CN108381052A - A kind of converter vaporization flue site welding method - Google Patents

A kind of converter vaporization flue site welding method Download PDF

Info

Publication number
CN108381052A
CN108381052A CN201810059621.5A CN201810059621A CN108381052A CN 108381052 A CN108381052 A CN 108381052A CN 201810059621 A CN201810059621 A CN 201810059621A CN 108381052 A CN108381052 A CN 108381052A
Authority
CN
China
Prior art keywords
welding
flue
comb
evaporated
evaporated flue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810059621.5A
Other languages
Chinese (zh)
Inventor
孔炯
朱红刚
郭建华
陈志�
张俊
郑治飞
汪柱兵
琚志海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810059621.5A priority Critical patent/CN108381052A/en
Publication of CN108381052A publication Critical patent/CN108381052A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • B23K31/027Making tubes with soldering or welding

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention provides a kind of converter vaporization flue site welding method, belongs to installing construction method, processing step is as follows:One, preparation of construction, smooth location arrange moulding bed;Two, group pair, handles comb groove, and relative distance between the first evaporated flue and the first evaporated flue is adjusted using chain block;Wind-proof shed is set up on the outside of evaporated flue welding region, operating platform is set up on the inside of evaporated flue;Three, it welds, centering, spot welding, using outer after in elder generation, horizontal direction both sides, both sides interlock welding procedure welding;It is filled at the neutral gear among comb one and comb two using parting bead after welding, filling filling weld seam, it is ensured that No leakage.The present invention solves the problems, such as during welding to ensure during converter vaporization flue section construction Assembling, welding, installation that the control difficulty of the misalignment of the circularity of evaporated flue itself and each seamless steel pipe docking and welding quality is big.

Description

A kind of converter vaporization flue site welding method
Technical field
The present invention relates to technical field of buildings, and in particular to a kind of converter vaporization flue site welding method is suitable for vapour Change flue welding.
Background technology
Converter vaporization flue, also referred to as waste heat boiler are one of main corollary equipments of pneumatic steelmaking.The equipment is working When to collect high-temperature flue gas to the maximum extent, bear highest furnace gas temperature and violent frequent temperature change, while operating mode is most It is severe, is easiest to bond the slag of splash.Converter vaporization flue has a circle comb, will produce in steelmaking process a large amount of High-temperature flue gas, main component are carbon monoxide.Coal gas of converter calorific capacity is a kind of first-class fuel up to 7524-9196kJ, can Fuel as equipment such as heater for rolling steel, lime sleeve kiln, ladle bakings.Also contain a large amount of high Fe contents in flue gas simultaneously Dust can be used as the superior raw material of sinter after collection.In addition, high-temperature flue gas is steamed by heat exchange and recyclable a large amount of steam Vapour purposes is very wide, can be not only used for producing, and can be used for living.Therefore, very great to converter gas using energy source meaning.If this A little high-temperature flue gas do not recycle, and distribute and will produce serious pollution in workshop and air, jeopardize health of human body and agricultural production, simultaneously Power grid, TV and communication etc. can be interfered.In pneumatic steelmaking, the processing that flue gas is generated to steel-making is the master of steel mill Environmental Protection Level One of indicate, an important factor for recycling and reuse of coal gas and steam are also its capability of energy dissipation, and the steam of pneumatic steelmaking With coal-gas recovering realized by off-gas recovery purification system.
Evaporated flue system is made of movable flue, fixed flue, mobile section, oblique section and bending section, is arranged in steel-making In each layer platform of high building;In general evaporated flue diameter reaches 4.1m, and long 56m, such large volume, overweight equipment can not be straight Transport and installation are connect, is all section construction Assembling, welding, installation;Evaporated flue by 186 φ 60 × 5 seamless steel Pipe is assembled into a circle, ensures the circularity and each seamless steel pipe of evaporated flue itself during welding after segmentation is marched into the arena The misalignment of docking and the control difficulty of welding quality are big.
Invention content
The present invention provides a kind of converter vaporization flue site welding method, it is therefore intended that solves to propose in above-mentioned background technology Converter vaporization flue section construction Assembling, welding, ensure during welding during installation evaporated flue from The big problem of the control difficulty of the misalignment and welding quality of the circularity of body and the docking of each seamless steel pipe.
To achieve the above object, the embodiment of the present invention provides a kind of converter vaporization flue site welding method, including following Step:
Step 1, preparation of construction
1) the comb material of evaporated flue is No. 20 boiler steels, and welding procedure qualification report and welding are formulated according to this requirement Technique guiding book;
2) levelling of the land is compacted, and has the condition of gasification cooling flue sectional;
3) on the ground by the placement of moulding bed level;
Step 2, group pair
1) the first evaporated flue of segmentation and the second evaporated flue are lifted respectively to moulding bed, using beveling machine to comb Groove processing, ensure bevel angle and comb end verticality, to meet welding requirements;
2) wind-proof shed is set up on the outside of welding region, and operating platform is set up on the inside of evaporated flue;
3) chain block is utilized to adjust relative distance between the first evaporated flue and the second evaporated flue;
4) cleaning derusting is carried out in the port of comb, it is ensured that without grease, water, rust staining etc.;
Step 3, welding
1) centering, spot welding, with the fixture of same material by the first evaporated flue and the corresponding comb pair of the second evaporated flue Mouth is concordant, and spot welding;
2) entire welding procedure is outer after being in elder generation;When the weld seam of welding inside comb, while electrode holder on the inside of welding, and Lead to tunger tube to outside to protect, to build welding surroundings;
3) ultrasound examination is carried out after the completion of butt weld welding, and next procedure can be carried out after qualified;
4) it is filled at the neutral gear among the first comb and the second comb in parting bead, filling filling weld seam, it is ensured that No leakage;
5) coating paint, welding are completed.
Preferably, qualification of welding procedure ensures the standard before welding and basis in step 1, and by qualification of welding procedure system Determine welding procedure guiding book.
Preferably, in step 2, the height of wind-proof shed and operating platform reaches the requirement stood for welding personnel;It is windproof It is length 6m, width 3m, height 6m that canopy, which utilizes scaffold building, outer laying PVC windproof and rain proof cloth, size,.
Preferably, in step 2, after the first evaporated flue and the second evaporated flue are in place, the counterpart of comb has in order to control Spacing is adjusted using chain block in body, and four sets of 5t chain blocks are respectively set in circumferencial direction in chain block;Formally welding It is in the 50mm of comb port to the cleanup area in comb port before connecing.
Preferably, in step 3, the welding sequence of rear outer welding procedure is the level two from evaporated flue in the elder generation It welds up and down side.
In conclusion compared with prior art, the present invention advantage following points:
1) the smooth compacting in place must be carried out before group is to evaporated flue, ensure that the docking of equipment most clock synchronization is smooth, with It avoids welding stress in welding process caused by uneven lower layer.
2) the processing quality of comb groove directly affects subsequent welding quality, group to it is preceding carry out groove processing, with Ensure that welding fabrication is good;Groove end verticality is unanimously to ensure that counterpart distance meets code requirement.
3) wind-proof shed (5) is set as preventing influence of the external environment to welding region.
4) it is the welding ensured inside evaporated flue, operating platform (4) is set up inside evaporated flue, ensures operating personnel Safety.
5) rear outer welding procedure is to ensure the weld seam welding of internal comb (1) in the elder generation.
Description of the drawings
Fig. 1 illustrates the preparation of construction schematic diagram of the present invention;
Fig. 2 illustrates the flue group of the present invention to schematic diagram;
Fig. 3 illustrates the flue welding schematic diagram of the present invention;
It illustrates:1. comb, 2. filling weld seams, 3. moulding beds, operating platform, 5. outer wind-proof sheds, 6. electrode holders, 7. in 4. Tunger tube, 8. first evaporated flues, 9. second evaporated flues, 10. chain blocks, 11. first combs, 12. second combs, 13. Groove, 14. butt welds, 15. parting beads.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described the application principle of the present invention.
Embodiment one
A kind of converter vaporization flue site welding method as shown in Figure 1 to Figure 3, includes the following steps:
Step 1, preparation of construction
1) 1 material of comb of evaporated flue is No. 20 boiler steels, and welding procedure qualification report and weldering are formulated according to this requirement Connect technique guiding book;
2) levelling of the land is compacted, and has the condition of gasification cooling flue sectional;
3) on the ground by the horizontal placement of moulding bed 3;
Step 2, group pair
1) the first evaporated flue 8 of segmentation and the second evaporated flue 9 are lifted respectively to moulding bed 3, utilizes beveling machine pair The groove 13 of comb 1 is handled, and ensures the verticality of bevel angle and 1 end of comb, to meet welding requirements;
2) wind-proof shed 5 is set up on the outside of welding region, and operating platform 4 is set up on the inside of evaporated flue;
3) chain block 10 is utilized to adjust relative distance between the first evaporated flue 8 and the second evaporated flue 9;
4) cleaning derusting is carried out in the port of comb 1, it is ensured that without grease, water, rust staining etc.;
Step 3, welding
1) centering, spot welding, with the fixture of same material by 9 corresponding comb of the first evaporated flue 8 and the second evaporated flue 1 counterpart is concordant, and spot welding;
2) entire welding procedure is outer after being in elder generation;When the weld seam of welding inside comb 1, while electrode holder 6 on the inside of welding, and And tunger tube 7 is led to outside and is protected, to build welding surroundings;
3) ultrasound examination is carried out after the completion of the welding of butt weld 14, and next procedure can be carried out after qualified;
4) it is filled at the neutral gear among the first comb 11 and the second comb 12 in parting bead 15, filling filling weld seam 2, it is ensured that nothing Leakage;
5) coating paint, welding are completed.
Wherein, qualification of welding procedure ensures the standard before welding and basis in step 1, and is formulated by qualification of welding procedure Welding procedure guiding book;In step 2, the height of wind-proof shed 5 and operating platform 4 reaches the requirement stood for welding personnel;It is anti- It is length 6m, width 3m, height 6m that wind canopy 5, which utilizes scaffold building, outer laying PVC windproof and rain proof cloth, size,;In step 2, After the first evaporated flue 8 and the second evaporated flue 9 are in place, the counterpart of comb 1 is specific in order to control, and chain block 10 is utilized to carry out Spacing is adjusted, four sets of 5t chain blocks are respectively set in circumferencial direction in chain block 10;Before formal welding, to 1 end of comb Cleanup area in mouthful is in 1 port 50mm of comb;In step 3, the welding sequence of rear outer welding procedure in the elder generation It is to be welded up and down from the horizontal both sides of evaporated flue.
A kind of converter vaporization flue site welding method proposed by the invention, uses special welding procedure and welding is arranged It applies, ensures that counterpart is accurate using moulding bed and chain block cooperation;Ensure to weld using external windproof and rain proof canopy and welding ventilation protection Connect environment;Utilize rear outer in elder generation, the welding procedure that horizontal direction both sides, both sides are staggeredly welded, control welding deformation, guarantee welding matter Amount;Construction speed totally is improved, and reduces cost, shortens the duration.
Site welding of the present invention ensures welding environment by the way that corresponding measure is arranged;Using special welding technique, weldering is reduced Deformation is connect, improves weldquality in whole installation process, safe and efficient, reliable in quality.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment including a series of elements includes not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including institute State in the process, method, article or equipment of element that there is also other identical elements.
The above is only the specific implementation mode of the present invention, is made skilled artisans appreciate that or realizing this hair It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (5)

1. a kind of converter vaporization flue site welding method, which is characterized in that include the following steps:
Step 1, preparation of construction
1) comb (1) material of evaporated flue is No. 20 boiler steels, and welding procedure qualification report and welding are formulated according to this requirement Technique guiding book;
2) levelling of the land is compacted, and has the condition of gasification cooling flue sectional;
3) on the ground by the placement of moulding bed (3) level;
Step 2, group pair
1) the first evaporated flue (8) of segmentation and the second evaporated flue (9) are lifted respectively to moulding bed (3), utilizes beveling machine Groove (13) processing to comb (1), ensures the verticality of bevel angle and comb (1) end, to meet welding requirements;
2) wind-proof shed (5) is set up on the outside of welding region, and operating platform (4) is set up on the inside of evaporated flue;
3) chain block (10) is utilized to adjust relative distance between the first evaporated flue (8) and the second evaporated flue (9);
4) cleaning derusting is carried out in the port of comb (1), it is ensured that without grease, water, rust staining etc.;
Step 3, welding
1) centering, spot welding, with the fixture of same material by the first evaporated flue (8) and the corresponding comb of the second evaporated flue (9) (1) counterpart is concordant, and spot welding;
2) entire welding procedure is outer after being in elder generation;When the weld seam of welding inside comb (1), while electrode holder (6) on the inside of welding, and And tunger tube (7) is led to outside and is protected, to build welding surroundings;
3) ultrasound examination is carried out after the completion of butt weld (14) welding, and next procedure can be carried out after qualified;
4) it is filled at the neutral gear among the first comb (11) and the second comb (12) in parting bead (15), filling filling weld seam (2), really Protect No leakage;
5) coating paint, welding are completed.
2. a kind of converter vaporization flue site welding method according to claim 1, which is characterized in that welded in step 1 Procedure qualification ensures the standard before welding and basis, and formulates welding procedure guiding book by qualification of welding procedure.
3. a kind of converter vaporization flue site welding method according to claim 1, which is characterized in that in step 2, prevent The height of wind canopy (5) and operating platform (4) reaches the requirement stood for welding personnel;Wind-proof shed (5) utilizes scaffold building, Outer laying PVC windproof and rain proof cloth, size are length 6m, width 3m, height 6m.
4. a kind of converter vaporization flue site welding method according to claim 1, which is characterized in that in step 2, After first evaporated flue (8) and the second evaporated flue (9) are in place, the counterpart of comb (1) is specific in order to control, utilizes chain block (10) spacing is adjusted, four sets of 5t chain blocks are respectively set in circumferencial direction in chain block (10);Before formal welding, It is in comb (1) port 50mm to the cleanup area in comb (1) port.
5. a kind of converter vaporization flue site welding method according to claim 1, which is characterized in that in step 3, institute The welding sequence of outer welding procedure is welded up and down from the horizontal both sides of evaporated flue after stating in elder generation.
CN201810059621.5A 2018-01-22 2018-01-22 A kind of converter vaporization flue site welding method Pending CN108381052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810059621.5A CN108381052A (en) 2018-01-22 2018-01-22 A kind of converter vaporization flue site welding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810059621.5A CN108381052A (en) 2018-01-22 2018-01-22 A kind of converter vaporization flue site welding method

Publications (1)

Publication Number Publication Date
CN108381052A true CN108381052A (en) 2018-08-10

Family

ID=63076130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810059621.5A Pending CN108381052A (en) 2018-01-22 2018-01-22 A kind of converter vaporization flue site welding method

Country Status (1)

Country Link
CN (1) CN108381052A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110814559A (en) * 2019-09-30 2020-02-21 日照钢铁控股集团有限公司 Method for processing forced circulation cooling flue of converter
CN112453744A (en) * 2020-11-27 2021-03-09 中国十七冶集团有限公司 Method for prefabricating and installing pipeline of converter oxygen lance valve station
CN114085944A (en) * 2021-11-25 2022-02-25 中国二十冶集团有限公司 Combined jig frame for flue system and assembling method for flue system
CN114799410A (en) * 2022-05-06 2022-07-29 南通中远海运船务工程有限公司 Forming process of ultra-large marine flange

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58132390A (en) * 1982-02-03 1983-08-06 Mitsubishi Heavy Ind Ltd Manufacture of tube with peg fin
CN101804501A (en) * 2010-04-01 2010-08-18 中国二十二冶集团有限公司 Ground assembling and welding integral installation and construction technology for vaporization-cooling chimney
PL220073B1 (en) * 2012-07-13 2015-08-31 Energoinstal Spółka Akcyjna Method for welding components for the energy industry, especially wall panels sealed boilers
CN106435087A (en) * 2016-08-29 2017-02-22 中国十七冶集团有限公司 Sectional assembling and mounting method for converter vaporization flue
CN107214466A (en) * 2017-06-22 2017-09-29 五冶集团上海有限公司 The adjusting apparatus of counterpart is made for pipeline
CN206677447U (en) * 2017-03-07 2017-11-28 中国二十冶集团有限公司 Platform for boiler heating surface water-cooling wall high-altitude butt welding

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58132390A (en) * 1982-02-03 1983-08-06 Mitsubishi Heavy Ind Ltd Manufacture of tube with peg fin
CN101804501A (en) * 2010-04-01 2010-08-18 中国二十二冶集团有限公司 Ground assembling and welding integral installation and construction technology for vaporization-cooling chimney
PL220073B1 (en) * 2012-07-13 2015-08-31 Energoinstal Spółka Akcyjna Method for welding components for the energy industry, especially wall panels sealed boilers
CN106435087A (en) * 2016-08-29 2017-02-22 中国十七冶集团有限公司 Sectional assembling and mounting method for converter vaporization flue
CN206677447U (en) * 2017-03-07 2017-11-28 中国二十冶集团有限公司 Platform for boiler heating surface water-cooling wall high-altitude butt welding
CN107214466A (en) * 2017-06-22 2017-09-29 五冶集团上海有限公司 The adjusting apparatus of counterpart is made for pipeline

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《LO00MW超超临界火电机组施工技术丛书》编委会: "《施工技术与管理》", 30 November 2010, 中国电力出版社 *
孔炯等: "大型汽化烟道现场组装技术研究", 《机电工程技术》 *
胡友忠: "浅谈2×250t汽化冷却烟道现场焊接技术", 《科技风》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110814559A (en) * 2019-09-30 2020-02-21 日照钢铁控股集团有限公司 Method for processing forced circulation cooling flue of converter
CN112453744A (en) * 2020-11-27 2021-03-09 中国十七冶集团有限公司 Method for prefabricating and installing pipeline of converter oxygen lance valve station
CN114085944A (en) * 2021-11-25 2022-02-25 中国二十冶集团有限公司 Combined jig frame for flue system and assembling method for flue system
CN114799410A (en) * 2022-05-06 2022-07-29 南通中远海运船务工程有限公司 Forming process of ultra-large marine flange
CN114799410B (en) * 2022-05-06 2024-04-26 南通中远海运船务工程有限公司 Forming process of ultra-large marine flange

Similar Documents

Publication Publication Date Title
CN108381052A (en) A kind of converter vaporization flue site welding method
CN113846198A (en) Construction method for building blast furnace body
CN106586912B (en) Hot-blast stove on-bne repair refractory material transportation system, group and repair method
CN106766929B (en) Independent hot-blast stove on-bne repair Nai Cai transportation system and repair method
CN206330432U (en) It is a kind of to eliminate the process structure that Mialz lime kiln runs wind
CN201327293Y (en) Melting furnace
CN213238394U (en) Hot air secondary utilization device of rotary kiln
CN102134620B (en) Blast furnace shaft upper part rapid heating for producing lining by wet method
CN101748894B (en) Auxiliary quick construction method of temporary light rail in coke furnace building thermal state project
CN109141087A (en) A kind of hot logistics system based on accumulation of heat module
CN107176606A (en) The system and method for reclaiming carbide liquid sensible heat
CN203881135U (en) Overall modular structure of industrial furnace
CN101760208A (en) Method for installing coke dry quenching slot shell
CN207351230U (en) A kind of flue gas tandem recycles ring cold machine
CN201678623U (en) High temperature compensator for dry quenching
CN205888057U (en) Exempt from roast package ware device of switching -over from heat accumulation
CN209763769U (en) Novel furnace
CN2743352Y (en) High temperature compensator for dry extinguishing coke
CN211804649U (en) Converter vaporization flue on-site assembly support rack device
CN2935055Y (en) Configuration structure for coal-fired molten salt furnace and residual heat steam generator
CN204188010U (en) A kind of thick furnace dedusting is stretched airtight petticoat pipe
CN104215082B (en) Thick furnace dedusting is stretched airtight petticoat pipe
CN103388978B (en) Material guiding device for electric-arc furnace
CN211394516U (en) Device is assembled fast to blast furnace stove bottom sealed cowling casing
CN203904383U (en) Flue support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810

RJ01 Rejection of invention patent application after publication