CN105420432B - A kind of replacing options of blast furnace cooling stave - Google Patents

A kind of replacing options of blast furnace cooling stave Download PDF

Info

Publication number
CN105420432B
CN105420432B CN201510890383.9A CN201510890383A CN105420432B CN 105420432 B CN105420432 B CN 105420432B CN 201510890383 A CN201510890383 A CN 201510890383A CN 105420432 B CN105420432 B CN 105420432B
Authority
CN
China
Prior art keywords
water pipe
cooling water
furnace
cooling
stave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510890383.9A
Other languages
Chinese (zh)
Other versions
CN105420432A (en
Inventor
田庆元
李京业
李鹏芸
孙延龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201510890383.9A priority Critical patent/CN105420432B/en
Publication of CN105420432A publication Critical patent/CN105420432A/en
Application granted granted Critical
Publication of CN105420432B publication Critical patent/CN105420432B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/10Cooling; Devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Blast Furnaces (AREA)

Abstract

本发明提供了一种高炉冷却壁的更换方法,本发明的更换方法实现了炉内不进人、大面积、快速更换冷却壁的操作;采用炉内不进人的更换方式可以大大降低受煤气、高温、高空坠物等不利因素影响所造成的危险;且不出残铁、不用开残铁门、不作残铁槽、不清理炉内残铁渣等处理,从而大大减少了施工时间;不用大面积割除炉皮,以降低施工难度及工作强度,且使得高炉复风后炉皮变形的应力变小;减少打水凉炉对冷却壁的损伤,延长了高炉的使用寿命。

The invention provides a method for replacing staves of a blast furnace. The replacement method of the invention realizes the operation of large-area and rapid replacement of staves without entering the furnace; the replacement method without entering the furnace can greatly reduce the impact of gas , high temperature, high-altitude falling objects and other unfavorable factors; and there is no residual iron, no need to open the residual iron door, no residual iron tank, no cleaning of residual iron slag in the furnace, etc., thus greatly reducing the construction time; no need Cut off the furnace skin in a large area to reduce the construction difficulty and work intensity, and reduce the stress of the furnace skin deformation after the blast furnace is re-aired; reduce the damage to the stave of the water cooling furnace, and prolong the service life of the blast furnace.

Description

一种高炉冷却壁的更换方法A method for replacing cooling walls of blast furnace

技术领域technical field

本发明涉及高炉设备吊装技术领域,尤其涉及一种高炉冷却壁的更换方法。The invention relates to the technical field of hoisting of blast furnace equipment, in particular to a method for replacing a cooling wall of a blast furnace.

背景技术Background technique

高炉冷却壁是高炉重要冷却设备之一,其主要材质是铸铁、铸钢或铜材料。由于高炉冷却壁具有承受力大、温度高及内部循环水冷却能力的变化等原因,易造成冷却壁出现不同程度的损坏,严重时可导致高炉炉壳烧穿引起泄漏。而高炉冷却壁是炼铁的主要设备,其检修时间的长短将直接影响高炉的正常生产,传统的大面积更换冷却壁的方法是采用“休风-降料线-第一段冷却壁处出残铁-清理残铁-炉内进人设吊盘-拆除冷却壁”的处理过程,再按照“安装冷却壁-拆除吊盘-喷涂-恢复炉皮-上料-送风”的方法进行恢复,此类施工方法的周期大约是30天。Blast furnace stave is one of the important cooling equipment of blast furnace, and its main material is cast iron, cast steel or copper. Due to the large bearing capacity, high temperature, and changes in the cooling capacity of the internal circulating water of the blast furnace stave, it is easy to cause different degrees of damage to the stave, and in severe cases, it may cause the blast furnace shell to burn through and cause leakage. The blast furnace stave is the main equipment for ironmaking, and the length of its maintenance time will directly affect the normal production of the blast furnace. The traditional method of large-scale replacement of the stave is to adopt the method of "shutdown-feeding line-outlet from the first section of the stave". The treatment process of residual iron - cleaning residual iron - entering the furnace to set up hanging pan - removing stave" is followed by the method of "installing cooling stave - removing hanging pan - spraying - restoring furnace skin - loading - air supply" , The cycle of this type of construction method is about 30 days.

长期以来,高炉更换冷却壁普遍采用炉内进人设吊盘,为满足炉内能进人的条件,对高炉必须做到降料线、放残铁、炉皮开门、炉内打水、清渣后炉内清空,然后进人设吊盘,使得冷却壁拆安施工方便,喷涂勾缝效果好。但是采用炉内进人更换的方式施工周期长,高炉需要长时间处于停机状态。且由于受生产单位施工空间、生产节奏及安全生产等因素的限制,存在现场环境复杂、工期紧张、施工区域狭窄、吊装空间不足等实际问题,使得施工单位不能在短时间内大面积更换冷却壁,继而降低了工作效率。For a long time, the cooling stave of the blast furnace has generally been replaced by people entering the furnace and setting hanging plates. In order to meet the conditions for people entering the furnace, it is necessary to lower the material line, put residual iron, open the door of the furnace skin, draw water in the furnace, and clean the furnace. After the slag is removed, the furnace is emptied, and then a hanging plate is installed, which makes the dismantling and installation of the cooling wall convenient, and the spraying and pointing effect is good. However, it takes a long construction period to adopt the method of entering and replacing people in the furnace, and the blast furnace needs to be shut down for a long time. And due to the limitation of the construction space, production rhythm and safety production of the production unit, there are practical problems such as complex site environment, tight construction period, narrow construction area, and insufficient hoisting space, which makes it impossible for the construction unit to replace cooling walls in a large area in a short period of time. , thereby reducing work efficiency.

发明内容Contents of the invention

本发明的目的在于,为了解决大面积更换冷却壁时,炉内不进人,不设吊盘,减少与煤气、高空坠物、高温等不利因素造成的影响,本发明提供一种快速大面积更换冷却壁的施工方法。The purpose of the present invention is to solve the problem of no people entering the furnace and no suspension plate when replacing cooling walls in a large area, so as to reduce the influence caused by unfavorable factors such as gas, falling objects, and high temperature. The construction method of replacing the stave.

为了实现上述目的,本发明提供的一种高炉冷却壁的更换方法,包括:In order to achieve the above object, a method for replacing a blast furnace stave provided by the present invention includes:

步骤1)在待拆除的冷却壁集中的位置将炉皮割开,形成与冷却壁尺寸相同的检修门,并在检修门临近的平台上设置电动卷扬机,同时在检修门的上方搭设电动葫芦;Step 1) Cut the furnace skin at the location where staves to be removed are concentrated to form an inspection door with the same size as the stave, and set up an electric hoist on the platform adjacent to the inspection door, and set up an electric hoist above the inspection door;

步骤2)将冷却壁上裸露于炉壳外部的第一冷却水管和第二冷却水管的接头割除后,在冷却壁上的第一冷却水管、第二冷却水管、第三冷却水管和第四冷却水管同一侧的末端均焊接吊装口,并在炉壳外搭设千斤顶,该千斤顶抵设于第三冷却水管和第四冷却水管的末端;Step 2) After cutting off the joints of the first cooling water pipe and the second cooling water pipe exposed on the outside of the furnace shell on the cooling wall, the first cooling water pipe, the second cooling water pipe, the third cooling water pipe and the fourth cooling water pipe on the cooling wall The ends on the same side of the water pipes are all welded to the hoisting port, and a jack is set up outside the furnace shell, and the jack is set against the ends of the third cooling water pipe and the fourth cooling water pipe;

步骤3)在第一冷却水管和第二冷却水管的吊装口上分别连接一根钢丝绳后,通过卸扣将两根钢丝绳在炉壳外与电动卷扬机连接;Step 3) After connecting a steel wire rope respectively on the hoisting ports of the first cooling water pipe and the second cooling water pipe, connect the two steel wire ropes with the electric winch outside the furnace shell through a shackle;

步骤4)在第三冷却水管和第四冷却水管的吊装口上分别连接一根钢丝绳,并驱动千斤顶挤压第三冷却水管和第四冷却水管,使得冷却壁与炉壳分离后将第三冷却水管和第四冷却水管连接的两根钢丝绳穿入炉内,此时冷却壁通过第一冷却水管和第二冷却水管连接的钢丝绳吊于炉内;Step 4) Connect a steel wire rope to the hoisting ports of the third cooling water pipe and the fourth cooling water pipe respectively, and drive the jack to squeeze the third cooling water pipe and the fourth cooling water pipe, so that after the stave is separated from the furnace shell, the third cooling water pipe The two steel wire ropes connected with the fourth cooling water pipe are passed into the furnace, and at this time, the stave is hung in the furnace through the steel wire ropes connected with the first cooling water pipe and the second cooling water pipe;

步骤5)将第三冷却水管和第四冷却水管连接的钢丝绳与电动葫芦连接后拆除卸扣,使得第一冷却水管、第二冷却水管与电动卷扬机连接的钢丝绳断开,并利用电动葫芦将冷却壁从检修门吊出炉外;Step 5) Remove the shackle after connecting the wire rope connected to the third cooling water pipe and the fourth cooling water pipe to the electric hoist, so that the wire rope connected to the first cooling water pipe and the second cooling water pipe is disconnected from the electric winch, and the cooling water pipe is connected to the electric hoist. The wall is hung out of the furnace from the inspection door;

步骤6)将更换的冷却壁通过电动卷扬机从炉顶吊入炉内,并牵引该冷却壁与电动卷扬机连接的钢丝绳,使得冷却壁上的各冷却水管分别插接在炉壳对应的位置上,最后在冷却壁的各冷却水管上分别焊接接头并密封检修门。Step 6) hoist the replaced stave into the furnace from the furnace roof through the electric hoist, and pull the steel wire rope connecting the stave to the electric hoist, so that the cooling water pipes on the stave are respectively plugged into the corresponding positions of the furnace shell, Finally, the joints are respectively welded on the cooling water pipes of the stave and the inspection door is sealed.

作为上述技术方案的进一步改进,所述步骤2)中的千斤顶通过门形架固定于炉壳上,所述的门形架焊接于炉壳外。As a further improvement of the above technical solution, the jack in step 2) is fixed on the furnace shell through a gantry, and the gantry is welded outside the furnace shell.

作为上述技术方案的进一步改进,所述步骤5)中第三冷却水管和第四冷却水管连接的钢丝绳还与炉顶上由探尺箱的安装孔、大方孔、点火孔、十字测温装置的安装孔牵入炉内的钢丝绳连接。As a further improvement of the above-mentioned technical scheme, the steel wire rope connected by the third cooling water pipe and the fourth cooling water pipe in the step 5) is also connected with the installation hole of the probe box, the large square hole, the ignition hole, and the cross temperature measuring device on the furnace roof. The installation hole is drawn into the steel wire rope connection in the furnace.

作为上述技术方案的进一步改进,所述步骤6)中更换的冷却壁的热面环缝、竖缝均通过设置密封条进行密封。As a further improvement of the above technical solution, the annular seam and the vertical seam of the cooling wall replaced in the step 6) are all sealed by setting a sealing strip.

本发明的一种高炉冷却壁的更换方法的优点在于:The advantage of the replacement method of a kind of blast furnace stave of the present invention is:

本发明的更换方法实现了炉内不进人、大面积、快速更换冷却壁的操作;采用炉内不进人的更换方式可以大大降低受煤气、高温、高空坠物等不利因素影响所造成的危险;且不出残铁、不用开残铁门、不作残铁槽、不清理炉内残铁渣等处理,从而大大减少了施工时间;不用大面积割除炉皮,以降低施工难度及工作强度,且使得高炉复风后炉皮变形的应力变小;减少打水凉炉对冷却壁的损伤,延长了高炉的使用寿命。The replacement method of the present invention realizes the operation of rapid replacement of cooling walls in a large area without entering the furnace; adopting the replacement method without entering the furnace can greatly reduce the damage caused by unfavorable factors such as gas, high temperature, and falling objects. Dangerous; no residual iron, no need to open the residual iron door, no residual iron tank, no cleaning of residual iron slag in the furnace, etc., thus greatly reducing the construction time; no need to cut off the furnace skin in a large area to reduce construction difficulty and work intensity , and make the stress of the furnace skin deformation smaller after the blast furnace is revived; reduce the damage to the cooling wall of the cooling furnace, and prolong the service life of the blast furnace.

附图说明Description of drawings

图1为高炉的俯视图。Figure 1 is a top view of a blast furnace.

图2为高炉的炉体结构示意图。Fig. 2 is a schematic diagram of the furnace body structure of the blast furnace.

图3a为本发明实施例中设置的门形架结构示意图。Fig. 3a is a schematic diagram of the structure of the gantry provided in the embodiment of the present invention.

图3b为图3a中示出的门形架安装示意图。Fig. 3b is a schematic diagram of installing the gantry shown in Fig. 3a.

图4a为冷却壁的冷面结构示意图。Fig. 4a is a schematic diagram of the cold surface structure of the stave.

图4b为冷却壁的热面结构示意图。Fig. 4b is a schematic diagram of the thermal surface structure of the stave.

图4c为冷却壁上的冷却水管的结构示意图。Fig. 4c is a structural schematic diagram of the cooling water pipe on the cooling wall.

图5为本发明实施例中设置的检修门及电动葫芦的位置关系图。Fig. 5 is a positional diagram of the inspection door and the electric hoist provided in the embodiment of the present invention.

附图标记reference sign

1、炉壳 2、点火孔 3、探尺箱1. Furnace shell 2. Ignition hole 3. Probe box

4、大方孔 5、十字测温装置 6、平台4. Large square hole 5. Cross temperature measuring device 6. Platform

8、冷却壁 9、检修门 10、电动卷扬机8. Stave 9. Inspection door 10. Electric hoist

11、钢丝绳 12、门形架 13、第一冷却水管11. Steel wire rope 12. Gantry frame 13. The first cooling water pipe

14、第三冷却水管 15、第四冷却水管 16、第二冷却水管14. The third cooling water pipe 15. The fourth cooling water pipe 16. The second cooling water pipe

17、电动葫芦 18、钢板17. Electric hoist 18. Steel plate

具体实施方式detailed description

下面结合附图和实施例对本发明所述的一种高炉冷却壁的更换方法进行详细说明。A method for replacing a blast furnace stave according to the present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

参考图1、2、3a、3b、4a、4b所示,本发明的一种高炉冷却壁的更换方法,所述方法包括:Shown with reference to Fig. 1,2,3a, 3b, 4a, 4b, a kind of blast furnace stave replacement method of the present invention, described method comprises:

步骤1)在待拆除的冷却壁8较集中的位置将炉皮割开,形成与冷却壁尺寸相同的检修门9,其数量可根据更换冷却壁数量定为1-4个,以方便冷却壁检修;在检修门9处搭设电动葫芦17,并在检修门9最近的平台6上设置电动卷扬机10;Step 1) Cut the furnace skin at the concentrated position of the stave 8 to be removed to form an inspection door 9 with the same size as the stave, and its quantity can be determined as 1-4 according to the number of staves to be replaced to facilitate Overhaul; set up an electric hoist 17 at the inspection door 9, and set an electric winch 10 on the nearest platform 6 of the inspection door 9;

步骤2)将冷却水管上裸露于炉壳外部的第一冷却水管13、第二冷却水管16的接头割除与炉壳齐,在冷却壁8上的第一冷却水管13、第二冷却水管16、第三冷却水管14和第四冷却水管15同一侧的末端均焊接吊装口,即图4所示的四根水管的末端焊接吊装口,并在炉壳1外搭设千斤顶,该千斤顶抵设于第三冷却水管14和第四冷却水管15的末端;对此,可在待拆除的冷却壁的炉壳处焊接门型架12,用于安装千斤顶;所述门型架12的结构如图3a所示,其焊接在高炉的炉壳1上,具体位置跨于第三冷却壁水管14、第四冷却水管15之上;所述的门形架可由厚度为25mm-35mm的钢板直接切割后焊接成形;Step 2) the joints of the first cooling water pipe 13 and the second cooling water pipe 16 exposed on the cooling water pipe outside the furnace shell are cut off to be flush with the furnace shell, the first cooling water pipe 13 on the stave 8, the second cooling water pipe 16, The ends of the third cooling water pipe 14 and the same side of the fourth cooling water pipe 15 are all welded to the hoisting mouth, that is, the ends of the four water pipes shown in Fig. The ends of three cooling water pipes 14 and the fourth cooling water pipe 15; for this, the portal frame 12 can be welded at the furnace shell of the cooling stave to be removed, for installing the jack; the structure of the portal frame 12 is as shown in Figure 3a As shown, it is welded on the furnace shell 1 of the blast furnace, and its specific position spans above the third stave water pipe 14 and the fourth cooling water pipe 15; the gantry can be directly cut and welded by a steel plate with a thickness of 25mm-35mm ;

步骤3)在第一冷却水管13、第二冷却水管16顶端的吊装口上各栓一钢丝绳,通过卸扣将两根钢丝绳在炉外与电动卷扬机10连接;Step 3) Bolt a steel wire rope on the hoisting openings at the tops of the first cooling water pipe 13 and the second cooling water pipe 16, and connect the two steel wire ropes with the electric hoist 10 outside the furnace through a shackle;

步骤4)在第三冷却水管14、第四冷却水管15的吊装口上各栓一根钢丝绳,并用千斤顶顶冷却壁,即顶住第三冷却水管14、第四冷却水管15,直至冷却壁离开炉皮,此时冷却壁8通过第一冷却水管13和第二冷却水管16连接的钢丝绳吃劲吊于炉内,并将第三冷却水管14、第四冷却水管15的吊装口栓有的两根钢丝绳穿入炉内;Step 4) Bolt a steel wire rope on the hoisting openings of the third cooling water pipe 14 and the fourth cooling water pipe 15, and use a jack to support the stave, that is, withstand the third cooling water pipe 14 and the fourth cooling water pipe 15 until the stave leaves the furnace At this time, the stave 8 is strenuously hung in the furnace by the steel wire rope connected by the first cooling water pipe 13 and the second cooling water pipe 16, and the two hoisting ports of the third cooling water pipe 14 and the fourth cooling water pipe 15 are bolted. The steel wire rope is threaded into the furnace;

步骤5)当第三冷却水管14、第四冷却水管15的绳头塞进炉内后,从检修门9处将该第三冷却水管14、第四冷却水管15的钢丝绳与电动葫芦17进行连接,通过电动葫芦17起吊吃劲后,松开第一冷却水管13、第二冷却水管16绳扣上的卸扣,以断开电动卷扬机10的连接,并通过电动葫芦17牵引旧冷却壁从检修门9吊出;Step 5) After the rope ends of the third cooling water pipe 14 and the fourth cooling water pipe 15 are inserted into the furnace, connect the wire ropes of the third cooling water pipe 14 and the fourth cooling water pipe 15 with the electric hoist 17 from the inspection door 9 , after the electric hoist 17 is used for hoisting, loosen the shackles on the rope buckle of the first cooling water pipe 13 and the second cooling water pipe 16 to disconnect the connection of the electric winch 10, and pull the old cooling wall through the electric hoist 17 from the maintenance Door 9 hangs out;

此时可把图1中所示的炉顶大方孔4、点火孔2及探尺箱3向炉内垂下的钢丝绳11用铁钩牵引至检修门处,与第三冷却水管14、第四冷却水管15的钢丝绳也进行连接,利用炉顶卷扬机及电动葫芦的共同驱动作用将旧的冷却壁从检修门9处牵出,以降低第三冷却水管14、第四冷却水管15与电动葫芦连接的钢丝绳的压力,同时避免冷却壁起吊时左右晃动,提高运动的平稳性。At this time, the large square hole 4 on the top of the furnace shown in Figure 1, the ignition hole 2 and the steel wire rope 11 that the probe box 3 hangs down in the furnace can be pulled to the inspection door with an iron hook, and connected with the third cooling water pipe 14 and the fourth cooling water pipe. The wire rope of the water pipe 15 is also connected, and the old stave is pulled out from the maintenance door 9 by the common driving action of the furnace roof hoist and the electric hoist, so as to reduce the connection between the third cooling water pipe 14 and the fourth cooling water pipe 15 and the electric hoist. The pressure of the steel wire rope, while avoiding the left and right shaking of the stave when hoisting, improves the stability of the movement.

步骤6)将更换的冷却壁通过电动卷扬机10从炉顶吊入炉内,并牵引该冷却壁与电动卷扬机10连接的钢丝绳,使得冷却壁上的各冷却水管分别插接在炉壳1对应的位置上,最后在冷却壁的各冷却水管上分别焊接接头并密封检修门9;对此,可在新的冷却壁上的第一冷却水管13、第二冷却水管16顶端设置吊装鼻,用以穿入钢丝绳,并可从大方孔4处利用卷扬机10从炉顶将新的冷却壁吊装到炉内。Step 6) Hang the replaced stave into the furnace from the furnace roof through the electric hoist 10, and pull the steel wire rope connecting the stave to the electric hoist 10, so that each cooling water pipe on the stave is respectively plugged into the corresponding part of the furnace shell 1 On the position, at last weld the joints respectively on each cooling water pipe of the stave and seal the inspection door 9; for this, the first cooling water pipe 13 and the top of the second cooling water pipe 16 on the new stave can be provided with hoisting noses for Insert the wire rope, and use the winch 10 from the furnace roof to hoist the new cooling stave into the furnace from the large square hole 4.

另外,由于检修门的尺寸与冷却壁的尺寸相同,因此在所有冷却壁更换安装完成后,可在检修门的开口处直接镶嵌冷却壁,并在四条焊缝处焊接如图5中所示的钢板18,使得冷却壁在实现了封闭的同时减少了焊接应力,减轻其结构变形。In addition, since the size of the access door is the same as that of the stave, after all staves are replaced and installed, the stave can be directly embedded in the opening of the access door and welded at the four welds as shown in Figure 5 The steel plate 18 enables the stave to be closed while reducing the welding stress and reducing its structural deformation.

更换的新冷却壁的热面环缝、竖缝均可通过设置密封条进行密封。在冷却壁安装前,将新冷却壁热面单侧竖缝和环缝焊接两根厚度2mm、长度等同冷却壁高度、宽度等同两块冷却壁安装后间隙尺寸的密封条。安装到位后,两块冷却壁之间存在此块密封条,在高炉喷涂后,可以用灌浆的方法将冷却壁之间的空隙填满。The ring seam and vertical seam of the hot surface of the new stave to be replaced can be sealed by setting a sealing strip. Before stave installation, weld two sealing strips with a thickness of 2mm, a length equal to the height of the stave, and a width equal to the size of the gap between the two staves installed, on one side of the vertical seam and the ring seam on the hot surface of the new stave. After the installation is in place, there is a sealing strip between the two staves. After the blast furnace is sprayed, the gap between the staves can be filled by grouting.

如图1所示,所述的平台6指的是高炉大方孔处的平台,将高炉大方孔4、点火孔2、探尺箱3、十字测温装置5拆除,并在平台6设卷扬机10,此时钢丝绳11可从探尺箱3的安装孔、大方孔4、点火孔2、十字测温装置5的安装孔垂入炉内。As shown in Figure 1, the platform 6 refers to the platform at the large square hole of the blast furnace. The large square hole 4 of the blast furnace, the ignition hole 2, the probe box 3, and the cross temperature measuring device 5 are removed, and a hoist 10 is set on the platform 6. , this moment, wire rope 11 can hang down in the furnace from the installation hole of probe box 3, the installation hole of generous hole 4, ignition hole 2, cross temperature measuring device 5.

本发明上述实施例中的高炉冷却壁更换方法简单易行,施工过程安全可控,对施工技术水平和技术难度要求不高;在施工过程中,材料浪费少,施工设施可重复利用,时间占用短,质量容易控制。通过该方法对冷却壁进行更换,延长了高炉冷却壁使用的寿命,减少检修次数,提高了安全性能。The blast furnace stave replacement method in the above embodiments of the present invention is simple and easy to implement, the construction process is safe and controllable, and the requirements for construction technology level and technical difficulty are not high; during the construction process, there is less material waste, construction facilities can be reused, and time is occupied Short and easy to control the quality. The stave is replaced by the method, which prolongs the service life of the stave of the blast furnace, reduces the times of maintenance and improves the safety performance.

最后所应说明的是,以上实施例仅用以说明本发明的技术方案而非限制。尽管参照实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,对本发明的技术方案进行修改或者等同替换,都不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than limit them. Although the present invention has been described in detail with reference to the embodiments, those skilled in the art should understand that modifications or equivalent replacements to the technical solutions of the present invention do not depart from the spirit and scope of the technical solutions of the present invention, and all of them should be included in the scope of the present invention. within the scope of the claims.

Claims (4)

1. a kind of replacing options of blast furnace cooling stave, it is characterised in that including:
Step 1) stove skin is cut open in the position of cooling wall (8) concentration to be removed, formed and examined with cooling wall (8) size identical Door (9) is repaiied, and electrical hoist (10) is set on the platform (6) that maintenance door (9) is closed on, while the top in maintenance door (9) Set up electric block (17);
Step 2) by the first cooling water pipe (13) being exposed on cooling wall outside furnace shell and the joint of the second cooling water pipe (16) After cutting off, the first cooling water pipe (13), the second cooling water pipe (16), the 3rd cooling water pipe (14) on cooling wall (8) and Hoisting port is welded in the end of four cooling water pipes (15) the same side, and sets up jack outside furnace shell (1), and the jack is supported and is located at The end of 3rd cooling water pipe (14) and the 4th cooling water pipe (15);
Step 3) connect steel cable respectively on the hoisting port of the first cooling water pipe (13) and the second cooling water pipe (16) after, Two steel wire ropes are connected with electrical hoist (10) outside in furnace shell (1) by shackle;
Step 4) steel cable is connected respectively on the hoisting port of the 3rd cooling water pipe (14) and the 4th cooling water pipe (15), and Jack is driven to extrude the 3rd cooling water pipe (14) and the 4th cooling water pipe (15) so that after cooling wall (8) is separated with furnace shell (1) Two steel wire ropes that 3rd cooling water pipe (14) and the 4th cooling water pipe (15) are connected are penetrated in stove, and now cooling wall (8) leads to The steel wire rope for crossing the first cooling water pipe (13) and the second cooling water pipe (16) connection is hung in stove;
Step 5) steel wire rope of the 3rd cooling water pipe (14) and the connection of the 4th cooling water pipe (15) is connected with electric block (17) After remove shackle so that the steel wire rope that the first cooling water pipe (13), the second cooling water pipe (16) are connected with electrical hoist (10) Disconnect, and hung out cooling wall (8) outside stove from maintenance door (9) using electric block (17);
Step 6) cooling wall of replacing is hung in stove by electrical hoist (10) from furnace roof, and draw the cooling wall with it is electronic The steel wire rope of hoist engine (10) connection so that each cooling water pipe on cooling wall is plugged on the corresponding position of furnace shell (1) respectively, Finally joint is respectively welded on each cooling water pipe of cooling wall and maintenance door (9) is sealed.
2. the replacing options of blast furnace cooling stave according to claim 1, it is characterised in that the step 2) in jack It is fixed on by portal (12) on furnace shell (1), described portal (12) is welded in furnace shell (1) outside.
3. the replacing options of blast furnace cooling stave according to claim 1, it is characterised in that the step 5) in the 3rd cooling Water pipe (14) and the 4th cooling water pipe (15) connection steel wire rope also with the mounting hole on furnace roof by stock rod case (3), big square hole (4), the mounting hole of fire hole (2) and cross temperature measurer (5) leads the steel wire rope connection in stove.
4. the replacing options of blast furnace cooling stave according to claim 1, it is characterised in that the step 6) in change it is cold But the hot face ring seam of wall, perps are by setting sealing strip to be sealed.
CN201510890383.9A 2015-12-04 2015-12-04 A kind of replacing options of blast furnace cooling stave Expired - Fee Related CN105420432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510890383.9A CN105420432B (en) 2015-12-04 2015-12-04 A kind of replacing options of blast furnace cooling stave

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510890383.9A CN105420432B (en) 2015-12-04 2015-12-04 A kind of replacing options of blast furnace cooling stave

Publications (2)

Publication Number Publication Date
CN105420432A CN105420432A (en) 2016-03-23
CN105420432B true CN105420432B (en) 2017-08-25

Family

ID=55498967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510890383.9A Expired - Fee Related CN105420432B (en) 2015-12-04 2015-12-04 A kind of replacing options of blast furnace cooling stave

Country Status (1)

Country Link
CN (1) CN105420432B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893135B (en) * 2017-11-28 2019-08-06 甘肃酒钢集团宏兴钢铁股份有限公司 A treatment method for partial cracking of blast furnace shell
CN107699650B (en) * 2017-11-28 2019-04-26 武汉钢铁有限公司 Method for mounting blast furnace cooling wall
CN109722497A (en) * 2018-10-30 2019-05-07 上海宝冶冶金工程有限公司 A kind of blast furnace repairs construction method in changing in short term
CN112266995A (en) * 2020-10-27 2021-01-26 中国十九冶集团有限公司 Method for removing cooling wall of blast furnace
CN113832275B (en) * 2021-09-09 2023-01-24 武汉钢铁有限公司 Method for replacing whole circle of blast furnace copper cooling wall without entering people

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102212630A (en) * 2011-05-23 2011-10-12 北京首钢建设集团有限公司 Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold
CN102399925A (en) * 2011-11-22 2012-04-04 攀钢集团冶金工程技术有限公司 Method for replacing blast furnace cooling wall
CN103484587A (en) * 2013-09-30 2014-01-01 天津二十冶建设有限公司 Method for replacing cooling wall of blast furnace with material
CN203582282U (en) * 2013-10-31 2014-05-07 中国一冶集团有限公司 Automatic tripping device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11315311A (en) * 1998-05-08 1999-11-16 Nkk Corp How to suspend the blast furnace replacement stage in the furnace

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102212630A (en) * 2011-05-23 2011-10-12 北京首钢建设集团有限公司 Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold
CN102399925A (en) * 2011-11-22 2012-04-04 攀钢集团冶金工程技术有限公司 Method for replacing blast furnace cooling wall
CN103484587A (en) * 2013-09-30 2014-01-01 天津二十冶建设有限公司 Method for replacing cooling wall of blast furnace with material
CN203582282U (en) * 2013-10-31 2014-05-07 中国一冶集团有限公司 Automatic tripping device

Also Published As

Publication number Publication date
CN105420432A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN105420432B (en) A kind of replacing options of blast furnace cooling stave
CN102927363A (en) Construction method for extracting blind plate under coal gas
CN107699650A (en) A method for installing a cooling wall of a blast furnace
CN105369002B (en) A kind of hot air furnace hot air branch pipe repairing inner liner frock and its method for repairing and mending
CN105238420A (en) Coke oven riser tube replacement apparatus and coke oven riser tube replacement method
CN106016233B (en) A kind of long solder joint of span few boiler penthouse and its hanging method
CN114920133A (en) Large chimney dismounting method
CN201915116U (en) Vacuum tank cover for vacuum refining furnace
CN209702791U (en) Suspender is used in a kind of dismounting of blast furnace bustle pipe
CN103611741B (en) Steel plate annealing device and slow cooling method thereof
CN108015519B (en) The drawing process covered in blast furnace
CN107446595A (en) A kind of method of full stove integral replacing coke oven coke oven uprising tube
CN115418427B (en) Integral replacement method of sealing valve transmission mechanism on blast furnace top
CN205258515U (en) Frock is repaired to hot -blast furnace hot -blast branch pipe inside lining
CN204355993U (en) A kind of New-type hot-air furnace vault manhole repairs hanging apparatus online
CN201272666Y (en) Special slings for sealing and replacing helical cooling water apparatus of COREX ironmaking furnace
CN219347325U (en) Anode furnace oxidation-reduction eye brick group capable of being replaced on line
CN209854184U (en) A structure for installing a blast furnace cooling device
CN202187025U (en) A steelmaking converter gasification flue inspection hole device
CN204356353U (en) Converter gasification oxygen sublance mouth and feed opening water-cooling jacket
CN104946835B (en) Blast furnace hot-blast valve maintenance platform
CN104164522A (en) Ironmaking blast furnace cooling wall copper plate disassembly and assembly device and application thereof
CN101747912B (en) Replacement construction technology of secondary superheater for dry quenching boiler
CN219624048U (en) Split assembled water-cooling chute of rotary kiln incinerator
CN203845728U (en) Auxiliary device for mounting cathode in electrolytic cell

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170825