CN108178062A - A kind of natural gas line installation gripping arranging apparatus - Google Patents

A kind of natural gas line installation gripping arranging apparatus Download PDF

Info

Publication number
CN108178062A
CN108178062A CN201810019149.2A CN201810019149A CN108178062A CN 108178062 A CN108178062 A CN 108178062A CN 201810019149 A CN201810019149 A CN 201810019149A CN 108178062 A CN108178062 A CN 108178062A
Authority
CN
China
Prior art keywords
gear
natural gas
front side
rack
gas line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810019149.2A
Other languages
Chinese (zh)
Inventor
胡志廷
黄浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810019149.2A priority Critical patent/CN108178062A/en
Publication of CN108178062A publication Critical patent/CN108178062A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles

Abstract

The present invention relates to a kind of natural gas line installation equipment more particularly to a kind of natural gas line installation gripping arranging apparatus.The technical problem to be solved in the present invention is to provide it is a kind of do not need to manually ground carry out command post with do not need to a large amount of time, lifting during will not damage worker will not damage natural gas line natural gas line installation gripping arranging apparatus.In order to solve the above technical problem, the present invention provides such a natural gas lines to install with arranging apparatus is gripped, and includes installing plate, wheel, the first sliding rail, the first sliding block, supporting rod, second sliding rail etc.;Wheel is equipped on the downside of installing plate, the first sliding rail is installed by bolted connection on the upside of installing plate, the first sliding rail inner sliding type is connected with the first sliding block.The worker that will not damage during invention achieves not needing to manually carry out command post on ground not need to a large amount of time, lifting will not damage the effect of natural gas line.

Description

A kind of natural gas line installation gripping arranging apparatus
Technical field
The present invention relates to a kind of natural gas line installation equipment more particularly to a kind of natural gas line installation gripping placements Equipment.
Background technology
Gas pipeline is assembled by single cell by root.Modern collecting pipe and gas pipeline is by steel Pipe is formed through electric welding connection.Steel pipe has that seamless pipe, spiral seam pipe, straight-seam pipes are a variety of, seamless pipe be suitable for caliber for 529 millimeters with Under pipeline, spiral seam pipe and straight-seam pipes are suitable for large diameter pipeline.The pipe cross-sectional configuration of gathering line, complicated is interior Coating-steel pipe-external insulation layer-heat preservation (cold insulation) layer;Simple then only steel pipe and external insulation layer, and inside coating and heat preservation (cold insulation) layer adds determining again depending on gas transmission technique.
At present when being installed to natural gas line, most of is all that natural gas line is hung required peace using loop wheel machine In the position of dress, but in this way have the drawback that need worker carry out ground commander, need so a large amount of time come into Row check and correction, and be also possible to damage worker or natural gas line is encountered other positions to cause to damage when loop wheel machine lifts It is bad.
Therefore there is an urgent need for research and develop a kind of mistake for not needing to manually carry out command post on ground not need to a large amount of time, lift The natural gas line installation that the worker that will not damage in journey will not damage natural gas line is overcome at present with gripping arranging apparatus In the presence of the mistake for needing manually to carry out commander's needs a large amount of time on ground, lift when being lifted to natural gas line May damage in journey worker or damage natural gas line the shortcomings that.
Invention content
(1)Technical problems to be solved
The present invention needs manually to command on ground to overcome when natural gas line is lifted to exist at present The shortcomings that needing to damage worker during a large amount of time, lifting or damage natural gas line, the present invention will solve Certainly the technical issues of, is to provide a kind of process for not needing to manually carry out command post on ground not need to a large amount of time, lift In will not damage worker will not damage natural gas line natural gas line installation gripping arranging apparatus.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a natural gas lines to install with gripping arranging apparatus, packet Included installing plate, wheel, the first sliding rail, the first sliding block, supporting rod, the second sliding rail, the second sliding block, cylinder, L-shaped bar, movable plate, Fixed plate and lanyard, installing plate downside are equipped with wheel, the first sliding rail are equipped with by bolted connection on the upside of installing plate, the One sliding rail inner sliding type is connected with the first sliding block, and the first upper end of slide block is equipped with supporting rod by welding, and supporting rod is right Side is equipped with the second sliding rail by bolted connection, and the second sliding rail inner sliding type is connected with the second sliding block, supporting rod left side Cylinder is installed by bolted connection, L-shaped is installed by welding on the upside of the Telescopic-cylinder cylinder of cylinder upper end Bar, L-shaped bar lower end are mounted on the upside of the second sliding block by welding, and the second sliding block right end is equipped with by welding Movable plate, movable plate downside right are equipped with fixed plate, lanyard are connected on the downside of fixed plate by welding.
Preferably, clamping device has been further included, clamping device includes guide sleeve, guide rail, the first rack, the first screw rod, One gear and clamping plate, fixed plate front side are equipped with clamping device, and fixed plate front side top is equipped with guide sleeve, leads by welding Set inner sliding type is connected with guide rail, and the left and right sides is connected with the first rack on the downside of guide rail, and threaded hole, threaded hole are provided on the right side of guide sleeve The first screw rod is inside rotary with, the first screw rod coordinates with threaded hole, and the lower section left and right sides is rotatably connected with the first tooth on front side of fixed plate Wheel, first gear are engaged with the first rack, and clamping plate is connected on rear side of first gear.
Preferably, nut, the second screw rod and briquetting have been further included, spiral shell is installed by welding on the right side of installing plate Mother is rotary with the second screw rod in nut, and the second screw rod coordinates with nut, and the second screw rod lower end is rotatably connected with briquetting.
Preferably, linkage clamp device has been further included, linkage clamp device includes the second rack, third rack, first Fixed block, second gear, the second fixed block, third gear, runner and transmission item, movable plate are equipped with linkage clamp device, peace Middle part is connected with the second rack on front side of loading board, and top is connected with third rack on the left of guide rail, and left passes through welding on front side of movable plate Mode the first fixed block is installed, the first fixed block is located at the second rack right, and the second fixed block front side top rotatably connects Second gear is connected to, second gear is engaged with the second rack, and left and front side right are pacified by welding on front side of movable plate Equipped with the second fixed block, the second fixed block is located at the first fixed block right, and the second fixed block front side top is rotatably connected with Three gears, left side third gear are engaged with second gear, and right side third gear is engaged with third rack, are connected on front side of third gear There is runner, transmission item is connected between runner.
Preferably, connecting rod, reel, crank, steel wire rope and fixed pulley have been further included, left passes through weldering on the upside of installing plate The mode connect is equipped with connecting rod, and connecting rod front side top is rotatably connected with reel, crank is connected on front side of reel, around Steel wire rope is wound in line wheel, fixed pulley is connected on the left of connecting rod, steel wire rope is connected to by fixed pulley on the left of the first sliding block.
Operation principle:When user needs to install natural gas line, which can be moved to by user On the left of the natural gas line mounting groove of required installation natural gas line, Natural Gas Pipeline Transportation to be mounted then will be needed to the peace The right side of tankage, then user cylinder can be controlled to extend, Telescopic-cylinder bar drive L-shaped bar move up, so as to drive second Sliding block and movable plate move up, and so as to which fixed plate and lanyard be driven to move up, then user can move right the first cunning Block, the first sliding block drives supporting rod to move right, so as to which movable plate be driven to move right, so as to drive fixed plate and lanyard to the right Mobile, so as to which fixed plate and lanyard be made to be located above natural gas line, then user's control cylinder shortens, and Telescopic-cylinder bar drives Fixed plate and lanyard move down, and then user can hang over lanyard on natural gas line, and then user can control cylinder Pico- elongation, makes natural gas line be detached from ground, and then user can be moved to the left the first sliding block, and the first sliding block will drive lanyard It is moved to the left with natural gas line, it, then can be with so as to which natural gas line be made to be moved to above natural gas line mounting groove User unlocks lanyard, makes to fall in natural gas line mounting groove under natural gas line.
Because having further included clamping device, clamping device includes guide sleeve, guide rail, the first rack, the first screw rod, the first tooth Wheel and clamping plate, are equipped with clamping device on front side of fixed plate, and fixed plate front side top is equipped with guide sleeve by welding, in guide sleeve Slidingtype is connected with guide rail, and the left and right sides is connected with the first rack on the downside of guide rail, and threaded hole, threaded hole inward turning are provided on the right side of guide sleeve There is the first screw rod, the first screw rod coordinates with threaded hole, and the lower section left and right sides is rotatably connected with first gear on front side of fixed plate, the One gear is engaged with the first rack, and clamping plate is connected on rear side of first gear, and natural gas line is fixed when user's needs stabilization When, user can be moved up with push rail, so as to which the first rack be driven to move up, so as to make first the first tooth of rack drives Wheel rotation, first gear drive the angle between clamping plate to reduce, and so as to clamp natural gas line, then user can rotate first Screw rod, the first screw rod make it no longer carry out by the precession to the left of the cooperation with threaded hole so as to which the first screw rod be made to fix guide rail It is mobile, so as to which clamping plate be made to clamp natural gas line.
Because having further included nut, the second screw rod and briquetting, nut, spiral shell are installed by welding on the right side of installing plate The second screw rod is rotary in mother, the second screw rod coordinates with nut, and the second screw rod lower end is rotatably connected with briquetting, when user is installing When placing natural gas line, user can rotate the second screw rod, the second screw rod by the downward precession of cooperation with nut, from And make the second screw rod that briquetting be pushed to move down, so as to which briquetting be made to touch ground, so as to which briquetting be enable to fix the equipment On the ground.
Because having further included linkage clamp device, linkage clamp device includes the second rack, third rack, the first fixation Block, second gear, the second fixed block, third gear, runner and transmission item, movable plate are equipped with linkage clamp device, installing plate The second rack is connected in the middle part of front side, top is connected with third rack, the side that movable plate front side left passes through welding on the left of guide rail Formula is equipped with the first fixed block, and the first fixed block is located at the second rack right, and the second fixed block front side top is rotatably connected with Second gear, second gear are engaged with the second rack, and left and front side right are equipped with by welding on front side of movable plate Second fixed block, the second fixed block are located at the first fixed block right, and the second fixed block front side top is rotatably connected with third tooth Wheel, left side third gear are engaged with second gear, and right side third gear is engaged with third rack, are connected with and are turned on front side of third gear It takes turns, is connected with transmission item between runner, when directly gripping natural gas line when user needs to move down fixed plate, works as movement When plate moves down, the first fixed block will be driven to move up, so as to which second gear be driven to be rotated clockwise on the second rack, Second gear will drive left side third gear to rotate counterclockwise, and so as to which left side runner be driven to rotate counterclockwise, left side runner passes through Transmission item drives right side runner to rotate counterclockwise, so as to which right side third gear be driven to rotate counterclockwise, so as to drive third rack It moves up, natural gas line is gripped so as to which the angle between clamping plate be driven to reduce, then user can slightly upwards Mobile movable plate makes natural gas line be detached from ground without departing from clamping plate.
Because having further included connecting rod, reel, crank, steel wire rope and fixed pulley, left passes through welding on the upside of installing plate Mode connecting rod is installed, connecting rod front side top is rotatably connected with reel, and crank, coiling are connected on front side of reel Be wound with steel wire rope on wheel, fixed pulley be connected on the left of connecting rod, steel wire rope is connected to by fixed pulley on the left of the first sliding block, when with When family needs the labour-saving to be moved to the left the first sliding block, user can rotate clockwise crank, and crank drives reel to revolve clockwise Turn, so as to make reel wraparound steel wire rope, so as to make steel wire rope that the first sliding block be driven to be moved to the left.
(3)Advantageous effect
It will not during invention achieves not needing to manually carry out command post on ground not need to a large amount of time, lifting The worker that damages will not damage the effect of natural gas line, clamp natural gas line by using clamping plate and then driven by cylinder It is moved up and down and it is driven to be moved to the left simultaneously makes natural gas line enter the mode in mounting groove, quickly will be not only able to Natural gas line is stably placed in mounting groove, additionally it is possible to avoid the artificial commander needed for eminence lifting.
Description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the main structure diagram of clamping device of the present invention.
Fig. 3 is the main structure diagram of briquetting of the present invention.
Fig. 4 is the main structure diagram of present invention linkage clamp device.
Fig. 5 is the main structure diagram of reel of the present invention.
Label in attached drawing for:1- installing plates, 2- wheels, the first sliding rails of 3-, the first sliding blocks of 4-, 5- supporting rods, 6- second Sliding rail, the second sliding blocks of 7-, 8- cylinders, 9-L shape bars, 10- movable plates, 11- fixed plates, 12- lanyards, 30- clamping devices, 301- are led Set, 302- guide rails, the first racks of 303-, 304- threaded holes, the first screw rods of 305-, 306- first gears, 307- clamping plates, 3021- Nut, the second screw rods of 3022-, 3023- briquettings, 31- linkage clamp devices, the second racks of 311-, 312- third racks, 313- the One fixed block, 314- second gears, the second fixed blocks of 315-, 316- third gears, 317- runners, 318- transmission items, 3121- connect Extension bar, 3122- reels, 3123- cranks, 3124- steel wire ropes, 3125- fixed pulleys.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of natural gas line installation gripping arranging apparatus, as shown in Figs. 1-5, includes installing plate 1, wheel 2, the first sliding rail 3rd, the first sliding block 4, supporting rod 5, the second sliding rail 6, the second sliding block 7, cylinder 8, L-shaped bar 9, movable plate 10, fixed plate 11 and lanyard 12,1 downside of installing plate is equipped with wheel 2, and 1 upside of installing plate is equipped with the first sliding rail 3, the first sliding rail by bolted connection 3 inner sliding types are connected with the first sliding block 4, and 4 upper end of the first sliding block is equipped with supporting rod 5,5 right side of supporting rod by welding Second sliding rail 6 is installed by bolted connection, 6 inner sliding type of the second sliding rail is connected with the second sliding block 7, and supporting rod 5 is left Side is equipped with cylinder 8 by bolted connection, is installed by welding on the upside of 8 telescoping cylinder of cylinder of 8 upper end of cylinder There is L-shaped bar 9,9 lower end of L-shaped bar is mounted on 7 upside of the second sliding block by welding, and 7 right end of the second sliding block passes through welding Mode is equipped with movable plate 10, and 10 downside right of movable plate is equipped with fixed plate 11,11 downside of fixed plate by welding It is connected with lanyard 12.
Embodiment 2
A kind of natural gas line installation gripping arranging apparatus, as shown in Figs. 1-5, includes installing plate 1, wheel 2, the first sliding rail 3rd, the first sliding block 4, supporting rod 5, the second sliding rail 6, the second sliding block 7, cylinder 8, L-shaped bar 9, movable plate 10, fixed plate 11 and lanyard 12,1 downside of installing plate is equipped with wheel 2, and 1 upside of installing plate is equipped with the first sliding rail 3, the first sliding rail by bolted connection 3 inner sliding types are connected with the first sliding block 4, and 4 upper end of the first sliding block is equipped with supporting rod 5,5 right side of supporting rod by welding Second sliding rail 6 is installed by bolted connection, 6 inner sliding type of the second sliding rail is connected with the second sliding block 7, and supporting rod 5 is left Side is equipped with cylinder 8 by bolted connection, is installed by welding on the upside of 8 telescoping cylinder of cylinder of 8 upper end of cylinder There is L-shaped bar 9,9 lower end of L-shaped bar is mounted on 7 upside of the second sliding block by welding, and 7 right end of the second sliding block passes through welding Mode is equipped with movable plate 10, and 10 downside right of movable plate is equipped with fixed plate 11,11 downside of fixed plate by welding It is connected with lanyard 12.
Clamping device 30 is further included, clamping device 30 includes guide sleeve 301, guide rail 302, the first rack 303, the first spiral shell Bar 305, first gear 306 and clamping plate 307,11 front side of fixed plate are equipped with clamping device 30, and 11 front side top of fixed plate passes through weldering The mode connect is equipped with guide sleeve 301, and 301 inner sliding type of guide sleeve is connected with guide rail 302, and the 302 downside left and right sides of guide rail is connected with First rack 303, the right side of guide sleeve 301 are provided with threaded hole 304, are rotary with the first screw rod 305 in threaded hole 304, the first screw rod 305 with Threaded hole 304 coordinates, and the front side of the fixed plate 11 lower section left and right sides is rotatably connected with first gear 306, first gear 306 and the One rack 303 engages, and 306 rear side of first gear is connected with clamping plate 307.
Embodiment 3
A kind of natural gas line installation gripping arranging apparatus, as shown in Figs. 1-5, includes installing plate 1, wheel 2, the first sliding rail 3rd, the first sliding block 4, supporting rod 5, the second sliding rail 6, the second sliding block 7, cylinder 8, L-shaped bar 9, movable plate 10, fixed plate 11 and lanyard 12,1 downside of installing plate is equipped with wheel 2, and 1 upside of installing plate is equipped with the first sliding rail 3, the first sliding rail by bolted connection 3 inner sliding types are connected with the first sliding block 4, and 4 upper end of the first sliding block is equipped with supporting rod 5,5 right side of supporting rod by welding Second sliding rail 6 is installed by bolted connection, 6 inner sliding type of the second sliding rail is connected with the second sliding block 7, and supporting rod 5 is left Side is equipped with cylinder 8 by bolted connection, is installed by welding on the upside of 8 telescoping cylinder of cylinder of 8 upper end of cylinder There is L-shaped bar 9,9 lower end of L-shaped bar is mounted on 7 upside of the second sliding block by welding, and 7 right end of the second sliding block passes through welding Mode is equipped with movable plate 10, and 10 downside right of movable plate is equipped with fixed plate 11,11 downside of fixed plate by welding It is connected with lanyard 12.
Clamping device 30 is further included, clamping device 30 includes guide sleeve 301, guide rail 302, the first rack 303, the first spiral shell Bar 305, first gear 306 and clamping plate 307,11 front side of fixed plate are equipped with clamping device 30, and 11 front side top of fixed plate passes through weldering The mode connect is equipped with guide sleeve 301, and 301 inner sliding type of guide sleeve is connected with guide rail 302, and the 302 downside left and right sides of guide rail is connected with First rack 303, the right side of guide sleeve 301 are provided with threaded hole 304, are rotary with the first screw rod 305 in threaded hole 304, the first screw rod 305 with Threaded hole 304 coordinates, and the front side of the fixed plate 11 lower section left and right sides is rotatably connected with first gear 306, first gear 306 and the One rack 303 engages, and 306 rear side of first gear is connected with clamping plate 307.
Nut 3021, the second screw rod 3022 and briquetting 3023 are further included, 1 right side of installing plate is installed by welding There is nut 3021, the second screw rod 3022 is rotary in nut 3021, the second screw rod 3022 coordinates with nut 3021, the second screw rod 3022 Lower end is rotatably connected with briquetting 3023.
Embodiment 4
A kind of natural gas line installation gripping arranging apparatus, as shown in Figs. 1-5, includes installing plate 1, wheel 2, the first sliding rail 3rd, the first sliding block 4, supporting rod 5, the second sliding rail 6, the second sliding block 7, cylinder 8, L-shaped bar 9, movable plate 10, fixed plate 11 and lanyard 12,1 downside of installing plate is equipped with wheel 2, and 1 upside of installing plate is equipped with the first sliding rail 3, the first sliding rail by bolted connection 3 inner sliding types are connected with the first sliding block 4, and 4 upper end of the first sliding block is equipped with supporting rod 5,5 right side of supporting rod by welding Second sliding rail 6 is installed by bolted connection, 6 inner sliding type of the second sliding rail is connected with the second sliding block 7, and supporting rod 5 is left Side is equipped with cylinder 8 by bolted connection, is installed by welding on the upside of 8 telescoping cylinder of cylinder of 8 upper end of cylinder There is L-shaped bar 9,9 lower end of L-shaped bar is mounted on 7 upside of the second sliding block by welding, and 7 right end of the second sliding block passes through welding Mode is equipped with movable plate 10, and 10 downside right of movable plate is equipped with fixed plate 11,11 downside of fixed plate by welding It is connected with lanyard 12.
Clamping device 30 is further included, clamping device 30 includes guide sleeve 301, guide rail 302, the first rack 303, the first spiral shell Bar 305, first gear 306 and clamping plate 307,11 front side of fixed plate are equipped with clamping device 30, and 11 front side top of fixed plate passes through weldering The mode connect is equipped with guide sleeve 301, and 301 inner sliding type of guide sleeve is connected with guide rail 302, and the 302 downside left and right sides of guide rail is connected with First rack 303, the right side of guide sleeve 301 are provided with threaded hole 304, are rotary with the first screw rod 305 in threaded hole 304, the first screw rod 305 with Threaded hole 304 coordinates, and the front side of the fixed plate 11 lower section left and right sides is rotatably connected with first gear 306, first gear 306 and the One rack 303 engages, and 306 rear side of first gear is connected with clamping plate 307.
Nut 3021, the second screw rod 3022 and briquetting 3023 are further included, 1 right side of installing plate is installed by welding There is nut 3021, the second screw rod 3022 is rotary in nut 3021, the second screw rod 3022 coordinates with nut 3021, the second screw rod 3022 Lower end is rotatably connected with briquetting 3023.
Linkage clamp device 31 is further included, linkage clamp device 31 includes the second rack 311, third rack 312, the One fixed block 313, second gear 314, the second fixed block 315, third gear 316, runner 317 and transmission item 318, movable plate 10 It is equipped with linkage clamp device 31, the front side of installing plate 1 middle part is connected with the second rack 311, and 302 left side top of guide rail is connected with the Three racks 312,10 front side left of movable plate are equipped with the first fixed block 313 by welding, and the first fixed block 313 is located at Second rack, 311 right, 315 front side top of the second fixed block are rotatably connected with second gear 314, second gear 314 and Two racks 311 engage, and 10 front side left of movable plate and front side right are equipped with the second fixed block 315 by welding, the Two fixed blocks 315 are located at 313 right of the first fixed block, and 315 front side top of the second fixed block is rotatably connected with third gear 316, left side third gear 316 is engaged with second gear 314, and right side third gear 316 is engaged with third rack 312, third tooth 316 front side of wheel is connected with runner 317, and transmission item 318 is connected between runner 317.
Connecting rod 3121, reel 3122, crank 3123, steel wire rope 3124 and fixed pulley 3125, installing plate 1 are further included Upside left is equipped with connecting rod 3121 by welding, and 3121 front side top of connecting rod is rotatably connected with reel 3122,3122 front side of reel is connected with crank 3123, and steel wire rope 3124 is wound on reel 3122, and 3121 left side of connecting rod connects Fixed pulley 3125 is connected to, steel wire rope 3124 is connected to 4 left side of the first sliding block by fixed pulley 3125.
Operation principle:When user needs to install natural gas line, which can be moved to by user On the left of the natural gas line mounting groove of required installation natural gas line, Natural Gas Pipeline Transportation to be mounted then will be needed to the peace The right side of tankage, then user cylinder 8 can be controlled to extend, 8 telescopic rod of cylinder drives L-shaped bar 9 to move up, so as to drive the Two sliding blocks 7 and movable plate 10 move up, and so as to which fixed plate 11 and lanyard 12 be driven to move up, then user can move right Dynamic first sliding block 4, the first sliding block 4 drives supporting rod 5 to move right, solid so as to drive so as to which movable plate 10 be driven to move right Fixed board 11 and lanyard 12 move right, so as to make fixed plate 11 and lanyard 12 is located above natural gas line, then user's control Cylinder 8 shortens, and 8 telescopic rod of cylinder drives fixed plate 11 and lanyard 12 to move down, and then lanyard 12 can be hung over day by user In right feed channel, then user can control cylinder 8 to extend slightly, and natural gas line is made to be detached from ground, and then user can be to The first sliding block 4 is moved left, the first sliding block 4 will drive lanyard 12 and natural gas line to be moved to the left, so as to move natural gas line It moves above natural gas line mounting groove, lanyard 12 then can be unlocked with user, make to fall on natural gas under natural gas line In Pipe installing slot.
Because having further included clamping device 30, clamping device 30 includes guide sleeve 301, guide rail 302, the first rack 303, One screw rod 305, first gear 306 and clamping plate 307,11 front side of fixed plate are equipped with clamping device 30, and 11 front side top of fixed plate leads to The mode for crossing welding is equipped with guide sleeve 301, and 301 inner sliding type of guide sleeve is connected with guide rail 302, and the 302 downside left and right sides of guide rail connects The first rack 303 is connected to, 301 right side of guide sleeve is provided with threaded hole 304, the first screw rod 305, the first screw rod are rotary in threaded hole 304 305 coordinate with threaded hole 304, and the 11 front side lower section left and right sides of fixed plate is rotatably connected with first gear 306, first gear 306 engage with the first rack 303, and 306 rear side of first gear is connected with clamping plate 307, when user needs stable fix naturally During feed channel, user can be moved up with push rail 302, so as to which the first rack 303 be driven to move up, so as to make the first tooth Item 303 drives first gear 306 to rotate, and first gear 306 drives the angle between clamping plate 307 to reduce, so as to clamp natural gas Pipeline, then user can rotate the first screw rod 305, the first screw rod 305 by the precession to the left of the cooperation with threaded hole 304, from And the first screw rod 305 is made, which to fix guide rail 302, makes it no longer be moved, so as to which clamping plate 307 be made to clamp natural gas line.
Because having further included nut 3021, the second screw rod 3022 and briquetting 3023,1 right side of installing plate is by welding Nut 3021 is installed, the second screw rod 3022 is rotary in nut 3021, the second screw rod 3022 coordinates with nut 3021, the second screw rod 3022 lower ends are rotatably connected with briquetting 3023, and when user is when natural gas line is placed in installation, user can rotate the Two screw rods 3022, the second screw rod 3022 is by the downward precession of cooperation with nut 3021, so as to which the second screw rod 3022 be made to push pressure Block 3023 moves down, so as to which briquetting 3023 be made to touch ground, so as to which briquetting 3023 be enable to fix the equipment on ground On.
Because having further included linkage clamp device 31, linkage clamp device 31 includes the second rack 311, third rack 312nd, the first fixed block 313, second gear 314, the second fixed block 315, third gear 316, runner 317 and transmission item 318, are moved Movable plate 10 is equipped with linkage clamp device 31, and 1 front side middle part of installing plate is connected with the second rack 311, and 302 left side top of guide rail connects Third rack 312 is connected to, 10 front side left of movable plate is equipped with the first fixed block 313, the first fixed block by welding 313 are located at 311 right of the second rack, and 315 front side top of the second fixed block is rotatably connected with second gear 314, second gear 314 engage with the second rack 311, and 10 front side left of movable plate and front side right are equipped with the second fixed block by welding 315, the second fixed block 315 is located at 313 right of the first fixed block, and 315 front side top of the second fixed block is rotatably connected with third Gear 316, left side third gear 316 are engaged with second gear 314, and right side third gear 316 is engaged with third rack 312, the Three gears, 316 front side is connected with runner 317, transmission item 318 is connected between runner 317, when user needs to move down fixation When directly gripping natural gas line during plate 11, when movable plate 10 moves down, the first fixed block 313 will be driven to move up, So as to which second gear 314 be driven to be rotated clockwise on the second rack 311, second gear 314 will drive left side third gear 316 Rotation counterclockwise, so as to which left side runner 317 be driven to rotate counterclockwise, left side runner 317 drives right side runner by being driven item 318 317 rotations counterclockwise, so as to drive the rotation counterclockwise of right side third gear 316, so as to which third rack 312 be driven to move up, Natural gas line is gripped so as to which the angle between clamping plate 307 be driven to reduce, then user can move up shifting slightly Movable plate 10 makes natural gas line be detached from ground without departing from clamping plate 307.
Because having further included connecting rod 3121, reel 3122, crank 3123, steel wire rope 3124 and fixed pulley 3125, peace 1 upside left of loading board is equipped with connecting rod 3121 by welding, 3121 front side top of connecting rod be rotatably connected with around Line wheel 3122,3122 front side of reel are connected with crank 3123, steel wire rope 3124 are wound on reel 3122, and connecting rod 3121 is left Side is connected with fixed pulley 3125, and steel wire rope 3124 is connected to 4 left side of the first sliding block by fixed pulley 3125, when user's needs are laborsaving When being moved to the left the first sliding block 4, user can rotate clockwise crank 3123, and crank 3123 drives reel 3122 clockwise Rotation, so as to make 3122 wraparound steel wire rope 3124 of reel, so as to make steel wire rope 3124 that the first sliding block 4 be driven to be moved to the left.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

1. a kind of natural gas line installation gripping arranging apparatus, which is characterized in that include installing plate(1), wheel(2), One sliding rail(3), the first sliding block(4), supporting rod(5), the second sliding rail(6), the second sliding block(7), cylinder(8), L-shaped bar(9), it is mobile Plate(10), fixed plate(11)And lanyard(12), installing plate(1)Downside is equipped with wheel(2), installing plate(1)Upside is connected by bolt The mode connect is equipped with the first sliding rail(3), the first sliding rail(3)Inner sliding type is connected with the first sliding block(4), the first sliding block(4)On End is equipped with supporting rod by welding(5), supporting rod(5)Right side is equipped with the second sliding rail by bolted connection (6), the second sliding rail(6)Inner sliding type is connected with the second sliding block(7), supporting rod(5)Bolted mode is passed on left to install There is cylinder(8), cylinder(8)The cylinder of upper end(8)L-shaped bar is installed by welding on the upside of telescoping cylinder(9), L-shaped bar(9) Lower end is mounted on the second sliding block by welding(7)Upside, the second sliding block(7)Right end is equipped with shifting by welding Movable plate(10), movable plate(10)Downside right is equipped with fixed plate by welding(11), fixed plate(11)Downside connects There is lanyard(12).
2. a kind of natural gas line installation gripping arranging apparatus according to claim 1, which is characterized in that further included Clamping device(30), clamping device(30)Include guide sleeve(301), guide rail(302), the first rack(303), the first screw rod (305), first gear(306)And clamping plate(307), fixed plate(11)Front side is equipped with clamping device(30), fixed plate(11)Front side Top is equipped with guide sleeve by welding(301), guide sleeve(301)Inner sliding type is connected with guide rail(302), guide rail(302) The first rack is connected at left and right sides of downside(303), guide sleeve(301)Right side is provided with threaded hole(304), threaded hole(304)Inward turning There is the first screw rod(305), the first screw rod(305)With threaded hole(304)Cooperation, fixed plate(11)The left and right sides rotates below front side Formula is connected with first gear(306), first gear(306)With the first rack(303)Engagement, first gear(306)Rear side connects There is clamping plate(307).
3. a kind of natural gas line installation gripping arranging apparatus according to claim 2, which is characterized in that further included Nut(3021), the second screw rod(3022)And briquetting(3023), installing plate(1)Right side is equipped with nut by welding (3021), nut(3021)Inside it is rotary with the second screw rod(3022), the second screw rod(3022)With nut(3021)Cooperation, the second screw rod (3022)Lower end is rotatably connected with briquetting(3023).
4. a kind of natural gas line installation gripping arranging apparatus according to claim 3, which is characterized in that further included Link clamp device(31), link clamp device(31)Include the second rack(311), third rack(312), the first fixed block (313), second gear(314), the second fixed block(315), third gear(316), runner(317)With transmission item(318), it is mobile Plate(10)It is equipped with linkage clamp device(31), installing plate(1)The second rack is connected in the middle part of front side(311), guide rail(302)It is left Third rack is connected with above side(312), movable plate(10)Front side left is equipped with the first fixed block by welding (313), the first fixed block(313)Positioned at the second rack(311)Right, the second fixed block(315)Front side top rotatably connects There is second gear(314), second gear(314)With the second rack(311)Engagement, movable plate(10)Front side left and front side right Second fixed block is installed by welding(315), the second fixed block(315)Positioned at the first fixed block(313)Right, the Two fixed blocks(315)Front side top is rotatably connected with third gear(316), left side third gear(316)With second gear (314)Engagement, right side third gear(316)With third rack(312)Engagement, third gear(316)Front side is connected with runner (317), runner(317)Between be connected with transmission item(318).
5. a kind of natural gas line installation gripping arranging apparatus according to claim 4, which is characterized in that further included Connecting rod(3121), reel(3122), crank(3123), steel wire rope(3124)And fixed pulley(3125), installing plate(1)Upside Left is equipped with connecting rod by welding(3121), connecting rod(3121)Front side top is rotatably connected with reel (3122), reel(3122)Front side is connected with crank(3123), reel(3122)On be wound with steel wire rope(3124), connecting rod (3121)Left side is connected with fixed pulley(3125), steel wire rope(3124)Pass through fixed pulley(3125)It is connected to the first sliding block(4)It is left Side.
CN201810019149.2A 2018-01-09 2018-01-09 A kind of natural gas line installation gripping arranging apparatus Pending CN108178062A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810019149.2A CN108178062A (en) 2018-01-09 2018-01-09 A kind of natural gas line installation gripping arranging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810019149.2A CN108178062A (en) 2018-01-09 2018-01-09 A kind of natural gas line installation gripping arranging apparatus

Publications (1)

Publication Number Publication Date
CN108178062A true CN108178062A (en) 2018-06-19

Family

ID=62550289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810019149.2A Pending CN108178062A (en) 2018-01-09 2018-01-09 A kind of natural gas line installation gripping arranging apparatus

Country Status (1)

Country Link
CN (1) CN108178062A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113042714A (en) * 2021-03-11 2021-06-29 包骏骥 Demoulding clamp capable of rapidly demoulding

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205687404U (en) * 2016-05-25 2016-11-16 沈阳格泰水电设备有限公司 Turbine impeller stone tongs
CN107023712A (en) * 2017-05-27 2017-08-08 南昌浩牛科技有限公司 A kind of transport burial equipment buried for underground piping
CN107322089A (en) * 2017-08-18 2017-11-07 文永林 A kind of natural gas line is produced with convenient conveying type cutter device
CN107419793A (en) * 2017-05-27 2017-12-01 南昌诺义弘科技有限公司 A kind of burial equipment of subsoil drain

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205687404U (en) * 2016-05-25 2016-11-16 沈阳格泰水电设备有限公司 Turbine impeller stone tongs
CN107023712A (en) * 2017-05-27 2017-08-08 南昌浩牛科技有限公司 A kind of transport burial equipment buried for underground piping
CN107419793A (en) * 2017-05-27 2017-12-01 南昌诺义弘科技有限公司 A kind of burial equipment of subsoil drain
CN107322089A (en) * 2017-08-18 2017-11-07 文永林 A kind of natural gas line is produced with convenient conveying type cutter device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113042714A (en) * 2021-03-11 2021-06-29 包骏骥 Demoulding clamp capable of rapidly demoulding

Similar Documents

Publication Publication Date Title
CN108599007A (en) A kind of apparatus and method of high-tension line unmanned plane installation pulley insulating cord
CN207877016U (en) A kind of wire reel automatic handling device
CN204416793U (en) Backspring device
CN204549828U (en) A kind of metal pipe material auxiliary hoisting device
CN108172394A (en) A kind of coil winder
CN108691513A (en) A kind of Operating Pressure well head plays down tube and fortune pipe automation operating system and its device
JP2016152698A (en) Cable lifting device and cable laying method
CN108178062A (en) A kind of natural gas line installation gripping arranging apparatus
CN206929434U (en) A kind of pipe gallery line holder
ITTO20100711A1 (en) PARKING EQUIPMENT AND AUTOMATIC HANDLING OF DRILLING RODS AND ASSOCIATED DRILLING MACHINE
CN216157196U (en) Handling device for construction convenient to transport
CN207975465U (en) A kind of circulating cylinder for liquefied gas automatic loading production line
CN208174162U (en) It is a kind of quickly to repair cable robot
CN108298431A (en) A kind of natural gas line placement hanging device
CN107673263B (en) Lifting device is used in solar water container installation
CN106946088B (en) High-voltage grounding wire access device
CN103556811B (en) A kind of operation umbrella for restricted clearance is jumped and using method
CN102633160B (en) Automatic winding device of shuttle wire-unwinding machine of fishing net weaving machine
CN208456155U (en) A kind of steel girder erection auxiliary device used for construction
CN208360568U (en) A kind of high-strength screw-thread steel baling equipment
CN208672449U (en) A kind of stretch-proof test equipment for automobile interiors
CN207296917U (en) A kind of petroleum well workover pipe racking device
CN206439628U (en) A kind of CNG loads and unloads device of air
CN207418173U (en) Pulley lifting device
CN105507830B (en) Rack pipe mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180619