CN106586912B - Hot-blast stove on-bne repair refractory material transportation system, group and repair method - Google Patents
Hot-blast stove on-bne repair refractory material transportation system, group and repair method Download PDFInfo
- Publication number
- CN106586912B CN106586912B CN201611215890.3A CN201611215890A CN106586912B CN 106586912 B CN106586912 B CN 106586912B CN 201611215890 A CN201611215890 A CN 201611215890A CN 106586912 B CN106586912 B CN 106586912B
- Authority
- CN
- China
- Prior art keywords
- hot
- blast stove
- furnace
- construction
- layers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
- B66C11/02—Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The invention discloses a kind of group's hot-blast stove on-bne repair Nai Cai transportation systems, including being located at transport device and the hoisting apparatus in the furnace inside hot-blast stove outside the furnace outside hot-blast stove, the outer transport device of furnace mainly includes one layer of construction plane, operation platform, the first vertical transporting mechanism and the second vertical transporting mechanism, the erection construction platform on the outside of each construction hole of hot-blast stove sets up two layers of construction plane below the operation platform of bottom;The first vertical transporting mechanism is installed between one layer of construction plane and two layers of construction plane;Multiple second vertical transporting mechanisms are installed in two layers of construction plane.The invention also discloses a kind of group's hot-blast stove on-bne repair methods.The invention has the benefit that the outer transport device of furnace of the present invention has integrally avoided the lower pipeline equipment of hot-blast stove, without removing hot-blast furnace equipment in the case where can be realized in furnace and overhaul, reduce the cost of overhaul, while construction speed can be improved.
Description
Technical field
The present invention relates to stove construction technical fields, and in particular to a kind of group's hot-blast stove on-bne repair refractory material transport
Device and repair method.
Background technique
Blast furnace is the capital equipment of ironmaking, and hot-blast stove is one of main auxiliary device of blast furnace, is fired using blast furnace gas
The heat of burning provides the hot wind of high temperature by the heat exchange action of checker brick for blast furnace.Therefore, every seat height furnace is commonly equipped with 3 ~ 4
Seat hot-blast stove, so as to combustion heating and air-supply alternately operation.
Since hot-blast stove produces throughout the year, some checker brick fragmentations are serious, and a large amount of fragments are fallen down, and checkerwork cell blocking amount is larger, sternly
Thermal Efficiency of Hot Blast Stoves is affected again, therefore, is needed periodically to checker brick, partition wall transformation maintenance.When maintenance, hot-blast stove is successively examined one by one
It repairs.However, how to guarantee that blast furnace normally produces during maintenance, and build, the refractory material removed is transported, is transported is hot wind
The difficulties of furnace on-bne repair.
By taking height is 49.928 meters of hot-blast stove as an example, 39.3 meters of the masonry height of checker brick, what four hot-blast stoves used
Checker brick and totally 11000 tons or so of partition block, the big wall brick of partial destruction needs to change.On-bne repair construction main difficulty is embodied in
Following several points:
1) dismounting amount is big, removes more than 10000 tons of refractory material;
2) because other hot-blast stoves are also producing, equipment, structure can not move (the bottom that such as hot air duct is located at hot-blast stove
Portion), feeding, discharge pylon is difficult to close to hot-blast stove, and transport of materials is very difficult;
3) charging appliance can only can not manually be had bad luck close to hot-blast stove, most of removed material;
4) because hot-blast stove is to overhaul one by one, and have more interruption, the duration is long, and construction organization difficulty is larger;
5) building in hot wind furnace shell has insulating lining, and furnace roof liner is ball-type vault, opens up hole for installation monorail,
The entirety that will cause ball-type vault collapses;Monorail is installed outside furnace roof, the mobile range of electric block can only be in furnace roof
Towards within the diameter in day hole, lifting is limited in scope.
Summary of the invention
The technical problems to be solved by the present invention are: in view of the above-mentioned problems of the prior art, providing a kind of group's heat
Wind furnace on-bne repair refractory material transport device and repair method.
The technical solution adopted by the present invention is that: a kind of group's hot-blast stove on-bne repair Nai Cai transportation system, including it is located at heat
The outer transport device of furnace outside wind furnace and the hoisting apparatus in the furnace inside hot-blast stove, the outer transport device of furnace mainly includes one layer
Construction plane, operation platform, the first vertical transporting mechanism and the second vertical transporting mechanism, on the outside of each construction hole of hot-blast stove
Erection construction platform, sets up two layers of construction plane below the operation platform of bottom, and two layers of construction plane are located at hot-blast stove
Above flue bent pipe and cold wind bend pipe on the outside of furnace shell, the outer wall of two layers of construction plane and multiple hot-blast stoves is close;It is applied at one layer
The first vertical transporting mechanism is installed between work plane and two layers of construction plane, the first vertical transporting mechanism is used to construct one layer
Refractory material in plane is transported to two layers of construction plane;Multiple second vertical transporting mechanisms are installed in two layers of construction plane,
Second vertical transporting mechanism is adapted with the operation platform of same hot-blast stove.
According to the above scheme, first level transport establishment is installed in one layer of construction plane, first level transport establishment can connect
First vertical transporting mechanism;First level transport establishment includes the first main channel light rail, the first subchannel light rail and the first track
There are the first turntable in vehicle, the first main channel light rail and the first subchannel light rail intersection, and the first railcar can be light along the first main channel
Rail and the first subchannel city railcar.
According to the above scheme, first vertical transporting mechanism include the first pylon, first hoist and the first cage, first
Feeding-passage is equipped in pylon, feeding-passage is connected with one layer of construction plane, the top entrance of the first pylon and two layers of construction
Plane is connected.
According to the above scheme, the second horizontal transport mechanism, the second horizontal transport mechanism are equipped in two layers of construction plane
Connect the second vertical transporting mechanism at the top entrance and each hot-blast stove of the first pylon, the second vertical transporting mechanism packet
The second pylon, second hoist and the second cage are included, the top of the second pylon is higher than hot-blast stove, and the bottom of the second pylon is mounted on
In two layers of construction plane, each operation platform of the hot-blast stove respectively corresponds the entrance of second pylon.
According to the above scheme, operation platform is provided with funnel and slagging-off chute, the lower mouth of funnel and the branch chute of slagging-off chute
Connection, the lower end for the chute that removes the gred extend on the outside of the hot-blast stove flue bend pipe of one layer of construction plane.
According to the above scheme, third horizontal transport mechanism is equipped on operation platform, third horizontal transport mechanism includes roller-way
With roller-way pedestal, the roller-way is mounted on roller-way pedestal, and one end of roller-way is close to construction hole, and the other end of roller-way is close to second
Vertical transporting mechanism;One end of the roller-way pedestal is installed on idler wheel, and the other end of roller-way pedestal is equipped with shaft, and roller-way pedestal can
It rotates around the axis, roller-way pedestal can cover funnel;Arc-shaped guide rail, the operation road of arc-shaped guide rail and idler wheel are installed on operation platform
Diameter is consistent, and arcuately guide rail rolls idler wheel.
According to the above scheme, in the furnace hoisting apparatus include the first monorail, load-bearing davit and the first electric block, first
The both ends of monorail are erected at hot-blast stove vertically big coping, and the middle part of the first monorail and the lower end of load-bearing davit are connected,
The spherical vault of hot-blast stove is stretched out in the upper end of load-bearing davit;First electric block is mounted on the first monorail;First
Limit derrick is installed on monorail, limit derrick at least three ends are contacted with the inner wall of the spherical vault of hot-blast stove, limit well
Frame can prevent the first monorail in hot-blast stove, and vertically big coping is mobile.
According to the above scheme, it is respectively arranged with buffer gear at the both ends of the first monorail, buffer gear includes end plate, spring
And top plate, end plate are fixed on the end of the first monorail, and the bolt being axially movable, one end of bolt and top plate are installed on end plate
Fixedly connected to the inner side;Sheathed spring on bolt between end plate and top plate, one end of spring and end plate are connected, the other end of spring
It is connected with the inside of top plate, the spring is in compressive state always, and the outside of top plate holds out against hot-blast stove under the action of the spring
Inner wall.
According to the above scheme, the transportation system further includes furnace roof handling apparatus, and furnace roof handling apparatus includes door shaped stent,
Horizontal the second monorail and the second electric block are installed between door shaped stent and pylon top.
A kind of group's hot-blast stove on-bne repair method, mainly includes the following steps:
Step 1: blowing out: blowing out is gradually promoted according to the position of hot-blast stove, after blowing out at each valve of pipeline of hot air furnace
Add blind plate;Cooling is forced after the spherical vault temperature of hot-blast stove is down to 200 DEG C or less;
Step 2: setting up transportation system as described above: installing the outer transport device of furnace respectively, hoisting apparatus and furnace roof are hung in furnace
Shipping unit;
Step 3: removing former refractory material in hot-blast stove and being transported to outside furnace: removing the former fire resisting in hot-blast stove from top to bottom
Brick slag after dismounting is sorted packing by material in hot-blast stove, in case subsequent recovery utilizes;Biggish brick slag is through transporting dress outside furnace
The designated place stacking for being transported to one layer of construction plane is set, tiny brick slag send the flue to one layer of plane of constructing curved through the chute that removes the gred
On the outside of pipe;
Step 4: transporting new refractory material: the refractory material that need to be built being transported to one layer of construction plane, and by kind, rule
Lattice classification is stacked, and eye-catching mark is made;And using vertical transporting mechanism, in furnace hoisting apparatus and furnace roof handling apparatus by the new of needs
Refractory material, which is transported to specify in furnace from one layer of construction plane, builds place;
Step 5: building checker brick: checker brick with seam at 1-8 layers to build, and three kinds of arrangements are alternately built since the 9th layer
It builds: checker brick must be fixed with timber wedge every three layers;Most upper six layers of code is at platform is pushed away, and every layer of combustion chamber side is moved back one piece, the good grid of code
Grid control line on brick post-tensioning;
Step 6: building partition wall: positioning with partition wall template unwrapping wire and by " ten ", corrected using partition wall template when masonry;
Build partition wall and code checker brick alternately;
Step 7: surplus material is transported construction site after the completion of new refractory material laying.
The invention has the benefit that
1, the outer transport device of furnace of the present invention has integrally avoided the lower pipeline equipment of hot-blast stove, without removing hot-blast stove
Maintenance in furnace can be realized in the case where equipment to be reduced compared with prior art without removing cold wind bend pipe and flue bent pipe
The cost of overhaul, while construction speed can be improved, improve production efficiency;
2, the present invention is whole sets up installation, it can be achieved that multiple hot-blast stoves while overhauling, and improves work efficiency;Working procedure
Few, construction progress is fast, shortens maintenance duration;
3, the outer transport device of furnace of the present invention forms transportation network with horizontal transport mechanism using multi-level vertical transport, effectively
Immovable equipment and structure are avoided, is improved work efficiency;
4, the present invention is additionally provided with hoisting apparatus in furnace, the outer transport device of hoisting apparatus furnace and furnace roof handling apparatus phase in furnace
Mutually cooperation, and hoisting apparatus avoids without welding monorail and removes the former ball-type vault liner built, be improved work in furnace
Make efficiency, reduces construction cost;
5, the funnel being connected to branch chute is opened up on operation platform, can clear up tiny brick slag in real time, avoids tiny brick slag
Accumulated plugging;Roller-way bottom is equipped with idler wheel, and roller-way can move on operation platform, on the one hand can better adapt to the transport of brick slag,
On the other hand, covering bell mouth can be blocked, prevents construction personnel from stepping on sky, ensure that the safety of construction personnel.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of a specific embodiment of the invention.
Fig. 2 is enlarged diagram at A in Fig. 1.
Fig. 3 is the structural schematic diagram of operation platform.
Fig. 4 is the structural schematic diagram after the roller way corner on operation platform.
Fig. 5 is the structural schematic diagram of the outer transport device of the present embodiment furnace.
Fig. 6 is hot-blast stove schematic diagram of internal structure.
Fig. 7 is the enlarged diagram in Fig. 6 at B.
Fig. 8 is the structural schematic diagram of hoisting apparatus in furnace of the present invention.
In figure: 1, one layer of construction plane;2, two layers of construction plane;3, the first vertical transporting mechanism;4, the second vertical transport
Mechanism;5, the first pylon;6, the second pylon;7, the first cage;8, first level transport establishment;9, the second horizontal transport mechanism;
10, operation platform;10.1, funnel;10.2, roller-way pedestal;10.3, roller-way;10.4, idler wheel;10.5, arc-shaped guide rail;10.6, turn
Axis;11, the first main channel light rail;12, the first subchannel light rail;13, the first turntable;14, the first railcar;15, slagging-off is slipped
Cylinder;15.1, branch chute;16, construction hole;17, feeding-passage;18, the first monorail;19, end plate;20, top plate;21, bolt;
22, spring;23, load-bearing davit;24, hole for hoist;25, cross bar;26, U-shaped card;27, derrick is limited;28, the first electric block;
29, door shaped stent;30, the second monorail;31, the second electric block;32,1# hot-blast stove;33,2# hot-blast stove;34,3# hot wind
Furnace;35,4# hot-blast stove;36, furnace shell;37, vertical big-wall;38, partition wall;39, checker brick;40, ball-type vault;41, towards day hole;
42, flue bent pipe;43, cold wind bend pipe;44, top platform.
Specific embodiment
For a better understanding of the present invention, technical solution of the present invention is done further below with reference to embodiment and attached drawing
Explanation.
Hot-blast stove on-bne repair Nai Cai transportation system, group as shown in Figure 1, including being located at the furnace outward transport outside hot-blast stove
Defeated device and the hoisting apparatus in the furnace inside hot-blast stove.
As the outer transport device of Fig. 2 ~ furnace shown in fig. 5 mainly include one layer of construction plane 1, operation platform 10, first vertically
Transport establishment 3 and the second vertical transporting mechanism 4, in 16 outside erection construction platform 10 of each construction hole of hot-blast stove, in bottom
Operation platform 10 below set up two layers of construction plane 2, two layers of construction plane 2 are located at the flue on the outside of hot-air stove shell 36
The outer wall of 43 top of bend pipe 42 and cold wind bend pipe, two layers of construction plane 2 and multiple hot-blast stoves is close;In one layer of construction 1 He of plane
The first vertical transporting mechanism 3 is installed between two layers of construction plane 2, the first vertical transporting mechanism 3 is used for one layer of construction plane 1
On refractory material be transported to two layers of construction plane 2;Multiple second vertical transporting mechanisms 4 are installed in two layers of construction plane 2, often
A second vertical transporting mechanism 4 is adapted with the operation platform 10 of same hot-blast stove;The height of second vertical transporting mechanism 4 is more than
The height of hot-blast stove.
First level transport establishment 8 is installed in one layer of construction plane 1, it is vertical that first level transport establishment 8 can connect first
Transport establishment 3;First level transport establishment 8 includes the first main channel light rail 11, the first subchannel light rail 12 and the first railcar
14, there are the first turntable 13 in the first main channel light rail 11 and 12 intersection of the first subchannel light rail, and the first railcar 14 can be along first
Main channel light rail 11 and the operation of the first subchannel light rail 12;First railcar 14 is run on the first main channel light rail 11, is passed through
First turntable 13 is redirect on the first subchannel light rail 12, material is transported to the first vertical transporting mechanism 3, and by the first vertical fortune
Transfer mechanism 3 is hung in two layers of construction plane 2.First vertical transporting mechanism 3 includes the first pylon 5, first hoist and the first tank
Cage 7, the first pylon 5 is interior equipped with feeding-passage 17, and feeding-passage 17 is connected with one layer of construction plane 1, and the top of the first pylon 5 goes out
Entrance is connected with two layers of construction plane 2.
The second horizontal transport mechanism 9 is equipped in two layers of construction plane 2, the second horizontal transport mechanism 9 connects the first pylon 5
Top entrance and each hot-blast stove at the second vertical transporting mechanism 4.Second horizontal transport mechanism 9 is transported with first level
8 structure of transfer mechanism is identical comprising (appended drawing reference does not exist for the second main channel light rail, the second subchannel light rail and the second railcar
Shown in figure), there are the second turntable in the second main channel light rail and the second subchannel light rail intersection, and the second railcar can be main along second
Channel light rail and the second subchannel city railcar;Second railcar is run on the second main channel light rail, is turned by the second turntable
To on the second subchannel light rail, the material in the first vertical transporting mechanism 3 is transported to each hot winds in two layers of construction plane 2
At furnace, and it is hung to by the second vertical transporting mechanism 4 each layer operation platform 10 of hot-blast stove.Second vertical transporting mechanism 4 and first
3 structure of vertical transporting mechanism is identical comprising the second pylon 6, second hoist and the second cage, the second pylon 6 are higher than heat
Wind furnace, the bottom of the second pylon 6 are mounted in two layers of construction plane 2, and each operation platform 10 of the hot-blast stove respectively corresponds
The entrance of one the second pylon 6.Refractory material in two layers of construction plane 2 enters the second tower through the second horizontal transport mechanism 9
The entrance of 6 lower part of frame, and it is transported to by the second cage each operation platform 10 of hot-blast stove.
As shown in Fig. 2 ~ Fig. 3, operation platform 1 be provided with funnel 10.1 and slagging-off chute 15, the lower mouth of funnel 10.1 with remove
The branch chute 15.1 of slag chute 15 is connected to, and the lower end of slagging-off chute 15 passes through two layers of construction plane 2, extends to one layer of construction plane
1 42 outside of hot-blast stove flue bend pipe;The waste and scrap removed in furnace is transported to the feed opening of branch chute 15.1 by belt feeder, through removing
To 42 outside of flue bent pipe of one layer of plane 1 of constructing under slag chute 15, open ground is transported to by first level transport establishment 8, then
Automobile tipping bucket is packed into loading machine to transport outside the venue.Third horizontal transport mechanism, third horizontal transport are equipped on operation platform 10
Mechanism is separately connected the second vertical transporting mechanism 4 and construction hole 16;Third horizontal transport mechanism includes roller-way 10.3 and roller-way bottom
Seat 10.2, the roller-way 10.3 is mounted on roller-way pedestal 10.2 (railcar is run along roller-way 10.2), and the one of roller-way 10.3
End is close to construction hole 16, and the other end of roller-way 10.3 is close to the second vertical transporting mechanism 4.Preferably, the one of roller-way pedestal 10.2
End is installed on idler wheel 10.4, and the other end of roller-way pedestal 10.2 is equipped with shaft 10.6(shaft 10.6 and is preferably placed at the second vertical fortune
One end of transfer mechanism 4), roller-way pedestal 10.2 10.6 rotation, the roller-way pedestal 10.2 can cover funnel 10.1 around the shaft.It is excellent
Selection of land is installed on arc-shaped guide rail 10.5 on operation platform 10, and arc-shaped guide rail 10.5 is consistent with the operating path of idler wheel 10.4, idler wheel
The 10.4 arcuately rollings of guide rail 10.5.When clearing up tiny brick slag by funnel 10.1, during roller-way pedestal 10.2 with shaft 10.6 is
It 30 ° or -30 ° of heart corner, is removed from 10.1 top of funnel;When need to enter and leave railcar transport material when, by roller-way pedestal 10.2 with
Shaft 10.6 is the reduction of axle center corner, and the both ends of roller-way 10.3 are separately connected the second vertical transporting mechanism 4 and construction hole 16;This
When, funnel 10.1 is blocked by roller-way pedestal 10.2 and roller-way 10.3, steps on sky to prevent construction personnel.
Hoisting apparatus is used to the refractory material on platform inside furnace being transported to construction location in furnace, as shown in Fig. 6 ~ Fig. 8, master
It to include the first monorail 18, load-bearing davit 23 and the first electric block 28, the both ends of the first monorail 18 are erected at hot-blast stove
The top of vertical big-wall 37, the middle part of the first monorail 18 and the lower end of load-bearing davit 23 are connected (can be to be bolted), load-bearing
The spherical vault 40 of hot-blast stove is stretched out in the upper end of davit 23, and the upper end of load-bearing davit 23 offers hole for hoist, passes through in hole for hoist
A piece cross bar 25, cross bar 25 are connected with the spherical vault 40 of hot-blast stove;First electric block 28 is mounted on the first monorail
On 18.
It is respectively arranged with buffer gear at the both ends of the first monorail 18, buffer gear includes end plate 19, spring 22 and top
Plate 20, end plate 19 are fixed on the end of the first monorail 18, are installed with the bolt 21 being axially movable on end plate 19, and the one of bolt 21
End is fixedly connected to the inner side with top plate 20;Sheathed spring 22 on bolt 21 between end plate 19 and top plate 20, one end of spring 22 with
End plate 19 is connected, and the other end of spring 22 is connected with the inside of top plate 20, and the spring 22 is in compressive state, top plate 20 always
Outside the inner wall of hot-blast stove is held out against under the action of spring 22.Setting is installed on buffering spacer on the outside of top plate 20.
It is installed on limit derrick 27 on the first monorail 18, limits at least three ends of derrick 27 and the spherical of hot-blast stove is encircleed
The inner wall contact on top 40, limit derrick 27 can prevent the first monorail 18 mobile at the top of the vertical big-wall 37 of hot-blast stove;It is limiting
Four end ends of position derrick 27 are respectively fixed with the bed course for buffering.Preferably, it is equipped in the upper surface of vertical big-wall 37
Multiple horizontal backing plates, horizontal cushion block are contacted with the bottom of the bottom of the first monorail 18 or limit derrick 27, and horizontal backing plate increases
Vertical big-wall 37 and the first monorail 18 and the forced area for limiting derrick 27, and be conducive to the leveling of the first monorail 18.
In the present embodiment, in order to improve the stability of this hoisting apparatus, it is arranged symmetrically two load-bearing davits 23, the upper end of load-bearing davit 23
Stretch out be opened in spherical vault 40 towards day hole, cross bar 25 is by U-shaped card 26 and is mounted on towards the flanged joint on day hole 41.
For the ease of installing and removing hoisting apparatus and platform inside furnace in furnace, furnace is installed on the top platform 44 of hot-blast stove
Push up handling apparatus.As shown in Figure 1 and Figure 5, furnace roof handling apparatus includes door shaped stent 29, in door shaped stent 29 and the second pylon 6
Horizontal the second monorail 30 and the second electric block 31, the second monorail 30 and the second electric block 31 are installed between top
For the refractory material out of hot-blast stove the furnace towards after being removed hoisting apparatus and platform inside furnace in transport furnace in day hole 41.
The present invention also provides a kind of group's hot-blast stove on-bne repair refractory material repair method, main includes following step
It is rapid:
Step 1: blowing out: it include four hot-blast stoves in the present embodiment, the maintenance of checker brick 39, partition wall 38 in each hot-blast stove
By the sequence of 3# hot-blast stove 34,4# hot-blast stove 35,2# hot-blast stove 33,1# hot-blast stove 32, blowing out is promoted one by one;In hot wind after blowing out
The hot-blast valve of each pipeline of furnace, flue bent pipe valve, combustion air valve, adds blind plate at cold blast sliding valve at gas valve, and wherein hot air pipe exports
The blind plate back side will add reinforcing rib, need to use three layers of (700mm wide) firebreak of lightweight brick masonry in hot air pipe before blind plate installation, pacify
Washer is added when dress prevents gas leakage;Cooling is forced after the temperature of hot-blast stove spherical vault 40 is down to 200 DEG C or less, is such as opened
Cold wind is blasted towards day hole 41, at the lower part manhole of hot-blast stove;
Step 2: setting up the transportation system: hoisting apparatus and furnace roof handling apparatus in the outer transport device of installation furnace, furnace,
Wherein, the outer transport device of furnace include one layer of construction, 1, two layer of plane construction plane 2, operation platform 10(bottom operation platform
Installation slagging-off chute 15 on 10), the first vertical transporting mechanism 3 and the second vertical transporting mechanism 4 etc.;
Step 3: removing former refractory material in hot-blast stove and being transported to outside furnace: removing the fire proofed wood in hot-blast stove from top to bottom
Material is opened the construction hole 16 former construction hole 16(and opened up when newly building furnace body, applied using original when tearing open to construction 16 position of hole
Work hole 16 is to reduce the aperture patch of furnace shell 36);Partition wall 38 is removed using pneumatic pick and crowbar, is needed before dismounting to ceramic burner
Device carries out covering protection, and reinforces to the partition wall of reservation 38 every 5 meters (vertical directions);Brick slag after dismounting divides in hot-blast stove
Choosing is packaged, in case subsequent recovery utilizes;Biggish brick slag is transported to the designated place heap of one layer of construction plane 1 through transport device outside furnace
It puts, tiny brick slag is sent through the slagging-off chute 15 of operation platform 10 to 42 outside of flue bent pipe of one layer of plane 1 of constructing, by first
Railcar 14 is sent to open ground, then is packed into automobile tipping bucket with loading machine and is transported outside the venue;
Step 4: transporting new refractory material: by the automobile used for refractory material that need to be built from the whole container in warehouse (or packaging
Case) it is transported to one layer of construction plane (fork truck handling), and stacked by kind, specification classification, make eye-catching mark;And use vertical transport
The new refractory material of needs is transported in furnace by hoisting apparatus and furnace roof handling apparatus from one layer of construction plane in mechanism, furnace specifies block
Build place;
Step 5: building checker brick 39: checker brick 39 with seam at 1-8 layer to build, and three kinds of arrangements replace since the 9th layer
Build, the 9th layer of code when it is levelling and with fire grate checkerwork cell to good, after complete 9 layers of code, correct checkerwork cell with the steel pipe that diameter is 38 millimeters,
Groove should be beaten before steel pipe;It to be stayed between checker brick 39 and furnace wall (vertical big-wall 37 and partition wall 38) and set expansion joint (E.J.), expansion joint (E.J.) size is
25 millimeters or so;When need to build vertical big-wall 37,39 surface of checker brick is covered tightly with rubber, prevents checkerwork cell from blocking, periphery lattice
39 scene of sub- brick is processed with hand, and when processing should pad fritter rubber skin;Checker brick 39, but wood must be fixed with timber wedge every three layers
Wedge not beaten too tight, and checker brick 39 is avoided to shift;Most upper six layers of code is at platform is pushed away, and every layer of combustion chamber side is moved back one piece, the good grid of code
Grid control line should be pulled on when brick 39;
Step 6: building partition wall 38: partition wall template unwrapping wire is simultaneously positioned using " ten " word, and partition wall template school is utilized when masonry
Just;It builds partition wall 38 alternately to build with code checker brick 39, first builds 1 meter high partition wall 38, then build 1 meter of high checker brick
39;
Step 7: surplus material is transported construction site after the completion of new refractory material laying.
These are only the preferred embodiment of the present invention, is not intended to restrict the invention, for those skilled in the art
For member, the invention may be variously modified and varied.All within the spirits and principles of the present invention, it is made it is any modification,
Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of group's hot-blast stove on-bne repair Nai Cai transportation system, which is characterized in that including being located at outside the furnace outside hot-blast stove
Transport device and the hoisting apparatus in the furnace inside hot-blast stove, the outer transport device of furnace mainly include one layer of construction plane, construction
Platform, the first vertical transporting mechanism and the second vertical transporting mechanism, the erection construction platform on the outside of each construction hole of hot-blast stove,
Two layers of construction plane are set up below the operation platform of bottom, two layers of construction plane are located at the flue on the outside of hot-air stove shell
Above bend pipe and cold wind bend pipe, the outer wall of two layers of construction plane and multiple hot-blast stoves is close;It is applied in one layer of construction plane and two layers
The first vertical transporting mechanism is installed between work plane, the first vertical transporting mechanism is used for the fire proofed wood that one layer is constructed in plane
Material is transported to two layers of construction plane;Multiple second vertical transporting mechanisms, the second vertical transport machine are installed in two layers of construction plane
Structure is adapted with the operation platform of same hot-blast stove.
2. group's hot-blast stove on-bne repair Nai Cai as described in claim 1 transportation system, which is characterized in that one layer of construction plane
On install first level transport establishment, first level transport establishment can connect the first vertical transporting mechanism;First level transporter
Structure includes the first main channel light rail, the first subchannel light rail and the first railcar, and the first main channel light rail and the first subchannel are light
There is the first turntable in rail intersection, and the first railcar can be along the first main channel light rail and the first subchannel city railcar.
3. group's hot-blast stove on-bne repair Nai Cai as described in claim 1 transportation system, which is characterized in that described first is vertical
Transport establishment includes the first pylon, first hoist and the first cage, is equipped with feeding-passage, feeding-passage and one in the first pylon
Layer construction plane is connected, and the top entrance of the first pylon is connected with two layers of construction plane.
4. group's hot-blast stove on-bne repair Nai Cai as claimed in claim 3 transportation system, which is characterized in that two layers of construction
The second horizontal transport mechanism is equipped in plane, the second horizontal transport mechanism connects the top entrance of the first pylon, and each
Second vertical transporting mechanism at a hot-blast stove, the second vertical transporting mechanism include the second pylon, second hoist and the second cage,
The top of second pylon is higher than hot-blast stove, and the bottom of the second pylon is mounted in two layers of construction plane, each of described hot-blast stove
Operation platform respectively corresponds the entrance of second pylon.
5. group's hot-blast stove on-bne repair Nai Cai as described in claim 1 transportation system, which is characterized in that operation platform setting
There are funnel and slagging-off chute, the lower mouth of funnel is connected to the branch chute of slagging-off chute, and the lower end for the chute that removes the gred extends to one layer and applies
On the outside of the hot-blast stove flue bend pipe of work plane.
6. group's hot-blast stove on-bne repair Nai Cai as claimed in claim 5 transportation system, which is characterized in that operation platform upper berth
Equipped with third horizontal transport mechanism, third horizontal transport mechanism includes roller-way and roller-way pedestal, and the roller-way is mounted on roller-way bottom
On seat, one end of roller-way is close to construction hole, and the other end of roller-way is close to the second vertical transporting mechanism;One end of the roller-way pedestal
It is installed on idler wheel, the other end of roller-way pedestal is equipped with shaft, and roller-way pedestal can rotate around the axis, and roller-way pedestal can cover funnel;
Arc-shaped guide rail is installed on operation platform, arc-shaped guide rail is consistent with the operating path of idler wheel, and arcuately guide rail rolls idler wheel.
7. group's hot-blast stove on-bne repair Nai Cai as described in claim 1 transportation system, which is characterized in that lifting in the furnace
Device includes the first monorail, load-bearing davit and the first electric block, and it is vertically big that the both ends of the first monorail are erected at hot-blast stove
Coping, the middle part of the first monorail and the lower end of load-bearing davit are connected, and the spherical shape of hot-blast stove is stretched out in the upper end of load-bearing davit
Vault;First electric block is mounted on the first monorail;It is installed on limit derrick on the first monorail, limits derrick
At least three ends are contacted with the inner wall of the spherical vault of hot-blast stove, and limit derrick can prevent the first monorail vertically big in hot-blast stove
Coping is mobile.
8. group's hot-blast stove on-bne repair Nai Cai as claimed in claim 7 transportation system, which is characterized in that in the first monorail
Both ends be respectively arranged with buffer gear, buffer gear includes end plate, spring and top plate, and end plate is fixed on the end of the first monorail
Portion is installed with the bolt being axially movable, one end of bolt and fixedlying connected to the inner side for top plate on end plate;Inserting between end plate and top plate
Sheathed spring on pin, one end of spring and end plate are connected, and the other end of spring is connected with the inside of top plate, and the spring is located always
In compressive state, the outside of top plate holds out against the inner wall of hot-blast stove under the action of the spring.
9. group's hot-blast stove on-bne repair Nai Cai as described in claim 1 transportation system, which is characterized in that the transportation system
It further include furnace roof handling apparatus, furnace roof handling apparatus includes door shaped stent, is equipped with water between door shaped stent and pylon top
Flat the second monorail and the second electric block.
10. a kind of group's hot-blast stove on-bne repair method, which is characterized in that mainly include the following steps:
Step 1: blowing out: gradually promoting blowing out according to the position of hot-blast stove, added at each valve of pipeline of hot air furnace after blowing out
Blind plate;Cooling is forced after the spherical vault temperature of hot-blast stove is down to 200 DEG C or less;
Step 2: setting up transportation system described in claim 1: installing transport device outside furnace, hoisting apparatus and furnace roof in furnace respectively
Handling apparatus;
Step 3: removing former refractory material in hot-blast stove and being transported to outside furnace: the former refractory material in hot-blast stove is removed from top to bottom,
Brick slag after dismounting is sorted into packing in hot-blast stove, in case subsequent recovery utilizes;Biggish brick slag is transported through transport device outside furnace
It is stacked to the designated place of one layer of plane of constructing, tiny brick slag is sent through the chute that removes the gred to outside the flue bent pipe of one layer of construction plane
Side;
Step 4: transporting new refractory material: the refractory material that need to be built being transported to one layer of construction plane, and by kind, specification point
Class is stacked, and eye-catching mark is made;It is hung using hoisting apparatus in the first vertical transporting mechanism, the second vertical transporting mechanism, furnace and furnace roof
New refractory material is transported to specify in furnace by shipping unit from one layer of construction plane builds place;
Step 5: building checker brick: at 1-8 layers to build with seam, three kinds of arrangements are alternately built checker brick since the 9th layer: every
Every three layers checker brick must be fixed with timber wedge;Most upper six layers of code is at platform is pushed away, and every layer of combustion chamber side is moved back one piece, the good checker brick post-tensioning of code
Upper grid control line;
Step 6: building partition wall: positioning with partition wall template unwrapping wire and by " ten ", corrected using partition wall template when masonry;It builds
Partition wall and code checker brick are alternately;
Step 7: surplus material is transported construction site after the completion of new refractory material laying.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611215890.3A CN106586912B (en) | 2016-12-26 | 2016-12-26 | Hot-blast stove on-bne repair refractory material transportation system, group and repair method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611215890.3A CN106586912B (en) | 2016-12-26 | 2016-12-26 | Hot-blast stove on-bne repair refractory material transportation system, group and repair method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106586912A CN106586912A (en) | 2017-04-26 |
CN106586912B true CN106586912B (en) | 2019-03-05 |
Family
ID=58603781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611215890.3A Active CN106586912B (en) | 2016-12-26 | 2016-12-26 | Hot-blast stove on-bne repair refractory material transportation system, group and repair method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106586912B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110257578A (en) * | 2019-06-29 | 2019-09-20 | 上海二十冶建设有限公司 | The not aperture of the large-scale resistance to material of external combustion stove feeds construction method |
CN112591617A (en) * | 2020-12-07 | 2021-04-02 | 中国十九冶集团有限公司 | Hot blast stove refractory material conveying device and method |
CN114684536A (en) * | 2022-03-31 | 2022-07-01 | 满洲里达赉湖热电有限公司 | Method for overhauling furnace wall hole door of boiler |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS53128845A (en) * | 1977-04-18 | 1978-11-10 | Nippon Steel Corp | Transfer device for vertical article |
JPH05229644A (en) * | 1992-02-20 | 1993-09-07 | Nippon Steel Corp | Device for conveying and distributing brick for hot blast stove |
JPH05229651A (en) * | 1992-02-20 | 1993-09-07 | Nippon Steel Corp | Device for conveying brick for construction work of hot blast stove |
CN201801272U (en) * | 2010-09-25 | 2011-04-20 | 中国十九冶集团有限公司武汉分公司 | Hot-blast stove masonry vertical transportation system |
CN203127962U (en) * | 2013-03-25 | 2013-08-14 | 中国十七冶集团有限公司 | Material transportation device for hot blast stove |
CN103484589B (en) * | 2013-09-13 | 2015-01-07 | 中国十九冶集团有限公司 | Low-temperature hot blast heater construction method |
CN104848037B (en) * | 2015-06-11 | 2017-05-31 | 中国二十二冶集团有限公司 | Opening construction technique does not build mud automatic conveying system by laying bricks or stones to hot-blast stove |
-
2016
- 2016-12-26 CN CN201611215890.3A patent/CN106586912B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106586912A (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106586912B (en) | Hot-blast stove on-bne repair refractory material transportation system, group and repair method | |
CN106766929B (en) | Independent hot-blast stove on-bne repair Nai Cai transportation system and repair method | |
CN106435087B (en) | A kind of converter vaporization flue piecewise combination installation method | |
CN102146488B (en) | Modularized and integrative disassembling and installing methods for blast furnace | |
CN102692131B (en) | Method for overhauling fire-resistant material for annular air duct and chute in coke dry quenching furnace | |
CN105177202B (en) | A kind of blast furnace overhaul method | |
CN109097516A (en) | The construction method of blast furnace overhaul engineering replacement last furnace shell | |
CN109231007B (en) | Electric furnace body hoisting and mounting process | |
CN101363069B (en) | Simple upper furnace repair equipment and furnace repair technology | |
CN101858161A (en) | Construction method of low-temperature double-wall storage tanks | |
JP2010280809A (en) | Installation method of oven top equipment in coke oven construction | |
CN203359745U (en) | Hot blast stove refractory vertical transport device | |
CN105448366B (en) | A kind of installation method of Nuclear Power Station Condensers | |
CN206330432U (en) | It is a kind of to eliminate the process structure that Mialz lime kiln runs wind | |
CN102399925A (en) | Method for replacing cooling wall of blast furnace | |
CN108913832A (en) | The method for dismounting of resistance to material in a kind of super-huge hot-blast stove furnace | |
CN102134620B (en) | Blast furnace shaft upper part rapid heating for producing lining by wet method | |
CN100489410C (en) | Technique for inner lining construction for unopened hot-blast stove furnace jacket | |
CN110512910A (en) | A kind of steel-making main building height integrally increases installation method across steel construction | |
CN104129600A (en) | Circulating steel ball mechanical conveying device | |
CN107062898A (en) | Column type brick and tile sintering kiln | |
CN206458066U (en) | Hot-blast stove overhauls operation platform | |
CN207275602U (en) | The sliding platform removed for pipeline under the conditions of complex space | |
CN114993055A (en) | Refractory material dismantling method in external combustion type hot blast stove online modification process | |
CN109913601A (en) | Extend the method in blast furnace generation furnace life |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |