CN106463938B CN201580030633.XA CN201580030633A CN106463938B CN 106463938 B CN106463938 B CN 106463938B CN 201580030633 A CN201580030633 A CN 201580030633A CN 106463938 B CN106463938 B CN 106463938B
Authority
CN
China
Prior art keywords
cross arm
mentioned
interim wooden
stage
wooden cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201580030633.XA
Other languages
Chinese (zh)
Other versions
CN106463938A (en
Inventor
崔敏洙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Turk Su
Dawning Electronic Communication Engineering (strain)
Original Assignee
Turk Su
Dawning Electronic Communication Engineering (strain)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Turk Su, Dawning Electronic Communication Engineering (strain) filed Critical Turk Su
Priority claimed from PCT/KR2015/005797 external-priority patent/WO2015190814A1/en
Publication of CN106463938A publication Critical patent/CN106463938A/en
Application granted granted Critical
Publication of CN106463938B publication Critical patent/CN106463938B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B17/00Insulators or insulating bodies characterised by their form
    • H01B17/14Supporting insulators
    • H01B17/16Fastening of insulators to support, to conductor, or to adjoining insulator
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers
    • H02G7/205Installation of electric cables, extending along a pole

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

Illustrate the invention in relation to controller switching equipment livewire work method.The controller switching equipment livewire work method of the present invention:Include to install newly set the stage of electric pole, interim wooden cross arm is fixed on the new stage set on electric pole, electric wire is fixed to the stage for the wire rack being mounted on interim wooden cross arm, moves up interim wooden cross arm or wire rack on the electrical wiring between having set electric pole, stage for placing the wires on the predetermined mounting height of PIN cross-arms, the stage that PIN cross-arms are installed to the new stage for setting electric pole, are moved to PIN cross-arms by stage that interim wooden cross arm or wire rack are moved down to PIN cross-arms direction, by the electric wire for being connected to wire rack.

Description

Controller switching equipment livewire work method
Technical field
The present invention is the related content of controller switching equipment livewire work method, be about using controller switching equipment livewire work with auxiliary Device is helped newly to set the content of electric pole.
Background technology
The top of electric pole can generally install cross-arm, and cross-arm is insulated by horizontal iron cross arm and 3 on iron cross arm Son composition.3 phase electric wires are connected respectively to 3 insulators by binder.
When safeguarding mounted electric pole, cross-arm, insulator, old insulator is replaced with new insulator, is replaced with new cross-arm Old cross-arm is replaced with new electric pole with regard to originals such as the extension angle increases of electric wire caused by the change in location of electric pole or electric pole Cause has PIN cross-arms replacing with the operations such as interior cross-arm.Also have and set newly setting for electric pole etc. because the extended position change of electric wire etc. is new The operation of controller switching equipment.
These work are the security risks that the electric wire of electriferous state moves up and down, therefore has certain.So in order to Security risk is reduced, livewire work is preferably carried out, is just developing various devices and technology.
Related online technique Korean published Patent announce No. 2006-0082713 (2006.7.19. is disclosed, Denomination of invention:Have the distribution line operation multi-axis robot of 2 dimensions and the comprehensive driving method of 3 dimensions) it is illustrated.
Invention content
It solves the problems, such as
The object of the present invention is to provide staff to automatically move electric wire simultaneously in the position far from electric wire using electric power remote The method of the new controller switching equipment livewire work for setting electric pole, to make, controller switching equipment livewire work is safer, successfully carries out.
Solution to the problem
The controller switching equipment livewire work method of the present invention:Include newly to set electric wire on the electrical wiring between having set electric pole Interim wooden cross arm is fixed to the above-mentioned new stage set on electric pole, said wires is connected to mounted on upper by the stage of bar It states the stage on the wire rack on interim wooden cross arm, move up above-mentioned interim wooden cross arm or said wires holder, it will be above-mentioned Above-mentioned PIN cross-arms are installed to the above-mentioned new rank set on electric pole by stage that electric wire is placed on the predetermined installation site of PIN cross-arms Section, by stage that above-mentioned interim wooden cross arm or said wires holder are moved down to above-mentioned PIN cross-arms direction, will be connected to it is above-mentioned The stage that the said wires of wire rack are moved to above-mentioned PIN cross-arms.
It is that the 1st lifting moving portion receives the 1st driver by the ideal method that above-mentioned interim wooden cross arm moves up or down Power after, move up and down above-mentioned interim wooden cross arm.
It is that the 2nd lifting moving portion receives the 2nd driver by the best approach that said wires holder moves up or down After power, said wires holder is moved up and down.
Said wires are connected to the stage on said wires holder, said wires is preferably included and is inserted into said wires branch In the state of internal stent on frame, the process of carrier openings is closed with sticking department;Said wires are moved to above-mentioned PIN cross-arms Stage, preferably include the process for the outside that said wires are pulled out to above-mentioned holder by above-mentioned opening.
Above-mentioned PIN cross-arms, preferably take the horizontally arranged of common cross-arm.
Invention effect
Controller switching equipment livewire work auxiliary device according to the present invention utilizes the electronic of the 1st driver or the 2nd driver Power automatically adjusts the height of interim wooden cross arm, the height of each wire rack, the electric wire height being fixed on wire rack, can be light Pine carries out newly setting electric pole.
According to the present invention, the 1st driver or the 2nd driver can use electric drill, the electricity for being generally used for replacing controller switching equipment The electric tools such as dynamic screwdriver, staff can be easily real without the electric device needed for the mobile wire rack of specially preparation It is existing.
According to the present invention, the height of interim wooden cross arm and wire rack entirety can be not only adjusted with multistage, by only up and down The sub- extension that electric wire fixing segments are formed in mobile wire rack, you can 3 sections adjust electric wire fixing segments or electric wire height.
According to the present invention, can automatic or manual adjust electric wire fixing segments or electric wire height, adjustment length is up to vertical extension The length in portion, the length of main extension, the sum of the length of sub- extension adjust interim wooden cross arm and wire rack by multistage Highly, close to after target fulcrum, by finely tuning sub- extension, electric wire fixing segments are more accurately placed in object height.
According to the present invention, staff selectively adjusts interim wooden cross arm on one side according to operating environment or convenience Highly, the height of wire rack whole height, sub- extension can be stablized, easily be temporarily placed within electric wire into being about to electric wire on one side Operation on holder ensures PIN cross-arms being installed to the new operation for setting space needed for electric pole.
According to the present invention, using the 1st driver or the 2nd driver, staff can be long-range with electric wire remote position Electric wire is moved to the top of PIN cross-arms, can more easily control ensure newly to set the livewire work space needed for electric pole, can be reduced new If staff leads to the danger of safety accident with line contacts when electric pole.
According to the present invention, when the different LP insulators of multiple height are installed, using the 2nd lifting moving portion, insulated according to LP The height of son, individually lifts wire rack, can easily carry out operation, when using live-wire work tool and utensil difficulty, also may be used The above lower adjustment uses position, and operation is made to be more prone to.
According to the present invention, multiple wire racks are mounted in the state of interim wooden cross arm, move up interim wooden cross arm, can The trouble that wire rack moves up one by one is avoided, all wire racks can be moved up simultaneously with identical displacement.
Description of the drawings
Fig. 1 is the perspective sketch map of the controller switching equipment livewire work auxiliary device of one embodiment of the invention.
Fig. 2 is the interim wooden cross arm fixed part of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion.
Fig. 3 is the lateral concept map of the 1st lifting moving portion internal structure of one embodiment of the invention.
Fig. 4 to illustrate the invention one embodiment the 1st driving portion operation concept map.
Fig. 5 is the wire rack of one embodiment of the invention and the perspective sketch map in the 2nd lifting moving portion.
Fig. 6 to illustrate the invention one embodiment the 2nd lifting moving portion operation concept map.
Fig. 7 to illustrate the invention one embodiment into electric wire fixing segments be inserted into electric wire process concept map.
The flow chart of Fig. 8 controller switching equipment livewire work methods of one embodiment to illustrate the invention.
Fig. 9 is to illustrate electric between having set electric pole in the controller switching equipment livewire work method of one embodiment of the invention The concept map of electric pole process is newly set on line circuit.
Figure 10 is to illustrate interim wooden cross arm being fixed in the controller switching equipment livewire work method of one embodiment of the invention The new concept map for setting electric pole process.
Figure 11 is to illustrate wire rack to electric wire side in the controller switching equipment livewire work method of one embodiment of the invention To the concept map for the process of moving up.
Figure 12 is in the controller switching equipment livewire work method of one embodiment of the invention, and explanation will be wired to and be mounted on The concept map of the wire rack process of interim wooden cross arm.
Figure 13 is to illustrate wire rack to moving up in the controller switching equipment livewire work method of one embodiment of the invention It is dynamic, make the concept map for the process that electric wire is placed on the predetermined mounting height of PIN cross-arms.
Figure 14 is to illustrate PIN cross-arms being fixed on newly in the controller switching equipment livewire work method of one embodiment of the invention If the concept map of electric pole process.
Figure 15 is to illustrate wire rack is horizontal to PIN in the controller switching equipment livewire work method of one embodiment of the invention The LP insulators direction of load moves down the concept map of process.
Figure 16 is to illustrate to move electric wire to LP insulators in the controller switching equipment livewire work method of one embodiment of the invention The concept map of dynamic process.
Figure 17 is to illustrate to set interim wooden cross arm from newly in the controller switching equipment livewire work method of one embodiment of the invention The concept map of electric pole disassembly process.
Specific implementation mode
The particular content to carry out an invention
With reference to the drawing in attachment, illustrate the embodiment of the controller switching equipment livewire work method of the present invention.During this, it is It conveniently clearly demonstrates, the thickness of the line in drawing or the size of component etc. may compare exaggeration.
Aftermentioned term is to consider the function in the present invention and the term that defines, according to user, operating personnel purpose or Convention may be different.Therefore, these terms should be defined based on this detail entire content.
First, illustrate the controller switching equipment livewire work auxiliary device 500 of the present invention.
Fig. 1 is the perspective sketch map of the controller switching equipment livewire work auxiliary device of one embodiment of the invention.
With reference to figure 1, controller switching equipment livewire work of the invention is horizontal by interim wooden cross arm 510, interim wood with auxiliary device 500 Carry on a shoulder pole fixed part 520, the 1st lifting moving portion 530, wire rack 540, the 2nd lifting moving portion 550 composition.
Interim wooden cross arm 510, which is fixed on, newly to be set on electric pole 13, and wire rack 540 and is connected on wire rack 540 Electric wire 30 formed support bear a heavy burden frame.The interim wooden cross arm 510 of one embodiment of the invention by horizontal extension portion 511, hang down Straight extension 513, holder 515 form.
Horizontal extension portion 511 is that horizontal direction extends.Therefore, vertical extensions 513 are fixed on and newly set electric pole In the state of 13, horizontal extension portion 511 newly sets the PIN iron cross arms on electric pole 13 and is arranged side by side with will be mounted on.Horizontal water One or more wire racks 540 are installed on flat extension 511.
Vertical extensions 513 are connected to the bottom in horizontal extension portion 511.Vertical extensions 513 along it is new set electric pole 13 with Vertical direction extends, and is fixed on by interim wooden cross arm 520 and is newly set on electric pole 13.
Holder 515 is rod shape, and inclination is installed between horizontal extension portion 511 and vertical extensions 513, and connects level Extension 511 and vertical extensions 513.The top of holder 515 connects with the chaining part 516 mounted on 511 end of horizontal extension portion It connects, keeps its rotatable, the lower part of holder 515 is connect with vertical extensions 513.By above-mentioned connection structure, holder 515 with On the basis of the interconnecting piece of vertical extensions 513, support level extension 511.
The method that chaining part 516 is installed to horizontal extension portion 511:Chaining part 516 is inserted into level frame interconnecting piece 521 After end, the bolts fitting such as lifting bolt is run through to the side of chaining part 516, chaining part 516 and horizontal extension portion 511 is tight It is close to and is connected together.
Fig. 2 is the interim wooden cross arm fixed part of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion;Fig. 3 For the lateral concept map of the 1st lifting moving portion internal structure of one embodiment of the invention;Fig. 4 implementations to illustrate the invention The concept map of the 1st driving portion operation of example.
Interim wooden cross arm 510 or the 1st lifting moving portion 530 are fixed on by interim wooden cross arm fixed part 520 newly sets electric pole 13.With reference to figure 2, the interim wooden cross arm fixed part 520 of one embodiment of the invention is by interim wooden cross arm interconnecting piece 521 and electric pole Interconnecting piece 523 forms.
Interim wooden cross arm interconnecting piece 521 is the part being connect with interim wooden cross arm 510 or the 1st lifting moving portion 530.Temporarily Wooden cross arm interconnecting piece 521, which possesses, can load and unload interim wooden cross arm 510 or the 1st interconnecting piece 531a in the 1st lifting moving portion 530 2nd interconnecting piece, 522 structure.
In one embodiment of the invention, the 1st interconnecting piece 531a longitudinally (upper and lower) can extend, and lower part is in the opening wider than top Shape, the 2nd interconnecting piece 522 are the appearance to 530 side of the 1st lifting moving portion outer interconnecting piece outstanding, and the width of end can pass through The lower part of 1st interconnecting piece 531a, but top can not be passed through.
The 2nd interconnecting piece 522 is inserted into the lower part of 1st interconnecting piece 531a, the lifting of interim wooden cross arm 510 or the 1st is lifted in releasing The external force of moving portion 530, because of interim wooden cross arm 510 or the weight in the 1st lifting moving portion 530, the 1st interconnecting piece 531a is to moving down It is dynamic, so that the 2nd interconnecting piece 522 is located at the top of the 1st interconnecting piece 531a.At this point, the end of the 2nd interconnecting piece 522 hangs over the 1st interconnecting piece The top of 531a.By above-mentioned assembling, interim wooden cross arm 510 or the 1st lifting moving portion 530 can be connected mounted in interim wooden cross arm On portion 521.
Electric pole interconnecting piece 523 is secured to the new part for setting electric pole 13.Electric pole interconnecting piece 523 and interim wooden cross arm Interconnecting piece 521 connects, and possesses and may be mounted to new set on electric pole 13 or from the clip structure dismantled thereon.
General clip is the accessory that the 1st accessory is connected to the 2nd accessory, can encase the 2nd accessory " ㄈ " shape or " C " Shape or band-like, there are the connectors such as bolt or nut in end.Although the electric pole interconnecting piece of one embodiment of the invention 523 be clip structure, newly sets electric pole 13 but if can be fixed to interim wooden cross arm 510, not limit structure and appearance.
It, will be on interim wooden cross arm 510 in the state that 1st lifting moving portion 530 is to be fixed on interim wooden cross arm fixed part 520 Lower movement.With reference to 2~Fig. 4 of figure, the 1st lifting moving portion 530 of one embodiment of the invention is by electric pole mounting portion 531 and the 1st Driving portion 533 forms.
In the state that electric pole mounting portion 531 is to be mounted on interim wooden cross arm fixed part 520, formation can be supported including hanging down The frame of interim wooden cross arm 510 and 30 weight of electric wire including straight extension 513.531 side of electric pole mounting portion has and can face When wooden cross arm fixed part 520 on the 1st interconnecting piece 531a that loads and unloads.Have and the 1st interconnecting piece 531a on interim wooden cross arm fixed part 520 The 2nd interconnecting piece 522 being spirally connected.It, can be by the 1st lifting moving by being spirally connected for the 1st interconnecting piece 531a and the 2nd interconnecting piece 522 Portion 530 is installed on interim wooden cross arm fixed part 520.By releasing being spirally connected for the 1st interconnecting piece 531a and the 2nd interconnecting piece 522, 1st lifting moving portion 530 and interim wooden cross arm fixed part 520 can be separated.
Vertical extensions 513 are installed so that it can move up and down in the offside of electric pole mounting portion 531.Installation is vertically prolonged When long portion 513, electric pole mounting portion 531 is run through up and down, so that it is coordinated the movement of the 1st driving portion 533, move up and down. To prevent from hindering the movement of vertical extensions 513, the electricity connecting with vertical extensions 513 with the friction of electric pole mounting portion 531 Line bar mounting portion 531 is mounted with multiple rollers 532 in a manner of being arranged above and below.When vertical extensions 513 are upward/lower mobile, rolling Son 532 keeps the state contacted with vertical extensions 513, coordinates the movement of vertical extensions 513, to side or reverse rotation.
1st driving portion 533 is mounted on electric pole mounting portion 531, will interim wood after the power for receiving the 1st driver 41 Cross-arm 510 moves up and down.1st driver 41 can be applicable in electric drill, the electric screw driver etc. replaced and generally used when controller switching equipment The driving devices such as electric tool or motor.1st driving portion 533 of one embodiment of the invention is by the 1st driving section 534, the 1st beam barrel 537, the 1st transmission belt 538 forms.
1st driving section 534 is to be rotated to drive by the 1st driver 41.In one embodiment of the invention, the 1st driving section 534 It is made of the 1st worm screw 535 and the 1st worm gear 536.
There is the 1st power receiving portion 535a being connect with the 1st driver 41 in the end of 1st worm screw 535, receives the 1st driver 41 rotary powers transmitted.1st worm gear 536 is engaged with the 1st worm screw 535, is separately mounted on the 1st beam barrel 537 and transmission shaft, with The linkage of 1st worm screw 535 is rotated.Using electric tool as the 1st driver 41 in use, the 1st worm screw 535 with the 1st by swashing The rotation linkage for encouraging device 41 is rotated, and the 1st worm gear 536 is then rotated in deceleration by the rotation linkage with the 1st worm screw 535, Increase rotary force simultaneously.
As described above, according to the turbine structure for having the 1st worm screw 535 and the 1st worm gear 536, power can only be from the 1st worm screw 535 transmit to the 1st worm gear 536, can not be transmitted from the 1st worm gear 536 to the 1st worm screw 535.That is, imposing rotation to the 1st worm gear 536 Power, can not be such that the 1st worm screw 535 rotates, and the 1st worm gear 536 will not rotate.
1st worm gear 536 is connect by the 1st beam barrel 537 and the 1st transmission belt 538 with interim wooden cross arm 510, according to above-mentioned Worm gear arrangement can prevent from making interim wooden cross arm 510 move down because of the weight such as interim wooden cross arm 510 and electric wire 30.
The 1st transmission belt 538 is rolled or unlocked to 1st beam barrel 537, to side or reverse rotation, by the 1st driving section 534.1st Beam barrel 537 is the cylindrical structure that can batch the 1st transmission belt 538, is connected on transmission shaft with the 1st worm gear 536.
1st transmission belt 538 will be rolled to the 1st beam barrel 537, and end is connected to interim wooden cross arm 510.1st transmission belt 538 can To be the general transmission belt of flat rectangle or linear section, the linear accessories such as cable, cable wire can also be used.1st transmission belt, 538 end The connector and interim wooden cross arm 510 that end can be connected and be detached by hook, connector (fitt ing), buckle, spiro connecting piece etc. into Row connection.
1st driver 41 is rotated with the state that its end is connect with the 1st power receiving portion 535a to side, rotary power It is transferred to the 1st beam barrel 537 by the 1st driving section 534, the 1st beam barrel 537 will while rolling the 1st transmission belt 538 to side rotation The interim wooden cross arm 510 being connect with 538 end of the 1st transmission belt is pulled upwardly.If making the 1st driver 41 reversely rotate, the 1st axis Cylinder 537 also reversely rotates, and unlocks interim wooden cross arm 510 while the 1st transmission belt 538 and declines.
The safety position limiter 539 for limiting interim wooden cross arm 510 and moving down can be added in 510 bottom of interim wooden cross arm.This In invention one embodiment, safety position limiter 539 is the banded structure with certain length, end and interim wooden cross arm 510 Connection.Safety position limiter 539 can be connected with as the 1st transmission belt 538 by hook, connector (fitting), buckle, spiro connecting piece etc. The connector for connecing and detaching is attached with interim wooden cross arm 510.
With reference to 1~Fig. 4 of figure, the controller switching equipment livewire work of one embodiment of the invention is in auxiliary device 500, interim wood Cross-arm 510 is attached by the 1st lifting moving portion 530 and interim wooden cross arm fixed part 520.That is, interim wooden cross arm fixed part 520 are fixed to by the 1st lifting moving portion 530 and interim wooden cross arm fixed part 520 and newly set electric pole 13.
But controller switching equipment livewire work of the invention is in auxiliary device 500, if the 1st lifting moving portion 530 can only Interim wooden cross arm 510 is lifted, is not necessarily intended to be mounted between interim wooden cross arm 510 and interim wooden cross arm fixed part 520.That is, facing When wooden cross arm 510 not by the 1st lifting moving portion 530, but be directly installed to by interim wooden cross arm fixed part 520 and newly set electricity In line bar 13;It is installed not between interim wooden cross arm 510 and interim wooden cross arm fixed part 520 in 1st lifting moving portion 530 To the other positions for newly setting electric pole 13, the lifting of interim wooden cross arm 510 is controlled.
Fig. 5 is the wire rack of one embodiment of the invention and the perspective sketch map in the 1st lifting moving portion;Fig. 6 is to illustrate this The concept map of the 1st lifting moving portion operation of invention one embodiment;Fig. 7 one embodiment to illustrate the invention it is solid to electric wire Determine the concept map that electric wire process is inserted into portion.
Wire rack 540 mounted on the support of the state of interim wooden cross arm 510 to be connected to the new electric wire set on electric pole 13 30.With reference to figure 5, the wire rack 540 of one embodiment of the invention is made of extension 541 and electric wire fixing segments 545.
Extension 541 is extended structure to pass through the 2nd lifting moving portion 550 mounted on horizontal extension portion 511 up and down It moves up and down.The extension 541 of one embodiment of the invention is by main extension 542, sub- extension 543,544 groups of fixed part At.
Main extension 542 is connect with lifting moving portion 550, after the power for receiving the 2nd driver 42, is moved by the 2nd lifting Dynamic portion 550 moves up and down.Sub- extension 543 includes isolation material, is mounted on the main extension of cylindrical shape in the way to insert Bottom inside 542 makes it that can be moved to the top of main extension 542.
The sub- extension 543 moved up is fixed on main extension 542 by fixed part 544 and extension 541.It is fixed Portion 544 can be used rotary fixing device, run through device through sub- extension 543 and main extension 542.
When fixed part 544 is using rotary fixing device, son is prolonged by way of rotating fixed part 544 to side Long portion 543 is fixed on main extension 542, and the connection of sub- extension 543 and main extension 542 can be released by reversely rotating.Such as Fruit has fixed part 544, after sub- extension 543 is moved to object height, by with 544 stator extension 543 of fixed part Process adjust the length of extension 541 manually.
If without fixed part 544, screw bolt and nut is set in the interconnecting piece of sub- extension 543 and main extension 542, is led to Cross the mode for rotating sub- extension 543 to side, sub- extension 543 be fixed on main extension 542, make its can not on move down It is dynamic;The connection of sub- extension 543 and main extension 542 can be released by reversely rotating sub- extension 543.
Electric wire fixing segments 545 be install electricity lines 30 part, be mounted on sub- extension 543 top.Electric wire fixing segments 545 will Electric wire 30 is tightly attached on wire rack 540.With reference to figure 7, the electric wire fixing segments 545 of one embodiment of the invention are by holder 546 and sticking department 548 form.
Holder 546 is attached with extension 541, and have can supply lines 30 by opening 546a.Sticking department 548 with Holder 546 is attached, switch opening 546a.In one embodiment of the invention, 546a is in 546 top of holder, sticking department for opening 548 are mounted on one end of holder 546, rotatable.
When sticking department 548 is rotated to side, the other end that sticking department 548 hangs over holder 546 simultaneously closes off opening 546a. When (with reference to figure 5) reversely rotates sticking department 548, the other end of the sticking department 548 far from holder 546 opens simultaneously opening 546a. Electric wire 30 is inserted into electric wire fixing segments by (with reference to figure 7) as described above, while by operating the switch opening 546a of sticking department 546 545 are fixed, or electric wire 30 is removed from electric wire fixing segments 545.
It is mounted with lower roller 547 on holder 546, it can be made to be rotated in specified position, is mounted on sticking department 548 Top roller 549 can be such that it is rotated in specified position.The insertion 546 inside sticking department 548 of holder of electric wire 30 is locked Under state, the outside of electric wire 30 is contacted with lower roller 547 and top roller 549.That is, electric wire 30 is being inserted into electric wire fixing segments In the state of 545, electric wire 30 is in rolling contact with electric wire fixing segments 545.
It therefore, can when relative displacement occurring during replacing controller switching equipment, between electric wire fixing segments 545 and electric wire 30 It prevents electric wire 30 from being injured by electric wire fixing segments 545, the connection status for keeping electric wire fixing segments 545 and electric wire 30 can be stablized, simultaneously It can ensure the smooth movement of electric wire fixing segments 545 or electric wire 30.
2nd lifting moving portion 550 moves up and down wire rack 540.2nd lifting moving portion 550 can individually lift each electric wire Holder 540.Therefore, the quantity in the 2nd lifting moving portion 550 is determined by the quantity of wire rack 540.With reference to figure 6, the present invention the 2nd 2nd lifting moving portion 550 of embodiment is made of 551 and the 1st driving portion 553 of interim wooden cross arm mounting portion.
Interim wooden cross arm mounting portion 551 is mounted on horizontal extension portion 511.There is folder on interim wooden cross arm mounting portion 551 Minor structure is connected in horizontal extension portion 511, and can be loaded and unloaded.Clip structure in relation to interim wooden cross arm mounting portion 551 can refer to 523 related description of electric pole interconnecting piece, is not repeated herein.
There is guide wire rack 540 to move up and down to lead on the interim wooden cross arm mounting portion 551 of one embodiment of the invention Rail 552.It is lifted, is had on guide rail 552 extended hollow up and down with being inserted into the state inside guide rail 552 in order to make wire rack 540 Guide-track groove 552a.
If lifting moving portion 550 can be fixed in horizontal extension portion 511, interim wooden cross arm mounting portion 551 includes suitable Clip structure on interim wooden cross arm fixed part 520 or the structure different from interim wooden cross arm fixed part 520, are not limited to spy Fixed structure and shape.
2nd driving portion 553 is mounted on interim wooden cross arm mounting portion 551, will be electric after the power for receiving the 2nd driver 42 Line bracket 540 moves up and down.2nd driver 42 is identical as the 1st driver 41, can use general when replacing controller switching equipment operation The driving devices such as the electric tools such as the electric screw driver used or motor.2nd driving portion 553 of the 2nd embodiment of the invention is by the 2nd Driving section 554, the 2nd beam barrel 557, the 1st transmission belt 558 composition.
2nd driving section 554 is to be rotated to drive by the 2nd driver 42.In one embodiment of the invention, the 2nd driving section 554 It is made of the 2nd worm screw 555 and the 2nd worm gear 556, there is the 2nd power receiving portion being connect with the 2nd driver 42 in 555 end of the 2nd worm screw 555a。
1st biography of the 2nd driving section 554, the 2nd beam barrel 557, the 2nd band 558 and the 1st driving portion 533 on the 2nd driving portion 553 Dynamic portion 534, the 1st beam barrel 537, the structure of the 1st transmission belt 538 are identical, omit related description herein.
According to the worm gear arrangement that the 2nd worm screw 555 and the 2nd worm gear 556 form, it can prevent the weight because of electric wire 30 etc. from causing Wire rack 540 moves down.In the state that the end of 2nd driver 42 is connect with the 2nd power receiving portion 555a, by by 2 drivers 42 pull up or move down wire rack 540 to side or reverse rotation.
Controller switching equipment livewire work auxiliary device 500 according to the present invention is swashed using above-mentioned 1st driver 41 or the 2nd The power of device 42 is encouraged, the height of interim wooden cross arm 510, the height of wire rack 540, frame can be automatically adjusted in wire rack 540 On electric wire 30 height.
It illustrates further:Using the 1st driver 41, the 1st movement is carried out, makes interim wooden cross arm 510 and mounted on facing When wooden cross arm 510 on wire rack 540 closer to or far from electric wire 30;Using the 2nd driver 42, the 2nd movement is carried out, Make wire rack 540 closer to or far from electric wire 30.By adjusting the height of sub- extension 543, fine tuning is connected to sub- extension The overall length of the height of electric wire fixing segments 545 in portion 543 or scalable adjustment wire rack 540.
According to the present invention, the 1st driver 41 or the 2nd driver 42 can use the electricity for being generally used for replacing controller switching equipment The electric tools such as brill, electric screw driver, staff is without specially preparing the electric device needed for mobile wire rack 540 Easily realize.
According to the present invention supporting electric wire 30 can be moved up and down using the electric power of the 1st driver 41 or the 2nd driver 42 The wire rack 540 of weight moves up and down electric wire 30 without using pulley etc. by tractive force, and livewire work is made to become more light Pine.
According to the present invention, the 1st driver 41 and the 1st lifting moving portion 530, the 2nd driver 42 and the 2nd lifting moving are utilized Portion 550 is accurately put into object height with certain speed movement wire rack 540 or electric wire 30.
The controller switching equipment livewire work of the present invention of following explanation above structure newly sets electric pole with auxiliary device 500 --- The controller switching equipment livewire work method of the present invention.
It in the present invention, newly sets and PIN cross-arms 23 is installed on electric pole 13, PIN cross-arms 23, which are that common cross-arm is horizontally arranged, to be formed. Common cross-arm is different from multiple insulators and is all installed to the new extended arm for setting 13 side of electric pole, it is insulator newly to set electricity Centered on line bar 13, it is evenly distributed on the cross-arm of the new both sides for setting electric pole.If PIN cross-arms 23 are the structure of common cross-arm, Staff can be uniformly distributed in the space between the LP insulators 25 of its both sides centered on newly to set electric pole 13 and carry out The livewire work of PIN cross-arms 23 is installed.
The flow chart of Fig. 8 controller switching equipment livewire work methods of one embodiment to illustrate the invention.
With reference to figure 8, the controller switching equipment livewire work method of one embodiment of the invention includes between having set electric pole 10 30 circuit of electric wire on set up and newly set the stage S1 of electric pole 13, interim wooden cross arm 510 is fixed to newly sets the rank of electric pole 13 Section S2, the stage S3 that the wire rack 540 on interim wooden cross arm 510 is moved up to 30 direction of electric wire, by electric wire 30 are fixed on stage S4 on the wire rack 540 on interim wooden cross arm 510, by interim wooden cross arm 510 or electric wire branch Frame 540 is moved further up, and electric wire 30 is placed in stage S5 on 23 predetermined mounting height of PIN cross-arms, by PIN cross-arms 23 It is installed to the new stage S6 set on electric pole 13, interim wooden cross arm 510 or wire rack 540 is downward to 23 direction of PIN cross-arms Mobile stage S7, the stage S8 that the electric wire 30 being connect with wire rack 540 is moved to PIN cross-arms 23 and by interim wooden cross arm 510 from the stage S9 for newly setting electric pole 13 and removing.
Fig. 9 is to illustrate electric between having set electric pole in the controller switching equipment livewire work method of one embodiment of the invention The concept map of electric pole process is newly set on line circuit;Figure 10 is the controller switching equipment livewire work method of one embodiment of the invention In, illustrate interim wooden cross arm being fixed on the new concept map for setting electric pole process;Figure 11 is the distribution of one embodiment of the invention In equipment live operational method, illustrate the concept map that wire rack is moved up to process to electric wire direction.
Figure 12 is in the controller switching equipment livewire work method of one embodiment of the invention, and explanation will be wired to and be mounted on The concept map of the wire rack process of interim wooden cross arm;Figure 13 is the controller switching equipment livewire work method of one embodiment of the invention In, illustrate to move up wire rack, makes the concept map for the process that electric wire is placed on the predetermined mounting height of PIN cross-arms;Figure 14 newly set electric pole mistake in the controller switching equipment livewire work method of one embodiment of the invention, to illustrate PIN cross-arms being fixed on The concept map of journey.
Figure 15 is to illustrate wire rack is horizontal to PIN in the controller switching equipment livewire work method of one embodiment of the invention The LP insulators direction of load moves down the concept map of process;Figure 16 is the controller switching equipment livewire work of one embodiment of the invention In method, illustrate the concept map to LP insulator moving process by electric wire;Figure 17 is the controller switching equipment of one embodiment of the invention In livewire work method, illustrate interim wooden cross arm from the concept map for newly setting electric pole disassembly process.
With reference to figure 9, the side for the stage S1 that electric pole 13 is newly set on 30 circuit of electric wire between having set electric pole 10 is realized Method:It has set to organize to stand on 30 circuit of electric wire between electric pole 13 in a pair and has newly set electric pole 13.
With reference to figure 10, the method that interim wooden cross arm 510 is fixed on the new stage S2 for setting electric pole 13 is realized:It will interim wood Cross-arm fixed part 520, which is fixed on, newly to be set on electric pole 13, and the 1st lifting moving portion 530 is fixed on interim wooden cross arm fixed part 520, the 1st lifting moving portion 530 and interim wooden cross arm 510 are connected, the 2nd lifting moving portion 550 and wire rack 540 are fixed on On interim wooden cross arm 510, keep its position corresponding with mounted LP insulators 22.
A pair of adjacent electric wire 30 set between electric pole 10 such as Fig. 9 is bent downwardly, therefore electric wire 30 sets electric pole newly Under PIN cross-arms 23 on 13.And interim wooden cross arm 510 is further below, i.e., below electric wire 30.That is, by interim wooden cross arm 510 Mounted on when newly setting on electric pole 13, wire rack 540 will be under electric wire 30.
Sequence when connecting interim wooden cross arm 510 and the 1st lifting moving portion 530 is first to be mounted on vertical extensions 513 1st lifting moving portion 530, behind 513 top of vertical extensions connection horizontal extension portion 511, in horizontal extension portion 511 and vertically Mounting bracket 515 between extension 513.
The sequence of mounting bracket 515 between horizontal extension portion 511 and vertical extensions 513:Chaining part 516 is mounted on water After on flat extension, the top of holder 515 is mounted on chaining part 516 so that it can rotate, the lower part peace of holder 515 So that it can by loading and unloading on the fasteners such as the lifting bolt mounted in 513 lower part of vertical extensions.
The sequence 2nd lifting moving portion 550 and wire rack 540 being fixed on interim wooden cross arm 510:First by the 2nd liter Drop moving portion 550 is fixed on interim wooden cross arm 510, then wire rack 540 is connected in the 2nd lifting moving portion 550.Also may be used After first wire rack 540 to be connected in the 2nd lifting moving portion 550, then the 2nd lifting moving portion 550 is fixed on temporarily On wooden cross arm 510.
Also it can realize and interim wooden cross arm 510 is fixed on the new method for setting the stage S2 on electric pole 13:The 2nd liter will be equipped with The interim wooden cross arm 510 of drop moving portion 550 and wire rack 540 is connected to the 1st lifting moving portion 530 or interim wooden cross arm is fixed Portion 520.
With reference to figure 11, the stage S3 for moving up interim wooden cross arm 510 or the 3rd wire rack 540 to electric wire 30 is realized Method:Staff is moved up sub- extension 543 to electric wire 30 by way of manual operation.
Also the method that can realize the stage S3 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root According to operating condition or the convenience of staff, by the 1st driver 41 and the 1st lifting moving portion 530, only by interim wooden cross arm 510 move up;It, only will be on interim wooden cross arm 510 or by the 2nd driver 42 and the 2nd lifting moving portion 550 Wire rack 540 moves up.
Also the method that can realize the stage S3 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root , can be by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff, it only will interim wood cross Load 510 moves up, and by the 2nd driver 42 and the 2nd lifting moving portion 550, will only be mounted on interim wooden cross arm 510 Wire rack 540 move up.
Also the method that can realize the stage S3 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root It, can be by the 1st driver 41 and the 1st lifting moving portion 530, by interim wooden cross arm according to operating condition or the convenience of staff 510 move up with staff through manual operation, and sub- extension 543 is moved up to 30 direction of electric wire.
Also the method that can realize the stage S3 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root According to operating condition or the convenience of staff, can will be mounted on interim by the 2nd driver 42 and the 2nd lifting moving portion 550 The wire rack 540 of wooden cross arm 510 is moved up with staff by manual operation, by sub- extension 543 to 30 side of electric wire To movement.
Also the method that can realize the stage S3 for moving up interim wooden cross arm 510 or wire rack 540 to electric wire 30:Root It, can be by the 1st driver 41 and the 1st lifting moving portion 530, by interim wooden cross arm according to operating condition or the convenience of staff 510 move up, by the 2nd driver 42 and the 2nd lifting moving portion 550, by the electric wire branch on interim wooden cross arm 510 Frame 540 moves up and staff is by manual operation, and sub- extension 543 is moved to 30 direction of electric wire.
The present invention explanation in, wire rack 540 is moved up or down, include by the main extension 542 of movement, The mobile wire rack 540 including main extension 542 and sub- extension 543 is whole, or only moves on wire rack 540 The embodiment of the sub- extension in portion 543, the part for the electric wire fixing segments 545 being connect with electric wire 30 in wire rack 540 include The process of 540 upper height of wire rack is adjusted upward or downward.
That is, in the explanation of the present invention, mobile wire rack 540 includes by the 2nd driver 42 and the 2nd lifting moving portion Only the embodiment, synthesis of mobile sub- extension 543 are moved in 550 movement wire rack, 540 whole embodiment, wire rack 540 The embodiment of dynamic wire rack 540 and mobile sub- 543 process of extension.
Therefore, even if the whole and mobile sub- extension 543 of not specified mobile wire rack 540, explanation of the invention In to mention mobile wire rack 540 just refer to one of above three embodiments.
In the state of the opening 546a for opening holder 546 top, into be about to interim wooden cross arm 510 or wire rack 540 to When the stage S3 that 30 direction of electric wire moves up, after completing the stage S3 for moving up wire rack 540 to 30 direction of electric wire, Electric wire 30 is entered by the 546a that is open inside holder 546.
With reference to figure 12, realize stage electric wire 30 being fixed on the wire rack 540 on interim wooden cross arm 510 The method of S4:Locking electric wire 30 enters internal 546 sticking department 548 of holder through the 546a that is open, that is, is opened with the block of sticking department 548 Mouth 546a.
Interim wooden cross arm 510 or wire rack 540 are moved up, it is high that electric wire 30 is placed in the predetermined installation of PIN cross-arms 23 Stage S5 on degree is to ensure that the new process for setting and installing space needed for PIN cross-arms 23 on electric pole 13.
With reference to figure 13, interim wooden cross arm 510 or wire rack 540 are moved further up, electric wire 30 are placed in by realization The method of stage S5 on 23 predetermined mounting height of PIN cross-arms:Upwards by the 1st driver 41 and the 1st lifting moving portion 530 Mobile interim wooden cross arm 510, and wire rack 540 is moved up by the 2nd driver 42 and the 2nd lifting moving portion 550.
Also the method that can realize the stage S5 being placed in electric wire 30 on 23 predetermined mounting height of PIN cross-arms:According to operation The convenience of condition and staff, can be only by moving interim wooden cross arm by the 1st driver 41 and the 1st lifting moving portion 530 510, or wire rack 540 is moved by the 2nd driver 42 and the 2nd lifting moving portion 550, or be manually operated by staff Sub- extension 543 is moved up to 30 direction of electric wire.
Also the method that can realize the stage S5 being placed in electric wire 30 on 23 predetermined mounting height of PIN cross-arms:According to operation The convenience of condition or staff, it is by the 1st driver 41 and the 1st lifting moving portion 530, interim wooden cross arm 510 is upward It is mobile;And staff is moved sub- extension 543 to 30 direction of electric wire by manual operation.
Also the method that can realize the stage S5 being placed in electric wire 30 on 23 predetermined mounting height of PIN cross-arms:According to operation The convenience of condition or staff can will be mounted on interim wooden cross arm by the 2nd driver 42 and the 2nd lifting moving portion 550 510 wire rack 540 moves up;And staff is moved sub- extension 543 to 30 direction of electric wire by manual operation It is dynamic.
Also the method that can realize the stage S5 being placed in electric wire 30 on 23 predetermined mounting height of PIN cross-arms:According to operation The convenience of condition or staff, can by the 1st driver 41 and the 1st lifting moving portion 530, by interim wooden cross arm 510 to Upper movement, and by the 2nd driver 42 and the 2nd lifting moving portion 550, by the electric wire branch on interim wooden cross arm 510 Frame 540 moves up and staff is by manual operation, and sub- extension 543 is moved to 30 direction of electric wire.
Electric wire 30 is placed in the stage S5 on 23 predetermined mounting height of PIN cross-arms, it is assumed that the predetermined installation of PIN cross-arms 23 It is highly constant, the distance of electric wire 30 is moved up according to a pair of adjacent degree of sag for having set electric wire 30 between electric pole 10, that is, Interim wooden cross arm 510 is fixed on and the height of interim wooden cross arm 510 is installed in the new stage S2 set on electric pole 13 is varied from. Staff predicts there is an error when 30 degree of sag of electric wire, or interim wooden cross arm 510 and main extension 542 is maximum to moving up Dynamic sum of the distance less than electric wire 30 move up apart from when, sub- extension 543 can be used.For example, staff predicts electric wire 30 sagging 1m, when the maximum of interim wooden cross arm 510 and main extension 542 being moved up sum of the distance being set as 1m, even if electric Sagging 30 reality of line is 1.5m, and staff can be smoothly completed by the way that sub- extension 543 is moved up 0.5m again by electric wire 30 The stage S5 being placed on the predetermined mounting height of PIN cross-arms.
With reference to figure 14, the method for realization stage S6 of installation PIN cross-arms 23 on newly setting electric pole 13:Electric wire 30 is placed in Stage S5 on 23 predetermined mounting height of PIN cross-arms, using reserved working space, installation includes PIN iron cross arms 24 and more The PIN cross-arms of a LP insulators 25.
The stage S6 that PIN cross-arms 23 are installed on newly setting electric pole 13, after first installing PIN iron cross arms 24, by multiple LP Insulator 25 is installed on PIN iron cross arms 24, or the PIN iron cross arms equipped with multiple LP insulators 25 are installed to and newly set electric wire Bar 13.
With reference to figure 15, the stage for moving down interim wooden cross arm 510 or wire rack 540 to PIN cross-arms direction is realized The method of S7:Staff will be interim using the 1st driver 41 and the 1st lifting moving portion 530 in the place far from electric wire 30 Wooden cross arm 510 is automatic and remotely moves down.
Also it can realize the stage S7's for moving down interim wooden cross arm 510 or wire rack 540 to 23 direction of PIN cross-arms Method:According to operating condition or the convenience of staff, only by the 2nd driver 43 and the 2nd lifting moving portion 550 to moving up Dynamic interim wooden cross arm 510 or staff are moved sub- extension 543 to 30 direction of electric wire by manual operation.
Also it can realize the stage S7's for moving down interim wooden cross arm 510 or wire rack 540 to 23 direction of PIN cross-arms Method:According to operating condition or the convenience of staff, by the 1st driver 41 and the 1st lifting moving portion 530, will only face When wooden cross arm 510 move down, and by the 2nd driver 42 and the 2nd lifting moving portion 550, it is horizontal will to be only mounted on interim wood Wire rack 540 in load 510 moves up.
Also it can realize the stage S7's for moving down interim wooden cross arm 510 or wire rack 540 to 23 direction of PIN cross-arms Method:It will be interim by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff Wooden cross arm 510 moves down and staff is by manual operation, and sub- extension 543 is moved down to 30 direction of electric wire.
Also it can realize the stage S7's for moving down interim wooden cross arm 510 or wire rack 540 to 23 direction of PIN cross-arms Method:It will be installed by the 2nd driver 42 and the 2nd lifting moving portion 550 according to operating condition or the convenience of staff The wire rack 540 of interim wooden cross arm 510 move down and staff by manual operation, by sub- extension 543 to 30 direction of electric wire moves down.
Also it can realize the stage S7's for moving down interim wooden cross arm 510 or wire rack 540 to 23 direction of PIN cross-arms Method:It will be interim by the 1st driver 41 and the 1st lifting moving portion 530 according to operating condition or the convenience of staff Wooden cross arm 510 moves down, and by the 2nd driver 42 and the 2nd lifting moving portion 550, will be mounted on interim wooden cross arm 510 On wire rack 540 move down and staff by manual operation, by sub- extension 543 to 30 direction of electric wire to Lower movement.
With reference to figure 16, the side for the stage S8 for moving the electric wire 30 being connect with wire rack 540 to PIN cross-arms 23 is realized Method:After the multiple electric wires 30 being connect with multiple wire racks 540 are adjacent to and are fixed on multiple LP insulators 25, electricity is released Line 30 and wire rack 540 connect.Refer to fixed to LP insulators 25 by electric wire 30, with connections such as rubber cable, adhesive tape, buckles Electric wire 30 is fixed to LP insulators 25 by part.
The method for releasing the connection of electric wire 30 and wire rack 540 is that spin locking portion 548 opens opening 546a, passes through Opening 546a pulls out electric wire 30 to outside holder 546.
With reference to figure 17, realize interim wooden cross arm 510 from the method for newly setting the stage S9 removed on electric pole 13:By After 2 lifting moving portions 550 and wire rack 540 are removed from interim wooden cross arm 510, by interim wooden cross arm 510 from interim wood It is removed in cross-arm fixed part 520 or the 1st lifting moving portion 530, by the 1st lifting moving portion 530 from interim wooden cross arm fixed part 520 remove, then interim wooden cross arm fixed part 520 is removed from new set on electric pole 13.
Also it can realize interim wooden cross arm 510 from the method for newly setting the stage S9 removed on electric pole 13:The 2nd will be equipped with The interim wooden cross arm 510 of lifting moving portion 550 and wire rack 540 is removed from new set on electric pole 13.
According to the method for controller switching equipment livewire work as described above of the invention, the flow as shown in Fig. 9~Figure 17 can Using controller switching equipment livewire work easily electric pole is newly set with auxiliary device 500.
About multiple LP insulators 25, each stage shown in unified applicable Figure 10~Figure 16, by once will be interim What the stage S3 that wooden cross arm 510 or wire rack 540 are moved up to 30 direction of electric wire extremely moved electric wire 30 to PIN cross-arms 23 The process of stage S8 can install PIN cross-arms 23 in new set on electric pole 13.
About each LP insulators 25, by separately from by interim wooden cross arm 510 or wire rack 540 to 30 direction of electric wire The process of the stage S3 moved up to the stage S8 for moving from electric wire 30 to PIN cross-arms 23, that is, being applicable in by multiplicating will The stage S3 that interim wooden cross arm 510 or wire rack 540 are moved up to 30 direction of electric wire extremely moves electric wire 30 to PIN cross-arms 23 Dynamic stage S8 installs multiple LP insulators 25 successively.
According to the present invention interim wooden cross arm 510 is automatically adjusted using the 1st driver 41 or 42 electric power of the 2nd driver Highly, the height of wire rack 540, the height of the electric wire 30 moved to 540 direction of wire rack, easily realize and newly set electric pole Operation.
According to the present invention, the height of 540 entirety of interim wooden cross arm 510 and wire rack can be not only adjusted with multistage, may be used also 543,3 sections of the sub- extension by moving up and down live wire fixed part 545 in wire rack 540 adjust electric wire fixing segments 545 or The height of electric wire 30.
According to the present invention, staff selectively adjusts the height of interim wooden cross arm 510 according to operating condition or convenience The whole height of degree, wire rack 540, the height of sub- extension 543, you can easily carry out newly setting electric pole operation.
According to the present invention, using the 1st driver 41 or the 2nd driver 42, staff can be in the place far from electric wire 30 Electric wire 30 is moved on PIN cross-arms 23, can easily ensure PIN cross-arms 23 being installed to needed for new set on electric pole 13 Livewire work space, at the same can be to avoid installation PIN cross-arms 23 when, staff is in direct contact caused by electric wire 30 dangerous.
According to the present invention, multiple wire racks 540 have been installed in the state of interim wooden cross arm 510, are moved up interim Wooden cross arm 510, the trouble that can be one by one moved to avoid wire rack 540 keep the displacement that multiple wire racks 540 move up equal It is identical.
The present invention is the explanation carried out by embodiment in drawing, but this only illustrates, if it is having this The people of technical field relevant knowledge, it should can understand other implementations of can develop from the present invention various deformation and ad eundem Example.Therefore, technical protection scope of the invention should be following patent claim.

Claims (3)

1. a kind of controller switching equipment livewire work method,
About using including interim wooden cross arm, be fixed on above-mentioned interim wooden cross arm newly setting the interim wooden cross arm on electric pole and fixing Portion, is mounted on above-mentioned interim wooden cross arm, the electric wire of supporting electric wire at the 1st lifting moving portion for moving up and down above-mentioned interim wooden cross arm The controller switching equipment livewire work of holder, the 2nd lifting moving portion for individually lifting each said wires holder newly sets electricity with auxiliary device The controller switching equipment livewire work method of line bar,
Newly set the stage of electric pole between electric pole on said wires circuit including having set;
Above-mentioned interim wooden cross arm is fixed on the above-mentioned new stage for setting electric pole;
Said wires are connected to the stage of the wire rack on above-mentioned interim wooden cross arm;
Move up above-mentioned interim wooden cross arm and said wires holder, by said wires be placed in the predetermined mounting height of PIN cross-arms it On stage;
Above-mentioned PIN cross-arms are installed to the above-mentioned new stage for setting electric pole;
The stage that said wires holder is moved down to above-mentioned PIN cross-arms direction;
And the said wires for being connected to said wires holder are moved to the stage of above-mentioned PIN cross-arms;
It is that above-mentioned 1st lifting moving portion receives to come from the 1st driver by the method that above-mentioned interim wooden cross arm moves up or down Power after, move up and down above-mentioned interim wooden cross arm;It is by the method that said wires holder moves up or down, the above-mentioned 2nd After lifting moving portion receives the power from the 2nd driver, said wires holder is moved up and down;
Above-mentioned interim wooden cross arm and said wires holder are moved up, said wires are placed in the predetermined mounting height of PIN cross-arms On stage, including by above-mentioned 1st driver and above-mentioned 1st lifting moving portion, move up above-mentioned interim wooden cross arm Process and by above-mentioned 2nd driver and above-mentioned 2nd lifting moving portion, promotes the process of wire rack to realize.
2. controller switching equipment livewire work method according to claim 1, which is characterized in that
Said wires are fixed to the stage of said wires holder,
Include that in the state that said wires insertion has the internal stent of said wires holder, above-mentioned holder is closed with sticking department The process of opening;
Said wires are moved to the stage of above-mentioned PIN cross-arms,
Include that electric wire is pulled out by process to above-mentioned bracket outer by above-mentioned opening.
3. controller switching equipment livewire work method according to claim 1, which is characterized in that
Above-mentioned PIN cross-arms are horizontally arranged common cross-arms.
CN201580030633.XA 2014-01-20 2015-06-09 Controller switching equipment livewire work method Active CN106463938B (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR20140006513 2014-01-20
KR1020140069775A KR101473823B1 (en) 2014-01-20 2014-06-09 Method for hot line work of power distribution equipment
KR10-2014-0069775 2014-06-09
PCT/KR2015/005797 WO2015190814A1 (en) 2014-06-09 2015-06-09 Power distribution facility live-line working method

Publications (2)

Publication Number Publication Date
CN106463938A CN106463938A (en) 2017-02-22
CN106463938B true CN106463938B (en) 2018-09-07

Family

ID=52679199

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201580030633.XA Active CN106463938B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method
CN201580030707.XA Active CN106463940B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it
CN201580030649.0A Active CN106463939B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device
CN201580030710.1A Active CN106463941B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201580030707.XA Active CN106463940B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it
CN201580030649.0A Active CN106463939B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device
CN201580030710.1A Active CN106463941B (en) 2014-01-20 2015-06-09 Controller switching equipment livewire work method

Country Status (2)

Country Link
KR (12) KR101473822B1 (en)
CN (4) CN106463938B (en)

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101631916B1 (en) 2015-09-14 2016-06-20 탑이앤지 주식회사 Method for changing power distribution line in hot line
KR101616484B1 (en) 2015-09-21 2016-04-28 (주)우신전기기술사사무소 Method for changing power distribution line in hot line
CN106545213A (en) * 2015-09-23 2017-03-29 国网辽宁省电力有限公司本溪供电公司 A kind of adjustable bearing pole girdle ring
CN107288406A (en) * 2016-03-30 2017-10-24 国网辽宁省电力有限公司本溪供电公司 A kind of adjustable bearing pole girdle ring
CN105762702B (en) * 2016-04-01 2017-08-04 中国南方电网有限责任公司超高压输电公司南宁局 The method of replacing ± 800kV DC power transmission line L insulator strings
KR101757195B1 (en) * 2016-10-11 2017-07-11 주식회사 성진 Stationary Auxiliary Arm Apparatus and Method Using In Uninterruptible Power Distribution Work
CN107437712A (en) * 2016-12-30 2017-12-05 广州程科电子科技有限公司 A kind of durable electric insulation post
KR101864309B1 (en) 2017-01-19 2018-06-05 삼성기술감리 주식회사 Apparatus for changing power distribution line in hot line
KR101889080B1 (en) 2017-02-20 2018-08-16 주식회사진흥기업 live jumper wire wirelessly disconnect and connect method
CN107086488A (en) * 2017-04-28 2017-08-22 国网山东省电力公司青岛供电公司 A kind of charged for replacement overhead transmission line straight line pole cross-arm, insulator arrangement
CN107039919A (en) * 2017-05-05 2017-08-11 国网江苏省电力公司常州供电公司 A kind of wire-binding device
CN107504343A (en) * 2017-08-11 2017-12-22 国网浙江台州市黄岩区供电公司 Stand transformer base leveling device
CN110088171B (en) 2017-10-12 2022-03-04 株式会社吴羽 Continuous polymerization apparatus and method for continuously producing polymer
JP7089791B2 (en) * 2017-12-18 2022-06-23 株式会社永木精機 Insulator separation method and direction change tool, pillar lifting device, insulator support tool and utility pole fixer used in this method.
CN108321753A (en) * 2017-12-28 2018-07-24 青岛九州汇德新能源有限公司 A kind of solar energy system power supply support device
CN108155601A (en) * 2018-01-08 2018-06-12 国网辽宁省电力有限公司鞍山供电公司 A kind of method that on-load straight line pole changes tension-resistant rod
CN108258617A (en) * 2018-01-16 2018-07-06 国网新疆电力公司塔城供电公司 A kind of more changing device that formula overhanging golden tool is twisted for transmission line of electricity aerial condutor
CN108683122B (en) * 2018-06-08 2020-07-28 国网山东省电力公司青岛供电公司 Auxiliary device and method for sharing straight line rod of corridor in live migration
KR101955155B1 (en) * 2018-07-11 2019-03-06 대원전기 주식회사 Uninterruptible power method and Indirect live lifting device for Electronic pole for power line
KR102112471B1 (en) * 2018-11-30 2020-05-19 한국전력공사 Method for hot line work
KR102321043B1 (en) 2018-12-12 2021-11-03 주식회사 중앙백신연구소 A promoter being expressed in Kluyveromyces marxianus strain and the gene expression system using thereof
KR102273339B1 (en) * 2019-06-10 2021-07-06 한국전력공사 Wire support device supporting switchgear lead wire or jumper wire
KR102650799B1 (en) * 2019-12-18 2024-03-26 한국전력공사 Auxiliary apparatus for hot line work of power distribution equipment and method for hot line work of power distribution equipment using thereof
CN111456520B (en) * 2020-03-22 2021-04-02 徐宏坤 Distribution line building device and installation method
KR102173375B1 (en) * 2020-03-30 2020-11-03 김정호 Uninterruptible power method and lndirect live lifting device for Electronic polefor power line
KR102173377B1 (en) * 2020-06-10 2020-11-03 김정호 Uninterruptible power method of utilization electric power line device
KR102173378B1 (en) * 2020-06-10 2020-11-03 김정호 electric power line device for Uninterruptible power method
CN111987639A (en) * 2020-08-04 2020-11-24 中国电建集团河南工程有限公司 Construction method for replacing tension porcelain insulator
CN111910982A (en) * 2020-08-05 2020-11-10 国网黑龙江省电力有限公司伊春供电公司 Transmission line ground clearance promotes cross arm
KR102240478B1 (en) * 2020-09-22 2021-04-16 대원전기 주식회사 Insulator clip for indirect live wire and LP insulator replacement indirect live wire method using the same
KR102236410B1 (en) * 2020-10-14 2021-04-05 이종학 Wire installing method
CN112551258B (en) * 2020-11-18 2023-01-24 广东电网有限责任公司 Cable support device and electric power support equipment
CN112366603B (en) * 2020-11-18 2022-05-24 广东电网有限责任公司 Electric power supporting equipment
KR20220085571A (en) 2020-12-15 2022-06-22 한국전력공사 Fixing device for distribution facility and fixing method using the same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510029A (en) * 2011-11-22 2012-06-20 上海市电力公司 Ground potential electrified bar cutter device changing method
CN103510739A (en) * 2013-10-24 2014-01-15 国网湖南省电力公司带电作业中心 Multifunctional combinatorial insulation cross arm

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4188477B2 (en) * 1999-02-04 2008-11-26 株式会社中電工 How to remove an imaginary ground wire
KR20050103700A (en) * 2004-04-27 2005-11-01 양희성 A
KR100934083B1 (en) * 2007-11-05 2009-12-24 양희성 Jumper Wire Fixture
JP5306031B2 (en) * 2009-04-13 2013-10-02 中国電力株式会社 Indirect hot tool support
FI125939B (en) * 2010-12-30 2016-04-15 Meclimb Oy Method and apparatus for transporting tools to a workplace along an elongated piece and use of the apparatus
KR101218710B1 (en) * 2011-01-31 2013-01-09 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101106236B1 (en) * 2011-06-28 2012-01-19 주식회사 지이플러스 Apparatus and method for live wire using trane truck
KR101344289B1 (en) * 2012-04-27 2013-12-23 임용호 The pole fittings changing method use lifting apparatus
KR101243860B1 (en) * 2012-04-27 2013-03-20 임용호 The changing device of lp insualtor for power distribution line
KR101254577B1 (en) * 2012-11-21 2013-04-15 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101275111B1 (en) * 2013-02-13 2013-06-17 임용호 Replacement method for power distribution equipment of direct live wire for double insulation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510029A (en) * 2011-11-22 2012-06-20 上海市电力公司 Ground potential electrified bar cutter device changing method
CN103510739A (en) * 2013-10-24 2014-01-15 国网湖南省电力公司带电作业中心 Multifunctional combinatorial insulation cross arm

Also Published As

Publication number Publication date
KR20150087783A (en) 2015-07-30
CN106463941A (en) 2017-02-22
KR101473822B1 (en) 2014-12-18
CN106463940B (en) 2018-09-11
KR101473821B1 (en) 2014-12-18
KR101473823B1 (en) 2014-12-18
KR20150087785A (en) 2015-07-30
KR20150087786A (en) 2015-07-30
CN106463939A (en) 2017-02-22
CN106463940A (en) 2017-02-22
CN106463941B (en) 2018-09-07
CN106463938A (en) 2017-02-22
KR20150087782A (en) 2015-07-30
KR101592964B1 (en) 2016-02-25
KR101473820B1 (en) 2014-12-18
KR20150087784A (en) 2015-07-30
CN106463939B (en) 2018-09-11
KR20150087779A (en) 2015-07-30
KR20150087780A (en) 2015-07-30
KR20150087781A (en) 2015-07-30

Similar Documents

Publication Publication Date Title
CN106463938B (en) Controller switching equipment livewire work method
CN106827603B (en) A kind of wheel production steel ring automatic grabbing device
CN108599007A (en) A kind of apparatus and method of high-tension line unmanned plane installation pulley insulating cord
CN107370079A (en) It is a kind of to connect and hook the livewire work method of clip lead
CN111115523A (en) Special logistics support vehicle for electric power operation and maintenance
CN105401873A (en) Insulating elevator
CN109702707A (en) A kind of distribution network live line work robot
CN108462117A (en) A kind of skyscraper cable-laying gear and its application method
CN108150786A (en) A kind of environment supervision instrument stent
CN206669659U (en) A kind of multi-angle LED installs equipment
CN108996400B (en) Battery box hoisting accessory
CN106144974A (en) A kind of bucket lowering or hoisting gear
CN209748055U (en) insulating rope sideslip prevention device for feeding
CN108178062A (en) A kind of natural gas line installation gripping arranging apparatus
US20170260745A1 (en) Hanging Three Dimensional Grid System For Lighting, Data, and Power
CN109066453B (en) Special tool for repairing overhead lightning conductor of power transmission line
CN207719617U (en) A kind of power distribution cabinet with movable support
CN201040702Y (en) Lifting device for TV set
CN105071307B (en) A kind of device of auxiliary connection and the method that wiring is carried out using the device
CN207006069U (en) A kind of infrared illumination system structure of liftable and the anglec of rotation
CN217296995U (en) Cigarette rack lifting device
CN206979135U (en) Self-balancing wall covering rack
CN218650222U (en) Flue-cured tobacco goes up heatable brick bed device
CN205442450U (en) Long -range controlled tower crane device
CN205384909U (en) Electric power cable recovery unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant