CN206677447U - Platform for boiler heating surface water-cooling wall high-altitude butt welding - Google Patents
Platform for boiler heating surface water-cooling wall high-altitude butt welding Download PDFInfo
- Publication number
- CN206677447U CN206677447U CN201720215804.2U CN201720215804U CN206677447U CN 206677447 U CN206677447 U CN 206677447U CN 201720215804 U CN201720215804 U CN 201720215804U CN 206677447 U CN206677447 U CN 206677447U
- Authority
- CN
- China
- Prior art keywords
- cooling wall
- heating surface
- surface water
- boiler heating
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
It the utility model is related to the installing area of large-sized boiler, specifically a kind of platform for boiler heating surface water-cooling wall high-altitude butt welding;It is characterized in that:It includes hanging framework, landing slab;Wherein, hanging framework includes bottom plate, fence and connecting rod, and connecting rod is vertically arranged on bottom plate, and fence is located at connecting rod bottom and is connected with bottom plate;Landing slab is laid on the bottom plate of hanging framework, and whole framework of hanging is hung on the fin of boiler heating surface water-cooling wall by connecting rod.This platform is when in use, hanging framework is hung on the fin of boiler heating surface water-cooling wall on ground in advance, lifted by crane simultaneously with boiler heating surface water-cooling wall afterwards, so as to remove the step of subsequently building jig in high-altitude from, simultaneously, this platform is connected by hanging the fin of framework and water-cooling wall, is realized purpose that is removable and reusing, has been saved the construction costs such as man power and material.
Description
Technical field
The installing area of large-sized boiler is the utility model is related to, is specifically that one kind is used for boiler heating surface water-cooling wall high-altitude pair
The platform of mouth welding.
Background technology
Waste heat boiler water-cooling wall has the characteristics of volume is big, quality weight, and water-cooling wall is cumbersome for installation, parts are more, pipeline
Welding amount is big.Therefore under the conditions of restricted clearance, water-cooling wall installation has the multiple lifting of needs, construction safety is difficult to ensure that,
The problem of efficiency of construction is low, and installation period is long:Water-cooling wall is needed to pipe joint welding, pipe joint quantity later in place
Extremely more, high-altitude installation exercise and weld job bring serious potential safety hazard, and high-altitude group is to danger, while the welding matter of pipeline
Amount is difficult to ensure that the first-time qualification rate of pipeline film making is low, has a strong impact on construction speed, adds construction cost.
The content of the invention
The purpose of this utility model is, there is provided a kind of boiler heating surface water-cooling wall high-altitude butt welding that can be reused
Platform, it can efficiently and effectively improve operating efficiency.
In order to achieve the above object, the utility model is realized in:
A kind of platform for boiler heating surface water-cooling wall high-altitude butt welding, it includes hanging framework, landing slab;Its
In, hanging framework includes bottom plate, fence and connecting rod, and connecting rod is vertically arranged on bottom plate, and fence is located at connecting rod bottom simultaneously
It is connected with bottom plate;Landing slab is laid on the bottom plate of hanging framework, it is whole hang framework by connecting rod and be hung on boiler by
On the fin of hot face water-cooling wall.
The described platform for boiler heating surface water-cooling wall high-altitude butt welding, connection anchor is set in the bottom of landing slab
Plate, connect and open up through hole on anchor slab, the through hole is to through connecting rope, fin and landing slab bottom in boiler heating surface water-cooling wall
Connected between the connection anchor slab in portion by connecting rope.
The described platform for boiler heating surface water-cooling wall high-altitude butt welding, in addition to safety rope, the safety rope
The connecting rod hung on framework to be connected by multiple hanging framework connections, or by safety rope.
This platform when in use, hangs over hanging framework on the fin of boiler heating surface water-cooling wall, afterwards on ground in advance
Lifted by crane simultaneously with boiler heating surface water-cooling wall, so as to remove the step of subsequently building jig in high-altitude from, meanwhile, this platform leads to
The fin for crossing hanging framework and water-cooling wall connects, and realizes purpose that is removable and reusing, has saved the construction such as man power and material
Cost.
Brief description of the drawings
Fig. 1 is the structural representation of this platform.
Embodiment
The utility model is further illustrated below by way of specific embodiment.
As shown in figure 1, a kind of platform for boiler heating surface water-cooling wall high-altitude butt welding, it include hanging framework 1,
Landing slab;Wherein, hanging framework 1 includes bottom plate 11, fence 12 and connecting rod 13, and connecting rod 13 is vertically arranged on bottom plate 11,
Fence 12 is located at the bottom of connecting rod 13 and is connected with bottom plate 11;Landing slab is laid on the bottom plate 11 of hanging framework 1, whole hanging
Framework 1 is hung on the fin 2 of boiler heating surface water-cooling wall by connecting rod 13.
The described platform for boiler heating surface water-cooling wall high-altitude butt welding, connection anchor is set in the bottom of landing slab
Plate, connect and open up through hole on anchor slab, the through hole is to through connecting rope, fin and landing slab bottom in boiler heating surface water-cooling wall
Connected between the connection anchor slab in portion by connecting rope.In this way, in use, whole platform is by hanging framework and boiler heating surface
The fin of water-cooling wall establishes top connection, is connected by landing slab bottom with the fin management bottom of boiler heating surface water-cooling wall,
So that whole platform is firmly bundled on platform.
The described platform for boiler heating surface water-cooling wall high-altitude butt welding, in addition to safety rope, the safety rope
The connecting rod hung on framework to be connected by multiple hanging framework connections, or by safety rope;During using this platform, behaviour
Making personnel can be by safety belt colligation on safety rope, so as to ensure safety during its construction.
This platform when in use, hangs over hanging framework on the fin of boiler heating surface water-cooling wall, afterwards on ground in advance
Lifted by crane simultaneously with boiler heating surface water-cooling wall, so as to remove the step of subsequently building jig in high-altitude from, meanwhile, this platform leads to
The fin for crossing hanging framework and water-cooling wall connects, and realizes purpose that is removable and reusing, has saved the construction such as man power and material
Cost.
Claims (3)
1. a kind of platform for boiler heating surface water-cooling wall high-altitude butt welding, it is characterized in that:It includes hanging framework, platform
Plate;Wherein, hanging framework includes bottom plate, fence and connecting rod, and connecting rod is vertically arranged on bottom plate, and fence is located at connecting rod bottom
Portion is simultaneously connected with bottom plate;Landing slab is laid on the bottom plate of hanging framework, and whole framework of hanging is hung on pot by connecting rod
On the fin of stove heating surface water-cooling wall.
2. the platform according to claim 1 for boiler heating surface water-cooling wall high-altitude butt welding, it is characterized in that:Flat
The bottom of platen sets connection anchor slab, connects and opens up through hole on anchor slab, and the through hole is to through connecting rope, in boiler heating surface water
Connected between the fin of cold wall and the connection anchor slab of landing slab bottom by connecting rope.
3. the platform according to claim 1 for boiler heating surface water-cooling wall high-altitude butt welding, it is characterized in that:Also wrap
Include safety rope, the safety rope is to by multiple hanging frameworks connections, or will hang by safety rope the connecting rod on framework
Connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720215804.2U CN206677447U (en) | 2017-03-07 | 2017-03-07 | Platform for boiler heating surface water-cooling wall high-altitude butt welding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720215804.2U CN206677447U (en) | 2017-03-07 | 2017-03-07 | Platform for boiler heating surface water-cooling wall high-altitude butt welding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206677447U true CN206677447U (en) | 2017-11-28 |
Family
ID=60392926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720215804.2U Active CN206677447U (en) | 2017-03-07 | 2017-03-07 | Platform for boiler heating surface water-cooling wall high-altitude butt welding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206677447U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108381052A (en) * | 2018-01-22 | 2018-08-10 | 中国十七冶集团有限公司 | A kind of converter vaporization flue site welding method |
CN109623104A (en) * | 2018-10-26 | 2019-04-16 | 上海锅炉厂有限公司 | A kind of T91 panelized-tube-wall section scene counterpart mounting process method |
CN113048461A (en) * | 2021-03-29 | 2021-06-29 | 河南省安装集团有限责任公司 | High-altitude assembly and installation device for boiler membrane type water-cooled wall and installation method thereof |
CN114161051A (en) * | 2021-11-11 | 2022-03-11 | 河南沃克曼建设工程有限公司 | Vertical boiler foundation construction combined platform and construction method for waste incineration power plant |
-
2017
- 2017-03-07 CN CN201720215804.2U patent/CN206677447U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108381052A (en) * | 2018-01-22 | 2018-08-10 | 中国十七冶集团有限公司 | A kind of converter vaporization flue site welding method |
CN109623104A (en) * | 2018-10-26 | 2019-04-16 | 上海锅炉厂有限公司 | A kind of T91 panelized-tube-wall section scene counterpart mounting process method |
CN113048461A (en) * | 2021-03-29 | 2021-06-29 | 河南省安装集团有限责任公司 | High-altitude assembly and installation device for boiler membrane type water-cooled wall and installation method thereof |
CN113048461B (en) * | 2021-03-29 | 2023-02-24 | 河南省安装集团有限责任公司 | High-altitude assembling and mounting device for boiler membrane type water-cooled wall and mounting method thereof |
CN114161051A (en) * | 2021-11-11 | 2022-03-11 | 河南沃克曼建设工程有限公司 | Vertical boiler foundation construction combined platform and construction method for waste incineration power plant |
CN114161051B (en) * | 2021-11-11 | 2024-02-13 | 河南沃克曼建设工程有限公司 | Combined platform and method for vertical boiler foundation construction of garbage incineration power plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206677447U (en) | Platform for boiler heating surface water-cooling wall high-altitude butt welding | |
CN103758045B (en) | Box girder wet joint formwork construction method under space limitation condition | |
CN209397712U (en) | The connection structure of antidetonation steel pipe in a kind of shear wall | |
CN203096620U (en) | Steel pipe arch rib operation platform | |
CN203066491U (en) | Locator for installing round tube type connection member | |
CN203959697U (en) | The equalizing bar of hoisting platform truss | |
CN206737541U (en) | Bit platform is entered in a kind of angle steel tower high-altitude | |
CN205242407U (en) | A cluster pipe, chute combination system for deep basal pit concrete placement | |
CN205975635U (en) | Foundation pit support structure | |
CN204825655U (en) | Arc case roof beam lifts by crane focus off -centre and installation leveling system that takes one's place | |
CN203022327U (en) | Elevator shaft high-altitude construction platform device | |
CN208686105U (en) | A kind of device controlling framework lower end filling concrete height | |
CN109629811A (en) | Detachable operating platform for steel pipe column | |
CN206014340U (en) | A kind of cooperation fork truck can 360 degree of pipe risers for rotating | |
CN202577927U (en) | Suspended basket for assembling honeycomb grid column structural steel framework | |
CN206570361U (en) | Device is built by laying on a kind of mammoth conveter furnace lining | |
CN207090836U (en) | It is a kind of for the installation of power station pipeline from climbing hoisting equipment | |
CN203977836U (en) | A kind of tool-type escalator building formwork platform | |
CN110306755A (en) | Kitchen chimney flue engineering construction method | |
CN204370796U (en) | Hoistway formwork platform | |
CN203922591U (en) | Vertical large diameter pipeline is installed Synchronous lifting platform | |
CN110206308A (en) | A kind of construction method for being poured simultaneously to wall multiple material | |
CN203742189U (en) | Cable fixing type hoistway protection device | |
CN204824952U (en) | Water -cooling fire door of converter | |
CN203924746U (en) | Protection canopy base plate and automatic lifting protection canopy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |