CN207150036U CN201720968141.1U CN201720968141U CN207150036U CN 207150036 U CN207150036 U CN 207150036U CN 201720968141 U CN201720968141 U CN 201720968141U CN 207150036 U CN207150036 U CN 207150036U
Authority
CN
China
Prior art keywords
guide rail
pull rope
electric block
vertical guide
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720968141.1U
Other languages
Chinese (zh)
Inventor
郑绪春
童庆望
徐侠松
王杰
汤祖澎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hubei Electric Power Transmission and Distribution Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201720968141.1U priority Critical patent/CN207150036U/en
Application granted granted Critical
Publication of CN207150036U publication Critical patent/CN207150036U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a kind of pinion and-rack split conductor line lifter.The line lifter is respectively arranged with the first electric block at spreader beam both ends, and on corresponding first electric block, the other end of the both ends of horizontal guide rail respectively with two the first pull ropes is connected the one ends wound of the first pull rope;Rack is provided with horizontal guide rail, second electric block is arranged on the spreader beam between two the first electric blocks, the middle part of second pull rope bypasses the second electric block, both ends of the both ends at the top of fagging respectively with the second pull rope are connected, two the 3rd pull rope both ends are connected to fagging both ends and the top of corresponding vertical guide rail, vertical guide rail for carry wire is provided with the pilot hole passed through by horizontal guide rail, and being meshed with the rack on horizontal guide rail and being sleeved on the gear on the output shaft of motor is movably arranged in corresponding pilot hole.The utility model can reduce the whole labor intensity for carrying line process, improve the security and efficiency of work.

Description

Pinion and-rack split conductor line lifter
Technical field
The utility model belongs to power transmission and transformation power line construction technical field, more particularly to a kind of division of pinion and-rack is led Line line lifter.
Background technology
Trade mark be the producer of commodity, operator produce at it, manufacture, processing, choosing on the commodity either sold or What the supplier of service used in the service that it is provided, for distinguishing commodity or servicing source, by word, figure, letter, Numeral, three-dimensional symbol, sound, color combination, or the combination of above-mentioned key element, have the mark of notable feature, are modern economies Product.
China electrical distribution is uneven, it is necessary to long distance powedr transmission, therefore defeated using extra-high voltage and super extra-high voltage more and more Electricity.Extra high voltage line transmission capacity is big, and security reliability is high, and extra high voltage line shaft tower is high, span is big, the increase of wire radical, leads Load level is caused to greatly improve, meanwhile, the diameter and weight of corresponding power transmission line and ground wire are also increasing.In order to reduce loss With raising power transmission efficiency, the use of split conductor is more and more extensive, such as the ultra-high-tension power transmission line for 220kV, usually using 2 Split conductor, 500kV ultra-high-tension power transmission line, usually used 4 split conductors, the transmission line of electricity of 750kV Northwest Grid, generally Using 6 split conductors, and 1000kV UHV transmission line, the split conductor of generally use eight.
Installation for eight points of column wires, it is all more multiple from unwrapping wire, stringing, hanging wire to the whole stringing technique of annex installation It is miscellaneous, it is general using technical maturity " 2 × mono- lead four " equipment synchronously unfolding mode, and main Work tool is hauling machine, tensioner, is led Line releasing pulley, pull rope.
During the utility model is realized, it is found by the applicant that prior art at least has the following disadvantages:
Because eight split conductors have, wire harness total cross section is big, sub-line quantity is more, the relative difficult control of sag and flatness between sub-line The features such as processed, certain difficulty is brought to later stage stringing, annex installation.Especially finally eight wires are installed to exactly In conductor spacer, so as to be finally completed the erection process of whole wire.This current country that works is substantially complete by manpower whole process Into, and at least need six workers to carry out coordinating operation in high-altitude.In addition, conductor length is long, weight is big, flying height is high and high Some empty uncertain factors all determine that task difficulty and degree of danger are larger.
Utility model content
Problem be present for above-mentioned prior art, the utility model provides a kind of automaticity high pinion and-rack point Wire lifting device is split, to reduce the whole labor intensity for carrying line process, improves security and efficiency of construction.
The utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of pinion and-rack split conductor line lifter, the line lifter include spreader beam, the first electric block, the first traction Rope, horizontal guide rail, gear, motor and lifting assembly, first electric block are provided with two, two first electricity Dynamic cucurbit is arranged on the spreader beam both ends, and first pull rope is corresponded with first electric block and set, Mei Gesuo State the first pull rope one end be wrapped in corresponding on first electric block, the both ends of the horizontal guide rail are respectively with two The other end connection of individual first pull rope;Rack, the lifting group are provided with the horizontal guide rail along its length Part includes the second electric block, the second pull rope, fagging, the 3rd pull rope and vertical guide rail, the second electric block installation On spreader beam between two first electric blocks, the middle part of second pull rope bypasses second electric block, Both ends of the both ends at the top of the fagging respectively with second pull rope are connected, and the 3rd pull rope and vertical guide rail are equal Two are correspondingly arranged on, one end of two the 3rd pull ropes is connected to the both ends of the bottom of the fagging, two institutes The other end for stating the 3rd pull rope connects with the top of the corresponding vertical guide rail respectively, and each vertical guide rail is along it Length direction is provided with pilot hole, and the horizontal guide rail passes through all pilot holes, the motor, the gear with The vertical guide rail, which corresponds, to be set, and the gear is movably arranged in the pilot hole of the corresponding vertical guide rail, The gear is meshed with the rack on the horizontal guide rail, and the gear is fixedly set in the output shaft of the motor On, the bottom of the vertical guide rail is used for carry wire.
Further, the lifting assembly also includes hoisting rope, and the one ends wound of the hoisting rope is electronic described second On cucurbit, the other end of the hoisting rope passes through the fagging, and extends downwardly, and rotates the other end of hoisting rope, can be to support The height of plate and two vertical guide rails is finely adjusted.
Further, the bottom of the vertical guide rail is provided with hook, for carry wire.
Further, the hook is linked up with for separation preventing.
The beneficial effects of the utility model are:
A kind of pinion and-rack split conductor line lifter of the present utility model, when in use, is first lifting wire carry On vertical guide rail in component, and cross-arm is fixed on tower crane, then controls the first electric block of both sides, make horizontal guide rail To proper height, then the second electric block in lifting assembly is controlled, adjustment vertical guide rail makes the height of wire to proper height Position meets requirement, finally controls motor, gear drives vertical guide rail horizontally to move, and then makes the horizontal position of wire Put satisfaction to require, that is, complete the positioning of wire, and then installation of the row conductor on conductor spacer can be entered, have it is simple in construction, Easy to operate, the characteristics of automaticity is high, the whole labor intensity for carrying line process can be reduced, improve the security and effect of work Rate.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is a kind of arrangement schematic diagram of pinion and-rack split conductor line lifter of the utility model embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
The utility model embodiment discloses a kind of pinion and-rack split conductor line lifter, to realize automation installation point Split wire.
Fig. 1 is a kind of arrangement schematic diagram of pinion and-rack split conductor line lifter of the utility model embodiment.Referring to Fig. 1, a kind of pinion and-rack split conductor line lifter of the utility model embodiment, including spreader beam 1, the first electric block 2, One pull rope 3, horizontal guide rail 4, gear 5, motor 6 and lifting assembly, wherein, the first electric block 2 is provided with two, and two Individual first electric block 2 is arranged on the both ends of spreader beam 1, and the first pull rope 3 and the first electric block 2, which correspond, to be set, Mei Ge One end of one pull rope 3 is wrapped on corresponding first electric block 2, and the both ends of horizontal guide rail 4 are led with two first respectively The other end connection of messenger 3;Rack 16 is provided with horizontal guide rail 4 along its length.
With reference to Fig. 1, the lifting assembly of the utility model embodiment includes the second electric block 11, the second pull rope 12, support Plate 7, the 3rd pull rope 8 and vertical guide rail 9, the second electric block 11 are arranged on the spreader beam 1 between two the first electric blocks 2 On, the middle part of the second pull rope 12 bypasses the second electric block 11, the both ends at the top of fagging 7 respectively with the second pull rope 12 Both ends connect, and the 3rd pull rope 8 and vertical guide rail 9 are correspondingly arranged on two, and one end of two the 3rd pull ropes 8 connects respectively At the both ends of the bottom of fagging 7, the other end of two the 3rd pull ropes 8 connects with the top of corresponding vertical guide rail 9 respectively, often Individual vertical guide rail 9 is provided with pilot hole 10 along its length, and horizontal guide rail 4 passes through all pilot holes 10, motor 5th, gear 6 is corresponded with vertical guide rail 9 and set, and gear 6 is movably arranged in the pilot hole 10 of corresponding vertical guide rail 9, tooth Wheel 6 can be vertically movable along pilot hole 10, and gear 6 is meshed with the rack 16 on horizontal guide rail 4, and gear 6 is fixedly set in driving On the output shaft of motor 5, the bottom of vertical guide rail 9 is used for carry wire 13.
A kind of pinion and-rack split conductor line lifter of the utility model embodiment, when in use, first by wire carry On vertical guide rail in lifting assembly, and cross-arm is fixed on tower crane, then controls the first electric block of both sides, make water Level gauge is to proper height, then controls the second electric block in lifting assembly, and adjustment vertical guide rail makes wire to proper height Height and position meet to require, finally control motor, gear drives vertical guide rail horizontally to move, and then makes wire Horizontal level meets requirement, that is, completes the positioning of wire, and then can enter installation of the row conductor on conductor spacer, has structure It is simple and convenient to operate, the characteristics of automaticity is high, the whole labor intensity for carrying line process can be reduced, improves the safety of work Property and efficiency.
With reference to Fig. 1, in the utility model embodiment, the bottom of spreader beam 1 can be provided with multiple pegs 14, the first electronic calabash The electric block 11 of reed 2 and second may be mounted on corresponding peg 14.
The lifting assembly of the utility model embodiment can be provided with one, can so install binary fission wire.Lifting Component can also be provided with two, three or four, so install conductors on quad bundled, six-multiple conductor and eight split conductors.It is right The installation of conductors on quad bundled, six-multiple conductor and eight split conductors is answered, preferably with the line lifter for only setting a lifting assembly It is repeated several times, is so that can mitigate load-bearing requirements of the wire to lifter.
With reference to Fig. 1, the lifting assembly of the utility model embodiment can also include hoisting rope 15, one end of the hoisting rope 15 It is wrapped on the second electric block 11, the other end of hoisting rope 15 passes through fagging 7, and extends downwardly, and rotates the another of hoisting rope 7 End, can be finely adjusted to the height of fagging 7 and two vertical guide rails 9.
Further, the utility model embodiment is provided with hook in the bottom of vertical guide rail 9, for carry wire.Hook Preferably linked up with from separation preventing, to prevent wire from departing from when mounted from hook.
Certainly, wire can also directly hang over the end of vertical guide rail 9 by rope system, and the utility model embodiment is to leading Carry mode of the line on vertical guide rail 9 is not limited herein.
Embodiment provided above is better embodiment of the present utility model, is only used for convenient explanation the utility model, and It is non-to make any formal limitation, any those of ordinary skill in the art to the utility model, if not departing from In the range of the utility model carries technical characteristic, locally change or repair using made by the utility model disclosed technology content The equivalent embodiment of decorations, and without departing from the technical characteristics of the utility model content, still fall within the utility model technical characteristic In the range of.

Claims (4)

1. a kind of pinion and-rack split conductor line lifter, it is characterised in that the line lifter includes spreader beam, the first electronic calabash Reed, the first pull rope, horizontal guide rail, gear, motor and lifting assembly, first electric block are provided with two, and two Individual first electric block is arranged on the spreader beam both ends, and first pull rope corresponds with first electric block Set, one end of each first pull rope is wrapped on corresponding first electric block, the horizontal guide rail The other end of the both ends respectively with two first pull ropes is connected;Set along its length on the horizontal guide rail with teeth Bar, the lifting assembly include the second electric block, the second pull rope, fagging, the 3rd pull rope and vertical guide rail, and described second Electric block is arranged on the spreader beam between two first electric blocks, and the middle part of second pull rope is around described the Two electric blocks, the both ends of the both ends at the top of the fagging respectively with second pull rope are connected, the 3rd pull rope Two are correspondingly arranged on vertical guide rail, one end of two the 3rd pull ropes is connected to the bottom of the fagging Both ends, the other end of two the 3rd pull ropes connect with the top of the corresponding vertical guide rail respectively, each described vertical Straight guide is provided with pilot hole along its length, and the horizontal guide rail passes through all pilot holes, the driving electricity Machine, the gear are corresponded with the vertical guide rail and set, and the gear is movably arranged on the corresponding vertical guide rail In the pilot hole, the gear is meshed with the rack on the horizontal guide rail, and the gear is fixedly set in the driving On the output shaft of motor, the bottom of the vertical guide rail is used for carry wire.
2. pinion and-rack split conductor line lifter according to claim 1, it is characterised in that the lifting assembly is also wrapped Hoisting rope is included, the one ends wound of the hoisting rope is on second electric block, and the other end of the hoisting rope is described in Fagging, and extend downwardly.
3. pinion and-rack split conductor line lifter according to claim 2, it is characterised in that the bottom of the vertical guide rail End is provided with hook.
4. pinion and-rack split conductor line lifter according to claim 3, it is characterised in that the hook is separation preventing Hook.
CN201720968141.1U 2017-08-04 2017-08-04 Pinion and-rack split conductor line lifter Active CN207150036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720968141.1U CN207150036U (en) 2017-08-04 2017-08-04 Pinion and-rack split conductor line lifter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720968141.1U CN207150036U (en) 2017-08-04 2017-08-04 Pinion and-rack split conductor line lifter

Publications (1)

Publication Number Publication Date
CN207150036U true CN207150036U (en) 2018-03-27

Family

ID=61674374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720968141.1U Active CN207150036U (en) 2017-08-04 2017-08-04 Pinion and-rack split conductor line lifter

Country Status (1)

Country Link
CN (1) CN207150036U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113666285A (en) * 2021-09-03 2021-11-19 中铁建大桥工程局集团第五工程有限公司 Socket joint formula nodular cast-iron pipe installation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113666285A (en) * 2021-09-03 2021-11-19 中铁建大桥工程局集团第五工程有限公司 Socket joint formula nodular cast-iron pipe installation device

Similar Documents

Publication Publication Date Title
CN102290742B (en) Tension stringing construction technology
CN104299489B (en) Super-pressure and extra-high voltage hybrid multifunctional transmission line of electricity training set
CN207150036U (en) Pinion and-rack split conductor line lifter
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN105800462A (en) Anti-explosion electric single beam crane
CN101582571A (en) Multi-supporting point self balancing paying-off tackle
CN104836156A (en) Synthetic insulator simple ladder
CN204754412U (en) Same terminal pole of two telegram in reply cables at present of unilateral cross arm
CN207150037U (en) Motor-driven split conductor line lifter
CN209585580U (en) Huge column modular is tilted from lifting operation platform
CN105776034A (en) Explosion-poof bridge crane
CN205346676U (en) High -speed railway of not stopping transport across device's span beam becomes width of cloth rotary mechanism
CN205653060U (en) Explosion -protection bridge crane
CN201466574U (en) Device for isoelectrically replacing insulator and accessory of iron tower of transmission line
CN205355673U (en) High -speed railway of not stopping transport across device's span beam rotary mechanism
CN201946913U (en) Working tool for electrified replacement of T-shaped hanging point suspension insulator on 110 kV line steel tube rod
CN105480873A (en) Support bar amplitude variation rotating mechanism of non-shutdown high-speed rail spanning device
CN201498948U (en) Novel traction tool
CN207218127U (en) A kind of high intensity packway bar
CN202856238U (en) Tool for live-line replacement of phase insulator chain in multi-circuit steel tower
CN203271226U (en) 220-kV one-way cable terminal steel pole tower
CN212387631U (en) Auxiliary lifting frame special for wiring robot
CN214934920U (en) Auxiliary device for cable processing
CN205329544U (en) High -speed railway of not stopping transport across device crosses over bridge floor system
CN104340899A (en) Manual gear type column switch hoisting device and application thereof

Legal Events