CN106586912A CN201611215890.3A CN201611215890A CN106586912A CN 106586912 A CN106586912 A CN 106586912A CN 201611215890 A CN201611215890 A CN 201611215890A CN 106586912 A CN106586912 A CN 106586912A
Authority
CN
China
Prior art keywords
stove
air stove
construction
roller
plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611215890.3A
Other languages
Chinese (zh)
Other versions
CN106586912B (en
Inventor
潘月清
黎耀南
吕生平
田红云
李少祥
郭继舟
夏春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201611215890.3A priority Critical patent/CN106586912B/en
Publication of CN106586912A publication Critical patent/CN106586912A/en
Application granted granted Critical
Publication of CN106586912B publication Critical patent/CN106586912B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • B66C11/02Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Abstract

The invention discloses a group air heating furnace on-line overhauling refractory material transport system. The group air heating furnace on-line overhauling refractory material transport system comprises a furnace outside transport device located outside an air heating furnace, and a furnace inside lifting device located in the air heating furnace. The furnace outside transport device mainly comprises a first layer construction plane, construction platforms, a first perpendicular transport mechanism and second perpendicular transport mechanisms. The construction platforms are built on the outer sides of all construction holes of the air heating furnace. A second layer construction plane is built below the construction platform on the bottom layer. The first perpendicular transport mechanism is installed between the first layer construction plane and the second layer construction plane. The multiple second perpendicular transport mechanisms are installed on the second layer construction plane. The invention further discloses a group air heating furnace on-line overhauling method. The group air heating furnace on-line overhauling refractory material transport system and the group air heating furnace on-line overhauling method have the beneficial effects that the furnace outside transport device avoids lower pipeline equipment of the air heating furnace overall, inside-furnace overhauling can be achieved under the condition that air heating furnace equipment does not need to be dismantled, overhauling cost is reduced,, and meanwhile the construction progress can be accelerated.

Description

Air stove on-bne repair refractory material transportation system of group and repair method
Technical field
The present invention relates to stove construction technical field, and in particular to a kind of group's air stove on-bne repair refractory material transport Device and repair method.
Background technology
Blast furnace is the capital equipment of ironmaking, and air stove is one of main auxiliary device of blast furnace, and which utilizes blast furnace gas to fire The heat of burning, by the heat exchange action of checker brick, provides the hot blast of high temperature for blast furnace.Therefore, 3 ~ 4 are commonly equipped with per seat height stove Seat air stove, so as to combustion heating and air-supply alternately operation.
As air stove is produced throughout the year, some checker brick fragmentations are serious, and a large amount of fragments fall down, and checkerwork cell blocking amount is larger, sternly Thermal Efficiency of Hot Blast Stoves is have impact on again, therefore, need periodically to checker brick, partition wall transformation maintenance.During maintenance, air stove one by one is examined successively Repair.However, how to ensure that during overhauling blast furnace is normally produced, and build by laying bricks or stones, the refractory material removed is transported, is transported is hot blast The difficulties of stove on-bne repair.
So that height is for 49.928 meters of air stove as an example, checker brick build 39.3 meters of height by laying bricks or stones, what four air stovees were used Totally 11000 tons or so of checker brick and partition block, the big wall brick of partial destruction need to change.On-bne repair construction main difficulty is embodied in It is following some:
1)Dismounting amount is big, removes more than 10000 tons of refractory material;
2)Because other air stovees are also in production, equipment, structure can not possibly be moved(As hot air duct is located at the bottom of air stove), Feeding, discharge pylon is difficult near air stove, and transport of materials is very difficult;
3)Charging appliance cannot manually can only be had bad luck near air stove, most of removed material;
4)Because air stove is to overhaul one by one, and there is more interruption, the persistent period is long, and construction organization difficulty is larger;
5)Insulating lining is built in hot blast furnace shell by laying bricks or stones, furnace roof liner is ball-type vault, has been that monorail is installed to open up hole, can make The entirety of spheroiding vault collapses;Monorail is installed outside furnace roof, the scope of electric block movement can only be in furnace roof towards day Within the diameter in hole, lifting is limited in scope.
The content of the invention
The technical problem to be solved is:For the problem that above-mentioned prior art is present, there is provided a kind of group's heat Wind furnace on-bne repair refractory material transport device and repair method.
The technical solution used in the present invention is:A kind of group's air stove on-bne repair Nai Cai transportation systems, including positioned at heat The outer conveying arrangement of stove outside wind furnace and positioned at hoisting apparatus in the stove inside air stove, the outer conveying arrangement of stove mainly includes one layer Construction plane, operation platform, the first vertical transporting mechanism and the second vertical transporting mechanism, on the outside of each construction hole of air stove Erection construction platform, sets up two layers of construction plane below the operation platform of bottom, and two layers of construction plane are located at air stove Above flue bent pipe and cold wind bend pipe on the outside of furnace shell, two layers of construction plane are close to the outer wall of multiple air stovees;Apply at one layer The first vertical transporting mechanism is installed between work plane and two layers of construction plane, the first vertical transporting mechanism is for one layer is constructed Refractory material in plane is transported to two layers of construction plane;Multiple second vertical transporting mechanisms are installed on plane construct at two layers, Second vertical transporting mechanism is adapted with the operation platform of same air stove.
By such scheme, in one layer of construction plane, first level transport establishment is installed, first level transport establishment can connect First vertical transporting mechanism;First level transport establishment includes the first main channel light rail, the first subchannel light rail and the first track There is the first rotating disk car, the first main channel light rail and the first subchannel light rail intersection, and the first railcar can be light along the first main channel Rail and the first subchannel city railcar.
By such scheme, first vertical transporting mechanism includes the first pylon, first hoist and the first cage, first Feeding-passage is provided with pylon, feeding-passage is connected with one layer of construction plane, and the top gateway of the first pylon is constructed with two layers Plane is connected.
By such scheme, in two layers of construction plane, the second horizontal transport mechanism, the second horizontal transport mechanism are equipped with Connect the top gateway of the first pylon, and the second vertical transporting mechanism at each air stove, the second vertical transporting mechanism bag The second pylon, second hoist and the second cage are included, the top of the second pylon is higher than air stove, and the bottom of the second pylon is arranged on In two layers of construction plane, each operation platform of the air stove corresponds to the gateway of second pylon respectively.
By such scheme, operation platform is provided with funnel and slagging-off chute, the lower mouth of funnel and a chute of slagging-off chute Connection, the lower end of the chute that removes the gred are extended on the outside of the hot-blast stove flue bend pipe of one layer of construction plane.
By such scheme, the 3rd horizontal transport mechanism on operation platform, is equipped with, the 3rd horizontal transport mechanism includes roller-way With roller-way base, the roller-way is arranged on roller-way base, and near construction hole, the other end of roller-way is near second for one end of roller-way Vertical transporting mechanism;One end of the roller-way base is installed on roller, and the other end of roller-way base is provided with rotating shaft, and roller-way base can Rotate around the axis, roller-way base can cover funnel;The operation road of arc-shaped guide rail, arc-shaped guide rail and roller is installed on operation platform Footpath is consistent, and arcuately guide rail is rolled roller.
By such scheme, in the stove, hoisting apparatus includes the first monorail, load-bearing davit and the first electric block, first The two ends of monorail are erected at the vertical big coping of air stove, and the middle part of the first monorail is connected with the lower end of load-bearing davit, Stretch out the spherical vault of air stove in the upper end of load-bearing davit;First electric block is arranged on the first monorail;First Limited location derrick is installed on monorail, spacing derrick at least three ends are contacted with the inwall of the spherical vault of air stove, spacing well Frame can prevent the first monorail in the vertical big coping movement of air stove.
By such scheme, buffer gear is respectively arranged with the two ends of the first monorail, buffer gear includes end plate, spring And top board, end plate is fixed on the end of the first monorail, the latch being axially movable, one end of latch and top board is installed with end plate Fixedly connected to the inner side;Sheathed spring on latch between end plate and top board, one end and the end plate of spring are connected, the other end of spring It is connected with the inner side of top board, the spring is in compressive state all the time, and the outside of top board holds out against air stove under the action of the spring Inwall.
By such scheme, the transportation system also includes furnace roof handling apparatus, and furnace roof handling apparatus include door shaped stent, The second horizontal monorail and the second electric block are installed between door shaped stent and pylon top.
A kind of group's air stove on-bne repair method, mainly comprises the steps:
Step one, blowing out:Position according to air stove gradually advances blowing out, is added after blowing out at each valve of pipeline of hot air furnace Blind plate;Cooling is forced after the spherical vault temperature of air stove is down to below 200 DEG C;
Step 2, set up transportation system as described above:It is respectively mounted hoisting apparatus and furnace roof handling dress in the outer conveying arrangement of stove, stove Put;
Step 3, remove in air stove former refractory material and be transported to outside stove:The former refractory material in air stove is removed from top to bottom, Brick slag after dismounting is sorted into packing in air stove, in case subsequent recovery is utilized;The outer conveying arrangement fortune of larger brick slag Jing stoves Appointed place to one layer of construction plane is stacked, and tiny brick slag Jing slagging-off chute is delivered to outside the flue bent pipe of one layer of construction plane Side;
Step 4, the new refractory material of transport:The refractory material that need to be built by laying bricks or stones is transported to into one layer of construction plane, and by kind, specification point Class is stacked, and makees eye-catching mark;And the new fire resisting that will be needed using hoisting apparatus in vertical transporting mechanism, stove and furnace roof handling apparatus Material is transported to specify in stove from one layer of construction plane builds place by laying bricks or stones;
Step 5, build checker brick by laying bricks or stones:Checker brick are to build by laying bricks or stones with seam in 1-8 layers, start three kinds of arrangement alternatings from the 9th layer and build by laying bricks or stones:Often Checker brick must be fixed with timber wedge every three layers;Most go up six layers of code one piece is moved back into platform, per layer of combustion chamber side is pushed away, the good checker brick post-tensioning of code Upper grid control line;
Step 6, build partition wall by laying bricks or stones:Position with partition wall model unwrapping wire and by " ten ", corrected using partition wall model when building by laying bricks or stones;Build by laying bricks or stones Partition wall is with code checker brick alternately;
After the completion of step 7, new refractory material laying, surplus material is transported into job site.
Beneficial effects of the present invention are:
1st, the outer conveying arrangement of stove of the present invention has integrally avoided the lower pipeline equipment of air stove, need not remove hot-blast furnace equipment In the case of i.e. be capable of achieving stove in maintenance, cold wind bend pipe and flue bent pipe need not be removed compared with prior art, maintenance is reduced Cost, while construction speed can be improve, improves production efficiency;
2nd, the present invention is overall sets up installation, is capable of achieving multiple air stovees and overhauls simultaneously, improves work efficiency;Working procedure is few, Construction progress is fast, shortens maintenance duration;
3rd, the outer conveying arrangement of stove of the present invention constitutes transportation network with horizontal transport mechanism using multi-level vertical transport, effectively avoids Immovable equipment and structure, improve work efficiency;
4th, the present invention is additionally provided with hoisting apparatus in stove, the outer conveying arrangement of hoisting apparatus stove and furnace roof handling apparatus phase interworking in stove Close, and hoisting apparatus need not weld monorail in stove, it is to avoid remove the ball-type vault liner that original is built by laying bricks or stones, be improved work effect Rate, reduces construction cost;
5th, the funnel connected with a chute is opened up on operation platform, tiny brick slag can be cleared up in real time, it is to avoid tiny brick slag muck product Blocking;Roller-way bottom is provided with roller, and roller-way can be moved on operation platform, on the one hand can better adapt to the transport of brick slag, another Aspect, can block covering bell mouth, prevent workmen from stepping on sky, it is ensured that the safety of workmen.
Description of the drawings
Fig. 1 is the structural representation of a specific embodiment of the invention.
Fig. 2 is enlarged diagram at A in Fig. 1.
Structural representations of the Fig. 3 for operation platform.
Fig. 4 is the structural representation after the roller way corner on operation platform.
Fig. 5 is the structural representation of the outer conveying arrangement of the present embodiment stove.
Fig. 6 is air stove internal structure schematic diagram.
Fig. 7 is the enlarged diagram at B in Fig. 6.
Fig. 8 is the structural representation of hoisting apparatus in stove of the present invention.
In figure:1st, one layer of construction plane;2nd, two layers of construction plane;3rd, the first vertical transporting mechanism;4th, the second vertical transport Mechanism;5th, the first pylon;6th, the second pylon;7th, the first cage;8th, first level transport establishment;9th, the second horizontal transport mechanism; 10th, operation platform;10.1, funnel;10.2nd, roller-way base;10.3, roller-way;10.4, roller;10.5, arc-shaped guide rail;10.6, turn Axle;11st, the first main channel light rail;12nd, the second subchannel light rail;13rd, the first rotating disk;14th, the first railcar;15th, slagging-off is slipped Cylinder;15.1st, prop up chute;16th, construction hole;17th, feeding-passage;18th, the first monorail;19th, end plate;20th, top board;21st, latch; 22nd, spring;23rd, load-bearing davit;24th, hole for hoist;25th, cross bar;26th, U-shaped card;27th, spacing derrick;28th, the first electric block; 29th, door shaped stent;30th, the second monorail;31st, the second electric block;32nd, 1# air stovees;33rd, 2# air stovees;34th, 3# hot blasts Stove;35th, 4# air stovees;36th, furnace shell;37th, vertical big-wall;38th, partition wall;39th, checker brick;40th, ball-type vault;41st, towards day hole; 42nd, flue bent pipe;43rd, cold wind bend pipe;44th, top platform.
Specific embodiment
For a better understanding of the present invention, technical scheme is done further with reference to embodiment and accompanying drawing Explanation.
Air stove on-bne repair Nai Cai transportation systems of group as shown in Figure 1, transport outward including the stove outside air stove Defeated device and positioned at hoisting apparatus in the stove inside air stove.
The outer conveying arrangement of stove as shown in Fig. 2 ~ Fig. 5 is mainly vertical including one layer of construction plane 1, operation platform 10, first Transport establishment 3 and the second vertical transporting mechanism 4, in each 16 outside erection construction platform 10 of construction hole of air stove, in bottom Operation platform 10 below set up one two layers construction planes 2, two layers construction planes 2 be located at hot-air stove shell 36 on the outside of flues Above bend pipe 42 and cold wind bend pipe 43, two layers of construction plane 2 are close to the outer wall of multiple air stovees;In one layer of construction 1 He of plane The first vertical transporting mechanism 3 is installed between two layers of construction plane 2, the first vertical transporting mechanism 3 is for by one layer of plane 1 of constructing On refractory material be transported to two layers construction planes 2;Multiple second vertical transporting mechanisms 4 are installed on plane 2 construct at two layers, often Individual second vertical transporting mechanism 4 is adapted with the operation platform 10 of same air stove;The height of the second vertical transporting mechanism 4 exceedes The height of air stove.
First level transport establishment 8 is installed in one layer of construction plane 1, it is vertical that first level transport establishment 8 can connect first Transport establishment 3;First level transport establishment 8 includes the first main channel light rail 11, the first subchannel light rail 12 and the first railcar 14, there is the first rotating disk 13 the first main channel light rail 11 and 12 intersection of the first subchannel light rail, and the first railcar 14 can be along first Main channel light rail 11 and the first subchannel light rail 12 run;First railcar 14 is run on the first main channel light rail 11, is passed through First rotating disk 13 is redirect on the first subchannel light rail 12, and material is transported to the first vertical transporting mechanism 3, and by the first vertical fortune Transfer mechanism 3 is hung in two layers of construction plane 2.First vertical transporting mechanism 3 includes the first pylon 5, first hoist and the first tank Cage 7, is provided with feeding-passage 17 in the first pylon 5, feeding-passage 17 is connected with one layer of construction plane 1, and the top of the first pylon 5 goes out Entrance is connected with two layers of construction plane 2.
The second horizontal transport mechanism 9 is equipped with two layers of construction plane 2, the second horizontal transport mechanism 9 connects the first pylon 5 Top gateway, and the second vertical transporting mechanism 4 at each air stove.Second horizontal transport mechanism 9 is transported with first level 8 structure of transfer mechanism is identical, and which includes the second main channel light rail, the second subchannel light rail and the second railcar(Reference does not exist Illustrate in figure), there is the second rotating disk the second main channel light rail and the second subchannel light rail intersection, and the second railcar can be along the second master Passage light rail and the second subchannel city railcar;Second railcar is run on the second main channel light rail, is turned by the second rotating disk To on the second subchannel light rail, the material in the first vertical transporting mechanism 3 is transported to into each hot blast in two layers of construction plane 2 At stove, and each layer operation platform 10 of air stove is hung to by the second vertical transporting mechanism 4.Second vertical transporting mechanism 4 and first 3 structure of vertical transporting mechanism is identical, and which includes the second pylon 6, second hoist and the second cage, the second pylon 6 higher than heat Wind furnace, in two layers of construction plane 2, each operation platform 10 of the air stove is corresponded to respectively for the bottom of the second pylon 6 The gateway of one the second pylon 6.The second horizontal transports of refractory material Jing mechanism 9 in two layers of construction plane 2 enters the second tower The gateway of 6 bottom of frame, and each operation platform 10 of air stove is transported to by the second cage.
As shown in Fig. 2 ~ Fig. 3, operation platform 1 is provided with funnel 10.1 and slagging-off chute 15, the lower mouth of funnel 10.1 with remove A chute 15.1 for slag chute 15 is connected, and the lower end of the chute 15 that removes the gred extends to one layer of construction plane through two layers of construction plane 2 On the outside of 1 hot-blast stove flue bend pipe 42;The waste and scrap removed in stove is transported to the feed opening of a chute 15.1 by belt feeder, and Jing is removed Under slag chute 15 on the outside of the flue bent pipe 42 of one layer of construction plane 1, open ground is transported to by first level transport establishment 8, then Load automobile tipping bucket with loader to transport outside the venue.The 3rd horizontal transport mechanism, the 3rd horizontal transport are equipped with operation platform 10 Mechanism connects the second vertical transporting mechanism 4 and construction hole 16 respectively;3rd horizontal transport mechanism includes roller-way 10.3 and roller-way bottom Seat 10.2, the roller-way 10.3 are arranged on roller-way base 10.2(Railcar is run along roller-way 10.2), the one of roller-way 10.3 Near construction hole 16, the other end of roller-way 10.3 is near the second vertical transporting mechanism 4 at end.Preferably, the one of roller-way base 10.2 End is installed on roller 10.4, and the other end of roller-way base 10.2 is provided with rotating shaft 10.6(Rotating shaft 10.6 is preferably placed at the second vertical fortune One end of transfer mechanism 4), roller-way base 10.2 10.6 can be rotated around the shaft, and the roller-way base 10.2 can cover funnel 10.1.It is excellent Selection of land, is installed on arc-shaped guide rail 10.5 on operation platform 10, arc-shaped guide rail 10.5 is consistent with the operating path of roller 10.4, roller 10.4 arcuately guide rail 10.5 roll.When clearing up tiny brick slag by funnel 10.1, during roller-way base 10.2 with rotating shaft 10.6 is 30 ° or -30 ° of heart corner, removes from 10.1 top of funnel;When need to come in and go out railcar transport material when, by roller-way base 10.2 with Rotating shaft 10.6 is reduced for axle center corner, and the two ends of roller-way 10.3 connect the second vertical transporting mechanism 4 and construction hole 16 respectively;This When, funnel 10.1 is blocked by roller-way base 10.2 and roller-way 10.3, in case workmen steps on sky.
In stove, for the refractory material on platform inside furnace is transported to construction location, as shown in Fig. 6 ~ Fig. 8, which leads hoisting apparatus To include the first monorail 18, load-bearing davit 23 and the first electric block 28, the two ends of the first monorail 18 are erected at air stove The top of vertical big-wall 37, the middle part of the first monorail 18 is connected with the lower end of load-bearing davit 23(It can be bolt connection), load-bearing The spherical vault 40 of air stove is stretched out in the upper end of davit 23, and the upper end of load-bearing davit 23 offers hole for hoist, passes through in hole for hoist A piece cross bar 25, cross bar 25 are connected with the spherical vault 5 of air stove;First electric block 28 is arranged on the first monorail 18 On.
Buffer gear is respectively arranged with the two ends of the first monorail 18, buffer gear includes end plate 19, spring 22 and top Plate 20, end plate 19 are fixed on the end of the second monorail 18, are installed with the latch 21 being axially movable on end plate 19, and the one of latch 21 End is fixedly connected to the inner side with top board 20;Sheathed spring 22 on latch 21 between end plate 19 and top board 20, one end of spring 22 with End plate 19 is connected, and the other end of spring 22 is connected with the inner side of top board 20, and the spring 22 is in compressive state, top board 20 all the time Outside the inwall of air stove is held out against in the presence of spring 22.Arrange on the outside of top board 20 and be installed on buffering spacer.
The spherical arch of limited location derrick 27, at least three ends of spacing derrick 27 and air stove is installed on the first monorail 18 The inwall contact on top 40, spacing derrick 27 can prevent the first monorail 18 in the top movement of the vertical big-wall of air stove 37;In limit Four end ends of position derrick 27 are respectively fixed with the bed course for buffering.Preferably, it is equipped with the upper surface of vertical big-wall 37 Multiple horizontal backing plates, horizontal cushion block are contacted with the bottom of the first monorail 18 or the bottom of spacing derrick 27, horizontal backing plate increase The lifting surface area of vertical big-wall 37 and the first monorail 18 and spacing derrick 27, and be conducive to the leveling of the first monorail 18. In the present embodiment, in order to improve the stability of this hoisting apparatus, two load-bearing davits 23, the upper end of load-bearing davit 23 are arranged symmetrically Stretch out be opened in spherical vault 40 towards day hole, cross bar 25 by U-shaped card 26 with installed in being connected towards the flange on day hole 41.
For the ease of installing and removing hoisting apparatus and platform inside furnace in stove, stove is installed on the top platform 44 of air stove Top handling apparatus.As shown in Figure 1 and Figure 5, furnace roof handling apparatus include door shaped stent 29, in door shaped stent 29 and the second pylon 6 The second horizontal monorail 30 and the second electric block 31, the second monorail 30 and the second electric block 31 are installed between top For from air stove towards refractory material in hoisting apparatus in transport stove in day hole 41 and the stove after platform inside furnace dismounting.
Present invention also offers a kind of group's air stove on-bne repair refractory material repair method, main to include following step Suddenly:
Step one, blowing out:The present embodiment includes four air stovees, and 3# is pressed in checker brick 39, the maintenance of partition wall 38 in each air stove Air stove 34,4# air stovees 35,2# air stovees 33, the order blowing out propulsion one by one of 1# air stovees 32;It is each in air stove after blowing out Blind plate, wherein warm-air pipe outlet blind plate are added at the hot-blast valve of pipeline, gas valve, flue bent pipe valve, combustion air valve, cold blast sliding valve Reinforcement will be set up in the back side, and blind plate need to use three layers of lightweight brick masonry in warm-air pipe before installing(700mm width)Firebreak, during installation Packing ring to be added prevents gas leakage;Cooling is forced after the temperature of air stove spherical vault 40 is down to below 200 DEG C, is such as opened towards day Hole 41, blast cold wind at the bottom manhole of air stove;
Step 2, set up the transportation system:Hoisting apparatus and furnace roof handling apparatus in the outer conveying arrangement of stove, stove are installed, wherein, The outer conveying arrangement of stove includes one layer of construction plane 1, two layers of construction plane 2, operation platform 10(Pacify on the operation platform 10 of bottom Dress slagging-off chute 15), the first vertical transporting mechanism 3 and the second vertical transporting mechanism 4 etc.;
Step 3, remove in air stove former refractory material and be transported to outside stove:The refractory material in air stove is removed from top to bottom, is torn open During to construction 16 position of hole, former construction hole 16 is opened(Construction hole 16 is opened up when body of heater is newly built by laying bricks or stones, using original construction hole 16 To reduce the perforate patch of furnace shell 36);Partition wall 38 is removed using pneumatic pick and crowbar, needs to carry out ceramic burner before dismounting Covering protection, and to retain partition wall 38 every 5 meters(Vertical direction)Reinforce;Brick slag after dismounting is sorted in air stove and is beaten Bag, in case subsequent recovery is utilized;The outer conveying arrangement of larger brick slag Jing stoves is transported to the appointed place of one layer of construction plane 1 and stacks, The slagging-off chute 15 of tiny brick slag Jing operation platforms 10 is delivered on the outside of the flue bent pipe 42 of one layer of construction plane 1, by the first rail Road car 14 delivers to open ground, then is transported outside the venue with loader loading automobile tipping bucket;
Step 4, the new refractory material of transport:By the automobile used for refractory material that need to be built by laying bricks or stones from the whole container in warehouse(Or packing cratess)Fortune To one layer of construction plane(Fork truck is loaded and unloaded), and stack by kind, specification classification, make eye-catching mark;And using vertical transporting mechanism, In stove, the new refractory material for needing is transported to specify in stove from one layer of construction plane and builds ground by laying bricks or stones by hoisting apparatus and furnace roof handling apparatus Point;
Step 5, build checker brick 39 by laying bricks or stones:Checker brick 39 are to build by laying bricks or stones with seam in 1-8 layers, start three kinds of arrangements from the 9th layer and alternately build Build, it is levelling during the 9th layer of code and with fire grate checkerwork cell to good, after code is complete 9 layers, with a diameter of 38 millimeters of steel pipes correction checkerwork cell, steel Groove should be beaten before pipe;Checker brick 39 and furnace wall(Vertical big-wall 37 and partition wall 38)Between to stay and set expansion joint (E.J.), expansion joint (E.J.) size is 25 Millimeter;When need to build vertical big-wall 37 by laying bricks or stones, 39 surface of checker brick is covered tightly with rubber, prevents checkerwork cell from blocking, periphery grid 39 scene of brick is processed with handss, and fritter rubber peel should be padded during processing;Checker brick 39, but timber wedge must be fixed with timber wedge every three layers Should not beat too tight, it is to avoid checker brick 39 are shifted;Most go up six layers of code one piece is moved back into platform, per layer of combustion chamber side is pushed away, the good checker brick of code Grid control line should be pulled on when 39;
Step 6, build partition wall 38 by laying bricks or stones:Partition wall model unwrapping wire is simultaneously positioned using " ten " word, is corrected using partition wall model when building by laying bricks or stones;Build Build partition wall 38 alternately to build by laying bricks or stones with code checker brick 39, first build 1 meter of high partition wall 38, then the checker brick 39 for building 1 meter high by laying bricks or stones by laying bricks or stones;
After the completion of step 7, new refractory material laying, surplus material is transported into job site.
The preferred embodiments of the present invention are these are only, the present invention is not limited to, for those skilled in the art For member, the present invention can have various modifications and variations.All any modifications within the spirit and principles in the present invention, made, Equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of group's air stove on-bne repair Nai Cai transportation systems, it is characterised in that include outside the stove outside air stove Conveying arrangement and positioned at hoisting apparatus in the stove inside air stove, the outer conveying arrangement of stove is mainly including one layer of construction plane, construction Platform, the first vertical transporting mechanism and the second vertical transporting mechanism, air stove each construction hole on the outside of erection construction platform, Two layers of construction plane are set up below the operation platform of bottom, two layers of construction plane are located at the flue on the outside of hot-air stove shell Above bend pipe and cold wind bend pipe, two layers of construction plane are close to the outer wall of multiple air stovees;Apply on one layer of construction plane and two layers It is installed on the first vertical transporting mechanism between work plane, the first vertical transporting mechanism is for fire proofed wood that one layer is constructed in plane Material is transported to two layers of construction plane;Multiple second vertical transporting mechanisms, the second vertical transport machine are installed on plane construct at two layers Structure is adapted with the operation platform of same air stove.
2. group's air stove on-bne repair Nai Cai transportation systems as claimed in claim 1, it is characterised in that one layer of construction plane On install first level transport establishment, first level transport establishment can connect the first vertical transporting mechanism;First level transporter Structure includes the first main channel light rail, the first subchannel light rail and the first railcar, and the first main channel light rail and the first subchannel are light There is the first rotating disk rail intersection, and the first railcar can be along the first main channel light rail and the first subchannel city railcar.
3. group's air stove on-bne repair Nai Cai transportation systems as claimed in claim 1, it is characterised in that described first is vertical Transport establishment includes the first pylon, first hoist and the first cage, and feeding-passage, feeding-passage and are provided with the first pylon Layer construction plane is connected, and the top gateway of the first pylon is connected with two layers of construction plane.
4. group's air stove on-bne repair Nai Cai transportation systems as claimed in claim 1, it is characterised in that two layers of construction It is equipped with the second horizontal transport mechanism in plane, the second horizontal transport mechanism connects the top gateway of the first pylon, and respectively Second vertical transporting mechanism at individual air stove, the second vertical transporting mechanism include the second pylon, second hoist and the second cage, The top of the second pylon is higher than air stove, the bottom of the second pylon in two layers of construction plane, the air stove each Operation platform corresponds to the gateway of second pylon respectively.
5. group's air stove on-bne repair Nai Cai transportation systems as claimed in claim 1, it is characterised in that operation platform is arranged The lower mouth for having funnel and slagging-off chute, funnel is connected with a chute for slagging-off chute, and the lower end of the chute that removes the gred extends to one layer and applies On the outside of the hot-blast stove flue bend pipe of work plane.
6. group's air stove on-bne repair Nai Cai transportation systems as claimed in claim 5, it is characterised in that operation platform upper berth The 3rd horizontal transport mechanism is provided with, the 3rd horizontal transport mechanism includes roller-way and roller-way base, and the roller-way is arranged on roller-way bottom On seat, near construction hole, the other end of roller-way is near the second vertical transporting mechanism for one end of roller-way;One end of the roller-way base Roller is installed on, the other end of roller-way base is provided with rotating shaft, and roller-way base can rotate around the axis, and roller-way base can cover funnel; Arc-shaped guide rail is installed on operation platform, arc-shaped guide rail is consistent with the operating path of roller, arcuately guide rail is rolled roller.
7. group's air stove on-bne repair Nai Cai transportation systems as claimed in claim 1, it is characterised in that lifting in the stove Device includes the first monorail, load-bearing davit and the first electric block, and it is vertically big that the two ends of the first monorail are erected at air stove Coping, the middle part of the first monorail are connected with the lower end of load-bearing davit, and the spherical of air stove is stretched out in the upper end of load-bearing davit Vault;First electric block is arranged on the first monorail;Limited location derrick, spacing derrick are installed on the first monorail At least three ends are contacted with the inwall of the spherical vault of air stove, and spacing derrick can prevent the first monorail vertically big in air stove Coping is moved.
8. group's air stove on-bne repair Nai Cai transportation systems as claimed in claim 7, it is characterised in that in the first monorail Two ends be respectively arranged with buffer gear, buffer gear includes end plate, spring and top board, and end plate is fixed on the end of the first monorail Portion, is installed with the latch being axially movable, one end of latch and fixedlying connected to the inner side for top board on end plate;Inserting between end plate and top board Sheathed spring on pin, one end and the end plate of spring are connected, and the other end of spring is connected with the inner side of top board, and the spring is located all the time In compressive state, the outside of top board holds out against the inwall of air stove under the action of the spring.
9. group's air stove on-bne repair Nai Cai transportation systems as claimed in claim 1, it is characterised in that the transportation system Also include furnace roof handling apparatus, furnace roof handling apparatus include door shaped stent, water are provided between door shaped stent and pylon top The second flat monorail and the second electric block.
10. a kind of group's air stove on-bne repair method, it is characterised in that mainly comprise the steps:
Step one, blowing out:Position according to air stove gradually advances blowing out, is added after blowing out at each valve of pipeline of hot air furnace Blind plate;Cooling is forced after the spherical vault temperature of air stove is down to below 200 DEG C;
Step 2, set up transportation system described in claim 1:It is respectively mounted hoisting apparatus and furnace roof in the outer conveying arrangement of stove, stove Handling apparatus;
Step 3, remove in air stove former refractory material and be transported to outside stove:The former refractory material in air stove is removed from top to bottom, Brick slag after dismounting is sorted into packing in air stove, in case subsequent recovery is utilized;The outer conveying arrangement fortune of larger brick slag Jing stoves Appointed place to one layer of construction plane is stacked, and tiny brick slag Jing slagging-off chute is delivered to outside the flue bent pipe of one layer of construction plane Side;
Step 4, the new refractory material of transport:The refractory material that need to be built by laying bricks or stones is transported to into one layer of construction plane, and by kind, specification point Class is stacked, and makees eye-catching mark;Using hoisting apparatus in vertical transporting mechanism, stove and furnace roof handling apparatus by new refractory material from one Layer construction plane is transported to specify in stove builds place by laying bricks or stones;
Step 5, build checker brick by laying bricks or stones:Checker brick are to build by laying bricks or stones with seam in 1-8 layers, start three kinds of arrangement alternatings from the 9th layer and build by laying bricks or stones:Often Checker brick must be fixed with timber wedge every three layers;Most go up six layers of code one piece is moved back into platform, per layer of combustion chamber side is pushed away, the good checker brick post-tensioning of code Upper grid control line;
Step 6, build partition wall by laying bricks or stones:Position with partition wall model unwrapping wire and by " ten ", corrected using partition wall model when building by laying bricks or stones;Build by laying bricks or stones Partition wall is with code checker brick alternately;
After the completion of step 7, new refractory material laying, surplus material is transported into job site.
CN201611215890.3A 2016-12-26 2016-12-26 Hot-blast stove on-bne repair refractory material transportation system, group and repair method Active CN106586912B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611215890.3A CN106586912B (en) 2016-12-26 2016-12-26 Hot-blast stove on-bne repair refractory material transportation system, group and repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611215890.3A CN106586912B (en) 2016-12-26 2016-12-26 Hot-blast stove on-bne repair refractory material transportation system, group and repair method

Publications (2)

Publication Number Publication Date
CN106586912A true CN106586912A (en) 2017-04-26
CN106586912B CN106586912B (en) 2019-03-05

Family

ID=58603781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611215890.3A Active CN106586912B (en) 2016-12-26 2016-12-26 Hot-blast stove on-bne repair refractory material transportation system, group and repair method

Country Status (1)

Country Link
CN (1) CN106586912B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110257578A (en) * 2019-06-29 2019-09-20 上海二十冶建设有限公司 The not aperture of the large-scale resistance to material of external combustion stove feeds construction method
CN112591617A (en) * 2020-12-07 2021-04-02 中国十九冶集团有限公司 Hot blast stove refractory material conveying device and method
WO2023184781A1 (en) * 2022-03-31 2023-10-05 满洲里达赉湖热电有限公司 Method for overhauling boiler wall hole door of boiler

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53128845A (en) * 1977-04-18 1978-11-10 Nippon Steel Corp Transfer device for vertical article
JPH05229644A (en) * 1992-02-20 1993-09-07 Nippon Steel Corp Device for conveying and distributing brick for hot blast stove
JPH05229651A (en) * 1992-02-20 1993-09-07 Nippon Steel Corp Device for conveying brick for construction work of hot blast stove
CN201801272U (en) * 2010-09-25 2011-04-20 中国十九冶集团有限公司武汉分公司 Hot-blast stove masonry vertical transportation system
CN203127962U (en) * 2013-03-25 2013-08-14 中国十七冶集团有限公司 Material transportation device for hot blast stove
CN103484589A (en) * 2013-09-13 2014-01-01 中国十九冶集团有限公司 Low-temperature hot blast heater construction method
CN104848037A (en) * 2015-06-11 2015-08-19 中国二十二冶集团有限公司 Hot blast stove-unopened construction process masonry slurry automatic conveying system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53128845A (en) * 1977-04-18 1978-11-10 Nippon Steel Corp Transfer device for vertical article
JPH05229644A (en) * 1992-02-20 1993-09-07 Nippon Steel Corp Device for conveying and distributing brick for hot blast stove
JPH05229651A (en) * 1992-02-20 1993-09-07 Nippon Steel Corp Device for conveying brick for construction work of hot blast stove
CN201801272U (en) * 2010-09-25 2011-04-20 中国十九冶集团有限公司武汉分公司 Hot-blast stove masonry vertical transportation system
CN203127962U (en) * 2013-03-25 2013-08-14 中国十七冶集团有限公司 Material transportation device for hot blast stove
CN103484589A (en) * 2013-09-13 2014-01-01 中国十九冶集团有限公司 Low-temperature hot blast heater construction method
CN104848037A (en) * 2015-06-11 2015-08-19 中国二十二冶集团有限公司 Hot blast stove-unopened construction process masonry slurry automatic conveying system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国工程建设标准化协会工业炉砌筑专业委员会: "《筑炉工程手册》", 31 January 2007 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110257578A (en) * 2019-06-29 2019-09-20 上海二十冶建设有限公司 The not aperture of the large-scale resistance to material of external combustion stove feeds construction method
CN112591617A (en) * 2020-12-07 2021-04-02 中国十九冶集团有限公司 Hot blast stove refractory material conveying device and method
WO2023184781A1 (en) * 2022-03-31 2023-10-05 满洲里达赉湖热电有限公司 Method for overhauling boiler wall hole door of boiler

Also Published As

Publication number Publication date
CN106586912B (en) 2019-03-05

Similar Documents

Publication Publication Date Title
TW421705B (en) Method of repairing coke oven and apparatus for taking-in bricks for repair
CN102692131B (en) Method for overhauling fire-resistant material for annular air duct and chute in coke dry quenching furnace
CN106586912A (en) Group air heating furnace on-line overhauling refractory material transport system and overhauling method
CN105177202B (en) A kind of blast furnace overhaul method
CN101928575A (en) Dry quenching laying method
KR19990045642A (en) Apparatus and processing system for preheating steel scrap for molten metal treatment furnace with co-flow of scrap and heating gas
CN106766929A (en) Independent hot-blast stove on-bne repair Nai Cai transportation systems and repair method
CN109097516A (en) The construction method of blast furnace overhaul engineering replacement last furnace shell
CN105542800B (en) Coke dry quenching furnace liner overhaul construction method
CN103776270A (en) Calcium carbide sensible heat recovery equipment and method for calcium carbide furnace
CN102251094A (en) Heat accumulating type soaking pit furnace capable of combusting low-calorific value coal gas
CN206330432U (en) It is a kind of to eliminate the process structure that Mialz lime kiln runs wind
CN102399925A (en) Method for replacing cooling wall of blast furnace
US7901616B2 (en) Method of building a direct smelting plant
CN102134620B (en) Blast furnace shaft upper part rapid heating for producing lining by wet method
CN104560065B (en) False corbel bracket and using method thereof during examining and repairing corbel bricks in dry quenching chute
CN108913832B (en) Method for dismantling refractory material in oversize hot blast stove
CN103776271A (en) Calcium carbide sensible heat recovery equipment for calcium carbide furnace
CN100489410C (en) Technique for inner lining construction for unopened hot-blast stove furnace jacket
CN208815048U (en) A kind of State of Blast Furnace is interior to protect canopy support device
CN104129600A (en) Circulating steel ball mechanical conveying device
CN107906971A (en) A kind of blast furnace mineral hot furnace slag cures the high, normal, basic waste heat recycling system of heat
CN203489686U (en) Movable flat-roofed annular kiln
CN206458066U (en) Hot-blast stove overhauls operation platform
CN202116623U (en) Heat storage type soaking pit combusting gas with low heat value

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant