CN106435087B - A kind of converter vaporization flue piecewise combination installation method - Google Patents
A kind of converter vaporization flue piecewise combination installation method Download PDFInfo
- Publication number
- CN106435087B CN106435087B CN201610744276.XA CN201610744276A CN106435087B CN 106435087 B CN106435087 B CN 106435087B CN 201610744276 A CN201610744276 A CN 201610744276A CN 106435087 B CN106435087 B CN 106435087B
- Authority
- CN
- China
- Prior art keywords
- flue
- oblique section
- lifting
- crane
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/28—Manufacture of steel in the converter
- C21C5/38—Removal of waste gases or dust
- C21C5/40—Offtakes or separating apparatus for converter waste gases or dust
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/28—Manufacture of steel in the converter
- C21C5/42—Constructional features of converters
- C21C5/46—Details or accessories
- C21C5/4686—Vehicles for supporting and transporting a converter vessel
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/25—Process efficiency
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Environmental & Geological Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of converter vaporization flue piecewise combination installation method of the present invention, the installation method includes the following steps:Including following construction procedure:Step 1: preparation of construction;Step 2: group pair;Gasification cooling flue, since diameter is big, state of marching into the arena substantially is that segmentation is marched into the arena, in view of reducing the safety of working at height, in the case where permission is turned in mill construction space, oblique section two and oblique section three are fitted together, corner flue one and corner flue two are fitted together;Step 3:Lifting;Oblique section assembly is lifted first, after the completion of oblique section assembly lifts, starts to lift corner segments assembly.It is an advantage of the invention that saving the use of large lifting equipment, improving labor efficiency and lowering labor intensity avoids or reduces the danger that working at height is brought, and improves installation management and control risk.
Description
Technical field
The present invention relates to a kind of construction methods, and more specifically, it relates to a kind of installations of converter vaporization flue piecewise combination
Method.
Background technology
Gasification cooling flue system is the important component of converter, as converter flue recycling key equipment,
There are direct lift-on/lift-off system and beam engineering method on installation method, but considers that the factors such as evaporated flue own dimensions are long, weight is big influence, vapour
Change flue, which must be segmented to march into the arena, to be installed, and how to ensure the installation quality of evaporated flue and improve installation effectiveness to be the weight considered
Point.Currently, existing do not retrieve in China national Patent Office about a kind of converter vaporization flue piecewise combination installation method;But
There is the Patent design of similar title;" a kind of converter vaporization flue row issued such as China national Patent Office's on February 26th, 2014
The construction method of dirty system ", application number:CN201310637261.X is mainly introduced by changing blow-off line layout,
Valve blowdown mode is improved to reach optimization evaporated flue contaminant removal effectiveness.Valve avoids the installation of human body significant points, can reach
The purpose of safety is improved, the centralized layout of valve has convenient for pipeline valve distribution, personal observations easy to operation and erect-position
Advantage installs quick draining valves additional respectively again after gate valve, usually that gate valve is normally opened, and blowdown effect is improved by operating quick draining valves
Rate can carry out on-call maintenance or replacement when quick draining valves breaks down or leaks with closing gate valve.But currently, not having also
A kind of converter vaporization flue piecewise combination installation method.
It will produce a large amount of high-temperature flue gas in steelmaking process, main component is carbon monoxide.Coal gas of converter calorific capacity is reachable
7524-9196kJ is a kind of first-class fuel, can be used as the fuel of the equipment such as heater for rolling steel, lime sleeve kiln, ladle baking.
The dust for also containing a large amount of high Fe contents in flue gas simultaneously, can be used as the superior raw material of sinter after collection.In addition, high-temperature flue gas
By heat exchange and recyclable a large amount of steam, utilization of steam is very wide, can be not only used for producing, and can be used for living.Therefore, to converter
Flue gas using energy source meaning is very great.If these high-temperature flue gas do not recycle, distributes and will produce serious dirt in workshop and air
Dye, jeopardize health of human body and agricultural production, while power grid, TV and communication can be interfered etc..In pneumatic steelmaking, steel-making is generated
The processing of flue gas is one of the outstanding feature of steel mill Environmental Protection Level, and the recycling and reuse of coal gas and steam are also that its energy consumption refers to
Target key factor, and the steam of pneumatic steelmaking and coal-gas recovering are realized by off-gas recovery purification system.
Invention content
The present invention in view of the deficiencies of the prior art, and provides a kind of converter vaporization flue piecewise combination installation method.It solves
Its progress, quality, safety problem for occurring in steel-making workshop Steel Structure Installation linking.
A kind of converter vaporization flue piecewise combination installation method of the present invention, the installation method include the following steps:
Step 1: preparation of construction;
1.1 fabricating yard Horizon seamlesses are real, meet the condition of the place level of gasification cooling flue sectional;
1.2 welding equipments are marched into the arena, and are all prepared in place with material the closing measure of evaporated flue in welding process;
1.3 carry out qualification of welding procedure to material according to the rules, assign weld job guiding book, and carry out to welding procedure
It tells somebody what one's real intentions are;
1.4 wldings are stored in special storehouse, storehouse drying, well-ventilated;
1.5 shoulder pole for hoisting prepare in place;
1.6, according to lifting requirements, wouldn't install the steel construction in gasification cooling flue hoisting process, structural stability
Girder must be installed;
1.7 are arranged gasification cooling flue installation center line and absolute altitude on steel structure girder according to the requirement of factory building columns alignment;
Step 2: group pair
Gasification cooling flue, since diameter is big, state of marching into the arena substantially is that segmentation is marched into the arena, it is contemplated that reduces the peace of working at height
Entirely, in the case where permission is turned in mill construction space, oblique section two and oblique section three are fitted together, by corner flue one and turned
Angle flue two fits together.
2.1 are lifted on oblique section two and oblique section three on the ground of smooth compacting, and level is put, and oblique section two and oblique section are controlled
Three levelness, centrad start in ground welding after parameter centering;
2.2 by corner flue one and the lifting to the ground of smooth compacting of corner flue two, and level is put, in corner cigarette
The levelness of two groups of road one and corner flue to controlling oblique section two and oblique section three in the process, center spacing, parameter centering finish
After weld;
Step 3:Lifting
3.1 lift oblique section assembly first, and after supporting beam stage+module welds, steel is hung up properly using crane A suspension hooks
Cord, shoulder pole for hoisting are lifted, and the uniform force of steel wire rope is kept;When all working all after setting completed, slowly rise
Hanging vehicle A suspension hooks, vertically sling, when oblique section assembly is more than insertion support Liangping after steel-making is high across technique platform from bottom to top
In platform, after oblique section assembly hypomere runs through supporting beam platform, oblique section assembly is slowly adjusted from downside using crane B suspension hooks
Angle, so that it is smoothly located on supporting beam platform, after angle adjusts, on platform one be arranged temporary support machine
Structure keeps oblique section assembly fixed angle;
3.2 after the completion of oblique section assembly lifts, and starts to lift corner segments assembly, is completed in corner segments assembly
Afterwards, it crane A suspension hooks is started with slings corner segments assembly and slowly fall on supporting beam platform, decoupling device after stablizing;
3.3 then lift oblique section one, since oblique section one is in workshop platform, can not directly lift, be hung using Relay Method
Dress, is first sling oblique section one with crane B suspension hooks, and oblique section one is mounted on lifting rope one and lifting rope two respectively before slinging
Upper and lower both sides four lifting lugs on, a reserved rope is separately pre-set on the lifting lug of upside, and on platform above
Elevator pulley combination is set;When crane B suspension hooks, which lift oblique section one, arrives the platform limit, the suspension hook of elevator pulley combination is placed, is hung
Reserved rope is played, then by elevator pulley combination and crane B suspension hooks synchronous matching that oblique section one is in place;Start to weld after in place
Connect oblique section one and oblique section assembly;
The mobile flue of 3.4 converter evaporation cooling air flues is monoblock type, before lifting, first installs mobile flue track,
It is mobile trolley used that mobile flue is lifted after erecting and welding again, integral hoisting gasification cooling flue mobile flue after centering,
Levelling capturing, installation terminate.
Further;Making place in the step 1 needs smooth compacting, ensure major diameter, the storage of the equipment of large-tonnage and
It is not easy to deform.
Further;Shoulder pole for hoisting in the step 1 is made of H profile steel, and spacing 500mm is set in shoulder pole for hoisting
Set long stiffened panel, gusset thickness 16mm;Total length is 5m.
Further;The longitudinal and transverse direction center that gasification cooling flue is provided according to factory building columns alignment in the step 1
Line.
Further;The special storehouse of wlding storage in the step 1, is equipped with thermometer and hygrometer, environment temperature is not
Less than 5 DEG C, air humidity is maintained at 50% or less;Wlding is kept away by the stacking method of type, the trade mark, specification, entry time classification
Exempt from chaotic in library.
Further;The lifting of oblique section assembly is to utilize single crane hoisting in the step 3, and two-shipper method in place starts
It is lifted using lifting A suspension hooks, follow-up auxiliary lifting B suspension hooks adjust the angle.
Further;The lifting of corner segments assembly lifts the lifting of A suspension hooks using single crane hoisting in the step 3.
Further;The lifting of oblique section one is to use single crane hoisting, the combined type lifting side of Alley Oop in the step 3
Formula is first sling oblique section one with crane B suspension hooks, in place using elevator pulley combination relay afterwards.
The sectionally assembled installation method of a kind of converter vaporization flue proposed by the invention, it is easy to assembly fast using ground
Victory, reliable in quality reduce the risk of working at height;Combined type lifting substantially reduces segmental hoisting and occupies the crane time, reduces
Large-scale crane machine-team takes and labour cost, improves construction speed, not only meets design and code requirement, but also reduce cost, contracting
The short duration.
The above-mentioned a kind of purposes of the sectionally assembled installation method of converter vaporization flue provided by the invention is constructed the factory buildings newly
Evaporated flue installation exercise work under environment, in the lifting of Alley Oop method can try out the evaporated flue in technology innovation project and hang
Pretend the application of industry;
The present invention has main advantageous effect below compared with traditional installation method:Save making for large lifting equipment
With improving labor efficiency and lowering labor intensity avoids or reduces the danger that working at height is brought, and improves installation management and control risk.Ground
Covering weave, it is convenient and reliable, improve welding quality.In conclusion present invention ground assembling in the installation of large-scale evaporated flue improves
Erecting and welding quality;Combined type lifting reduces working at height risk;In whole installation process, safe and efficient, reliable in quality.
Description of the drawings
1 converter evaporation cooling air flue of attached drawing forms layout drawing.
The oblique section assembly assembling schematic diagram of 2 converter evaporation cooling air flue of attached drawing.
3 converter evaporation cooling air flue corner segments assembly assembling schematic diagram of attached drawing.
The oblique section assembly lifting schematic diagram of 4 converter evaporation cooling air flue of attached drawing.
5 converter evaporation cooling air flue corner segments assembly lifting schematic diagram of attached drawing.
Oblique one lifting schematic diagram of section of 6 converter evaporation cooling air flue of attached drawing.
7 converter evaporation cooling air flue mobile flue lifting schematic diagram of attached drawing.
In figure:Skirt cover 1, mobile flue 2, oblique section 1, oblique section 24, oblique section 35, corner flue 1, corner flue 27,
Mobile flue track 8, mobile flue be mobile trolley used 9, supporting beam platform 10, oblique section assembly 11, shoulder pole for hoisting 12, crane A
Suspension hook 13, steel wire rope 14, crane B suspension hooks 15, platform 1, temporary support mechanism 17, corner segments assembly 18, elevator pulley blocks
Close 19, reserved rope 20, lifting rope 1, lifting rope 2 22.
Specific implementation mode
Below by specific embodiment, the technical solutions of the present invention will be further described, but the present invention is simultaneously
It is not limited to embodiment.
A kind of converter vaporization flue piecewise combination installation method of the present invention, which is characterized in that the installation method includes
Following steps:
Step 1: preparation of construction;
1.1 fabricating yard Horizon seamlesses are real, meet the condition of the place level of gasification cooling flue sectional;
1.2 welding equipments are marched into the arena, and are all prepared in place with material the closing measure of evaporated flue in welding process;
1.3 carry out qualification of welding procedure to material according to the rules, assign weld job guiding book, and carry out to welding procedure
It tells somebody what one's real intentions are;
1.4 wldings are stored in special storehouse, storehouse drying, well-ventilated;
1.5 shoulder pole for hoisting 12 prepare in place;
1.6, according to lifting requirements, wouldn't install the steel construction in gasification cooling flue hoisting process, structural stability
Girder must be installed;
1.7 are arranged gasification cooling flue installation center line and absolute altitude on steel structure girder according to the requirement of factory building columns alignment;
Step 2: group pair
2.1 are lifted on oblique section 24 and oblique section 35 on the ground of smooth compacting, and level is put, control oblique section 24 with
Levelness, the centrad of oblique section 35 start in ground welding after parameter centering;
2.2 by corner flue 1 and the lifting to the ground of smooth compacting of corner flue 27, and level is put, in corner
The levelness of 27 groups of flue 1 and corner flue to controlling oblique section 24 and oblique section 35 in the process, center spacing, parameter are looked for
It is welded after just;
Step 3:Lifting
3.1 lift oblique section assembly 11 first, after supporting beam 10 erecting and welding of platform, utilize crane A suspension hooks 13
Hang up properly steel wire rope, shoulder pole for hoisting 12 is lifted, keep the uniform force of steel wire rope;When all setting completed for work
Afterwards, slow raising crane A suspension hooks 13, vertically sling, after oblique section assembly 11 is more than to make steel high across technique platform from bottom to top
Insertion supporting beam platform 10 in, when oblique 11 hypomere of section assembly run through supporting beam platform 10 after, using crane B suspension hooks 15 from
Downside slowly adjusts the angle of oblique section assembly 11, it is made smoothly to be located on supporting beam platform 10, after angle adjusts,
Temporary support mechanism 17 is set on platform 1, keeps oblique 11 fixed angle of section assembly;
3.2 after the completion of oblique section assembly 11 lifts, and starts to lift corner segments assembly 18, in 18 groups of corner segments assembly
It after the completion of dress, starts with crane A suspension hooks 13 and slings corner segments assembly 18 and slowly fall on supporting beam platform 10, after stablizing
Decoupling device;
3.3 then lift oblique section 1, since oblique section 1 is in workshop platform, can not directly lift, using Relay Method
Lifting, is first sling oblique section 1 with crane B suspension hooks 15, is pacified respectively with lifting rope 1 and lifting rope 2 22 before slinging
On four lifting lugs of the upper and lower both sides of oblique section 1, a reserved rope 20 is separately pre-set on the lifting lug of upside, and
Elevator pulley combination 19 is set on platform above;When crane B suspension hooks 15 lift oblique section 1 to the platform limit, volume is placed
The suspension hook of pulley combination 19 is raised, hangs up and reserves rope 20, then will by elevator pulley combination 19 and 15 synchronous matching of crane B suspension hooks
Oblique section 1 is in place;Start to weld oblique section 1 and oblique section assembly 11 after in place;
The mobile flue 2 of 3.4 converter evaporation cooling air flues is monoblock type, before lifting, first installs mobile flue track
8, lift mobile flue mobile trolley used 9 after erecting and welding again, integral hoisting gasification cooling flue mobile tobacco after centering
Road 2, levelling capturing, installation terminates.
Making place in the step 1 needs smooth compacting, ensures that major diameter, the equipment of large-tonnage are stored and be not easy
Deformation.
Shoulder pole for hoisting 12 in the step 1 is made of H profile steel, spacing 500mm settings length in shoulder pole for hoisting 12
Stiffened panel, gusset thickness 16mm;Total length is 5m.
The longitudinal and transverse direction center line that gasification cooling flue is provided according to factory building columns alignment in the step 1.
The special storehouse of wlding storage in the step 1, is equipped with thermometer and hygrometer, and environment temperature is not less than 5
DEG C, air humidity is maintained at 50% or less;Wlding is avoided by the stacking method of type, the trade mark, specification, entry time classification in library
It is chaotic.
The lifting of oblique section assembly 11 is that single crane hoisting, two-shipper method in place is utilized to start in the step 3
The lifting of A suspension hooks is lifted, follow-up auxiliary lifting B suspension hooks adjust the angle.
The lifting of corner segments assembly 18 lifts the lifting of A suspension hooks using single crane hoisting in the step 3.
The lifting of oblique section 1 is that single crane hoisting, the combined type lifting mode of Alley Oop is used first to use in the step 3
Crane B suspension hooks sling oblique section 1, in place using 19 relay of elevator pulley combination afterwards.
Example the above is only the implementation of the present invention is not intended to limit the scope of the invention, every to utilize this hair
Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks
Domain is included within the scope of the present invention.
Claims (8)
1. a kind of converter vaporization flue piecewise combination installation method, which is characterized in that the installation method includes the following steps:
Step 1: preparation of construction;
1.1 fabricating yard Horizon seamlesses are real, meet the condition of the place level of gasification cooling flue sectional;
1.2 welding equipments are marched into the arena, and are all prepared in place with material the closing measure of gasification cooling flue in welding process;
1.3 carry out qualification of welding procedure to material according to the rules, assign weld job guiding book, and hand over welding procedure
Bottom;
1.4 wldings are stored in special storehouse, storehouse drying, well-ventilated;
1.5 shoulder pole for hoisting(12)Prepare in place;
1.6, according to lifting requirements, wouldn't install the steel construction in gasification cooling flue hoisting process, the girder of structural stability
It must install;
1.7 are arranged gasification cooling flue installation center line and absolute altitude on steel structure girder according to the requirement of factory building columns alignment;
Step 2: group pair;
2.1 by oblique section two(4)With oblique section three(5)It is lifted on the ground of smooth compacting, level is put, and oblique section two is controlled(4)
With oblique section three(5)Levelness, centrad, start in ground welding after parameter centering;
2.2 by corner flue one(6)With corner flue two(7)On lifting to the ground of smooth compacting, level is put, in corner
Flue one(6)With corner flue two(7)Group to controlling oblique section two in the process(4)With oblique section three(5)Levelness, between center
Away from being welded after parameter centering;
Step 3:Lifting;
3.1 lift oblique section assembly first(11), in supporting beam platform(10)After erecting and welding, crane A suspension hooks are utilized
(13)Hang up properly steel wire rope, shoulder pole for hoisting(12)It is lifted, keeps the uniform force of steel wire rope;When all settings that all works
After, slow raising crane A suspension hooks(13), vertically sling, when oblique section assembly(11)More than steel-making height after technique platform
Insertion supporting beam platform from bottom to top(10)In, when oblique section assembly(11)Hypomere runs through supporting beam platform(10)Afterwards, it utilizes
Crane B suspension hooks(15)Oblique section assembly is slowly adjusted from downside(11)Angle, so that it is smoothly located in supporting beam platform(10)
On, after angle adjusts, in platform one(16)Upper setting temporary support mechanism(17), keep oblique section assembly(11)It is fixed
Angle;
3.2 in oblique section assembly(11)After the completion of lifting, start to lift corner segments assembly(18), in corner segments assembly(18)
After being completed, crane A suspension hooks are started with(13)By corner segments assembly(18)It slings and slowly falls into supporting beam platform(10)
On, decoupling device after stablizing;
3.3 then lift oblique section one(3), due to oblique section one(3)In workshop platform, can not directly it lift, using Relay Method
Crane B suspension hooks are first used in lifting(15)By oblique section one(3)It slings, respectively with lifting rope one before slinging(21)With lifting rope
Two(22)Mounted on oblique section one(3)Upper and lower both sides four lifting lugs on, separately pre-set on the lifting lug of upside one it is reserved
Rope(20), and elevator pulley combination is set on platform above(19);When crane B suspension hooks(15)Lift oblique section one(3)It arrives
When the platform limit, elevator pulley combination is placed(19)Suspension hook, hang up reserve rope(20), then pass through elevator pulley combination(19)
With crane B suspension hooks(15)Synchronous matching is by oblique section one(3)In place;Start to weld oblique section one after in place(3)It is combined with oblique section
Body(11);
The mobile flue of 3.4 converter evaporation cooling air flues(2)Mobile flue track is first installed before lifting for monoblock type
(8), it is mobile trolley used that mobile flue is lifted again after erecting and welding(9), integral hoisting gasification cooling flue moves after centering
Dynamic flue(2), levelling capturing, installation terminates.
2. a kind of converter vaporization flue piecewise combination installation method according to claim 1, characterized in that the step 1
In making place need smooth compacting, ensure major diameter, the storage of the equipment of large-tonnage and be not easy to deform.
3. a kind of converter vaporization flue piecewise combination installation method according to claim 1, characterized in that the step 1
In shoulder pole for hoisting(12)It is made of H profile steel, shoulder pole for hoisting(12)Long stiffened panel is arranged in interior spacing 500mm, and gusset is thick
Spend 16mm;Total length is 5m.
4. a kind of converter vaporization flue piecewise combination installation method according to claim 1, characterized in that the step 1
In the longitudinal and transverse direction center line that gasification cooling flue is provided according to factory building columns alignment.
5. a kind of converter vaporization flue piecewise combination installation method according to claim 1, characterized in that the step 1
In wlding storage special storehouse, be equipped with thermometer and hygrometer, environment temperature be not less than 5 DEG C, air humidity is maintained at
50% or less;Wlding avoids confusion in library by the stacking method of type, the trade mark, specification, entry time classification.
6. a kind of converter vaporization flue piecewise combination installation method according to claim 1, characterized in that the step 3
In oblique section assembly(11)Lifting be utilize single crane hoisting, two-shipper method in place, start with lifting A suspension hooks lifting, after
Continuous auxiliary lifting B suspension hooks adjust the angle.
7. a kind of converter vaporization flue piecewise combination installation method according to claim 1, characterized in that the step 3
Middle corner segments assembly(18)Lifting lifts the lifting of A suspension hooks using single crane hoisting.
8. a kind of converter vaporization flue piecewise combination installation method according to claim 1, characterized in that the step 3
In oblique section one(3)Lifting be to use single crane hoisting, the combined type lifting mode of Alley Oop first uses crane B suspension hooks by oblique section
One(3)It slings, utilizes elevator pulley combination afterwards(19)Relay is in place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610744276.XA CN106435087B (en) | 2016-08-29 | 2016-08-29 | A kind of converter vaporization flue piecewise combination installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610744276.XA CN106435087B (en) | 2016-08-29 | 2016-08-29 | A kind of converter vaporization flue piecewise combination installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106435087A CN106435087A (en) | 2017-02-22 |
CN106435087B true CN106435087B (en) | 2018-08-17 |
Family
ID=58182342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610744276.XA Active CN106435087B (en) | 2016-08-29 | 2016-08-29 | A kind of converter vaporization flue piecewise combination installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106435087B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107763304A (en) * | 2017-10-20 | 2018-03-06 | 甘肃酒钢集团宏兴钢铁股份有限公司 | A kind of replacing options of the vertical FlexbleJoint in high-altitude |
CN108381052A (en) * | 2018-01-22 | 2018-08-10 | 中国十七冶集团有限公司 | A kind of converter vaporization flue site welding method |
CN109022672B (en) * | 2018-08-24 | 2020-03-10 | 中国二十冶集团有限公司 | Installation method of converter vaporization cooling flue during maintenance |
CN110306755A (en) * | 2019-07-03 | 2019-10-08 | 南通八建集团有限公司 | Kitchen chimney flue engineering construction method |
CN110373512B (en) * | 2019-08-16 | 2021-03-02 | 中国十七冶集团有限公司 | Combined installation method of converter dry dedusting equipment |
CN110724783B (en) * | 2019-10-23 | 2021-05-28 | 中国三冶集团有限公司 | Dismantling and installing method of waste heat boiler in converter environment-friendly reconstruction |
CN111395776A (en) * | 2020-04-23 | 2020-07-10 | 五冶集团上海有限公司 | Construction method for installing large-scale calcining furnace |
CN113736950A (en) * | 2021-09-30 | 2021-12-03 | 中冶华天南京工程技术有限公司 | Multipurpose flue traversing trolley frame |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101804501B (en) * | 2010-04-01 | 2012-04-25 | 中国二十二冶集团有限公司 | Ground assembling and welding integral installation and construction technology for vaporization-cooling chimney |
CN102703640B (en) * | 2012-04-17 | 2014-03-19 | 中国十七冶集团有限公司 | Method of maintenance and lifting for moving section flue at converter mouth |
CN102816891B (en) * | 2012-08-23 | 2014-02-12 | 中国十七冶集团有限公司 | Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter |
CN104846143B (en) * | 2015-06-09 | 2017-03-22 | 中国十九冶集团有限公司 | Construction method for replacing steelmaking converter flue |
-
2016
- 2016-08-29 CN CN201610744276.XA patent/CN106435087B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106435087A (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106435087B (en) | A kind of converter vaporization flue piecewise combination installation method | |
CN101812564B (en) | Method for installing converter in plug-in mode | |
CN104846143B (en) | Construction method for replacing steelmaking converter flue | |
CN106015729B (en) | A kind of reverse method in place of evaporated flue under sealing power house | |
CN105177202B (en) | A kind of blast furnace overhaul method | |
CN109097516A (en) | The construction method of blast furnace overhaul engineering replacement last furnace shell | |
CN203782169U (en) | Upper furnace repairing device for fixed waste heat flue of converter | |
CN206616184U (en) | Coke oven loss flue dust dust gathering arrester supporting construction | |
CN103883136B (en) | The rotary top cover of finished product protection in reactor building internal structure building course | |
CN101363069B (en) | Simple upper furnace repair equipment and furnace repair technology | |
CN107699650A (en) | A kind of installation method of blast furnace cooling stave | |
CN106766929B (en) | Independent hot-blast stove on-bne repair Nai Cai transportation system and repair method | |
CN109055637B (en) | Hydraulic lifting process for mounting furnace shell in blast furnace overhaul | |
CN103170612A (en) | Melting method of bonded iron on hot-metal ladle | |
CN105448366B (en) | A kind of installation method of Nuclear Power Station Condensers | |
CN107779533A (en) | The installation method of blast furnace cooling stave | |
CN106586912B (en) | Hot-blast stove on-bne repair refractory material transportation system, group and repair method | |
CN106834589B (en) | Converter Maintenance method | |
CN102399925A (en) | Method for replacing cooling wall of blast furnace | |
CN108824842A (en) | A kind of desulfurizing tower method for dismounting | |
CN106016233A (en) | Boiler roof with long span and fewer welding spots and hoisting method for boiler roof | |
CN209702791U (en) | Suspender is used in a kind of dismounting of blast furnace bustle pipe | |
CN203256286U (en) | Blast furnace throat steel brick replacing apparatus | |
CN202279833U (en) | Simple converter flue transition carriage | |
CN204508629U (en) | A kind of light type agricultural lifting appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |