CN107699650A - A method for installing a cooling wall of a blast furnace - Google Patents
A method for installing a cooling wall of a blast furnace Download PDFInfo
- Publication number
- CN107699650A CN107699650A CN201711218926.8A CN201711218926A CN107699650A CN 107699650 A CN107699650 A CN 107699650A CN 201711218926 A CN201711218926 A CN 201711218926A CN 107699650 A CN107699650 A CN 107699650A
- Authority
- CN
- China
- Prior art keywords
- cooling wall
- old
- cooling
- new
- water pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001816 cooling Methods 0.000 title claims abstract description 103
- 238000000034 method Methods 0.000 title claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- 238000009434 installation Methods 0.000 claims abstract description 29
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 27
- 238000004140 cleaning Methods 0.000 claims abstract 2
- 238000003466 welding Methods 0.000 claims abstract 2
- 239000000498 cooling water Substances 0.000 claims description 18
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 16
- 239000000463 material Substances 0.000 claims description 14
- 229910052742 iron Inorganic materials 0.000 claims description 8
- 238000007789 sealing Methods 0.000 claims description 5
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 3
- 229910052802 copper Inorganic materials 0.000 claims description 3
- 239000010949 copper Substances 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 239000000945 filler Substances 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims 3
- 239000008267 milk Substances 0.000 claims 1
- 210000004080 milk Anatomy 0.000 claims 1
- 235000013336 milk Nutrition 0.000 claims 1
- 238000012857 repacking Methods 0.000 claims 1
- 238000009826 distribution Methods 0.000 abstract description 8
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 230000002349 favourable effect Effects 0.000 abstract description 2
- 238000011084 recovery Methods 0.000 abstract description 2
- 238000005507 spraying Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 6
- 230000003628 erosive effect Effects 0.000 description 2
- 238000012856 packing Methods 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 238000003723 Smelting Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/10—Cooling; Devices therefor
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B5/00—Making pig-iron in the blast furnace
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Blast Furnaces (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种高炉冷却壁的安装方法,具体涉及一种应用于年修或中修时更换少量冷却壁的安装方法,属于高炉技术领域。The invention relates to a method for installing a cooling wall of a blast furnace, in particular to an installation method for replacing a small number of cooling walls during annual maintenance or intermediate maintenance, and belongs to the technical field of blast furnaces.
背景技术Background technique
高炉冷却壁是高炉生产冶炼中避免炉皮受高炉热负荷冲击的关键设备。一旦安装,需使用一代炉龄,但受高温侵蚀及炉料的冲刷磨损,个别冷却壁往往会提前损坏,失去冷却效果,影响高炉正常、安全生产。The blast furnace stave is the key equipment to avoid the furnace skin being impacted by the blast furnace heat load in the blast furnace production and smelting. Once installed, the furnace needs to be used for a generation, but due to high temperature erosion and the erosion and wear of the furnace material, individual staves are often damaged in advance, losing cooling effect and affecting the normal and safe production of the blast furnace.
面对这种情况,通常的做法是利用高炉中修的机会,对高炉进行空料线停炉,检修人员进入炉内,搭设活动吊盘,对冷却壁进行局部更换,然后挖炉缸恢复高炉生产。Faced with this situation, the usual method is to take advantage of the opportunity of the blast furnace’s intermediate maintenance to shut down the blast furnace with an empty material line, and the maintenance personnel enter the furnace, set up a movable hanging pan, partially replace the stave, and then dig out the hearth to restore the blast furnace Production.
这种技术可以实现冷却壁的局部更换,但检修周期长,成本较高,高炉投产后恢复较慢。This technology can realize partial replacement of staves, but the maintenance cycle is long, the cost is high, and the recovery of the blast furnace is slow after it is put into production.
发明内容Contents of the invention
本发明克服了现有技术的缺陷,提供一种高炉冷却壁的安装方法,可以实现利用高炉年修机会(一般5-6天时间)对冷却壁进行局部更换。The invention overcomes the defects of the prior art and provides a method for installing the stave of a blast furnace, which can realize partial replacement of the stave by taking advantage of the annual repair opportunity of the blast furnace (generally within 5-6 days).
本发明是这样实现的:The present invention is achieved like this:
一种高炉冷却壁的安装方法,包括旧冷却壁拆除和新冷却壁安装,A method for installing a blast furnace stave, including removing the old stave and installing a new stave,
旧冷却壁拆除包括如下步骤:The removal of the old stave includes the following steps:
(1)、炉顶开大方孔,拆除阀门箱及中心喉管,对布料溜槽进行改装,在布料溜槽上部安装改向滑轮,在布料溜槽下部安装定滑轮,利用料罐作为主吊点,安装主滑车组;(1) Open a large square hole on the top of the furnace, remove the valve box and the central throat, refit the distribution chute, install a reversing pulley on the upper part of the distribution chute, install a fixed pulley on the lower part of the distribution chute, use the material tank as the main lifting point, install main blocks;
(2)、将旧冷却壁外连管拆除,将与该旧冷却壁连接的上、下段冷却壁的水管用金属软管连通,确保上、下段冷却壁水流畅通,保护不更换的冷却壁;切割旧冷却壁密封罩,露出冷却壁铜管并切割至合适长度,以方便千斤顶出力为原则;(2) Remove the external connecting pipe of the old stave, and connect the water pipes of the upper and lower staves connected to the old stave with metal hoses to ensure the smooth water flow of the upper and lower staves and protect the staves that will not be replaced; Cut the old stave sealing cover to expose the copper pipe of the stave and cut it to a suitable length, so as to facilitate the output of the jack;
(3)、卷扬机的设置,设置1#、2#卷扬机于旧冷却壁上下管口所处平台,炉顶中心滑子的卷扬机设置于炉顶大方孔平台,1#和2#卷扬机的绳头分别引至与旧冷却壁上下管口水平平行位置;(3) The setting of the hoist, set the 1# and 2# hoist on the platform where the upper and lower nozzles of the old cooling wall are located, the hoist of the center slider of the furnace top is set on the large square hole platform on the furnace top, and the rope ends of the 1# and 2# hoist Lead to the horizontal and parallel positions with the upper and lower nozzles of the old cooling wall respectively;
(4)、旧冷却壁水管穿钢丝绳;用铁丝作牵引线将钢丝绳穿过冷却壁中间两根冷却水管,并用锥形固定卡具将钢丝绳与冷却水管管口固定,防止钢丝绳滑动;然后将1#卷扬机和2#卷扬机的绳头分别与上下两端的钢丝绳相连,并稍微受力;(4) The old stave water pipes are threaded with steel wire ropes; use iron wires as traction lines to pass the steel wire ropes through the two cooling water pipes in the middle of the stave, and use tapered fixing fixtures to fix the steel wire ropes with the nozzles of the cooling water pipes to prevent the steel wire ropes from sliding; then put 1 The rope ends of #winch and 2# winch are respectively connected with the wire ropes at the upper and lower ends, and are slightly stressed;
(5)、安装焊接用于顶出旧冷却壁的门型座子,安装位置为旧冷却壁对角两个冷却水管孔外;(5) Install and weld the door-shaped seat for ejecting the old cooling wall, and the installation position is outside the two cooling water pipe holes at the opposite corners of the old cooling wall;
(6)、拆卸旧冷却壁螺栓,分别安装两台千斤顶在门型座子上,顶松冷却壁,同时1#、2#卷扬机配合逐渐顶出冷却壁,将冷却壁顶出;(6) Remove the old stave bolts, respectively install two jacks on the door-shaped seat, loosen the stave, and at the same time, the 1# and 2# winches cooperate to gradually push out the stave to push out the stave;
(7)、中心滑子钩头的挂设;落中心滑子至更换高度,利用布料溜槽旋转将勾头转至更换冷却壁方向,用铁钩将中心滑子钩进冷却壁的绳扣内,点动中心滑子,使钩头受力;(7) Hanging of the hook head of the center slider; drop the center slider to the replacement height, use the cloth chute to rotate the hook head to the direction of replacing the cooling wall, and hook the center slider into the rope buckle of the cooling wall with an iron hook , jog the center slider to force the hook head;
(8)、中心滑子与1#、2#卷扬机配合,将旧冷却壁从大方孔吊出,此时1#、2#卷扬机绳头同步升至大方孔平台;(8) The center slider cooperates with the 1# and 2# winches to lift the old cooling wall out of the large square hole, and at this time the rope heads of the 1# and 2# winches are synchronously lifted to the big square hole platform;
(9)、清理拆除的旧冷却壁周围及其炉壳内侧灌浆料,从炉壳冷却壁水管孔处伸入,用铲子、凿子将灌浆料清理干净,为安装新冷却壁做好准备;(9) Clean up the grouting material around the old stave and the inner side of the furnace shell, extend it from the water pipe hole of the stave in the furnace shell, clean the grouting material with a shovel and chisel, and prepare for the installation of a new stave;
新冷却壁安装包括如下步骤:New stave installation includes the following steps:
(1)、安装新冷却壁前,在新冷却壁热面设置吊点并对热面进行喷涂,同时将取代填料的密封板安装到位;(1) Before installing the new cooling wall, set the lifting point on the hot surface of the new cooling wall and spray the hot surface, and install the sealing plate replacing the packing in place;
(2)、新冷却壁水管穿钢丝绳;用铁丝作牵引线将钢丝绳穿过新冷却壁中间两根水管,并用锥形固定卡具将钢丝绳与冷却壁水管管口固定,防止钢丝绳滑动;(2) The new stave water pipes are threaded with steel wire ropes; use iron wires as traction lines to pass the steel wire ropes through the two water pipes in the middle of the new stave, and use tapered fixing fixtures to fix the steel wire ropes to the nozzles of the stave water pipes to prevent the wire ropes from sliding;
(3)、将新冷却壁水管引出钢丝绳绳头提前与1#、2#卷扬机绳头连接,用炉顶吊车将新冷却壁吊至大方孔并倒换至中心滑子上,中心滑子钩头挂于新冷却壁改装的热面吊耳上;(3) Connect the rope head of the steel wire rope leading out of the water pipe of the new stave to the rope head of the hoist 1# and 2# in advance, hoist the new stave to the large square hole with the furnace roof crane and switch it to the center slider, and the hook head of the center slider Hang on the hot surface lugs modified by the new stave;
(4)、利用两台卷扬机与中心滑子配合将新冷却壁缓慢降落至安装处,利用1#、2#卷扬机将新冷却壁受力落位;(4) Use two winches to cooperate with the center slider to slowly lower the new cooling wall to the installation place, and use 1# and 2# hoisting machines to place the new cooling wall under force;
(5)、调整新冷却壁安装各项技术参数,包括调整新冷却壁与相邻冷却壁间隙及新冷却壁的冷却水管与炉壳间隙;(5) Adjust the technical parameters of the new stave installation, including adjusting the gap between the new stave and the adjacent stave and the gap between the cooling water pipe and the furnace shell of the new stave;
(6)、冷却壁固定,调整好间隙后,紧固螺栓,从炉皮外部开孔灌浆,完成冷却壁的安装,实现全程无人进入炉内操作。(6) The cooling stave is fixed. After adjusting the gap, tighten the bolts, and grout the holes from the outside of the furnace skin to complete the installation of the cooling stave, so that no one enters the furnace for operation.
更进一步的方案是:A further solution is:
所述锥形固定卡具的一端塞入冷却水管内并固定,锥形固定卡具中间有一个贯穿钢丝绳的小孔,钢丝绳穿过小孔后,锥形固定卡具通过塞入冷却水管的一端将钢丝绳压紧并固定。One end of the tapered fixing fixture is inserted into the cooling water pipe and fixed. There is a small hole through the steel wire rope in the middle of the tapered fixing fixture. After the steel wire rope passes through the small hole, the tapered fixing fixture is inserted into one end of the cooling water pipe Compress and secure the wire rope.
更进一步的方案是:A further solution is:
所述门型座子采用工字钢I16。The door-shaped seat adopts I-beam I16.
更进一步的方案是:A further solution is:
所述门型座子上安装的两台千斤顶为50t千斤顶。The two jacks installed on the door-shaped seat are 50t jacks.
更进一步的方案是:A further solution is:
所述炉顶吊车为65T吊车。The furnace top crane is a 65T crane.
更进一步的方案是:A further solution is:
调整冷却壁与相邻冷却壁间隙为20mm±5mm,冷却水管与炉壳间隙大于8mm。Adjust the gap between the stave and the adjacent stave to be 20mm±5mm, and the gap between the cooling water pipe and the furnace shell to be greater than 8mm.
更进一步的方案是:A further solution is:
所述紧固螺栓的预紧力为400N·m。The pre-tightening force of the fastening bolts is 400N·m.
为了安全操作,在更换冷却壁之前,需要将料线降至需要更换冷却壁的下沿0.5米处,压水渣控制炉内温度,安装点火枪将料面煤气点着以控制煤气含量。For safe operation, before replacing the stave, it is necessary to lower the material line to 0.5 meters from the lower edge of the stave to be replaced, press water slag to control the temperature in the furnace, and install an ignition gun to ignite the gas on the material surface to control the gas content.
本申请通过对布料溜槽进行改装,确保中心滑子吊绳更接近需要更换的冷却壁。对冷却壁吊点进行改装,由原来的上侧面改至冷却壁热面,且不影响热面耐火料的喷涂。加工锁定钢丝绳用的专用锥形卡具。制作冷却壁测缝盖板取代原来的人工填料,确保灌浆料不泄漏。This application refits the distributing chute to ensure that the center slider suspension rope is closer to the cooling wall that needs to be replaced. Refit the stave hanging point from the original upper side to the hot side of the stave without affecting the refractory spraying on the hot side. Special tapered jig for processing locking wire rope. Make the stave joint measuring cover plate to replace the original artificial filler to ensure that the grouting material does not leak.
本发明可以实现在高炉不空料线停炉的前提下对损坏冷却壁进行局部更换。缩短了检修工期,降低了成本,同时对高炉恢复生产提供有利的条件。The invention can realize partial replacement of damaged staves on the premise that the blast furnace is not stopped due to empty material line. The maintenance period is shortened, the cost is reduced, and favorable conditions are provided for the resumption of production of the blast furnace.
附图说明Description of drawings
图1 炉内吊装示意图;Figure 1 Schematic diagram of hoisting in the furnace;
图2 旧冷却壁吊装钢丝绳固定图;Fig. 2 The wire rope fixing diagram for hoisting the old stave;
图3旧冷却壁拆除示意图;Figure 3 is a schematic diagram of the removal of the old stave;
图4新冷却壁安装示意图。Figure 4 is a schematic diagram of the installation of the new stave.
其中,图2中A处为门型座子局部放大示意图;B处为锥形固定卡具局部放大示意图。Wherein, in Fig. 2, A is a partially enlarged schematic diagram of the door-shaped seat; B is a partially enlarged schematic diagram of the tapered fixing fixture.
具体实施方式detailed description
下面结合附图和具体实施例对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
一种高炉冷却壁的安装方法,包括:A method for installing a blast furnace stave, comprising:
1、旧冷却壁拆除1. Remove the old cooling wall
(1)、如附图1所示,炉顶开大方孔6,拆除阀门箱及中心喉管,保留齿轮箱2不拆除,对布料溜槽3进行改装后,在布料溜槽3上部安装改向滑轮4,在布料溜槽下部安装定滑轮5,利用料罐1作为主吊点,安装主滑车组16。(1) As shown in attached drawing 1, a large square hole 6 is opened on the top of the furnace, the valve box and the central throat are removed, and the gear box 2 is left undismantled. After the distribution chute 3 is refitted, a redirection pulley is installed on the upper part of the distribution chute 3 4. Install the fixed pulley 5 at the bottom of the distribution chute, use the material tank 1 as the main lifting point, and install the main block block 16.
(2)、将旧冷却壁外连管拆除,将与该冷却壁连接的上、下段冷却壁水管用金属软管连通,确保下段冷却壁水流畅通,保护不更换的冷却壁。切割旧冷却壁密封罩,露出的冷却壁铜管并切割至合适长度,以方便千斤顶出力为原则。(2) Remove the outer connecting pipe of the old stave, and connect the upper and lower stave water pipes connected with the stave with metal hoses to ensure the smooth water flow of the lower stave and protect the stave that will not be replaced. Cut the old stave sealing cover, and cut the exposed stave copper pipe to a suitable length, so as to facilitate the output of the jack.
本实施例中,以更换第六段冷却壁上方的旧冷却壁为例进行具体说明。In this embodiment, the replacement of the old stave above the sixth section of stave is taken as an example for specific description.
(3)、卷扬机的设置,设置1#卷扬机7、2#卷扬机8于旧冷却壁上下管口所处平台,炉顶中心滑子9的卷扬机设置于炉顶大方孔平台,1#卷扬机7和2#卷扬机8的绳头分别引至与旧冷却壁上下管口水平平行位置。(3) The setting of the hoist, set 1# hoist 7 and 2# hoist 8 on the platform where the upper and lower nozzles of the old cooling wall are located, the hoist of the furnace top center slider 9 is set on the large square hole platform on the furnace top, 1# hoist 7 and The rope heads of 2# winch 8 are respectively led to the horizontal and parallel positions with the upper and lower nozzles of the old cooling wall.
(4)、旧冷却壁水管穿钢丝绳。用铁丝作牵引线将钢丝绳12穿过旧冷却壁中间两根冷却水管13,并用专门加工的锥形固定卡具11将钢丝绳12与冷却水管13管口固定,防止钢丝绳滑动(如附图2的B处放大图)。然后将1#卷扬机7和2#卷扬机8的绳头分别与上下两端的钢丝绳相连,并稍微受力。(4) The old stave water pipes are threaded with steel wire ropes. Use iron wire as a traction line to pass the steel wire rope 12 through the two cooling water pipes 13 in the middle of the old cooling wall, and fix the steel wire rope 12 and the nozzle of the cooling water pipe 13 with a specially processed tapered fixing fixture 11 to prevent the steel wire rope from sliding (as shown in Figure 2 Enlarged view at B). Then the rope heads of 1# hoist 7 and 2# hoist 8 are connected to the wire ropes at the upper and lower ends respectively, and are slightly stressed.
(5)、安装焊接顶旧冷却壁的门型座子14,门型座子采用工字钢I16,安装位置为对角两个冷却水管孔外。具体如附图2中A处放大图所示。 (5) Install the door-shaped seat 14 of the old cooling wall welded on the top. The door-shaped seat is made of I-beam I16, and the installation position is outside the two cooling water pipe holes at the diagonal. The details are shown in the enlarged view at A in the accompanying drawing 2.
(6)、拆卸旧冷却壁螺栓,分别安装两台50t千斤顶15在门型座子14上,顶松旧冷却壁,同时1#、2#卷扬机配合逐渐顶出冷却壁,待旧冷却壁顶出如附图3所示位置。(6) Remove the bolts of the old cooling wall, install two 50t jacks 15 on the door-shaped seat 14, loosen the old cooling wall, and at the same time, 1# and 2# winches cooperate to gradually push out the cooling wall, and wait for the old cooling wall to top out of the position shown in Figure 3.
(7)、中心滑子钩头的挂设。如附图3所示,落中心滑子9至更换高度,利用布料溜槽3旋转将勾头转至更换冷却壁方向,用铁钩将其钩进冷却壁的绳扣内,点动中心滑子,使钩头受力。(7) Hanging of the hook head of the center slider. As shown in Figure 3, drop the center slider 9 to the replacement height, use the distribution chute 3 to rotate the hook head to the direction of replacing the cooling wall, hook it into the rope buckle of the cooling wall with an iron hook, and move the center slider , to force the hook head.
(8)、中心滑子与1#、2#卷扬机配合,将旧冷却壁从大方孔吊出,此时1#、2#卷扬机绳头同步升至大方孔平台。(8) The center slider cooperates with the 1# and 2# winches to lift the old cooling wall out of the large square hole, and at this time the rope heads of the 1# and 2# winches are synchronously lifted to the big square hole platform.
(9)、清理拆除的冷却壁周围及其炉壳内侧灌浆料,从炉壳冷却壁水管孔处伸入,用铲子、凿子将灌浆料清理干净,为安装新冷却壁做好准备。(9) Clean up the grouting material around the dismantled cooling wall and the inner side of the furnace shell, extend it from the water pipe hole of the cooling wall of the furnace shell, and clean the grouting material with a shovel or chisel to prepare for the installation of a new cooling wall.
2、安装新冷却壁2. Install a new cooling wall
(1)、安装冷却壁前,在新冷却壁热面设置吊点并对热面进行喷涂,将取代填料的密封板安装到位。(1) Before installing the stave, set the lifting point on the hot surface of the new stave and spray the hot surface, and install the sealing plate replacing the packing in place.
(2)、新冷却壁水管穿钢丝绳。用铁丝作牵引线将钢丝绳穿过新冷却壁中间两根水管,并用专门加工的锥形固定卡具将钢丝绳与新冷却壁水管管口固定,防止钢丝绳滑动。(2) The water pipes of the new stave are threaded with steel wire ropes. Use the iron wire as the traction line to pass the steel wire rope through the two water pipes in the middle of the new cooling wall, and use the specially processed tapered fixing fixture to fix the steel wire rope with the nozzle of the new cooling wall water pipe to prevent the steel wire rope from sliding.
(3)、将冷却壁水管引出钢丝绳绳头提前与1#、2#卷扬机绳头连接,用炉顶65T吊车将新冷却壁吊至大方孔并倒换至中心滑子上,中心滑子9钩头挂于新冷却壁改装的热面吊耳17上,如附图4所示。(3) Connect the rope head of the steel wire rope leading out of the stave water pipe to the rope head of 1# and 2# hoist in advance, and use the 65T crane on the furnace top to hoist the new stave to the large square hole and switch it to the center slider, which has 9 hooks The head is hung on the hot surface lug 17 refitted by the new cooling wall, as shown in Figure 4.
(4)、利用两台卷扬机与中心滑子配合将新冷却壁缓慢降落至安装处,利用1#、2#卷扬机将冷却壁受力落位。(4) Use two winches to cooperate with the center slider to slowly lower the new stave to the installation place, and use 1# and 2# hoists to place the stave under force.
(5)、调整冷却壁各技术参数,冷却壁与相邻冷却壁间隙(20mm±5),冷却水管与炉壳间隙(大于8mm)。(5) Adjust the technical parameters of the stave, the gap between the stave and the adjacent stave (20mm±5), the gap between the cooling water pipe and the furnace shell (greater than 8mm).
(6)、冷却壁固定,调整好间隙后,紧固螺栓,预紧力为400N·m。从炉皮外部开孔灌浆,完成冷却壁的安装,实现全程无人进入炉内操作。(6) The stave is fixed. After adjusting the gap, tighten the bolts with a pre-tightening force of 400N·m. Grouting is done from the outside of the furnace skin to complete the installation of the stave, so that no one enters the furnace for operation.
尽管这里参照本发明的解释性实施例对本发明进行了描述,上述实施例仅为本发明较佳的实施方式,本发明的实施方式并不受上述实施例的限制,应该理解,本领域技术人员可以设计出很多其他的修改和实施方式,这些修改和实施方式将落在本申请公开的原则范围和精神之内。Although the present invention has been described here with reference to the illustrative examples of the present invention, the above-mentioned examples are only preferred implementations of the present invention, and the implementation of the present invention is not limited by the above-mentioned examples. It should be understood that those skilled in the art Many other modifications and embodiments can be devised which will fall within the scope and spirit of the principles disclosed in this application.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711218926.8A CN107699650B (en) | 2017-11-28 | 2017-11-28 | Method for mounting blast furnace cooling wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711218926.8A CN107699650B (en) | 2017-11-28 | 2017-11-28 | Method for mounting blast furnace cooling wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107699650A true CN107699650A (en) | 2018-02-16 |
| CN107699650B CN107699650B (en) | 2019-04-26 |
Family
ID=61185550
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711218926.8A Active CN107699650B (en) | 2017-11-28 | 2017-11-28 | Method for mounting blast furnace cooling wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107699650B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108384909A (en) * | 2018-04-17 | 2018-08-10 | 中冶天工集团天津有限公司 | A blast furnace stave installation device and its application method |
| CN109722497A (en) * | 2018-10-30 | 2019-05-07 | 上海宝冶冶金工程有限公司 | A kind of blast furnace repairs construction method in changing in short term |
| CN113832275A (en) * | 2021-09-09 | 2021-12-24 | 武汉钢铁有限公司 | Method for replacing whole circle of blast furnace copper cooling wall without entering people |
| CN114395652A (en) * | 2021-12-24 | 2022-04-26 | 安阳钢铁股份有限公司 | Process method for online replacement of large-scale blast furnace throat cooling wall protection plate |
| CN116162753A (en) * | 2022-12-06 | 2023-05-26 | 攀钢集团工程技术有限公司 | Method for mounting cooling wall in tuyere zone of blast furnace |
| CN116715177A (en) * | 2023-06-13 | 2023-09-08 | 包钢西北创业建设有限公司 | A blast furnace maintenance platform and cooling stave replacement method |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS528882A (en) * | 1975-07-11 | 1977-01-24 | Nippon Steel Corp | Machine cooler damage detector unit |
| JPS5877511A (en) * | 1981-10-31 | 1983-05-10 | Nippon Steel Corp | Stripping and removing method for stave of blast furnace |
| JP2007308747A (en) * | 2006-05-17 | 2007-11-29 | Nippon Steel Corp | Stave cooler for blast furnace |
| CN102912051A (en) * | 2012-10-26 | 2013-02-06 | 莱芜钢铁集团有限公司 | Method for exchanging cooling wall of blast furnace taphole online |
| CN103266192A (en) * | 2013-05-17 | 2013-08-28 | 中国十七冶集团有限公司 | Hoisting method for replacing cooling wall in overhauling of blast furnace |
| CN103484587A (en) * | 2013-09-30 | 2014-01-01 | 天津二十冶建设有限公司 | Method for replacing cooling wall of blast furnace with material |
| CN105420432A (en) * | 2015-12-04 | 2016-03-23 | 山东钢铁股份有限公司 | Replacing method for cooling wall of blast furnace |
| CN106086263A (en) * | 2016-08-04 | 2016-11-09 | 河北钢铁股份有限公司承德分公司 | A kind of collaborative hanging method of blast furnace cooling stave |
-
2017
- 2017-11-28 CN CN201711218926.8A patent/CN107699650B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS528882A (en) * | 1975-07-11 | 1977-01-24 | Nippon Steel Corp | Machine cooler damage detector unit |
| JPS5877511A (en) * | 1981-10-31 | 1983-05-10 | Nippon Steel Corp | Stripping and removing method for stave of blast furnace |
| JP2007308747A (en) * | 2006-05-17 | 2007-11-29 | Nippon Steel Corp | Stave cooler for blast furnace |
| CN102912051A (en) * | 2012-10-26 | 2013-02-06 | 莱芜钢铁集团有限公司 | Method for exchanging cooling wall of blast furnace taphole online |
| CN103266192A (en) * | 2013-05-17 | 2013-08-28 | 中国十七冶集团有限公司 | Hoisting method for replacing cooling wall in overhauling of blast furnace |
| CN103484587A (en) * | 2013-09-30 | 2014-01-01 | 天津二十冶建设有限公司 | Method for replacing cooling wall of blast furnace with material |
| CN105420432A (en) * | 2015-12-04 | 2016-03-23 | 山东钢铁股份有限公司 | Replacing method for cooling wall of blast furnace |
| CN106086263A (en) * | 2016-08-04 | 2016-11-09 | 河北钢铁股份有限公司承德分公司 | A kind of collaborative hanging method of blast furnace cooling stave |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108384909A (en) * | 2018-04-17 | 2018-08-10 | 中冶天工集团天津有限公司 | A blast furnace stave installation device and its application method |
| CN108384909B (en) * | 2018-04-17 | 2023-09-08 | 中冶天工集团天津有限公司 | Blast furnace cooling wall mounting device and application method thereof |
| CN109722497A (en) * | 2018-10-30 | 2019-05-07 | 上海宝冶冶金工程有限公司 | A kind of blast furnace repairs construction method in changing in short term |
| CN113832275A (en) * | 2021-09-09 | 2021-12-24 | 武汉钢铁有限公司 | Method for replacing whole circle of blast furnace copper cooling wall without entering people |
| CN113832275B (en) * | 2021-09-09 | 2023-01-24 | 武汉钢铁有限公司 | Method for replacing whole circle of blast furnace copper cooling wall without entering people |
| CN114395652A (en) * | 2021-12-24 | 2022-04-26 | 安阳钢铁股份有限公司 | Process method for online replacement of large-scale blast furnace throat cooling wall protection plate |
| CN116162753A (en) * | 2022-12-06 | 2023-05-26 | 攀钢集团工程技术有限公司 | Method for mounting cooling wall in tuyere zone of blast furnace |
| CN116715177A (en) * | 2023-06-13 | 2023-09-08 | 包钢西北创业建设有限公司 | A blast furnace maintenance platform and cooling stave replacement method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107699650B (en) | 2019-04-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107699650A (en) | A method for installing a cooling wall of a blast furnace | |
| CN106435087B (en) | A kind of converter vaporization flue piecewise combination installation method | |
| CN101831309A (en) | Dry quenching furnace chute strut replacing method and device | |
| CN206536025U (en) | A kind of tundish cover of continuous casting tundish with Argon function | |
| CN102927363A (en) | Construction method for extracting blind plate under coal gas | |
| CN103276130A (en) | Maintenance method for air leakage from pipeline of hot-air system of blast furnace | |
| CN105420432B (en) | A kind of replacing options of blast furnace cooling stave | |
| CN102618677B (en) | Method for cleaning materials in large-scale blast furnace in overhaul | |
| CN109055638A (en) | A kind of method of last furnace shell and cooled bottom water crossed construction | |
| CN106834589B (en) | Converter Maintenance method | |
| CN209243086U (en) | The device of the quick handling cleaning cupola well of overhaul 2500m3 blast furnace | |
| CN115476311B (en) | A device and method for disassembling central components of a blast furnace top burden distributing device | |
| CN209702791U (en) | Suspender is used in a kind of dismounting of blast furnace bustle pipe | |
| CN106016233B (en) | A kind of long solder joint of span few boiler penthouse and its hanging method | |
| CN107699254B (en) | Maintenance process of coke oven ascending pipe | |
| CN114395652A (en) | Process method for online replacement of large-scale blast furnace throat cooling wall protection plate | |
| CN109649867A (en) | Polypropylene product degassing cabin upside-down construction technique | |
| CN114480759A (en) | Method for dismantling blast furnace downcomer | |
| CN102398023A (en) | Cleaning method and equipment for continuous casting tundish | |
| CN203429129U (en) | Device for clearing off brick residues broken holes in wall of coke oven hot repair carbonization chamber | |
| CN108015519B (en) | The drawing process covered in blast furnace | |
| CN206502573U (en) | A kind of hoistable platform for blast furnace building construction | |
| CN204355993U (en) | A kind of New-type hot-air furnace vault manhole repairs hanging apparatus online | |
| CN116240323A (en) | Construction method of removing refractory materials for maintenance in blast furnace and hot blast stove | |
| CN104031660B (en) | Coke oven hot repair coking chamber wall broken hole position brick slag method for cleaning |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |