;The upper end of support element 515 is connected with connecting elements 516, and can rotate;Branch The connectors such as the eyebolt that the lower end of support member 515 prepares with 513 lower end of vertical extension part are connected, it is ensured that can installing and dismounting.
The present embodiment will replace the LP of the installation insulators positioned at centre, and (22, hereinafter referred to as " the 2nd has installed LP insulation Son "), therefore the 2nd lifting moving part 550 and the 2nd Wire support part 540 be fixed on bendable wood 510 to have installed LP with the 2nd exhausted 22 corresponding position of edge.In addition, having installed LP insulators 22 to replace the 2nd, need to expand intermediate electric wire 30 and distance 3rd lifting moving part 550 and the 3rd Wire support part 650 are fixed on and electricity by farthest the distance between the electric wire 30 of electric pole 10 The farthest LP of installation insulators (22, hereinafter referred to as " the 3rd has installed LP insulators ") corresponding position in line bar 10.
Include by the operation process that the 2nd lifting moving part 550 and the 2nd Wire support part 540 are fixed on bendable wood 510, The 2nd lifting moving part 550 is fixed on bendable wood 510 first, then with the 2nd Wire support on the 2nd lifting moving part 550 Part 540 combines.Furthermore it is also possible to after by being combined with the 2nd Wire support part 540 on the 2nd lifting moving part 550, by the 2nd liter Drop moving member 550 is fixed on the realization of the process on bendable wood 510.
The operation process that 3rd lifting moving part 550 and the 3rd Wire support part 540 are fixed on bendable wood 510 includes, first First sliding moving member 560 is fixed on bendable wood 510, then will slide 550 He of the 3rd lifting moving part on moving member 560 3rd Wire support part 540 is combined.Furthermore it is also possible to by the way that the 3rd lifting moving part 550 and on moving member 560 will be slided 3 Wire support parts 540 are combined, and sliding moving member 560, which is then fixed on the process on bendable wood 510, realizes.
Bendable wood 510 is fixed on the stage S1 on electric pole 10 can also be by lifting moving part 550 and Wire support Part 540 will have been installed the process that bendable wood 510 is mounted on lifter 530 or bendable wood fixing piece 520 and realized.
With reference to figure 11, the 3rd Wire support part 540 installed on bendable wood 510 is moved upwards up to electric wire on electric pole 10 Stage S2 operation process at 30 includes that operating personnel's manual operation rises to sub- extension device 543 at electric wire 30.At this moment, 3 Wire support parts 540 should be located at position corresponding with electric wire 30.
In addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10, it can be according to work The convenience of industry condition or operating personnel only retain and move up bendable wood 510 by the 1st transmission device 41 and lifter 530 Process, or by the 2nd transmission device 42 and lifting moving part 550, move up the Wire support installed on bendable wood 510 The process of part 540.
It can be according to operation in addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10 The convenience of condition or operating personnel can will move up the mistake of bendable wood 510 by the 1st transmission device 41 and lifter 530 Journey, and by the 2nd transmission device 42 and lifting moving part 550, move up the Wire support part installed on bendable wood 510 540 process combines realization.
It can be according to operation in addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10 The convenience of condition or operating personnel, by the 1st transmission device 41 and lifter 530 move up bendable wood 510 process and Operating personnel is manually operated, and the process that sub- extension device 543 rises at electric wire 30 is combined realization.
It can be according to operation in addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10 The convenience of condition or operating personnel will be moved up by the 2nd transmission device 42 and lifting moving part 550 on bendable wood 510 The process of the Wire support part 540 of installation and operating personnel's manual operation, the process at electric wire 30 is risen to by sub- extension device 543 Combine realization.
It can be according to operation in addition, the 3rd Wire support part 540 is moved upward to the stage S2 at the electric wire 30 of electric pole 10 The convenience of condition or operating personnel, by the 1st transmission device 41 and lifter 530 move up bendable wood 510 process and By the 2nd transmission device 42 and lifting moving part 550, the mistake for the Wire support part 540 installed on bendable wood 510 is moved up Journey and operating personnel's manual operation, combine realization by the process that sub- extension device 543 rises at electric wire 30.
That is, in the explanation of the present invention, the operation of mobile Wire support part 540 includes passing through the 2nd transmission device 42 and the son that moves in the embodiment of entire Wire support part 540, and mobile Wire support part 540 of lifting moving part 550 prolong The embodiment of long part 543, by the operation process of mobile Wire support part 540 whole operation process and mobile sub- extension device 543 The whole embodiments such as the embodiment combined.
Therefore, in the explanation of the present invention, about the operation of mobile Wire support part 540, even if not mentioning shifting individually Dynamic Wire support part 540 is whole, and mobile sub- extension device 543, also means the one kind being applicable in the multiple embodiment.
In the explanation of the present invention, the operation for moving up or down the 3rd Wire support part 540 includes being led by mobile Extension device 542 moves the entire 3rd Wire support part 540 including main extension device 542 and sub- extension device 543, or only moves The embodiment of the sub- extension device 543 of dynamic 3rd Wire support part, 540 upper end setting, forms and connects electricity in the 3rd Wire support part 540 The part of the electric wire crimp 545 of line 30, that is, mean up-regulation or lower the whole of 540 upper end level of the 3rd Wire support part and make Industry.
It is executed in the state that the open piece 546a being arranged above holder 546 is opened by the 3rd Wire support part 540 to moving up It moves to the stage S2 at electric wire 30, after this stage, electric wire 30 is entered by open piece 546a inside holder 546.
With reference to figure 12, include by the stage S3 operation process that electric wire 30 is moved at the 3rd Wire support part 540, by electric wire 30 are moved at the 3rd Wire support part 540;It disconnects electric wire 30 and the connection status of LP insulators 22 has been installed.
At this moment, include that electric wire 30 passes through open piece by the operation process that electric wire 30 is moved at the 3rd Wire support part 540 546a enters, and the locking piece 548 on holder 546 is locked.That is, open piece 546a is closed by locking piece 548.
The operation process for disconnecting electric wire 30 and having installed the connection of LP insulators 22 includes dismantling connection electric wire 30 and having pacified The binding component of LP insulators 22 is filled, or binding component is removed from electric wire, binding component is removed.
Although not making diagram on the drawing of the present invention, under normal circumstances, in order to protect the controller switching equipments such as electric wire 30, Spool, insulator cover isoelectric line crust are used all on electric wire 30.By electric wire 30 and before the disconnection of LP insulators 22 has been installed, after It is continuous to move up the 3rd Wire support part 540, then when removing binding component, electric wire 30 and meeting between LP insulators 22 is installed Generate interval.
After electric wire 30 is moved at the 3rd Wire support part 540, disconnect electric wire 30 and installed LP insulators 22 it Before, continue to move up the 3rd Wire support part 540, then electric wire 30 and has installed no longer mutually close between LP insulators 22 Fitting, electric wire 30 and has installed and will produce interval between LP insulators 22, and wire outer skin, which is no longer hung over, has installed LP insulators 22 On.Later, operating personnel can move wire outer skin along electric wire 30 according to facility, smoothly execute controller switching equipment replacement operation.
At this moment, before disconnecting electric wire 30 and LP insulators 22 being installed, continue to move up the 3rd Wire support part 540, The 2nd transmission device 42 and lifting moving part 550 are then utilized, the process by moving up Wire support part 540 is realized.Certainly, The 1st transmission device 41 and lifter 530 can also be utilized, is realized by the process of mobile bendable wood 510.
3rd Wire support part 540 of supporting electric wire 30 is moved up and is moved to the direction far from electric pole, by electric wire 30 are one far from the stage S4 for having installed LP insulators 22 on bolt cross-arm 21 will install LP insulators 22 and has been changed to and newly set LP insulators 25 and the process for obtaining working space.
It moves up with reference to the 13, the 3rd Wire support part 540 of figure and is moved to the direction far from electric pole, electric wire 30 is remote Include that being moved up by the 1st transmission device 41 and lifter 530 can from the stage S4 operation process of LP insulators 22 has been installed Curved wooden 510;The 3rd Wire support part 540 is moved up by the 2nd transmission device 42 and the 3rd lifting moving part 550.
3rd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from having installed LP The stage S4 of insulator 22 can be only carried out using the 1st transmission device 41 and rise according to operating condition or the convenience of operating personnel The process that device 530 moves bendable wood 510 is dropped, or the 3rd electric wire is moved using the 2nd transmission device 42 and the 3rd lifting moving part 550 The process of support element 540 or operating personnel's manual operation, the process at electric wire 30 is risen to by sub- extension device 543.
In addition, the 3rd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from Install LP insulators 22 stage S4 can according to operating condition or the convenience of operating personnel, will by the 1st transmission device 41 and Lifter 530 moves up process and the operating personnel's manual operation of bendable wood 510, and sub- extension device 543 is risen to electric wire 30 The process at place combines realization.
In addition, the 3rd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from Install LP insulators 22 stage S4 can according to operating condition or the convenience of operating personnel, will utilize the 2nd transmission device 42 and 3rd lifting moving part 550 move up the 3rd Wire support part 540 installed on bendable wood 510 process and operating personnel it is manual Operation, combines realization by the process that sub- extension device 543 rises at electric wire 30.
In addition, the 3rd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from Install the stage of LP insulators 22 by the 1st transmission device 41 and can will rise according to operating condition or the convenience of operating personnel Drop device 530 moves up the process of bendable wood 510, and being moved up by the 2nd transmission device 42 and the 3rd lifting moving part 550 can The process for the 3rd Wire support part 540 installed on curved wooden 510, operating personnel's manual operation, electricity is risen to by sub- extension device 543 Process at line 30 combines realization.
It moves up in the 3rd Wire support part 540 and is moved to the direction far from electric pole, by electric wire 30 far from having installed In the stage S4 of LP insulators 22, the operation process for moving up the 3rd Wire support part 540 includes that operating personnel is far from electricity On the position of line 30, using the 2nd transmission device 42 and the 3rd lifting moving part 550, automatically and remotely by the 3rd Wire support part 540 Main extension device 542 move up.
In addition, move up the 3rd Wire support part 540 operation can according to operating condition or the convenience of operating personnel, It is realized by only moving up sub- extension device 543.In addition, the operation for moving up the 3rd Wire support part 540 can be by by 3 Wire support part 540 is whole, that is, by moving up the process of main extension device 542 and moving up the mistake of sub- extension device 543 Journey is realized.
It moves up in the 3rd Wire support part 540 and is moved to the direction far from electric pole, by electric wire 30 far from having installed In the stage S4 of LP insulators 22, the 3rd operation of the Wire support part 540 far from electric pole 10 can be operated into cunning by operating personnel Dynamic position fixing piece 564, sliding guide piece 563 can be in the state of mobile on horizontal extension part 511, by sliding guide piece 563 realize far from electric pole 10.At this moment, the 3rd Wire support part 540 is that medium is moved with sliding with bendable wood installation part 551 Part 560 is connected, so, the 3rd Wire support part 540 is identical far from electric pole 10 according to the displacement distance of sliding moving member 560 Distance.After 3rd Wire support part 540 is arranged on required position, operating personnel operates sliding position fixing piece 564, Sliding guide piece 563 is fastened on horizontal extension part 511, its movement is prevented.
With reference to figure 14, the operation process by the stage S5 that electric wire 30 is moved at the 2nd Wire support part 540 includes, will be electric Line 30 is moved at the 2nd Wire support part 540;It disconnects electric wire 30 and the connection of LP insulators 22 has been installed.In addition, the if the 2nd Wire support part 540 is mounted on before electric wire 30 to be moved to the stage S5 at the 2nd Wire support part 540 on bendable wood 510, then It will not sequentially go wrong.Therefore, it can be adjusted the 2nd electric wire branch according to operating condition or the convenience of operating personnel Support member 540 is installed to the time on bendable wood 510.
Include by the operation process that electric wire 30 is moved at the 2nd Wire support part 540, electric wire 30 by open piece 546a into Enter, the locking piece 548 on holder 546 is locked.That is, open piece 546a is closed by locking piece 548.
The operation process for disconnecting electric wire 30 and having installed the connection of LP insulators 22 includes dismantling connection electric wire 30 and having pacified The binding component of LP insulators 22 is filled, or binding component is removed from electric wire, binding component is removed.
Although not making diagram on the drawing of the present invention, under normal circumstances, in order to protect the controller switching equipments such as electric wire 30, Spool, insulator cover isoelectric line crust are used all on electric wire 30.By electric wire 30 and before the disconnection of LP insulators 22 has been installed, after It is continuous to move up the 3rd Wire support part 540, then when removing binding component, electric wire 30 and meeting between LP insulators 22 is installed Generate interval.
After electric wire 30 is moved at the 2nd Wire support part 540, disconnect electric wire 30 and installed LP insulators 22 it Before, continue to move up the 3rd Wire support part 540, then electric wire 30 and has installed no longer mutually close between LP insulators 22 Fitting, electric wire 30 and has installed and will produce interval between LP insulators 22, and wire outer skin, which is no longer hung over, has installed LP insulators 22 On.Later, operating personnel can move wire outer skin along electric wire 30 according to facility, smoothly execute controller switching equipment replacement operation.
At this moment, before disconnecting electric wire 30 and LP insulators 22 being installed, continue to move up the 2nd Wire support part 540, The 2nd transmission device 42 and lifting moving part 550 are then utilized, the process by moving up Wire support part 540 is realized.Certainly, The 1st transmission device 41 and lifter 530 can also be utilized, is realized by the process of mobile bendable wood 510.
2nd Wire support part 540 of supporting electric wire 30 is moved up electric wire 30 far from having been installed on bolt cross-arm 21 The stage S6 of LP insulators 22, which is one, will install LP insulators 22 and has been changed to and newly set LP insulators 25 and obtain working space Process.
With reference to figure 15, the 2nd Wire support part 540 is moved up, by electric wire 30 far from the rank for having installed LP insulators 22 Section S6, which is one, will install LP insulators 22 and be changed to the new process for setting LP insulators 25 and obtaining working space.
2nd Wire support part 540 is moved up, by electric wire 30 far from the stage S6 operation for having installed LP insulators 22 Journey includes moving up bendable wood 510 by the 1st transmission device 41 and lifter 530;Pass through the 2nd transmission device 42 and the 2nd liter Drop moving member 550 moves up the 2nd Wire support part 540.
2nd Wire support part 540 is moved up, it can basis far from the stage S6 for having installed LP insulators 22 by electric wire 30 Operating condition or the convenience of operating personnel only carry out and move bendable wood 510 using the 1st transmission device 41 and lifter 530 Process, or process or operation using the 2nd transmission device 42 and the 2nd lifting moving part 550 the 2nd Wire support part 540 of movement Personnel are manually operated, and sub- extension device 543 is risen to the process at electric wire 30.
In addition, the 2nd Wire support part 540 is moved up, by electric wire 30 far from the stage S6 for having installed LP insulators 22 Bendable wood can will be moved up by the 1st transmission device 41 and lifter 530 according to operating condition or the convenience of operating personnel 510 process and operating personnel's manual operation, combine realization by the process that sub- extension device 543 rises at electric wire 30.
In addition, the 2nd Wire support part 540 is moved up, by electric wire 30 far from the stage S6 for having installed LP insulators 22 The 2nd transmission device 42 and the 2nd lifting moving part 550 can will be utilized to moving up according to operating condition or the convenience of operating personnel The dynamic process mounted on the 2nd Wire support part 540 on bendable wood 510, operating personnel's manual operation, sub- extension device 543 is risen Process to electric wire 30 combines realization.
In addition, the 2nd Wire support part 540 is moved up, by electric wire 30 far from the stage S6 for having installed LP insulators 22 Bendable wood can will be moved up by the 1st transmission device 41 and lifter 530 according to operating condition or the convenience of operating personnel 510 process moves up the 2nd electric wire on bendable wood 510 using the 2nd transmission device 42 and the 2nd lifting moving part 550 The process of support element 540, operating personnel's manual operation, combines reality by the process that sub- extension device 543 rises at electric wire 30 It is existing.
With reference to figure 16, the LP of the installation insulators 22 on bolt cross-arm 21 are removed, by the new LP insulators 25 that set mounted on slotting Stage S7 operation process on pin cross-arm 21 includes, and using upward Wire support part 540, electric wire 30 is insulated far from LP has been installed The working space that the stage (S4, S6) of son 22 is obtained, will install LP insulators 22 and has been removed from bolt cross-arm 21, and installation is new If LP insulators 25.
With reference to figure 17, the 2nd Wire support part 540 of supporting electric wire 30 is dropped into the new stage S8 set at LP insulators 25 Operation process include passing through the 1st transmission device 41 and lifter 530 to decline bendable wood 510;Pass through 42 He of the 2nd transmission device 2nd lifting moving part 550 declines the 2nd Wire support part 540.
It can root in addition, the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage S8 set at LP insulators 25 According to operating condition or the convenience of operating personnel, only carries out and move bendable wood 510 using the 1st transmission device 41 and lifter 530 Process, or move using the 2nd transmission device 42 and the 2nd lifting moving part 550 process or the operation of the 2nd Wire support part 540 Personnel are manually operated, and sub- extension device 543 is dropped to the process at electric wire 30.
It can root in addition, the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage S8 set at LP insulators 25 According to operating condition or the convenience of operating personnel, the mistake of bendable wood 510 will be declined by the 1st transmission device 41 and lifter 530 Journey and operating personnel's manual operation, combine realization by the process that sub- extension device 543 drops at electric wire 30.
It can root in addition, the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage S8 set at LP insulators 25 According to operating condition or the convenience of operating personnel, the 2nd transmission device 42 and the 2nd lifting moving part 550 will be utilized to decline bendable wood The process for the 2nd Wire support part 540 installed on 510 and operating personnel's manual operation, drop to electric wire by sub- extension device 543 Process at 30 combines realization.
It can root in addition, the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage S8 set at LP insulators 25 According to operating condition or the convenience of operating personnel, the mistake of bendable wood 510 will be declined by the 1st transmission device 41 and lifter 530 Journey declines the 2nd Wire support part 540 installed on bendable wood 510 using the 2nd transmission device 42 and the 2nd lifting moving part 550 Process, operating personnel's manual operation, combines realization by the process that sub- extension device 543 drops at electric wire 30.
With reference to figure 18, electric wire is moved to the operation of the new stage S9 for setting LP insulators 25 from the 2nd Wire support part 540 Journey includes being bundled and being installed in electric wire 30 and new set in the state that LP insulators 25 fit closely, disconnect electric wire 30 and the 2nd The combination of Wire support part 540.Herein, electric wire 30 is bundled in and is newly set on LP insulators 25, meant and utilize foreskin steel wire, glue Band, clip etc. bundle component, and electric wire 30 is fixed on and is newly set on LP insulators 25.
The operation process for disconnecting the combination of electric wire 30 and the 2nd Wire support part 540 includes rotating locking piece 548, opening is opened Put part 546a;Electric wire 30 is moved to outside holder 546 by open piece 546a.
With reference to figure 19, the 3rd Wire support part 540 of supporting electric wire 30 is moved to the direction of electric pole and lower section, is approached It newly sets in the stage S10 of LP insulators 25, includes by the operation process that the 3rd Wire support part 540 is moved to 10 direction of electric pole, Operating personnel operates sliding position fixing piece 564, and sliding guide piece 563 can slide on horizontal extension part 511;By slide-and-guide Part 563 is moved to the direction of electric pole 10.At this moment, the 3rd Wire support part 540 is medium and sliding with bendable wood installation part 551 Moving member 560 is connected, and the 3rd Wire support part 540 is moved according to the displacement distance of sliding moving member 560 to the direction of electric pole 10 Move identical distance.After 3rd Wire support part 540 is moved to required position, operating personnel operates sliding position fixing piece 564, Sliding guide piece 563 is fixed on horizontal extension part 511, its movement is prevented.
3rd Wire support part 540 is moved to the direction of electric pole and lower section, close to the stage for newly setting LP insulators 25 In S10, the operation that the 3rd Wire support part 540 is moved down can will pass through according to operating condition or the convenience of operating personnel 2nd transmission device 42 and the 3rd lifting moving part 550 decline the 3rd Wire support part 540 on bendable wood 510 Mobile process and operating personnel's manual operation, combine realization by the process that sub- extension device 543 drops at electric wire 30.
In addition, the operation that the 3rd Wire support part 540 is moved down can be according to operating condition or the facility of operating personnel Property, the process of bendable wood 510 will be declined by the 1st transmission device 41 and lifter 530, pass through the 2nd transmission device 42 and the 3rd liter Moving member 550 is dropped, the 3rd Wire support part 540 on bendable wood 510 is carried out to decline mobile process, operating personnel Manual operation, combines realization by the process that sub- extension device 543 drops at electric wire 30.
With reference to figure 20, electric wire is moved to the operation of the new stage S11 for setting LP insulators 25 from the 3rd Wire support part 540 Process includes being bundled and being installed in electric wire 30 and new set in the state that LP insulators 25 fit closely;Release 30 He of electric wire The combination of 3rd Wire support part 540.Herein, electric wire 30 is bundled in and is newly set on LP insulators 25, meant and utilize foreskin steel Silk, adhesive tape, clip etc. bundle component, and electric wire 30 is fixed on and is newly set on LP insulators 25.
It includes rotating locking piece 548 to release the operation process that electric wire 30 and the 3rd Wire support part 540 combine, and opens and opens Part 546a;Electric wire 30 is moved to outside holder 546 by open piece 546a.
With reference to figure 21, the operation process by the stage S12 that bendable wood 510 is removed from electric pole 10 includes, by electric wire branch Support member 540 and lifting moving part 550 and sliding moving member 560 are removed from bendable wood 510;Bendable wood 510 is consolidated from bendable wood Determine to remove on part 520 or lifter 530;Lifter 530 is removed from bendable wood fixing piece 520;By bendable wood fixing piece 520 It is removed from electric pole 10.
In addition, the stage S12 that bendable wood 510 is removed from electric pole 10 can also be by 540 He of Wire support part Lifting moving part 550 and sliding moving member 560 are in the state of installation, and bendable wood 510 is removed reality from electric pole 10 It is existing.
According to the controller switching equipment livewire work method provided by the invention, it is driven using the 1st transmission device 41 or the 2nd The power of device 42, the height of automatic adjustment bendable wood 510 or the height of Wire support part 540, are moved to Wire support part 540 Electric wire 30 height, smoothly execute replace LP insulators operation.
In addition, according to the present invention, it not only can be with the whole height of sectional-regulated bendable wood 510 and Wire support part 540, also The sub- extension device 543 of electric wire crimp 545 can be provided in Wire support part 540 by only moving up and down, point three sections of adjustings The height of electric wire crimp 545 or electric wire 30.
Therefore, according to the present invention, operating personnel can select the height for adjusting bendable wood 510 according to operating condition and convenience The height of degree, the whole height of Wire support part 540, sub- extension device 543 more easily executes LP replacing insulator operations.
In addition, according to the present invention, using the 1st transmission device 41 or the 2nd transmission device 42, operating personnel can be far from electric wire It is executed electric wire 30 on 30 position far from the operation for having installed 22 upper end of LP insulators, more easily obtains and replace LP insulation The required livewire work space of son reduces operating personnel when replacing LP insulators and contacts the several of safety accident occurred with electric wire 30 Rate.
In addition, according to the present invention, in the state that multiple Wire support parts 540 are mounted on bendable wood 510, moving up Bendable wood 510 can be not necessarily to rise the cumbersome operation of each Wire support part respectively by rising bendable wood, but can simultaneously by Multiple Wire support parts rise overally identical displacement.
It is illustrated with auxiliary device below for according to the controller switching equipment livewire work of the 2nd embodiment of the invention.Distribution 2nd embodiment of equipment live operation auxiliary device is by the 3rd Wire support part 540, the 3rd lifting moving part of the 1st embodiment 550,650 and sliding moving member 560 be changed to the 3rd Wire support part 640, the 3rd lifting moving part 650, revolving part 660, at this A little aspects form difference, other constructions and operation logic in addition to this are identical as the 1st embodiment.Therefore, for the 2nd embodiment Explanation in, content part identical with the 1st embodiment will use the drawing of the 1st embodiment to illustrate.
With reference to figure 1, controller switching equipment livewire work auxiliary device according to the present embodiment includes bendable wood 510, bendable wood Fixing piece 520, lifter 530, Wire support part 540,640, lifting moving part 550,650.
State of the bendable wood 510 to be fixed on electric pole 10, by Wire support part 540,640 and supporting electric wire support element The frame that electric wire 30 bears a heavy burden on 540,640 is constituted.The bendable wood 510 of embodiment includes horizontal extension part 511, hangs down according to the present invention Straight extension device 513, support element 515.
Horizontal extension part 511 extends to be formed along horizontal direction.It is fixed on the state of electric pole 10 in vertical extension part 513 Under, horizontal extension part 511 is set up in parallel with the bolt cross-arm 21 on electric pole 10.Form horizontal horizontal extension part One or several Wire support parts 540 are installed on 511.
Vertical extension part 513 is connected to the lower end of horizontal extension part 511.Vertical extension part 513 is along electric pole 10 in vertical Histogram is fixed on to extension, and by bendable wood fixing piece 520 on electric pole 10.
Support element 515 is in rod-shaped, is tiltedly mounted between horizontal extension part 511 and vertical extension part 513, connection level is prolonged Long part 511 and vertical extension part 513.The connecting elements that the upper end of support element 515 can be installed in 511 end of horizontal extension part It is rotated on 516, the lower end of support element 515 is connected with vertical extension part 513.According to the connecting structure, support element 515 with hang down On the basis of the coupling part of straight extension device 513, support level extension device 511.
It is to pass through that connecting elements 516, which is mounted on horizontal extension part 511, and connecting elements 516 is inserted into horizontal platform connector Behind 521 ends, it will be attached behind 516 side of the bolt components such as eyebolt perforation connecting elements, make connecting elements 516 and water Flat extension device 511 fits closely to be realized together.
Referring to figs. 2 to Fig. 4, bendable wood 510 or lifter 530 are fixed on electric pole 10 by bendable wood fixing piece 520.According to Bendable wood fixing piece 520 according to the present embodiment includes bendable wood connector 521 and electric wire joint element for bar 523.
Bendable wood connector 521 is the part being connect with bendable wood 510 or lifter 530.Bendable wood connector 521 includes The 1st connector 531a on bendable wood 510 or lifter 530 can be carried out to the 2nd connector 522 of installing and dismounting.
In one of the embodiment of the present invention, the 1st connector 531a or more extends, and compared with upper end, the width of lower end is more Width, whole is in jag shape, and the 2nd connector 522 has the shape of the prominent engaging member in 530 side of lifter, the width of end Degree is, can be by the lower end of the 1st connector 531a, but can not pass through upper end.
The lower end of 1st connector 531a is inserted into the 2nd connector 522, releasing lifts bendable wood 510 or lifter 530 External force, bendable wood 510 or lifter 530 Gravitative Loads under, the 1st connector 531a is moved down, the 2nd connector 522 Positioned at the upper end of the 1st connector 531a.At this moment, the end of the 2nd connector 522 is in the shape for hanging over the 1st upper ends connector 531a State.According to the assembling, bendable wood 510 or lifter 530 can be dismantled and be installed from bendable wood connector 521.
Electric wire joint element for bar 523 is integrally fixed at the part on electric pole 10.Electric wire joint element for bar 523 and bendable wood connector 521 be connected, have can on electric pole 10 installing and dismounting fixture structure.
Under normal circumstances, fixture is the component used when the 1st component is bundled on the 2nd component, in order to wrap up the 2nd component And have " Xi " or " C " shape or band-like, end be provided with the connectors such as bolt or nut.In an embodiment of the present invention, Electric wire joint element for bar 523 has the construction of fixture, as long as but bendable wood 510 can be fixed on electric pole 10, construction It is not limited with shape.
Lifter 530 moves up and down bendable wood 510 with the state being fixed on bendable wood fixing piece 520.Referring to figs. 2 to figure 4, lifter 530 according to the present embodiment includes electric wire rod installation part 531 and lifting actuator 533.
Electric wire rod installation part 531 is made of frame, and the frame is in the state of being installed on bendable wood fixing piece 520, branch Support includes the heavy burden of the heavy burden and electric wire 30 of the bendable wood 510 of vertical extension part 513.The side of electric wire rod installation part 531 is arranged Have can on bendable wood fixing piece 520 installing and dismounting the 1st connector 531a.The 1st connection is provided on bendable wood fixing piece 520 Part 531a and the 2nd connector 522 being connected with bolt and nut.1st connector 531a and the 2nd connector 522 pass through bolt and nut Combination lifter 530 is fixed on bendable wood fixing piece 520.In addition, unscrewing the 1st connector 531a and the 2nd connector 522 Bolt and nut after, lifter 530 can be removed from bendable wood fixing piece 520.
The vertical extension part 513 of the other side of electric wire rod installation part 531 can move up and down.Vertical extension part 513 penetrates through Above and below electric wire rod installation part 531, the operation with lifting actuator 533 moves up and down after linking.It is connect with vertical extension part 513 Electric wire rod installation part 531 on be provided in multiple rolling members 532 for being arranged above and below, prevent and electric wire rod installation part 531 CONTACT WITH FRICTION leads to the mobile restricted of vertical extension part 513.When vertical extension part 513 moves up or down, rolling member 532 In the state of being contacted with vertical extension part 513, moving and turn to side or the other side with vertical extension part 513.
Lift actuator 533 be mounted on electric wire rod installation part 531 on, obtain the 1st transmission device 41 power after on move down Dynamic bendable wood 510.Herein, electric drill, the electric screw driver replaced and generally used when controller switching equipment can be used in the 1st transmission device 41 The equal driving devices such as electric tools or motor.The lifting actuator 533 of embodiment includes lifting drive transferring member according to the present invention 534, beam barrel 537, lifting conveyer belt 538 are lifted.
Lifting drive transferring member 534 rotates driving under the action of the 1st transmission device 41.In an embodiment of the present invention, Lifting drive transferring member 534 includes elevating endless screw 535 and elevating endless screw wheel 536.
The end of elevating endless screw 535 forms the lifting drive being engaged with the 1st transmission device 41 and enters part 535a, is passed from the 1st Dynamic device 41 obtains rotary force.Elevating endless screw wheel 536 and elevating endless screw 535 realize engagement, are mounted on lifting beam barrel 537 and moving axis On, it is rotated under the operation of elevating endless screw 535.When using electric tool as 1 transmission device 41, elevating endless screw 535 with The rotation of 1st transmission device 41 and rotate, elevating endless screw wheel 536 links with the rotation of elevating endless screw 535, as it is rotated in deceleration And increase rotary force.
The worm gear construction for having elevating endless screw 535 and elevating endless screw wheel 536 according to described in, can only be from elevating endless screw 535 Rotation rotary force is transmitted to elevating endless screw wheel 536,536 can not be taken turns from elevating endless screw and transmits rotation rotary force to elevating endless screw 535.That is, Apply rotary force to elevating endless screw wheel 536, then elevating endless screw 535 can not be made to rotate, also can not just make 536 rotation of elevating endless screw wheel Turn.
Elevating endless screw wheel 536 is connected by lifting beam barrel 537 and lifting conveyer belt 538 with bendable wood 510, according to the snail Wheel construction can prevent under the Gravitative Loads of bendable wood 510 and electric wire 30 etc., and bendable wood 510 moves down.
Lifting beam barrel 537 rotates to side or the other side under the action of lifting drive transferring member 534, will lift conveyer belt 538 roll or stretch.Lifting beam barrel 537 has epidermis, cylindrical, can be rolled up lifting conveyer belt 538, be connected to liter It drops on worm screw wheel 536 and moving axis.
Conveyer belt volume 538 is lifted on lifting beam barrel 537, end is connected with Wire support part 540.Herein, lifting passes Send band 538 that flat type square or the linear structures such as linear common conveyer belt or steel wire, rope can be used.Lift conveyer belt 538 The end installation component that can install and dismantle by draw ring, iron plug (fitting), clip, bolt and nut connector etc. with Bendable wood 510 connects.
The 1st transmission device 41 is revolved with entering the state that part 535a is engaged with lifting drive the end of 1st transmission device 41 Side is gone to, rotary force is transmitted to lifting beam barrel 537 by lifting drive transferring member 534, and lifting beam barrel 537 rotates to side Afterwards, lifting conveyer belt 538 be wound into lifting beam barrel 537 on when, with lifting conveyer belt 538 end be connected bendable wood 510 quilts Move upper end to.In addition, after the 1st transmission device 41 is rotated to the other side, lifting beam barrel 537 rotates to the other side, lifting transmission Band 538, which trails, to lower bendable wood 510.
The lower end of bendable wood 510, which adds to be equipped with, can limit the safety catch 539 that bendable wood 510 moves down.In this reality It applies in example, safety catch 539 is the band-like or bar for having certain length, and end is connected with bendable wood 510.Safety catch 539 with lifting conveyer belt 538 as, by draw ring, iron plug (fitting), clip, bolt and nut connector etc. can install and The installation component of dismounting is connect with bendable wood 510.
Referring to figs. 1 to Fig. 4, controller switching equipment livewire work auxiliary device according to the present embodiment, bendable wood 510 is to lift Device 530 is that medium is connected with bendable wood fixing piece 520.That is, bendable wood fixing piece 520, which has, to be fixed on electricity by lifter 530 Construction in line bar 10.
But controller switching equipment livewire work auxiliary device according to the present invention, as long as lifter 530 can lift bendable Wood 510 is not limited to the construction being mounted between bendable wood 510 and bendable wood fixing piece 520.That is, bendable wood 510 can not be with lifting Device 530 is medium, is directly installed on electric pole 10 by bendable wood fixing piece 520, lifter 530 can not reside at bendable It between wood 510 and bendable wood fixing piece 520, and is mounted on other positions, with the state liter on electric pole 10 Bendable wood 510 drops.
With reference to figure 5 to Fig. 7, Wire support part 540 is mounted in the state of bendable wood 510, is received electric pole 10 and is moved up The electric wire 30 moved, and support the part of the electric wire.The Wire support part 540 of embodiment includes extension device according to the present invention 541 and electric wire crimp 545.
Extension device 541 has upper and lower extended shape, is mounted on horizontal extension part 511, in the work of lifting moving part 550 It is moved up and down under.The extension device 541 of embodiment includes main extension device 542, sub- extension device 543, fixing piece according to the present invention 544。
Main extension device 542 is connected with lifting moving part 550, and the liter of operation is realized by receiving 42 power of the 2nd transmission device Drop moving member 550 moves up and down.Sub- extension device 543 is provided with insulating materials, and cylindric main extension device 542 is inserted into lower end Inside is moved to the upper end of main extension device 542 after installing by this method.That is, sub- extension device 543 can protrude from main extension device 542 Upper end.
The sub- extension device 543 moved up is fixed on main extension device 542 by fixing piece 544.Rotation can be used in fixing piece 544 The perforation utensil etc. of rotatable fixed appliance, perforation sub- extension device 543 and main extension device 542.
If the revolving fixed appliance of the use of fixing piece 544, can be incited somebody to action by the operation for rotating fixing piece 544 to side Sub- extension device 543 is fixed on main extension device 542, and the operation by being rotated to the other side, then can be by sub- extension device 543 from master It is removed on extension device 542.If having fixing piece 544, sub- extension device 543 can be moved to the height of needs, using admittedly Determine part 544 sub- extension device 543 is fixed on required position, the length of manually adjustable extension device 541.
In addition, other fixing pieces 544 can be not necessarily to, the coupling part difference between sub- extension device 543 and main extension device 542 Sub- connecting member and female connector are set, by rotating sub- extension device 543 to side, sub- extension device 543 is fixed on main extension On part 542, it must not move up and down.Sub- extension device 543 is rotated to the other side, then it can be by sub- extension device 543 from main extension device 542 Upper dismounting.
Electric wire crimp 545 is to hang the part of electric wire 30, is located at the upper end of sub- extension device 543.Electric wire crimp 545 fetters Electric wire 30 can not be detached from from Wire support part 540,640.With reference to figure 7, in the present embodiment, electric wire crimp 545 includes branch Frame 546 and locking piece 548.
Holder 546 is connect with extension device 541, formed allow electric wire 30 by open piece 546a.Locking piece 548 and branch Frame 546 is connected, and is responsible for folding open piece 546a.In an embodiment of the present invention, open piece 546a is located at the upper end of holder 546, Locking piece 548 is connected to the side of holder 546, rotatable.
When locking piece 548 is rotated to side, locking piece 548 is suspended to the other side of holder 546, closes open piece 546a (with reference to figure 5).When locking piece 548 is rotated to reverse side, other side of the locking piece 548 far from holder 546 opens open piece 546a (with reference to figure 7).As described above, can open piece 546a be carried out switching action by operating locking piece 548, electric wire 30 is inserted Enter electric wire crimp 545 to be fettered, or electric wire 30 is detached from electric wire crimp 545.
Lower end roller bearing 547 is mounted on the middle position of holder 546, rotatable.Upper end roller bearing 549 is mounted on locking piece 548 middle position, it is rotatable.According to this construction, electric wire 30 is inserted into the inside of holder 546, after locking locking piece 548, electricity The epidermis of line 30 is contacted with lower end roller bearing 547, upper end roller bearing 549.That is, after electric wire 30 is inserted into electric wire crimp 545, electric wire 30 with Electric wire crimp 545 forms the state of cloud contact.
According to this construction, during replacing controller switching equipment, Relative Displacement occurs for electric wire crimp 545 and electric wire 30 When, it can prevent electric wire 30 from being damaged by electric wire crimp 545, keep electric wire crimp 545 and electric wire 30 steady in contacting with each other Determine state, while can ensure that electric wire crimp 545 or electric wire 30 are smoothly mobile.
Lifting moving part 550 moves up and down Wire support part 540.Lifting moving part 550 can be moved independently Wire support part 540.According to this construction, lifting moving part 550 proportionally determines peace according to the number of Wire support part 540 Fill number.
With reference to figure 6, lifting moving part 550 according to the present embodiment includes bendable wood installation part 551 and actuator 553.
Bendable wood installation part 551 is mounted on horizontal extension part 511.Bendable wood installation part 551 has fixture structure, can be Horizontal extension part 511 is installed and is removed.About the fixture structure on bendable wood installation part 551, in electric wire joint element for bar 523 Part is illustrated, therefore omits repeated explanation.
The guiding that bootable Wire support part 540 moves up and down is formed on bendable wood installation part 551 according to the present embodiment Part 552.It is formed with extended hollow guiding orifice 552a up and down on guide part 552, allows Wire support part 540 to be inserted in it Internal state lifting moving.
Then include suitable as long as lifting moving part 550 can be fixed on horizontal extension part 511 by bendable wood installation part 551 With the fixture structure on bendable wood fixing piece 520, or the construction different with bendable wood fixing piece 520, it is not limited to specific structure It makes and shape.
Actuator 553 is mounted on bendable wood installation part 551, and electricity is moved up and down after obtaining the power of the 2nd transmission device 42 Line support element 540.Herein, the 2nd transmission device 42 is identical as the 1st transmission device 41, when replacement controller switching equipment operation can be used The driving devices such as the electric tools such as the electric drill generally used or motor.Actuator 553 according to the present invention includes power transmission part 554, beam barrel 557, conveyer belt 558.
Power transmission part 554 is rotated by the 2nd transmission device 42 to be driven.In the present embodiment, power transmission part 554 includes Worm screw 555 and worm screw wheel 556.The end of worm screw 555 forms the power lead-through 555a being mutually twisted with the 2nd transmission device 42.
The end of worm screw 555 forms the power lead-through 555a being mutually twisted with the 2nd transmission device 42, receives the 2nd transmission The rotary force of device 42.Worm screw wheel 556 and worm screw 555 are intermeshed, and are mounted on beam barrel 557 and moving axis, in the fortune of worm screw 555 The lower rotation of row.When 2nd transmission device 42 is using electric tool, worm screw 555 and the rotation of the 2nd transmission device 42 link, real Now rotate.Worm screw wheel 556 and the rotation of worm screw 555 link, and increase rotary force as it is rotated in deceleration.
The worm gear construction for having worm screw 555 and worm screw wheel 556 according to described in, can only take turns 556 biographies from worm screw 555 to worm screw Rotation rotary force is passed, 556 can not be taken turns from worm screw and transmits rotation rotary force to worm screw 555.That is, to worm screw wheel 556 apply rotary forces, then without Method makes worm screw 555 rotate, and also can not just make 556 rotation of worm screw wheel.
Worm screw wheel 556 is by beam barrel 557 and conveyer belt 558 and Wire support part 540 and is connected, according to the turbine structure It makes, can prevent under the Gravitative Loads of electric wire 30 etc., Wire support part 540 moves down.
Beam barrel 557 rotates to side or the other side under the action of power transmission part 554, and conveyer belt 558 is rolled or stretched Exhibition.Beam barrel 557 has epidermis, cylindrical, can be rolled up conveyer belt 558, is connected on worm screw wheel 556 and moving axis.
On beam barrel 557, end is connected conveyer belt volume 558 with Wire support part 540.Herein, conveyer belt 558 can be used Flat type square or the linear structures such as linear common conveyer belt or steel wire, rope.It the end of conveyer belt 558 can by draw ring etc. The installation component of installation and dismounting is connected with extension device 541.
2nd transmission device 42 is rotated to one by the end of transmission device 41 with the state being engaged with power lead-through 555a Side, rotary force is transmitted to beam barrel 557 by power transmission part 554, and after beam barrel 557 rotates to side, conveyer belt 558 is wound into axis When on cylinder 557, the Wire support part 540 being connected with the end of conveyer belt 558 is pulled to upper end.In addition, by the 2nd transmission device 42 After rotating to the other side, beam barrel 557 rotates to the other side, and conveyer belt 558, which trails, to lower Wire support part 540.
Using controller switching equipment livewire work auxiliary device according to the present invention, the 1st transmission device as described above is utilized The power of 41 or the 2nd transmission device 42 can automatically adjust the height of bendable wood 510 or the height of each Wire support part 540,640 Spend, hang over the height of electric wire 30 on Wire support part 540,640.
It more specifically, can be by bendable wood 510 and the electric wire branch on bendable wood 510 using the 1st transmission device 41 Support member 540,640 carries out 1 movement, close to or away from electric wire 30.Using the 2nd transmission device 42 can by Wire support part 540, 640 carry out 2 movements, close to or away from electric wire 30.In addition, carrying out 3 adjustment, fine tuning connection to the height of sub- extension device 543 In the height of the electric wire crimp 545 of 543 upper end of sub- extension device, or the flexible entire length for adjusting Wire support part 540,640.
In addition, according to the present invention, the 1st transmission device 41 or the 2nd transmission device 42 can be used and replace in controller switching equipment operation The electric tools such as the electric drill, the electric screw driver that generally use move Wire support part 540 without other electric device, 640, it can convenient working personnel execution operation.
In addition, according to the present invention, support is moved up and down using the power of the 1st transmission device 41 or the 2nd transmission device 42 The Wire support part 540,640 of 30 weight of electric wire moves up and down the cumbersome operation such as electric wire 30 without operating personnel using pulley, Ensure that staff is more smoothly performed livewire work.
In addition, according to the present invention, utilizing the 1st transmission device 41 and lifter 530, the 2nd transmission device 42 and lifting moving Part 550,650 moves Wire support part 540,640 or electric wire 30 by certain speed, can it be accurately placed on purpose height Position.
Wire support part 540 and lifting moving part 550 described above are about the 1st electric wire branch nearest on electric pole 10 Support member 540 and the 1st lifting moving part 550, and mounted on the 2nd Wire support part 540 in centre position and the 2nd lifting moving part 550 content.
Figure 22 is according to the Wire support part of the 2nd embodiment of the invention and the skeleton diagram of lifting moving part;Figure 23 is basis The operation of the lifting moving part of 2nd embodiment of the invention illustrates concept map;Figure 24 is according to 2nd embodiment of the invention by electric wire It is inserted into the procedure declaration concept map of electric wire crimp.
With reference to figure 22 to Figure 24, the 3rd Wire support part 640 and the 3rd lifting moving part 650 according to the present embodiment are mounted on (with reference to figure 26) on horizontal extension part 511.
3rd Wire support part 640 be to be mounted on bendable wood 510 in the state of, receive on electric pole 10 mobile to come Electric wire 30, and support the part of the electric wire.3rd Wire support part 640 includes extension device 641 and electric wire crimp 645.
Extension device 641 has upper and lower extended shape, is mounted on horizontal extension part 511, in the 3rd lifting moving part 650 Under the action of move up and down.The extension device 641 of embodiment includes main extension device 642, sub- extension device 643, fixes according to the present invention Part 644.
Main extension device 642 is connected with the 3rd lifting moving part 650, and operation is realized by receiving 42 power of the 2nd transmission device 3rd lifting moving part 650 moves up and down.Sub- extension device 643 is provided with insulating materials, and cylindric main extension device is inserted into lower end 642 inside is moved to the upper end of main extension device 642 after installing by this method.That is, sub- extension device 643 can protrude from main extension The upper end of part 642.
The sub- extension device 643 moved up is fixed on main extension device 642 by fixing piece 644.Rotation can be used in fixing piece 644 The perforation utensil etc. of rotatable fixed appliance, perforation sub- extension device 643 and main extension device 642.If fixing piece 644 is using rotation Sub- extension device 643 can be fixed on main extension device 642 by the fixed appliance of formula by the operation for rotating fixing piece 644 to side On, and the operation by being rotated to the other side, then sub- extension device 643 can be removed from main extension device 642.If having fixation Sub- extension device 643 can be then moved to the height of needs by part 644, and sub- extension device 643 is fixed on institute using fixing piece 644 It needs on position, the length of manually adjustable extension device 641.
In addition, other fixing pieces 644 can be not necessarily to, the coupling part difference between sub- extension device 643 and main extension device 642 Sub- connecting member and female connector are set, by rotating sub- extension device 643 to side, sub- extension device 643 is fixed on main extension On part 642, it must not move up and down.Sub- extension device 643 is rotated to the other side, then it can be by sub- extension device 643 from main extension device 642 Upper dismounting.
Electric wire crimp 645 is to hang the part of electric wire 30, is located at the upper end of sub- extension device 643.Electric wire crimp 645 fetters Electric wire 30 can not be detached from from Wire support part 640.In the present embodiment, electric wire crimp 645 includes holder 646 and locking piece 648。
Holder 646 is connected with extension device 641, formed allow electric wire 30 by open piece 646a.Locking piece 648 and branch Frame 646 is connected, and is responsible for folding open piece 646a.In an embodiment of the present invention, open piece 646a is located at the upper end of holder 646, Locking piece 648 is connected to the side of holder 646, rotatable.When locking piece 648 is rotated to side, locking piece 648 is suspended to holder 646 other side closes open piece 646a (with reference to figure 22).When locking piece 648 is rotated to reverse side, locking piece 648 is remote Other side from holder 646 opens open piece 646a (with reference to figure 24).As described above, can will be opened by operating locking piece 648 It puts part 646a and carries out switching action, electric wire 30, which is inserted into electric wire crimp 645, to be fettered, or by electric wire 30 from electric wire crimp 645 separation.
Lower end roller bearing 647 is mounted on the middle position of holder 646, rotatable.Upper end roller bearing 649 is mounted on locking piece 648 middle position, it is rotatable.According to this construction, electric wire 30 is inserted into the inside of holder 646, after locking locking piece 648, electricity The epidermis of line 30 is contacted with lower end roller bearing 647, upper end roller bearing 649.That is, after electric wire 30 is inserted into electric wire crimp 645, electric wire 30 with Electric wire crimp 645 forms the state of cloud contact.
According to this construction, during replacing controller switching equipment, Relative Displacement occurs for electric wire crimp 645 and electric wire 30 When, it can prevent electric wire 30 from being damaged by electric wire crimp 645, keep electric wire crimp 645 and electric wire 30 steady in contacting with each other Determine state, while can ensure that electric wire crimp 645 or electric wire 30 are smoothly mobile.3rd lifting moving part 650 is by the 3rd Wire support Part 640 moves up and down.3rd lifting moving part 650 can independently the 3rd Wire support part 640 of lifting moving.According to this structure It makes, the 3rd lifting moving part 650 proportionally determines installation number according to the number of the 3rd Wire support part 640.
The 3rd lifting moving part 650 according to the present embodiment includes bendable wood installation part 651 and actuator 653.Bendable wood is pacified Piece installing 651 is mounted on horizontal extension part 511.Bendable wood installation part 651 has fixture structure, passes through eyebolt and nut etc. Connector is installed and is removed on horizontal extension part 511.Bootable 3rd Wire support part is provided on bendable wood installation part 651 640 guide parts 652 moved up and down, are formed with extended hollow guidings orifice 652a up and down on guide part 652, and the permissible 3rd To be inserted in the state being oriented to inside orifice 652a, the operation with the 3rd lifting moving part 650 links Wire support part 640, realizes and rises Drop movement.
Actuator 653 is mounted on bendable wood installation part 651, and the 3rd is moved up and down after obtaining the power of the 2nd transmission device 42 Wire support part 640.Herein, the electricity such as the electric drill replaced and generally used when controller switching equipment operation can be used in the 2nd transmission device 42 The driving devices such as power driven tools or motor.Actuator 653 according to the present invention includes power transmission part 654, beam barrel 657, conveyer belt 658。
Power transmission part 654 is rotated by the 2nd transmission device 42 to be driven.In an embodiment of the present invention, power transmission part 654 include worm screw 655 and worm screw wheel 656.
The end of worm screw 655 forms the power lead-through 655a being mutually twisted with the 2nd transmission device 42, obtains the 2nd transmission The rotary force of device 42.Worm screw wheel 656 is realized with worm screw 655 to be engaged, and is mounted on beam barrel 657 and moving axis, is linked with worm screw 655 Rotation.When using electric tool as 2 transmission device 42, the rotation of worm screw 655 and the 2nd transmission device 42 links, worm screw wheel 656 link with the rotation of worm screw 655, increase rotary force as it is rotated in deceleration.
The turbine construction for having worm screw 655 and worm screw wheel 656 according to described in, can only take turns 656 biographies from worm screw 655 to worm screw Rotary force is passed, 656 can not be taken turns from worm screw and transmit rotary force to worm screw 655.That is, applying rotary force to worm screw wheel 656, then can not make Worm screw 655 rotates, and also can not just make 656 rotation of worm screw wheel.
Worm screw wheel 656 is connected by beam barrel 657 and conveyer belt 658 with the 3rd Wire support part 640, according to the worm gear structure It makes, can prevent under the Gravitative Loads of electric wire 30 etc., the 3rd Wire support part 640 moves down.
Beam barrel 657 rotates to side or the other side under the action of power transmission part 654, and conveyer belt 658 is rolled or stretched Exhibition.Beam barrel 657 has epidermis, cylindrical, can be rolled up conveyer belt 658, is connected on worm screw wheel 656 and moving axis.
On beam barrel 657, end is connected conveyer belt volume 658 with the 3rd Wire support part 640.Herein, conveyer belt 658 can Using flat type square or the linear structures such as linear common conveyer belt or steel wire, rope.The end of conveyer belt 658 passes through draw ring It is connected with extension device 641 etc. the installation component that can be installed and dismantle.
2nd transmission device 42 is rotated to one by the end of transmission device 41 with the state being engaged with power lead-through 655a Side, rotary force is transmitted to beam barrel 657 by power transmission part 654, and after beam barrel 657 rotates to side, conveyer belt 658 is wound into axis When on cylinder 657, the 3rd Wire support part 640 being connected with the end of conveyer belt 658 is pulled to upper end.In addition, the 2nd transmission is filled Set 42 rotate to the other side after, beam barrel 657 rotates to the other side, and conveyer belt 658 trails can be by the 3rd Wire support part 640 It lowers.
Revolving part 660 is connected with actuator 653 and bendable wood installation part 651, it is ensured that 653 rotatable bendable wood of actuator is pacified Piece installing 651.More specifically, revolving part 660 is connected with the plank and bendable wood installation part 651 for having guide part 652.Revolving part It is rotated after the power of 660 the 2nd transmission devices 42 of receiving, the actuator 653 for being connected to 660 side of revolving part is rotatably connected to separately The bendable wood installation part 651 of side.Revolving part 660 may include that worm screw (not shown) and worm screw wheel (not shown) at this moment do not obtain The power of 2nd transmission device 42 then cannot achieve the rotation of revolving part 660.It is therefore possible to prevent because the dead weight of electric wire 30 etc. causes The unexpected rotation of revolving part 660.
The controller switching equipment livewire work auxiliary device provided according to the present invention can be certainly using above-mentioned 2nd transmission device 42 It is dynamic to adjust the height of the whole height of the 1st, 2 Wire support part 540 or sub- extension device 543, and the 3rd electric wire branch can be automatically adjusted Rotation amount of the height and actuator 653 of the whole height of support member 640 or sub- extension device 643 to bendable wood installation part 651.
More specifically, the 1st, 2 Wire support parts 540 can be carried out to 1 overall movement using the 2nd transmission device 42, connect Close or remote from electric wire 30,2 adjustment are carried out to the height of sub- extension device 543, fine tuning is connected to the electric wire of 543 upper end of sub- extension device The height of crimp 545, or the flexible entire length for adjusting the 1st, 2 Wire support parts 540.In addition, utilizing the 2nd transmission device 42 3rd Wire support part 640 can be carried out to 1 overall movement, close to or away from electric wire 30, (643 height carries out to sub- extension device 2 adjustment, fine tuning are connected to the height of the electric wire crimp 645 of 643 upper end of sub- extension device, or the 3rd Wire support of flexible adjustment The entire length of part 640.Rotation of the actuator 653 to bendable wood installation part 651 can be accurately adjusted using the 2nd transmission device 42 Amount.By the above process, the interval of electric pole 10 and electric wire 30 is adjusted.
In addition, according to the present invention, the electronic work replaced and generally used in controller switching equipment operation can be used in the 2nd transmission device 42 Tool, without manpower movement the 1st, the height of electric wire crimp 545 of 2 Wire support part, 540 upper end, by electric power rather than manpower tune Save the height of the electric wire crimp 645 of 640 upper end of the 3rd Wire support part, the rotation amount of actuator 653.
In addition, according to the present invention, using the power of the 2nd transmission device 42 move up and down 30 weight of supporting electric wire the 1st, 2 Wire support parts 540 move up and down the cumbersome operation such as electric wire 30, it is ensured that staff is more without operating personnel using pulley Add and is smoothly performed livewire work.The 3rd electric wire of 30 weight of supporting electric wire is moved up and down using the power of the 2nd transmission device 42 Support element 640 moves up and down the cumbersome operation such as electric wire 30, it is ensured that staff is more smooth without operating personnel using pulley Ground executes livewire work.
In addition, according to the present invention, using the 2nd transmission device 42 and the 1st, 2 lifting moving parts 550, passing through mobile speed Mobile 1st, 2 Wire support parts 540 or electric wire 30, can accurately be placed on purpose height and position by it.Utilize 42 He of the 2nd transmission device 3rd lifting moving part 650 moves the 3rd Wire support part 640 or electric wire 30 by certain speed, can it be accurately placed on mesh Height and position.
In the following, using the controller switching equipment livewire work auxiliary device for the 2nd embodiment of the present invention for having the construction, needle To the distribution for having installed LP insulators 22 on bolt cross-arm 21 and being changed to new the 2nd embodiment of the present invention for setting LP insulators 25 is set Standby livewire work method illustrates.
Figure 25 is the declaration order figure according to the controller switching equipment livewire work method of the 2nd embodiment of the invention.
With reference to figure 25, the controller switching equipment livewire work method of the 2nd embodiment includes according to the present invention:Bendable wood 510 is consolidated The stage S101 being scheduled on electric pole 10;The 3rd Wire support part 640 installed on bendable wood 510 is moved upwards up to electric pole Stage S102 on 10 at electric wire 30;Electric wire 30 is moved to the stage S103 at the 3rd Wire support part 640;By supporting electric wire 30 the 3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from bolt cross-arm 21 The stage S104 of LP insulators 22 has been installed;Electric wire 30 is moved to the stage S105 at the 1st or the 2nd Wire support part 540;It will 1st or the 2nd Wire support part 540 of supporting electric wire 30 is moved up and is moved to the direction far from electric pole, and electric wire 30 is remote From the stage S106 for having installed LP insulators 22 on bolt cross-arm 21;The LP of the installation insulators 22 on bolt cross-arm 21 are removed, Stage S107 of the LP insulators 25 on bolt cross-arm 21 will newly be set;By the 1st or the 2nd Wire support part of supporting electric wire 30 540 drop to the new stage S108 set at LP insulators 25;Electric wire is moved to from the 1st or the 2nd Wire support part 540 and newly sets LP The stage S109 of insulator 25;3rd Wire support part 640 of supporting electric wire 30 is rotated and moved down to other directions, is connect The nearly stage S110 for newly setting LP insulators 25;Electric wire is moved to the new stage for setting LP insulators 25 from the 3rd Wire support part 640 S111;The stage S112 that bendable wood 510 is removed from electric pole 10.
The controller switching equipment livewire work method offer of 2nd embodiment of the invention is a kind of to utilize controller switching equipment in the 2nd embodiment Multiple LP insulators 22 of having installed are changed to multiple new methods for setting LP insulators 25 by livewire work auxiliary device.
Figure 26 is that bendable wood is fixed on electric wire in the controller switching equipment livewire work method according to the 2nd embodiment of the invention Procedure declaration concept map on bar;
Figure 27 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, and the 3rd Wire support part is upward The procedure declaration concept map being moved at electric wire;
Figure 28 is that electric wire is moved to the 3rd electric wire in the controller switching equipment livewire work method according to the 2nd embodiment of the invention Procedure declaration concept map at support element;
Figure 29 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, and the 3rd Wire support part is upward Mobile and single direction rotation, by electric wire far from the procedure declaration concept map for having installed LP insulators;
Figure 30 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, and electric wire is moved to the 1st or the Procedure declaration concept map at 2 Wire support parts;
Figure 31 is in the controller switching equipment livewire work method according to the 2nd embodiment of the invention, by the 1st or the 2nd Wire support Part moves up, electric wire far from the procedure declaration concept map for having installed LP insulators;
Figure 32 is will to have installed LP insulators more in the controller switching equipment livewire work method according to the 2nd embodiment of the invention It is changed to the new procedure declaration concept map for setting LP insulators;
Figure 33 is in the controller switching equipment livewire work method according to the 2nd embodiment of the invention, by the 1st or the 2nd Wire support Part, which declines, is moved to the new procedure declaration concept map set at LP insulators;
Figure 34 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, by electric wire from the 1st or the 2nd electricity Line support element is moved to the new procedure declaration concept map set at LP insulators;
Figure 35 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, and the 3rd Wire support part is reversed It rotates and declines and be moved to the new procedure declaration concept map set at LP insulators;
Figure 36 is in the controller switching equipment livewire work method according to 2nd embodiment of the invention, by electric wire from the 3rd Wire support Part is moved to the new procedure declaration concept map set at LP insulators;
Figure 37 is in the controller switching equipment livewire work method according to the 2nd embodiment of the invention, by bendable wood from electric pole The procedure declaration concept map of dismounting.
With reference to figure 26, the realization process by the stage S101 that bendable wood 510 is fixed on electric pole 10 includes, by bendable wood Fixing piece 520 is fixed on electric pole 10;Lifter 530 is fixed on bendable wood fixing piece 520;Connect 530 He of lifter Bendable wood 510;Lifting moving part 550,650 on fixed bendable wood 510 and Wire support part 540,640.
When connecting bendable wood 510 with lifter 530, erection sequence is that vertical extension part 513 is mounted on lifting first On device 530;Horizontal extension part 511 is mounted on to the upper end of vertical extension part 513;In horizontal extension part 511 and vertical extension part Support element 515 is installed between 513.
Operation process support element 515 being mounted between horizontal extension part 511 and vertical extension part 513 includes that will connect Connection member 516 is mounted on horizontal extension part 511;The upper end of support element 515 is connected with connecting elements 516, and can rotate;Branch The connectors such as the eyebolt that the lower end of support member 515 prepares with 513 lower end of vertical extension part are connected, it is ensured that can installing and dismounting.
Bendable wood 510 is fixed on the stage S101 on electric pole 10 can also be by lifting moving part 550,650 and electricity Line support element 540,640, by having installed, the process that bendable wood 510 is mounted on lifter 530 or bendable wood fixing piece 520 is real It is existing.
With reference to figure 27, the 3rd Wire support part 640 installed on bendable wood 510 is moved upwards up to electric wire on electric pole 10 Stage S102 operation process at 30 includes that operating personnel's manual operation rises to sub- extension device 643 at electric wire 30.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel only retain and move up bendable wood 510 by the 1st transmission device 41 and lifter 630 Process, or the electric wire branch installed on bendable wood 510 is moved up by the 2nd transmission device 42 and the 3rd lifting moving part 650 The process of support member 640.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel will move up the mistake of bendable wood 510 by the 1st transmission device 41 and lifter 530 Journey moves up the 3rd Wire support on bendable wood 510 by the 2nd transmission device 42 and the 3rd lifting moving part 650 The process of part 640 combines realization.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel will move up the mistake of bendable wood 510 by the 1st transmission device 41 and lifter 530 Journey and operating personnel's manual operation, are moved upward to the process at electric wire 30 by sub- extension device 643 and combine realization.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel will be moved up and will be mounted on by the 2nd transmission device 42 and the 3rd lifting moving part 650 The process of the 3rd Wire support part 640 on bendable wood 510 and operating personnel's manual operation, by sub- extension device 643 to moving up It moves to the process at electric wire 30 and combines realization.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel will move up the mistake of bendable wood 510 by the 1st transmission device 41 and lifter 530 Journey moves up the 3rd Wire support part installed on bendable wood 510 by the 2nd transmission device 42 and the 3rd lifting moving part 650 640 process, operating personnel's manual operation, is moved upward to the process at electric wire 30 by sub- extension device 643 and combines realization.
That is, in the explanation of the present invention, the operation of mobile Wire support part 640 includes passing through the 2nd transmission device 42 and the 3rd lifting moving part 650 moves the embodiment of entire 3rd Wire support part 640, and only moves the 3rd Wire support part The embodiment of 640 neutron extension devices 643, by the whole operation process of mobile 3rd Wire support part 640 and mobile sub- extension device The whole embodiments such as the embodiment that 643 operation process combines.
Therefore, in the explanation of the present invention, the operation of mobile 3rd Wire support part 640, even if not mentioning movement individually 3rd Wire support part 640 is whole, and mobile sub- extension device 643, also means the one kind being applicable in the multiple embodiment.
In the explanation of the present invention, the operation for moving up or down the 3rd Wire support part 640 includes being led by mobile Extension device 642 moves the entire 3rd Wire support part 640 including main extension device 642 and sub- extension device 643, or only moves The embodiment of the sub- extension device 643 of dynamic 3rd Wire support, 640 upper end setting, forms in the 3rd Wire support part 640 and connects electric wire The part of 30 electric wire crimp 645, that is, mean up-regulation or lower the overall operation of 640 upper end level of the 3rd Wire support part.
It is executed in the state that the open piece 646a being arranged above holder 646 is opened by the 3rd Wire support part 640 to moving up It moves to the stage S102 at electric wire 30, after this stage, electric wire 30 is entered by open piece 646a inside holder 546.
With reference to figure 28, include by the stage S103 operation process that electric wire 30 is moved at the 3rd Wire support part 640, it will be electric Line 30 is moved to the 3rd Wire support part 640;It disconnects electric wire 30 and the connection status of LP insulators 22 has been installed.
At this moment, include that electric wire 30 passes through open piece by the operation process that electric wire 30 is moved at the 3rd Wire support part 640 646a enters, and the locking piece 648 on holder 646 is locked.That is, open piece 646a is closed by locking piece 648.
It includes dismantling to connect electric wire 30 and to disconnect electric wire 30 and installed the operation process of 22 connection status of LP insulators The binding component of LP insulators 22 is installed, or binding component is removed from electric wire, binding component is removed.
Although not making diagram on the drawing of the present invention, under normal circumstances, in order to protect the controller switching equipments such as electric wire 30, Spool, insulator cover isoelectric line crust are used all on electric wire 30.By electric wire 30 and before the disconnection of LP insulators 22 has been installed, after It is continuous to move up the 3rd Wire support part 640, then when removing binding component, electric wire 30 and meeting between LP insulators 22 is installed Generate interval.
After electric wire 30 is moved at the 3rd Wire support part 640, disconnect electric wire 30 and installed LP insulators 22 it Before, continue to move up the 3rd Wire support part 640, then electric wire 30 and has installed no longer mutually close between LP insulators 22 Fitting, electric wire 30 and has installed and will produce interval between LP insulators 22, and wire outer skin, which is no longer hung over, has installed LP insulators 22 On.Later, operating personnel can move wire outer skin along electric wire 30 according to facility, smoothly execute controller switching equipment replacement operation.
At this moment, before disconnecting electric wire 30 and LP insulators 22 being installed, continue to move up the 3rd Wire support part 640, The 2nd transmission device 42 and the 3rd lifting moving part 650 are then utilized, the process by moving up Wire support part 640 is realized.When So, the 1st transmission device 41 and lifter 530 can also be utilized, is realized by the process of mobile bendable wood 510.
3rd Wire support part 640 of supporting electric wire 30 is moved up and is moved to the direction far from electric pole, by electric wire 30 are one far from the stage S104 for having installed LP insulators 22 on bolt cross-arm 21 will install LP insulators 22 and has been changed to newly If LP insulators 25 and the process for obtaining working space.
It moves up with reference to the 29, the 3rd Wire support part 640 of figure and is moved to the direction far from electric pole, electric wire 30 is remote Include being moved up by the 1st transmission device 41 and lifter 530 from the stage S104 operation process of LP insulators 22 has been installed Bendable wood 510;The 3rd Wire support part 640 is moved up by the 2nd transmission device 42 and the 3rd lifting moving part 650.
3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from having installed LP The stage S104 of insulator 22 can be only carried out according to operating condition or the convenience of operating personnel and utilize 41 He of the 1st transmission device Lifter 530 moves the process of bendable wood 510, or passes through the 3rd electricity of the 2nd transmission device 42 and the movement of the 3rd lifting moving part 650 The process of line support element 640 or operating personnel's manual operation, the process at electric wire 30 is moved upward to by sub- extension device 643.
In addition, the 3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from The stage S104 of installation LP insulators 22 can will pass through the 1st transmission device 41 according to operating condition or the convenience of operating personnel And lifter 530 moves up the process of bendable wood 510, sub- extension device 643 is moved upward to electricity by operating personnel's manual operation Process at line 30 combines realization.
In addition, the 3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from The stage S104 of installation LP insulators 22 can will pass through the 2nd transmission device 42 according to operating condition or the convenience of operating personnel And the 3rd lifting moving part 650 move up process and the operation of the 3rd Wire support part 640 on bendable wood 510 Personnel are manually operated, and sub- extension device 643 is moved upward to the process at electric wire 30 and combines realization.
In addition, the 3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from The stage S104 of installation LP insulators 22 can will pass through the 1st transmission device 41 according to operating condition or the convenience of operating personnel And lifter 530 moves up the process of bendable wood 510, and by the 2nd transmission device 42 and the 3rd lifting moving part 650 to Upper movement is mounted on the process of the 3rd Wire support part 640 on bendable wood 510, operating personnel's manual operation, by sub- extension device 643 processes for being moved upward at electric wire 30 combine realization.
It is rotated upwards and to certain orientation by the 3rd Wire support part 640, by electric wire 30 far from having installed LP insulators 22 Stage S104 in, operation that the 3rd Wire support part 640 is moved up is by operating personnel station in the position far from electric wire 30 On, using the 2nd transmission device 42 and the 3rd lifting moving part 650, master that is automatic and remotely moving up the 3rd Wire support part 640 The process of extension device 642 is realized.
In addition, the operation that the 3rd Wire support part 640 is moved up can be according to operating condition or the facility of operating personnel Property, the process by only moving up sub- extension device 643 is realized.In addition, the operation that the 3rd Wire support part 640 is moved up It is whole can will to move up the 3rd Wire support part 640, that is, move up the process of main extension device 642, and move up son and prolong The process of long part 643 combines realization.
It is rotated upwards and to certain orientation by the 3rd Wire support part 640, by electric wire 30 far from having installed LP insulators 22 Stage S104 in, by the 3rd Wire support part 640 to certain orientation (be subject to Figure 29, clockwise) rotation far from electric pole 10 The operation process turned includes that operating personnel, to 660 passing power of revolving part, rotates revolving part 660 by the 2nd transmission device 42; Then, it is connected to bendable wood installation part 651 of the rotatable connection of actuator 653 in the other side of 660 side of revolving part.At this moment, may be used Curved wood installation part 651 is fixedly mounted on horizontal extension part 511, and when revolving part 660 rotates, actuator 653 is according to revolving part 660 Rotation amount, rotate identical amount to the direction far from electric pole 10.Under the turning effort of actuator 653, the 3rd Wire support Part 640 reaches required position, and operating personnel stops 42 passing power of the 2nd transmission device, the rotation for the part 660 that stops rotating.In this way It is surprisingly rotated after capable of preventing the 3rd Wire support part 640 from reaching required position.
With reference to figure 30, electric wire 30 is moved to the operation process packet of the stage S105 at the 1st or the 2nd Wire support part 540 It includes, electric wire 30 is moved at the 1st or the 2nd Wire support part 540;It disconnects electric wire 30 and the connection of LP insulators 22 has been installed. In addition, if the 1st or the 2nd Wire support part 540 is in the stage being moved to electric wire 30 at the 1st or the 2nd Wire support part 540 It is mounted on bendable wood 510, then will not sequentially go wrong before S105.It therefore, can be according to operating condition or operating personnel Convenience, the 1st or the 2nd Wire support part 540 is installed to the time on bendable wood 510 by adjustment.
Include by the operation process that electric wire 30 is moved at the 1st or the 2nd Wire support part 540, electric wire 30 passes through open piece 546a enters, and the locking piece 548 on holder 546 is locked.That is, open piece 546a is closed by locking piece 548.
The operation process for disconnecting electric wire 30 and having installed the connection of LP insulators 22 includes dismantling connection electric wire 30 and having pacified The binding component of LP insulators 22 is filled, or binding component is removed from electric wire, binding component is removed.
Although not making diagram on the drawing of the present invention, under normal circumstances, in order to protect the controller switching equipments such as electric wire 30, Spool, insulator cover isoelectric line crust are used all on electric wire 30.By electric wire 30 and before the disconnection of LP insulators 22 has been installed, after It is continuous to move up the 1st or the 2nd Wire support part 540, then when removing binding component, electric wire 30 and installed LP insulators 22 it Between will produce interval.
After electric wire 30 is moved at the 1st or the 2nd Wire support part 540, disconnects electric wire 30 and LP insulators 22 have been installed Before, continue to move up the 1st or the 2nd Wire support part 540, then electric wire 30 and no longer phase has been installed between LP insulators 22 It mutually fits closely, electric wire 30 and has installed and will produce interval between LP insulators 22, wire outer skin no longer hangs over that have installed LP exhausted On edge 22.Later, operating personnel can move wire outer skin along electric wire 30 according to facility, smoothly execute controller switching equipment more Change operation.
At this moment, before disconnecting electric wire 30 and LP insulators 22 being installed, continue to move up the 3rd Wire support part 540, The 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550 are then utilized, by moving up the 1st or the 2nd Wire support part 540 Process realize.It is of course also possible to using the 1st transmission device 41 and lifter 530, the process by mobile bendable wood 510 is real It is existing.
1st or the 2nd Wire support part 540 of supporting electric wire 30 is moved up and is moved to the direction far from electric pole, LP insulators 22 will have been installed more by being one far from the stage S106 for having installed LP insulators 22 on bolt cross-arm 21 by electric wire 30 It is changed to the new process for setting LP insulators 25 and obtaining working space.
With reference to figure 31, the 1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, it will be electric Line 30 is one far from the stage S106 for having installed LP insulators 22 will install LP insulators 22 and has been changed to and newly set LP insulators 25 and obtain the process of working space.
1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, electric wire 30 is separate The stage S106 operation process for having installed LP insulators 22 includes that being moved up by the 1st transmission device 41 and lifter 530 can Curved wooden 510;The the 1st or the 2nd Wire support part is moved up by the 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550 540。
1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, electric wire 30 is separate The stage S106 for having installed LP insulators 22 can be only carried out according to operating condition or the convenience of operating personnel and utilize the 1st transmission Device 41 and lifter 530 move the process of bendable wood 510, or pass through the 2nd transmission device 42 and the 1st or the 2nd lifting moving Part 550 moves process or the operating personnel's manual operation of the 1st or the 2nd Wire support part 540, and sub- extension device 543 is risen to Process at electric wire 30.
In addition, the 1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 It can will pass through the 1st transmission according to operating condition or the convenience of operating personnel far from the stage S106 for having installed LP insulators 22 Device 41 and lifter 530 move up process and the operating personnel's manual operation of bendable wood 510, will be on sub- extension device 543 The process risen at electric wire 30 combines realization.
In addition, the 1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 The 2nd transmission can will be utilized far from the stage S106 for having installed LP insulators 22 according to operating condition or the convenience of operating personnel Device 42 and the 1st or the 2nd lifting moving part 550 move up the 1st or the 2nd Wire support part 540 installed on bendable wood 510 Process and operating personnel's manual operation, combine realization by the process that sub- extension device 543 rises at electric wire 30.
In addition, the 1st or the 2nd Wire support part 540 is moved up and is moved to the direction far from electric pole, by electric wire 30 It can will pass through the 1st transmission according to operating condition or the convenience of operating personnel far from the stage S106 for having installed LP insulators 22 Device 41 and lifter 530 move up the process of bendable wood 510, and will utilize the 2nd transmission device 42 and the 1st or the 2nd liter Drop moving member 550 moves up the process for the 1st or the 2nd Wire support part 540 installed on bendable wood 510, and operating personnel is manual Operation, combines realization by the process that sub- extension device 543 rises at electric wire 30.
Electric wire 30 is moved to stage S105 at the 1st or the 2nd Wire support part 540 and by the 1st or the 2nd Wire support part 540 move up and are moved to the direction far from electric pole, can far from the stage S106 for having installed LP insulators 22 by electric wire 30 It is moved to the 1st Wire support part 540 in electric wire, 640 mobile electric wire operation S105 and moves up operation S106 and all terminate Afterwards, it executes and electric wire is moved to the 2nd Wire support part 540,640 mobile electric wire operation S105 and move up operation S106. Conversely, electric wire can be moved to the 2nd Wire support part 540,640 mobile electric wire operation S105 and to move up operation S106 complete Cheng Hou is executed electric wire being moved to the 1st Wire support part 540,640 mobile electric wire operation S105 and moves up operation S106.Furthermore it is also possible to be moved to the movement of 540,640 and the 2 Wire support part 540,640 of the 1st Wire support part in electric wire After electric wire operation S105 wholes, execute 540,640 and the 2 Wire support part 540,640 of the 1st Wire support part to moving up Dynamic operation S106.Like this, electric wire is moved to the 1st or electric wire is moved to the operation S105 at the 2nd Wire support part 540 It can be according to operating condition or the convenience adjustment sequence of operating personnel with operation S106 is moved up.
With reference to figure 32, the LP of the installation insulators 22 on bolt cross-arm 21 are removed, by the new LP insulators 25 that set mounted on slotting The operation process of stage S107 on pin cross-arm 21 includes, using moving up Wire support part 540,640, electric wire 30 is separate The working space that the stage (S104, S106) of LP insulators 22 obtained has been installed, LP insulators 22 will be installed from bolt cross It is removed in load 21, installation newly sets LP insulators 25.
With reference to figure 33, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to and is newly set at LP insulators 25 The operation process of stage S108 includes declining bendable wood 510 by the 1st transmission device 41 and lifter 530;Pass through the 2nd transmission Device 42 and the 1st or the 2nd lifting moving part 550 decline the 1st or the 2nd Wire support part 540.
In addition, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage set at LP insulators 25 S108 can be according to operating condition or the convenience of operating personnel, and only carrying out can using the 1st transmission device 41 and the movement of lifter 530 Curved wooden 510 process, or the 1st or the 2nd electric wire branch is moved by the 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550 The process of support member 540 or operating personnel's manual operation, drop to the process at electric wire 30 by sub- extension device 543.
In addition, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage set at LP insulators 25 S108 can will decline bendable wood according to operating condition or the convenience of operating personnel by the 1st transmission device 41 and lifter 530 510 process and operating personnel's manual operation, combine realization by the process that sub- extension device 543 drops at electric wire 30.
In addition, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage set at LP insulators 25 S108 can will pass through the 2nd transmission device 42 and the 1st or the 2nd lifting moving part according to operating condition or the convenience of operating personnel The process for the 1st or the 2nd Wire support part 540 installed on 550 decline bendable wood 510 and operating personnel's manual operation, will be sub The process that extension device 543 drops at electric wire 30 combines realization.
In addition, the 1st or the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage set at LP insulators 25 S108 can will decline bendable wood according to operating condition or the convenience of operating personnel by the 1st transmission device 41 and lifter 530 510 process, and decline the installed on bendable wood 510 by the 2nd transmission device 42 and the 1st or the 2nd lifting moving part 550 The process of 1 or the 2nd Wire support part 540, operating personnel's manual operation, drops to the process at electric wire 30 by sub- extension device 543 Combine realization.
With reference to figure 34, electric wire is moved to the new stage S109 for setting LP insulators 25 from the 1st or the 2nd Wire support part 540 Operation process include being bundled and being installed in electric wire 30 and new set in the state that LP insulators 25 fit closely;Disconnect electricity The combination of line 30 and the 1st or the 2nd Wire support part 540.Herein, electric wire 30 is bundled in and is newly set on LP insulators 25, meant Component is bundled using foreskin steel wire, adhesive tape, clip etc., electric wire 30 is fixed on and is newly set on LP insulators 25.
The operation process for disconnecting the combination of electric wire 30 and the 1st or the 2nd Wire support part 540 includes rotating locking piece 548, Open open piece 546a;Electric wire 30 is moved to outside holder 546 by open piece 546a.
1st or the 2nd Wire support part 540 is dropped into the new stage S108 set at LP insulators 25 and by electric wire from the 1st Or the 2nd Wire support part 540 be moved to the new stage S109 for setting LP insulators 25 and can decline the 1st Wire support part 540, After 640 operation S108 and mobile electric wire operation S109 is fully completed, executes and decline the 2nd Wire support part 540,640 operation S108 and mobile electric wire operation S109.Conversely, the 2nd Wire support part 540,640 operation S108 and movement can also be being declined After electric wire operation S109 is fully completed, then executes and decline the 1st Wire support part 540,640 operation S108 and mobile electric wire operation S109.Furthermore it is also possible in the 1st Wire support part 540,640 is all complete with the operation S108 of the 2nd Wire support part 540 of decline Cheng Hou, then execute operation S109 electric wire being moved at 540,640 and the 2 Wire support part 540 of the 1st Wire support part.Picture In this way, the operation S108 and mobile electric wire operation S109 that decline the 1st or the 2nd Wire support part 540 can be according to operating condition or works The convenience of industry personnel adjusts the sequence of operation.
With reference to figure 35, the 3rd Wire support part 640 of supporting electric wire 30 is rotated and moved down to other direction, approached It newly sets in the stage S110 of LP insulators 25, by the 3rd Wire support part 640 to other direction (with reference to figure 34, counterclockwise) Rotation, the operation process close to electric pole 10 include that operating personnel's operating and driving device 41 turns to 660 passing power of revolving part Dynamic revolving part 660;Then, the actuator 653 for being connected to 660 side of revolving part is rotatably connected to the bendable wood installation of the other side Part 651.At this moment, bendable wood installation part 651 is fixedly mounted on horizontal extension part 511, when revolving part 660 rotates, actuator 653 According to the rotation amount of revolving part 660, identical amount is rotated to the direction close to electric pole 10.In the turning effort of actuator 653 Under, the 3rd Wire support part 640 reaches required position, and operating personnel stops 41 passing power of transmission device, and stop rotating part 660 Rotation.It is surprisingly rotated after capable of preventing the 3rd Wire support part 640 from reaching required position in this way.
3rd Wire support part 640 is rotated and moved down to other direction, close to the stage for newly setting LP insulators 25 In S110, moving down the operation of the 3rd Wire support part 640 can will utilize according to operating condition or the convenience of operating personnel 2nd transmission device 42 and the 3rd lifting moving part 650 move down the mistake for the 3rd Wire support part 640 installed on bendable wood 510 Journey and operating personnel's manual operation, combine realization by the process that sub- extension device 643 drops at electric wire 30.In addition, to The operation of lower the 3rd Wire support part 640 of movement can will be filled according to operating condition or the convenience of operating personnel by the 1st transmission The process of 41 and the decline bendable of lifter 530 wood 510 is set, and utilizes the 2nd transmission device 42 and the 3rd lifting moving part 650, to The process for the 3rd Wire support part 640 installed on lower mobile bendable wood 510, operating personnel's manual operation, by sub- extension device 643 The process dropped at electric wire 30 combines realization.
With reference to figure 36, electric wire is moved to the operation of the new stage S111 for setting LP insulators 25 from the 3rd Wire support part 640 Process includes being bundled and being installed in electric wire 30 and new set in the state that LP insulators 25 fit closely;Disconnect electric wire 30 with The combination of 3rd Wire support part 640.Herein, electric wire 30 is bundled in and is newly set on LP insulators 25, meant and utilize foreskin steel Silk, adhesive tape, clip etc. bundle component, and electric wire 30 is fixed on and is newly set on LP insulators 25.
The operation process for disconnecting the combination of electric wire 30 and the 3rd Wire support part 640 includes that rotation process locking piece 648 is beaten Open piece 646a is opened, is moved electric wire 30 outside holder 646 to by open piece 646a.
With reference to figure 37, the operation process by the stage S112 that bendable wood 510 is removed from electric pole 10 includes, by electric wire branch Support member 540,640 and lifting moving part 550,650 are removed from bendable wood 510;By bendable wood 510 from bendable wood fixing piece 520 Or it is removed on lifter 530;Lifter 530 is removed from bendable wood fixing piece 520;By bendable wood fixing piece 520 from electric wire It is removed on bar 10.In addition, the operation process for the stage S112 that bendable wood 510 is removed from electric pole 10 can also be by will be electric Line support element 540,640 and lifting moving part 550,650 remove the bendable wood 510 in installation condition from electric pole 10 It realizes.
The illustrated process for disposably executing Figure 26 to Figure 37, can disposably replace multiple LP insulators 22 of having installed Newly to set LP insulators 25.
In addition, the figure for executing Figure 26 to Figure 37 in order is process, multiple LP insulators 22 of having installed can be replaced respectively Newly to set LP insulators 25.That is, the process for executing Figure 26 to Figure 37 can be by any one multiple installed in LP insulators 22 Be changed to and newly set LP insulators 25, after the completion again by residue installed LP insulators 22 be changed to it is new set LP insulators 25 when, can The process of Figure 26 to Figure 37 is executed again.At this moment, in order to the LP of installation insulators 22 farthest on electric pole 10 are changed to newly If LP insulators 25, should execute during Figure 26 to Figure 37 with 640 relevant process of the 3rd Wire support part.In order to by distance The nearest LP of the installation insulators 22 of electric pole 10, which are changed to, newly sets LP insulators 25, should execute Figure 26 to Figure 37 in the process with the 1 Wire support part 540,640 relevant processes.
Above to the 2nd embodiment according to the present invention, using controller switching equipment livewire work auxiliary device by bolt cross-arm Multiple LP insulators 22 of having installed on 21 are changed to multiple new controller switching equipment livewire work methods progress for setting LP insulators 25 Explanation.Below with reference to Figure 26 to Figure 37, for the centre position of LP insulators 22 will have been installed on bolt cross-arm 21 Installation LP insulators 22 are changed to the new controller switching equipment livewire work method for setting LP insulators 25 and illustrate.
With reference to figure 26, the realization process by the stage S101 that bendable wood 510 is fixed on electric pole 10 includes, by bendable wood Fixing piece 520 is fixed on electric pole 10;Lifter 530 is fixed on bendable wood fixing piece 520;Connect 530 He of lifter Bendable wood 510;Lifting moving part 550,650 on fixed bendable wood 510 and Wire support part 540,640;It is exhausted with LP has been installed The position of edge 22 is corresponding.
When connecting bendable wood 510 with lifter 530, erection sequence is that vertical extension part 513 is mounted on lifting first On device 530;Horizontal extension part 511 is mounted on to the upper end of vertical extension part 513;In horizontal extension part 511 and vertical extension part Support element 515 is installed between 513.
Operation process support element 515 being mounted between horizontal extension part 511 and vertical extension part 513 includes that will connect Connection member 516 is mounted on horizontal extension part 511;The upper end of support element 515 is connected with connecting elements 516, and can rotate;Branch The connectors such as the eyebolt that the lower end of support member 515 prepares with 513 lower end of vertical extension part are connected, it is ensured that can installing and dismounting.
The present embodiment will replace the LP of the installation insulators positioned at centre, and (22, hereinafter referred to as " the 2nd has installed LP insulation Son "), therefore the 2nd lifting moving part 550 and the 2nd Wire support part 540 be fixed on bendable wood 510 to have installed LP with the 2nd exhausted 22 corresponding position of edge.In addition, having installed LP insulators 22 to replace the 2nd, need to expand intermediate electric wire 30 and distance 3rd lifting moving part 650 and the 3rd Wire support part 650 are fixed on and electricity by farthest the distance between the electric wire 30 of electric pole 10 The farthest LP of installation insulators (22, hereinafter referred to as " the 3rd has installed LP insulators ") corresponding position in line bar 10.
Include by the operation process that the 2nd lifting moving part 550 and the 2nd Wire support part 540 are fixed on bendable wood 510, The 2nd lifting moving part 550 is fixed on bendable wood 510 first, then with the 2nd Wire support on the 2nd lifting moving part 550 Part 540 combines.Furthermore it is also possible to after by being combined with the 2nd Wire support part 540 on the 2nd lifting moving part 550, by the 2nd liter Drop moving member 550 is fixed on the realization of the process on bendable wood 510.
The operation process that 3rd lifting moving part 650 and the 3rd Wire support part 640 are fixed on bendable wood 510 includes, first First sliding moving member 560 is fixed on bendable wood 510, then will slide 650 He of the 3rd lifting moving part on moving member 560 3rd Wire support part 640 is combined.Furthermore it is also possible to by the way that the 3rd lifting moving part 650 and on moving member 560 will be slided 3 Wire support parts 640 are combined, and sliding moving member 560, which is then fixed on the process on bendable wood 510, realizes.
Bendable wood 510 is fixed on the stage S101 on electric pole 10 can also be by lifting moving part 550,650 and electricity Line support element 540,640, by having installed, the process that bendable wood 510 is mounted on lifter 530 or bendable wood fixing piece 520 is real It is existing.
With reference to figure 27, the 3rd Wire support part 640 installed on bendable wood 510 is moved upwards up to electric wire on electric pole 10 Stage S102 operation process at 30 includes that operating personnel's manual operation rises to sub- extension device 643 at electric wire 30.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel only retain and move up bendable wood 510 by the 1st transmission device 41 and lifter 630 Process, or moved up by the 2nd transmission device 42 and the 3rd lifting moving part 650 installed on bendable wood 510 the 3rd electricity The process of line support element 640.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel will move up the mistake of bendable wood 510 by the 1st transmission device 41 and lifter 530 Journey moves up the 3rd Wire support part installed on bendable wood 510 by the 2nd transmission device 42 and the 3rd lifting moving part 650 640 process combines realization.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel will move up the mistake of bendable wood 510 by the 1st transmission device 41 and lifter 530 Journey and operating personnel's manual operation, are moved upward to the process at electric wire 30 by sub- extension device 643 and combine realization.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel will be moved up and will be mounted on by the 2nd transmission device 42 and the 3rd lifting moving part 650 The process of the 3rd Wire support part 640 on bendable wood 510 and operating personnel's manual operation, by sub- extension device 643 to moving up It moves to the process at electric wire 30 and combines realization.
In addition, the stage S102 the 3rd Wire support part 640 being moved upwards up on electric pole 10 at electric wire 30 can be according to work The convenience of industry condition or operating personnel will move up the mistake of bendable wood 510 by the 1st transmission device 41 and lifter 530 Journey, and the 3rd electric wire branch installed on bendable wood 510 is moved up by the 2nd transmission device 42 and the 3rd lifting moving part 650 The process of support member 640, operating personnel's manual operation, the process that sub- extension device 643 is moved upward at electric wire 30 is combined It realizes.
Therefore, in the explanation of the present invention, about the operation of mobile 3rd Wire support part 640, even if not mentioning individually Mobile Wire support part 640 is whole, and mobile sub- extension device 643, also means the one kind being applicable in the multiple embodiment.
In the explanation of the present invention, the operation for moving up or down the 3rd Wire support part 640 includes being led by mobile Extension device 642 moves the entire 3rd Wire support part 640 including main extension device 642 and sub- extension device 643, or only moves The embodiment of the sub- extension device 643 of dynamic 3rd Wire support part, 640 upper end setting, forms and connects electricity in the 3rd Wire support part 640 The part of the electric wire crimp 645 of line 30, that is, mean up-regulation or lower the whole of 640 upper end level of the 3rd Wire support part and make Industry.
It is executed in the state that the open piece 646a being arranged above holder 646 is opened by the 3rd Wire support part 640 to moving up It moves to the stage S102 at electric wire 30, after this stage, electric wire 30 is entered by open piece 646a inside holder 546.
With reference to figure 28, include by the stage S103 operation process that electric wire 30 is moved at the 3rd Wire support part 640, it will be electric Line 30 is moved at the 3rd Wire support part 640;It disconnects electric wire 30 and the connection of LP insulators 22 has been installed.
At this moment, include that electric wire 30 passes through open piece by the operation process that electric wire 30 is moved at the 3rd Wire support part 640 646a enters, and the locking piece 648 on holder 646 is locked.That is, open piece 646a is closed by locking piece 648.
The operation process for disconnecting electric wire 30 and having installed the connection status of LP insulators 22 includes dismantling connection 30 He of electric wire The binding component of LP insulators 22 has been installed, or binding component has been removed from electric wire, binding component has been removed.
Although not making diagram on the drawing of the present invention, under normal circumstances, in order to protect the controller switching equipments such as electric wire 30, Spool, insulator cover isoelectric line crust are used all on electric wire 30.By electric wire 30 and before the disconnection of LP insulators 22 has been installed, after It is continuous to move up the 3rd Wire support part 640, then when removing binding component, electric wire 30 and meeting between LP insulators 22 is installed Generate interval.
After electric wire 30 is moved at the 3rd Wire support part 640, disconnect electric wire 30 and installed LP insulators 22 it Before, continue to move up the 3rd Wire support part 640, then electric wire 30 and has installed no longer mutually close between LP insulators 22 Fitting, electric wire 30 and has installed and will produce interval between LP insulators 22, and wire outer skin, which is no longer hung over, has installed LP insulators 22 On.Later, operating personnel can move wire outer skin along electric wire 30 according to facility, smoothly execute controller switching equipment replacement operation.
At this moment, before disconnecting electric wire 30 and LP insulators 22 being installed, continue to move up the 3rd Wire support part 640, The 2nd transmission device 42 and lifting moving part 650 are then utilized, the process by moving up Wire support part 640 is realized.Certainly, The 1st transmission device 41 and lifter 530 can also be utilized, is realized by the process of mobile bendable wood 510.
3rd Wire support part 640 of supporting electric wire 30 is moved up and is moved to the direction far from electric pole, by electric wire 30 are one far from the stage S104 for having installed LP insulators 22 on bolt cross-arm 21 will install LP insulators 22 and has been changed to newly If LP insulators 25 and the process for obtaining working space.
It moves up with reference to the 29, the 3rd Wire support part 640 of figure and is moved to the direction far from electric pole, electric wire 30 is remote Include being moved up by the 1st transmission device 41 and lifter 530 from the stage S104 operation process of LP insulators 22 has been installed Bendable wood 510;The 3rd Wire support part 640 is moved up by the 2nd transmission device 42 and the 3rd lifting moving part 650.
3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from having installed LP The stage S104 of insulator 22 can be only carried out according to operating condition or the convenience of operating personnel and utilize 41 He of the 1st transmission device Lifter 530 moves the process of bendable wood 510, or passes through the 3rd electricity of the 2nd transmission device 42 and the movement of the 3rd lifting moving part 650 The process of line support element 640 or operating personnel's manual operation, the process at electric wire 30 is moved upward to by sub- extension device 643.
In addition, the 3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from The stage S104 of installation LP insulators 22 can will pass through the 1st transmission device 41 according to operating condition or the convenience of operating personnel And lifter 530 moves up process and the operating personnel's manual operation of bendable wood 510, and sub- extension device 643 is moved up Process to electric wire 30 combines realization.
In addition, the 3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from The stage S104 of installation LP insulators 22 can will pass through the 2nd transmission device 42 according to operating condition or the convenience of operating personnel And the 3rd lifting moving part 650 move up process and the operation of the 3rd Wire support part 640 on bendable wood 510 Personnel are manually operated, and sub- extension device 643 is moved upward to the process at electric wire 30 and combines realization.
In addition, the 3rd Wire support part 640 is moved up and is moved to the direction far from electric pole, by electric wire 30 far from The stage S104 of installation LP insulators 22 can will pass through the 1st transmission device 41 according to operating condition or the convenience of operating personnel And lifter 530 moves up the process of bendable wood 510, and by the 2nd transmission device 42 and the 3rd lifting moving part 650 to Upper movement is mounted on the process of the 3rd Wire support part 640 on bendable wood 510, operating personnel's manual operation, by sub- extension device 643 processes for being moved upward at electric wire 30 combine realization.
It is rotated upwards and to certain orientation by the 3rd Wire support part 640, by electric wire 30 far from having installed LP insulators 22 Stage S104 in, operation that the 3rd Wire support part 640 is moved up can be stood by operating personnel in the position far from electric wire 30 It sets, using the 2nd transmission device 42 and the 3rd lifting moving part 650, moves up automatically and remotely the 3rd Wire support part 640 The process of main extension device 642 is realized.
In addition, the operation that the 3rd Wire support part 640 is moved up can be according to operating condition or the facility of operating personnel Property, the process by only moving up sub- extension device 643 is realized.In addition, the operation that the 3rd Wire support part 640 is moved up It is whole can will to move up the 3rd Wire support part 640, that is, move up the process of main extension device 642, and move up son and prolong The process of long part 643 combines realization.
It is rotated upwards and to certain orientation by the 3rd Wire support part 640, by electric wire 30 far from having installed LP insulators 22 Stage S104 in, by the 3rd Wire support part 640 to certain orientation (be subject to Figure 29, clockwise) rotation far from electric pole 10 The operation process turned includes that operating personnel, to 660 passing power of revolving part, rotates revolving part 660 by the 2nd transmission device 42; Then, it is connected to bendable wood installation part 651 of the rotatable connection of actuator 653 in the other side of 660 side of revolving part.At this moment, may be used Curved wood installation part 651 is fixedly mounted on horizontal extension part 511, and when revolving part 660 rotates, actuator 653 is according to revolving part 660 Rotation amount, rotate identical amount to the direction far from electric pole 10.Under the turning effort of actuator 653, the 3rd Wire support Part 640 reaches required position, and operating personnel stops 42 passing power of the 2nd transmission device, the rotation for the part 660 that stops rotating.In this way It is surprisingly rotated after capable of preventing the 3rd Wire support part 640 from reaching required position.
With reference to figure 30, electric wire 30 is moved to the operation process packet of the stage S105 at the 1st or the 2nd Wire support part 540 It includes, electric wire 30 is moved at the 2nd Wire support part 540;It disconnects electric wire 30 and the connection of LP insulators 22 has been installed.In addition, If the 2nd Wire support part 540 is mounted on bendable before electric wire 30 to be moved to the stage S105 at the 2nd Wire support part 540 On wood 510, then will not sequentially it go wrong.Therefore, it can be adjusted the according to operating condition or the convenience of operating personnel 2 Wire support parts 540 are installed to the time on bendable wood 510.
Include by the operation process that electric wire 30 is moved at the 2nd Wire support part 540, electric wire 30 by open piece 546a into Enter, the locking piece 548 on holder 546 is locked.That is, open piece 546a is closed by locking piece 548.
The operation process for disconnecting electric wire 30 and having installed the connection of LP insulators 22 includes dismantling connection electric wire 30 and having pacified The binding component of LP insulators 22 is filled, or binding component is removed from electric wire, binding component is removed.
Although not making diagram on the drawing of the present invention, under normal circumstances, in order to protect the controller switching equipments such as electric wire 30, Spool, insulator cover isoelectric line crust are used all on electric wire 30.By electric wire 30 and before the disconnection of LP insulators 22 has been installed, after It is continuous to move up the 3rd Wire support part 540, then when removing binding component, electric wire 30 and meeting between LP insulators 22 is installed Generate interval.
After electric wire 30 is moved at the 2nd Wire support part 540, disconnect electric wire 30 and installed LP insulators 22 it Before, continue to move up the 3rd Wire support part 540, then electric wire 30 and has installed no longer mutually close between LP insulators 22 Fitting, electric wire 30 and has installed and will produce interval between LP insulators 22, and wire outer skin, which is no longer hung over, has installed LP insulators 22 On.Later, operating personnel can move wire outer skin along electric wire 30 according to facility, smoothly execute controller switching equipment replacement operation.
At this moment, before disconnecting electric wire 30 and LP insulators 22 being installed, continue to move up the 2nd Wire support part 540, The 2nd transmission device 42 and the 2nd lifting moving part 550 are then utilized, the process by moving up the 2nd Wire support part 540 is realized. It is of course also possible to using the 1st transmission device 41 and lifter 530, realized by the process of mobile bendable wood 510.
2nd Wire support part 540 of supporting electric wire 30 is moved up and is moved to the direction far from electric pole, by electric wire 30 are one far from the stage S106 for having installed LP insulators 22 on bolt cross-arm 21 will install LP insulators 22 and has been changed to newly If LP insulators 25 and the process for obtaining working space.
With reference to figure 31, the 2nd Wire support part 540 is moved up, by electric wire 30 far from the rank for having installed LP insulators 22 Section S106, which is one, will install LP insulators 22 and be changed to the new process for setting LP insulators 25 and obtaining working space.
2nd Wire support part 540 is moved up, by electric wire 30 far from the stage S106 operation for having installed LP insulators 22 Process includes moving up bendable wood 510 by the 1st transmission device 41 and lifter 530;Utilize the 2nd transmission device 42 and the 2nd Lifting moving part 550 moves up the 2nd Wire support part 540.
2nd Wire support part 540 is moved up, it can root far from the stage S106 for having installed LP insulators 22 by electric wire 30 According to operating condition or the convenience of operating personnel, only carries out and move bendable wood 510 using the 1st transmission device 41 and lifter 530 Process, either using the 2nd transmission device 42 and the 2nd lifting moving part 550 move the 2nd Wire support part 540 process or Operating personnel is manually operated, and sub- extension device 543 is risen to the process at electric wire 30.
In addition, the 2nd Wire support part 540 is moved up, by electric wire 30 far from the stage for having installed LP insulators 22 S106 can be according to operating condition or the convenience of operating personnel, and will be moved up by the 1st transmission device 41 and lifter 530 can Curved wooden 510 process and operating personnel's manual operation, the process that sub- extension device 543 rises at electric wire 30 is combined It realizes.
In addition, the 2nd Wire support part 540 is moved up, by electric wire 30 far from the stage for having installed LP insulators 22 S106 can according to operating condition or the convenience of operating personnel, will utilize the 2nd transmission device 42 and the 2nd lifting moving part 550 to Upper movement is mounted on the process of the 2nd Wire support part 540 and operating personnel's manual operation on bendable wood 510, by sub- extension device 543 processes risen at electric wire 30 combine realization.
In addition, the 2nd Wire support part 540 is moved up, by electric wire 30 far from the stage for having installed LP insulators 22 S106 can be according to operating condition or the convenience of operating personnel, and will be moved up by the 1st transmission device 41 and lifter 530 can Curved wooden 510 process, and moved up mounted on bendable wood 510 using the 2nd transmission device 42 and the 2nd lifting moving part 550 Sub- extension device 543, is risen to the process knot at electric wire 30 by the process of upper 2nd Wire support part 540, operating personnel's manual operation It realizes altogether.
With reference to figure 32, the LP of the installation insulators 22 on bolt cross-arm 21 are removed, by the new LP insulators 25 that set mounted on slotting The operation process of stage S107 on pin cross-arm 21 includes, using moving up Wire support part 540,640, electric wire 30 is separate The working space that the stage (S104, S106) of LP insulators 22 obtained has been installed, LP insulators 22 will be installed from bolt cross It is removed in load 21, installation newly sets LP insulators 25.
With reference to figure 33, the 2nd Wire support part 540 of supporting electric wire 30 is dropped into the new stage set at LP insulators 25 The operation process of S108 includes declining bendable wood 510 by the 1st transmission device 41 and lifter 530;Pass through the 2nd transmission device 42 and the 2nd lifting moving part 550 declines the 2nd Wire support part 540.
It can in addition, the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage S108 set at LP insulators 25 According to operating condition or the convenience of operating personnel, only carries out and move bendable wood using the 1st transmission device 41 and lifter 530 510 process, or the 2nd transmission device 42 and the 2nd lifting moving part 550 is utilized to move the process of the 2nd Wire support part 540, Or operating personnel's manual operation, sub- extension device 543 is dropped into the process at electric wire 30.
It can in addition, the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage S108 set at LP insulators 25 According to operating condition or the convenience of operating personnel, bendable wood 510 will be declined by the 1st transmission device 41 and lifter 530 Process and operating personnel's manual operation, combine realization by the process that sub- extension device 543 drops at electric wire 30.
It can in addition, the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage S108 set at LP insulators 25 According to operating condition or the convenience of operating personnel, the 2nd transmission device 42 and the 2nd lifting moving part 550 will be utilized to decline bendable The process for the 2nd Wire support part 540 installed on wood 510 and operating personnel's manual operation, sub- extension device 543 is dropped to Process at electric wire 30 combines realization.
It can in addition, the 2nd Wire support part 540 of supporting electric wire 30 is dropped to the new stage S108 set at LP insulators 25 According to operating condition or the convenience of operating personnel, bendable wood 510 will be declined by the 1st transmission device 41 and lifter 530 Process, and decline the 2nd Wire support installed on bendable wood 510 using the 2nd transmission device 42 and the 2nd lifting moving part 550 The process of part 540, operating personnel's manual operation, combines realization by the process that sub- extension device 543 drops at electric wire 30.
With reference to figure 34, electric wire is moved to the operation of the new stage S109 for setting LP insulators 25 from the 2nd Wire support part 540 Process includes being bundled and being installed in electric wire 30 and new set in the state that LP insulators 25 fit closely;Disconnect electric wire 30 with The combination of 2nd Wire support part 540.Herein, electric wire 30 is bundled in and is newly set on LP insulators 25, meant and utilize foreskin steel Silk, adhesive tape, clip etc. bundle component, and electric wire 30 is fixed on and is newly set on LP insulators 25.
The operation process for disconnecting the combination of electric wire 30 and the 2nd Wire support part 540 includes rotating locking piece 548, opening is opened Put part 546a;Electric wire 30 is moved to outside holder 546 by open piece 546a.
With reference to figure 35, the 3rd Wire support part 640 of supporting electric wire 30 is rotated and moved down to other direction, approached It newly sets in the stage S110 of LP insulators 25, by the 3rd Wire support part 640 to other direction (with reference to figure 34, counterclockwise) Rotation, the operation process close to electric pole 10 include that operating personnel's operating and driving device 41 turns to 660 passing power of revolving part Dynamic revolving part 660;Then, the actuator 653 for being connected to 660 side of revolving part is rotatably connected to the bendable wood installation of the other side Part 651.At this moment, bendable wood installation part 651 is fixedly mounted on horizontal extension part 511, when revolving part 660 rotates, actuator 653 According to the rotation amount of revolving part 660, identical amount is rotated to the direction close to electric pole 10.In the turning effort of actuator 653 Under, the 3rd Wire support part 640 reaches required position, and operating personnel stops 41 passing power of transmission device, and stop rotating part 660 Rotation.It is surprisingly rotated after capable of preventing the 3rd Wire support part 640 from reaching required position in this way.
3rd Wire support part 640 is rotated and moved down to other direction, close to the stage for newly setting LP insulators 25 In S110, moving down the operation of the 3rd Wire support part 640 can will utilize according to operating condition or the convenience of operating personnel 2nd transmission device 42 and the 3rd lifting moving part 650 move down the mistake for the 3rd Wire support part 640 installed on bendable wood 510 Journey and operating personnel's manual operation, combine realization by the process that sub- extension device 643 drops at electric wire 30.
In addition, move down the 3rd Wire support part 640 operation can according to operating condition or the convenience of operating personnel, The process of bendable wood 510 will be declined by the 1st transmission device 41 and lifter 530, and utilizes the 2nd transmission device 42 and the 3rd Lifting moving part 650, moves down the process for the 3rd Wire support part 640 installed on bendable wood 510, and operating personnel grasps manually Make, the process that sub- extension device 643 drops at electric wire 30 is combined into realization.
With reference to figure 36, electric wire is moved to the operation of the new stage S111 for setting LP insulators 25 from the 3rd Wire support part 640 Process includes being bundled and being installed in electric wire 30 and new set in the state that LP insulators 25 fit closely;Disconnect electric wire 30 with The combination of 3rd Wire support part 640.Herein, electric wire 30 is bundled in and is newly set on LP insulators 25, meant and utilize foreskin steel Silk, adhesive tape, clip etc. bundle component, and electric wire 30 is fixed on and is newly set on LP insulators 25.
The operation process for disconnecting the combination of electric wire 30 and the 3rd Wire support part 640 includes that rotation process locking piece 648 is beaten Open piece 646a is opened, is moved electric wire 30 outside holder 646 to by open piece 646a.
With reference to figure 37, the operation process by the stage S112 that bendable wood 510 is removed from electric pole 10 includes, by electric wire branch Support member 540,640 and lifting moving part 550,650 are removed from bendable wood 510;By bendable wood 510 from bendable wood fixing piece 520 Or it is removed on lifter 530;Lifter 530 is removed from bendable wood fixing piece 520;By bendable wood fixing piece 520 from electric wire It is removed on bar 10.
In addition, the operation process for the stage S112 that bendable wood 510 is removed from electric pole 10 can also be by by electric wire Bendable wood 510 in installation condition is removed reality by support element 540,640 and lifting moving part 550,650 from electric pole 10 It is existing.According to the controller switching equipment livewire work method provided by the invention, using the 1st transmission device 41 or the 2nd transmission device 42 power, the height of automatic adjustment bendable wood 510 or the height of Wire support part 540,640, to Wire support part 540,640 The height of mobile electric wire 30 smoothly executes the operation for replacing LP insulators.In addition, according to the present invention, can not only be segmented tune Save bendable wood 510 and Wire support part 540,640 whole height, can also by only moving up and down Wire support part 540, The sub- extension device 543 of electric wire crimp 545,645 is provided in 640, point three sections of adjusting electric wire crimps 545,645 or electric wire 30 Height.
Therefore, according to the present invention, operating personnel can select the height for adjusting bendable wood 510 according to operating condition and convenience The height of degree, the whole height of Wire support part 540,640, sub- extension device 543,643 more easily executes LP insulators more Change operation.
In addition, according to the present invention, using the 1st transmission device 41 or the 2nd transmission device 42, operating personnel can be far from electric wire It is executed electric wire 30 on 30 position far from the operation for having installed 22 upper end of LP insulators, more easily obtains and replace LP insulation The required livewire work space of son reduces operating personnel when replacing LP insulators and contacts the several of safety accident occurred with electric wire 30 Rate.
In addition, according to the present invention, in the state that multiple Wire support parts 540,640 are mounted on bendable wood 510, upwards Mobile bendable wood 510 can be not necessarily to rise the cumbersome operation of each Wire support part 540,640 respectively by rising bendable wood, and It is multiple Wire support parts 540,640 to rise overally identical displacement simultaneously.
Above with reference to embodiment illustrated in the drawings, the present invention is described, but this is the part reality of the present invention Example is applied, various deformation that the personnel of general knowledge make the embodiment of the present invention and identical is possessed in the technical field of the present invention Other embodiment etc., be within.Therefore, technical protection scope of the invention should be according to following following claims Book range is defined.

Claims (22)

1. a kind of controller switching equipment livewire work auxiliary device, which is characterized in that including:
Bendable wood;
The bendable wood is fixed into bendable wood fixing piece on utility poles;
On the bendable wood, support is connected to the Wire support part of electric wire on the electric pole;And
The lifting moving part of Wire support part described in independent-lifting,
The lifting moving part includes:
Bendable wood installation part is removably coupled on the bendable wood;
Actuator is mounted on the bendable wood installation part, Wire support is moved up and down after receiving power from the 2nd transmission device Part,
The bendable wood installation part includes:
Guide part is formed on bendable wood installation part, and the hollow guiding orifice moved up and down with guiding Wire support part,
The actuator includes:
Power transmission part, it includes:It is formed in end and is passed with the described 2nd to transmit rotary force from the 2nd transmission device The worm screw of the power lead-through of dynamic device occlusion;The worm screw wheel for engaging, thus linking with the worm screw and rotating with the worm screw;
Beam barrel takes turns with the worm screw combine on the same axis, is in linkage with the worm screw wheel and is rotated;And
Conveyer belt is crimped onto on beam barrel, and is connected with the Wire support part, to come by the driving of the 2nd transmission device The Wire support part is moved up and down,
At least one of multiple Wire support parts and the lifting moving part are by being movably disposed at the bendable The sliding moving member of wood left and right moves left and right.
2. controller switching equipment livewire work auxiliary device according to claim 1, which is characterized in that further comprise:
Move up and down the lifter of the bendable wood.
3. controller switching equipment livewire work auxiliary device according to claim 2, which is characterized in that
The lifter includes:
Electric wire rod installation part on the bendable wood fixing piece;And
On the electric wire rod installation part, after the power for receiving the 1st transmission device, the lifting of the bendable wood is moved up and down Actuator.
4. controller switching equipment livewire work auxiliary device according to claim 1, which is characterized in that
The Wire support part includes:
The main extension device moved up and down under the action of the lifting moving part;And
The prominent sub- extension device in the main extension device upper end.
5. a kind of controller switching equipment livewire work auxiliary device, which is characterized in that including:
Bendable wood;
The bendable wood is fixed into bendable wood fixing piece on utility poles;
On the bendable wood, support be connected to electric wire on the electric pole Wire support part and
The lifting moving part of Wire support part described in independent-lifting,
The lifting moving part includes:
Bendable wood installation part is removably coupled on the bendable wood;
Actuator is mounted on the bendable wood installation part, Wire support is moved up and down after receiving power from the 2nd transmission device Part,
The bendable wood installation part includes:
Guide part is formed on bendable wood installation part, and the hollow guiding orifice moved up and down with guiding Wire support part,
The actuator includes:
Power transmission part, it includes:It is formed in end and is passed with the described 2nd to transmit rotary force from the 2nd transmission device The worm screw of the power lead-through of dynamic device occlusion;The worm screw wheel for engaging, thus linking with the worm screw and rotating with the worm screw;
Beam barrel takes turns with the worm screw combine on the same axis, is in linkage with the worm screw wheel and is rotated;And
Conveyer belt is crimped onto on beam barrel, and is connected with the Wire support part, to come by the driving of the 2nd transmission device The Wire support part is moved up and down,
At least one of multiple described Wire support parts are under the action of the lifting moving part rotation that revolving part drives, rotation Go to the direction close to the electric pole, or the direction far from the electric pole.
6. controller switching equipment livewire work auxiliary device according to claim 5, which is characterized in that further comprise:
Move up and down the lifter of the bendable wood.
7. controller switching equipment livewire work auxiliary device according to claim 6, which is characterized in that
The lifter includes:
Electric wire rod installation part on the bendable wood fixing piece;And
On the electric wire rod installation part, after the power for receiving the 1st transmission device, the lifting of the bendable wood is moved up and down Actuator.
8. controller switching equipment livewire work auxiliary device according to claim 5, which is characterized in that
The Wire support part includes:
The main extension device moved up and down under the action of the lifting moving part;And
The prominent sub- extension device in the main extension device upper end.
9. a kind of controller switching equipment livewire work method, it includes bendable wood that this method, which utilizes,;The bendable wood is fixed on electric pole On bendable wood fixing piece;On the bendable wood, support is connected to multiple Wire supports of electric wire on the electric pole Part;And the controller switching equipment livewire work auxiliary device of multiple lifting moving parts of Wire support part described in independent-lifting,
The controller switching equipment livewire work method, which is characterized in that including:
The stage bendable wood being fixed on the electric pole;The electric wire is moved on the bendable wood Stage at the Wire support part;And
At least one stage for being moved to the separate electric pole in multiple Wire support parts of the electric wire is supported,
The stage that the electric wire is moved to the Wire support part includes:
It has installed on LP insulators to prevent the wire outer skin wrapped up outside the electric wire to be suspended to when moving, has been passed obtaining the 2nd Under the driving of the lifting moving part of dynamic device power, the Wire support part of the electric wire is supported to move up, by institute It states Wire support part and is placed into the stage installed above LP insulators;And
It dismantles and connects the electric wire and the binding component for having installed LP insulators, in the electric wire and described to have installed LP exhausted Space is formed between edge, and the wire outer skin is moved to the stage of the Wire support part along the electric wire.
10. controller switching equipment livewire work method according to claim 9, which is characterized in that including:It can described in moving up Curved wood or the Wire support part, by the electric wire far from the stage for having installed LP insulators on bolt cross-arm;It removes described Described on bolt cross-arm has installed LP insulators, and the stage of LP insulators is newly set to bolt cross-arm installation;
At least one of the multiple Wire support parts that will be far from the electric pole are moved to the electric pole, described in The new stage for setting LP insulators;And
The electric wire is moved to the new stage set on LP insulators from the Wire support part.
11. controller switching equipment livewire work method according to claim 9, which is characterized in that including:The electric wire is separate The stage for having installed LP insulators on bolt cross-arm;
Remove on the bolt cross-arm it is described LP insulators have been installed, the rank of LP insulators is newly set to bolt cross-arm installation Section;
At least one of the multiple Wire support parts that will be far from the electric pole are moved to the electric pole, described in The new stage for setting LP insulators;And
The electric wire is moved to the new stage set on LP insulators from the Wire support part.
12. controller switching equipment livewire work method according to claim 9, which is characterized in that including:Multiple electric wire branch Mobile operation of at least one of the support member far from the electric pole is installed by order to move left and right the bendable wood Sliding moving member moves left and right realization.
13. controller switching equipment livewire work method according to claim 9, which is characterized in that including:Far from the electric pole At least one of multiple Wire support parts be moved to stage of the electric pole.
14. controller switching equipment livewire work method according to claim 13, which is characterized in that including:Multiple electric wires At least one of support element close to the mobile operation of the electric pole is installed by order to move left and right the bendable wood Sliding moving member move left and right realization.
15. controller switching equipment livewire work method according to claim 9, which is characterized in that including:The controller switching equipment band Electric operation auxiliary device further includes the lifter for moving up and down the bendable wood.
16. a kind of controller switching equipment livewire work method, it includes bendable wood that this method, which utilizes,;The bendable wood is fixed on electric pole On bendable wood fixing piece;On the bendable wood, support is connected to multiple Wire supports of electric wire on the electric pole Part;And the controller switching equipment livewire work auxiliary device of multiple lifting moving parts of Wire support part described in independent-lifting,
The controller switching equipment livewire work method, which is characterized in that including:
The stage bendable wood being fixed on the electric pole;
The electric wire is moved to the stage at the Wire support part on the bendable wood;And
Support in multiple Wire support parts of the electric wire it is at least one rotation to far from the electric pole stage,
The stage that the electric wire is moved to the Wire support part includes:
It has installed on LP insulators to prevent the wire outer skin wrapped up outside the electric wire to be suspended to when moving, has been passed obtaining the 2nd Under the driving of the lifting moving part of dynamic device power, the Wire support part of the electric wire is supported to move up, by institute It states Wire support part and is placed into the stage installed above LP insulators;And
It dismantles and connects the electric wire and the binding component for having installed LP insulators, in the electric wire and described to have installed LP exhausted Space is formed between edge, and the wire outer skin is moved to the stage of the Wire support part along the electric wire.
17. controller switching equipment livewire work method according to claim 16, which is characterized in that including:It moves up described Bendable wood or the Wire support part, by the electric wire far from the stage for having installed LP insulators on bolt cross-arm;Remove institute State on bolt cross-arm it is described LP insulators have been installed, the stage of LP insulators is newly set to bolt cross-arm installation;
The rotation of at least one of multiple described Wire support parts of the electric pole be will be far to the electric pole, described in The new stage for setting LP insulators;And
The electric wire is moved to the new stage set on LP insulators from the Wire support part.
18. controller switching equipment livewire work method according to claim 16, which is characterized in that including:The electric wire is remote From the stage for having installed LP insulators on bolt cross-arm;
Remove on the bolt cross-arm it is described LP insulators have been installed, the rank of LP insulators is newly set to bolt cross-arm installation Section;
The rotation of at least one of multiple described Wire support parts of the electric pole be will be far to the electric pole, described in The new stage for setting LP insulators;And
The electric wire is moved to the new stage set on LP insulators from the Wire support part.
19. controller switching equipment livewire work method according to claim 16, which is characterized in that including:Multiple electric wires Rotary operation of at least one of the support element far from the electric pole be by order to move up and down the Wire support part by What the rotation of the revolving part of installation was realized.
20. controller switching equipment livewire work method according to claim 16, which is characterized in that including:Far from the electric wire At least one of multiple described Wire support parts of bar were rotated to the stage of the electric pole.
21. controller switching equipment livewire work method according to claim 20, which is characterized in that including:Multiple electric wires At least one of support element close to the rotary operation of the electric pole be by order to move up and down the Wire support part by What the rotation of the revolving part of installation was realized.
22. controller switching equipment livewire work method according to claim 16, which is characterized in that including:The controller switching equipment Livewire work auxiliary device further includes the lifter for moving up and down the bendable wood.
CN201580030649.0A 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device Active CN106463939B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR20140006513 2014-01-20
KR10-2014-0069760 2014-06-09
KR20140069760A KR101473820B1 (en) 2014-01-20 2014-06-09 Method for hot line work of power distribution equipment using thereof
PCT/KR2015/005794 WO2015190811A1 (en) 2014-06-09 2015-06-09 Auxiliary device for power distribution facility live-line working, and power distribution facility live-line working method using same

Publications (2)

Publication Number Publication Date
CN106463939A CN106463939A (en) 2017-02-22
CN106463939B true CN106463939B (en) 2018-09-11

Family

ID=52679199

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201580030649.0A Active CN106463939B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device
CN201580030707.XA Active CN106463940B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it
CN201580030710.1A Active CN106463941B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method
CN201580030633.XA Active CN106463938B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201580030707.XA Active CN106463940B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it
CN201580030710.1A Active CN106463941B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method
CN201580030633.XA Active CN106463938B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method

Country Status (2)

Country Link
KR (12) KR20150087783A (en)
CN (4) CN106463939B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456520A (en) * 2020-03-22 2020-07-28 徐宏坤 Distribution line building device and installation method

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101631916B1 (en) * 2015-09-14 2016-06-20 탑이앤지 주식회사 Method for changing power distribution line in hot line
KR101616484B1 (en) 2015-09-21 2016-04-28 (주)우신전기기술사사무소 Method for changing power distribution line in hot line
CN106545213A (en) * 2015-09-23 2017-03-29 国网辽宁省电力有限公司本溪供电公司 A kind of adjustable bearing pole girdle ring
CN107288406A (en) * 2016-03-30 2017-10-24 国网辽宁省电力有限公司本溪供电公司 A kind of adjustable bearing pole girdle ring
CN105762702B (en) * 2016-04-01 2017-08-04 中国南方电网有限责任公司超高压输电公司南宁局 The method of replacing ± 800kV DC power transmission line L insulator strings
KR101757195B1 (en) * 2016-10-11 2017-07-11 주식회사 성진 Stationary Auxiliary Arm Apparatus and Method Using In Uninterruptible Power Distribution Work
CN107437712A (en) * 2016-12-30 2017-12-05 广州程科电子科技有限公司 A kind of durable electric insulation post
KR101864309B1 (en) 2017-01-19 2018-06-05 삼성기술감리 주식회사 Apparatus for changing power distribution line in hot line
KR101889080B1 (en) 2017-02-20 2018-08-16 주식회사진흥기업 live jumper wire wirelessly disconnect and connect method
CN107086488A (en) * 2017-04-28 2017-08-22 国网山东省电力公司青岛供电公司 A kind of charged for replacement overhead transmission line straight line pole cross-arm, insulator arrangement
CN107039919A (en) * 2017-05-05 2017-08-11 国网江苏省电力公司常州供电公司 A kind of wire-binding device
CN110088171A (en) 2017-10-12 2019-08-02 株式会社吴羽 The method for continuous production of continuous polymerization unit and polymer
CN108321753A (en) * 2017-12-28 2018-07-24 青岛九州汇德新能源有限公司 A kind of solar energy system power supply support device
CN108155601A (en) * 2018-01-08 2018-06-12 国网辽宁省电力有限公司鞍山供电公司 A kind of method that on-load straight line pole changes tension-resistant rod
CN108683122B (en) * 2018-06-08 2020-07-28 国网山东省电力公司青岛供电公司 Auxiliary device and method for sharing straight line rod of corridor in live migration
KR101955155B1 (en) * 2018-07-11 2019-03-06 대원전기 주식회사 Uninterruptible power method and Indirect live lifting device for Electronic pole for power line
KR102112471B1 (en) * 2018-11-30 2020-05-19 한국전력공사 Method for hot line work
KR20200072000A (en) 2018-12-12 2020-06-22 주식회사 중앙백신연구소 A promoter being expressed in Kluyveromyces marxianus strain and the gene expression system using thereof
KR102173375B1 (en) * 2020-03-30 2020-11-03 김정호 Uninterruptible power method and lndirect live lifting device for Electronic polefor power line
KR102173378B1 (en) * 2020-06-10 2020-11-03 김정호 electric power line device for Uninterruptible power method
KR102173377B1 (en) * 2020-06-10 2020-11-03 김정호 Uninterruptible power method of utilization electric power line device
CN111987639A (en) * 2020-08-04 2020-11-24 中国电建集团河南工程有限公司 Construction method for replacing tension porcelain insulator
KR102240478B1 (en) * 2020-09-22 2021-04-16 대원전기 주식회사 Insulator clip for indirect live wire and LP insulator replacement indirect live wire method using the same
KR102236410B1 (en) * 2020-10-14 2021-04-05 이종학 Wire installing method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510029A (en) * 2011-11-22 2012-06-20 上海市电力公司 Ground potential electrified bar cutter device changing method
JP5306031B2 (en) * 2009-04-13 2013-10-02 中国電力株式会社 Indirect hot tool support
CN103510739A (en) * 2013-10-24 2014-01-15 国网湖南省电力公司带电作业中心 Multifunctional combinatorial insulation cross arm

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4188477B2 (en) * 1999-02-04 2008-11-26 株式会社中電工 How to remove an imaginary ground wire
KR20050103700A (en) * 2004-04-27 2005-11-01 양희성 A
KR100934083B1 (en) * 2007-11-05 2009-12-24 양희성 Jumper Wire Fixture
FI125939B (en) * 2010-12-30 2016-04-15 Meclimb Oy Method and apparatus for transporting tools to the work site along an elongate piece and use of the apparatus
KR101218710B1 (en) 2011-01-31 2013-01-09 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101106236B1 (en) * 2011-06-28 2012-01-19 주식회사 지이플러스 Apparatus and method for live wire using trane truck
KR101243860B1 (en) * 2012-04-27 2013-03-20 임용호 The changing device of lp insualtor for power distribution line
KR101344289B1 (en) * 2012-04-27 2013-12-23 임용호 The pole fittings changing method use lifting apparatus
KR101254577B1 (en) * 2012-11-21 2013-04-15 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101275111B1 (en) * 2013-02-13 2013-06-17 임용호 Replacement method for power distribution equipment of direct live wire for double insulation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5306031B2 (en) * 2009-04-13 2013-10-02 中国電力株式会社 Indirect hot tool support
CN102510029A (en) * 2011-11-22 2012-06-20 上海市电力公司 Ground potential electrified bar cutter device changing method
CN103510739A (en) * 2013-10-24 2014-01-15 国网湖南省电力公司带电作业中心 Multifunctional combinatorial insulation cross arm

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456520A (en) * 2020-03-22 2020-07-28 徐宏坤 Distribution line building device and installation method
CN111456520B (en) * 2020-03-22 2021-04-02 徐宏坤 Distribution line building device and installation method

Also Published As

Publication number Publication date
KR20150087782A (en) 2015-07-30
KR101473822B1 (en) 2014-12-18
CN106463941B (en) 2018-09-07
KR101473820B1 (en) 2014-12-18
KR20150087779A (en) 2015-07-30
KR101473823B1 (en) 2014-12-18
CN106463938B (en) 2018-09-07
CN106463938A (en) 2017-02-22
CN106463941A (en) 2017-02-22
KR20150087780A (en) 2015-07-30
KR101473821B1 (en) 2014-12-18
KR20150087781A (en) 2015-07-30
CN106463940B (en) 2018-09-11
KR20150087786A (en) 2015-07-30
CN106463939A (en) 2017-02-22
CN106463940A (en) 2017-02-22
KR20150087785A (en) 2015-07-30
KR20150087784A (en) 2015-07-30
KR20150087783A (en) 2015-07-30
KR101592964B1 (en) 2016-02-25

Similar Documents

Publication Publication Date Title
CN106463939B (en) Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device
KR101663458B1 (en) Apparatus for and Method of Making Cable Raid Grommet
DE102009041982A1 (en) Method for cable assembly in the tower of a wind turbine
CN104167687A (en) Tool for live-line replacement of suspension insulator and using working method thereof
AT510762A1 (en) Cable equipment, in particular prospector equipment for a stage or dgl.
KR101848936B1 (en) electric supply equipment replacement apparatus using a crane
CN108002269B (en) A kind of simple pole type transformer lifting device
CN109955925A (en) A kind of climbing level robot
DE102017128143B3 (en) Maintenance platform for maintenance of installations in a tower for a wind turbine and arrangement of a maintenance platform
CN106946088B (en) High-voltage grounding wire access device
CN202678840U (en) Self-help hand-operated hanging basket for high-voltage wire suspended working
CN105071307B (en) A kind of device of auxiliary connection and the method that wiring is carried out using the device
CN205681011U (en) Maintenance of overhead transmission line rope ladder head combination unit
CN108695763A (en) A kind of climbing cable safety foot control
CN104242154B (en) Length-width-adjustable quick take-up and pay-off device applicable to different models of cable reels and method for applying length-width-adjustable quick take-up and pay-off device
CN207572855U (en) A kind of power ampere loads line apparatus
CN102709849A (en) Manual multifunctional wire tightening device and wire tightening method
CN105042301A (en) Installing structure of transformer substation surveillance camera convenient to maintain
CN210763576U (en) Multifunctional combined wire pay-off rack
CN205141526U (en) Lead wire fixing device
CN210001315U (en) cable winder
CN204858419U (en) Transmission line hank knotting in advance twines work platform that is qualified for next round of competitions
CN203382469U (en) Outdoor bus operation lifting machine of transformer substation
CN110593635A (en) Lifting cross arm for live-wire work and use method thereof
JP6000857B2 (en) Money wheel for transfer work and transfer work method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant