CN209702791U - Suspender is used in a kind of dismounting of blast furnace bustle pipe - Google Patents

Suspender is used in a kind of dismounting of blast furnace bustle pipe Download PDF

Info

Publication number
CN209702791U
CN209702791U CN201920444337.XU CN201920444337U CN209702791U CN 209702791 U CN209702791 U CN 209702791U CN 201920444337 U CN201920444337 U CN 201920444337U CN 209702791 U CN209702791 U CN 209702791U
Authority
CN
China
Prior art keywords
bustle pipe
suspender
oil cylinder
hydraulic pressure
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920444337.XU
Other languages
Chinese (zh)
Inventor
章锐
涂俊魁
范兴海
晋杰
陈克胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Magang Equipment Overhaul Co Ltd
Original Assignee
Anhui Magang Equipment Overhaul Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Magang Equipment Overhaul Co Ltd filed Critical Anhui Magang Equipment Overhaul Co Ltd
Priority to CN201920444337.XU priority Critical patent/CN209702791U/en
Application granted granted Critical
Publication of CN209702791U publication Critical patent/CN209702791U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of blast furnace bustle pipe dismounting suspender, bustle pipe is the polygonal structure being spliced by plate rolling tube, there are spray paint and refractory brick in inside, bustle pipe is hung vertically by several groups and girt hangs platform by bustle pipe and furnace body frame column is fixed, the suspender is made of hydraulic pressure lift Oil cylinder, cylinder support, steel hinge line and conduit saddle, the hydraulic pressure lift Oil cylinder is fixed on bustle pipe by cylinder support and hangs on platform, hydraulic hoisting machine oil cylinder position was uniformly distributed right above bustle pipe along bustle pipe one week;The hydraulic pressure lift Oil cylinder is connected with steel hinge line, and steel hinge line passes perpendicularly through the bustle pipe for offering through-hole, is connected with the conduit saddle of mating production.A kind of method for dismounting of blast furnace bustle pipe dismounting suspender is also disclosed in the utility model, simplifies working procedure, the construction time is greatly saved, and the bustle pipe after disassembly can integrally drop down onto tuyere platform, dismounting is not take up main line duration, construction safety.

Description

Suspender is used in a kind of dismounting of blast furnace bustle pipe
Technical field
The utility model relates to blast furnace bustle pipe technical field of construction, and in particular to suspender is used in a kind of dismounting of blast furnace bustle pipe.
Background technique
Blast furnace bustle pipe is the polygonal structure being spliced by plate rolling tube, and there are a spray paint and refractory brick in inside, bustle pipe by Several groups are hung vertically and girt hangs platform by bustle pipe and furnace body frame column is fixed.Heat needed for blast furnace ore smelting Wind is generated by hot-blast stove, and hot wind is delivered to bustle pipe by hot-blast main, then enters height by blowpipe uniformly distributed on bustle pipe Furnace.When bustle pipe is removed, due to there is resistance to material in bustle pipe, there are the water supply and sewage endless tube of platform and medium and small set etc., heavier-weight outside, so needing Brick is first taken off, and removes the platform and pipeline being attached on bustle pipe.Due to segmentation remove it is dangerous, if bustle pipe waits tearing open part into one In the case that step removes spray paint, hoist engine can be used integrally to drop down onto tuyere platform, usually consider to remove part spray paint, otherwise Multistage can only be divided to remove in the sky.
When blast furnace overhaul, first residual iron placing takes off furnace after cool furnace, and the dismounting of furnace body, usual bustle pipe can be carried out by once taking off after furnace Time that is cooling, taking off brick only removes than furnace body to time early three days or so of bustle pipe hanging position of platform, if bustle pipe cannot and When remove and transport tuyere platform, just will appear with furnace body dismounting occupy tuyere platform simultaneously the case where, need at this time pause furnace body It removes, first tears bustle pipe open, thus occupy the more main line duration.
Utility model content
To solve the above problems, the utility model provides a kind of blast furnace bustle pipe dismounting suspender method, can be incited somebody to action using suspender Bustle pipe safely integrally falls on tuyere platform, and dismounting is high-efficient, and bustle pipe dismounting is not take up the main line duration.
The utility model the specific technical proposal is: a kind of blast furnace bustle pipe, which is removed, uses suspender, blast furnace bustle pipe is by roll of steel plate There are spray paint and refractory brick in the polygonal structure that pipe is spliced, inside, and bustle pipe is hung vertically by several groups and girt leads to It crosses bustle pipe hanging platform and furnace body frame column is fixed, the suspender is by hydraulic pressure lift Oil cylinder, cylinder support, steel hinge line and conduit saddle Composition, the hydraulic pressure lift Oil cylinder are fixed on bustle pipe by cylinder support and hang on platform, hydraulic hoisting machine oil cylinder position Right above bustle pipe, it was uniformly distributed along bustle pipe one week;The hydraulic pressure lift Oil cylinder is connected with steel hinge line, and steel hinge line is vertically worn The bustle pipe for offering through-hole is crossed, is connected with the conduit saddle of mating production.
Further, the suspender quantity is to be hung vertically the half of quantity.
Further, the through-hole on the bustle pipe is opened up so that oil cylinder axis is vertical centered on the intersection point of bustle pipe.
Further, the conduit saddle is fixed with bustle pipe spot welding.
A kind of blast furnace bustle pipe dismounting method for dismounting of suspender, steps are as follows:
1) blowpipe between bustle pipe and furnace shell is removed;
2) brick hole is outputed below bustle pipe;
3) it is hung vertically the quantity of half by bustle pipe, hydraulic pressure lift Oil cylinder and matched is set on bustle pipe hanging platform Cylinder support, hydraulic hoisting machine oil cylinder position were substantially evenly distributed right above bustle pipe along bustle pipe one week;
4) centered on the intersection point of oil cylinder axis and bustle pipe, vertical through-hole is outputed on bustle pipe, first opens upper diameter about The hole of 700mm is opened again after taking off brick in the bustle pipes such as hole below;
5) after the brick in bustle pipe is cooling, worker enters in bustle pipe, takes off brick from upper half toward lower half, removes the brick amount of bustle pipe The weight for bearing bustle pipe hanging reduces more than half;
6) through-hole below bustle pipe is outputed, the resistance to material of position of opening is removed before aperture, the clear size of opening opened is with elevator Whole steel hinge lines of oil cylinder can pass through;
7) steel hinge line for wearing elevator, the steel hinge line for promoting Oil cylinder passes through the bustle pipe of vertical open pores, with mating production Conduit saddle is connected;
8) conduit saddle is fixed with bustle pipe spot welding, pre-tightens steel hinge line, and bustle pipe girt and bustle pipe are disengaged, then is removed bustle pipe and hung down The conduit saddle directly hung;
9) pull suspender that bustle pipe is integrally dropped down onto tuyere platform by numerical control hydraulic elevator;
10) bustle pipe is segmented on tuyere platform, clears out or directly have bad luck to cast house after broken and is crushed again.
Compared with prior art, the utility model has the following beneficial effects: the utility model is hung using hydraulic hoisting machine cooperation Have overall pulling down bustle pipe, do not hung in bustle pipe during dismounting and weld lifting lug on platform and bustle pipe, without it is aerial remove bustle pipe platform and Water supply and sewage endless tube thereon, without reinforcing bustle pipe hanging platform, the spray paint in bustle pipe is not required to remove, and refractory brick does not need whole It removes, simplifies working procedure, the construction time is greatly saved, and the bustle pipe after disassembly can integrally drop down onto tuyere platform, removes It is not take up main line duration, construction safety.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model blast furnace bustle pipe;
Fig. 2 uses schematic diagram for the utility model suspender;
Fig. 3 is the position view of the utility model suspender;
1, bustle pipe, 2, plate rolling tube, 3, spray paint, 4, refractory brick, 5, bustle pipe platform, 6, be hung vertically, 7, bustle pipe hanging Platform, 8, tuyere platform, 9, be hung vertically conduit saddle, 10, furnace body steelframe, 11, last furnace shell, 12, hydraulic pressure lift Oil cylinder, 13, Cylinder support, 14, steel hinge line, 15 conduit saddles.
Specific embodiment
Further detailed description is done to the utility model with embodiment with reference to the accompanying drawings of the specification.
As shown in Figure 1, blast furnace bustle pipe is the polygonal structure being spliced by plate rolling tube, there are spray paint and fire resisting in inside Brick, bustle pipe is hung vertically by several groups and girt hangs platform by bustle pipe and furnace body frame column is fixed.
Existing bustle pipe, which removes common method, two kinds: after taking off brick, it is flat to drop down onto air port by hanging location segment Platform, such as certain 2500m3Blast furnace overhaul, bustle pipe is hung vertically by 8 groups is divided into 16 sections, drops down onto decompose again after tuyere platform and transports.It is another Kind it is after taking off brick, then removes spray paint, by Weight control within the scope of hoist engine Lifting Capacity, bustle pipe is integrally dropped down onto air port and is put down Platform, such as certain 2500m3Blast furnace overhaul after taking off brick, then removes the spray paint of half, makes to remove weight less than 120t.No matter which is used Kind method, the dismounting of bustle pipe affect the main line duration 2 days or more, and for the blast furnace of bigger volume, due to removing weight Increase, the scheme removed using hoist engine is also no longer applicable in.
The following examples give a kind of new bustle pipe method for dismounting, easy for construction, and save the duration.
Embodiment 1
Such as Fig. 1, Fig. 2, shown in Fig. 3, bustle pipe 1 is the polygonal structure being spliced by plate rolling tube 2, and there is spray paint in inside 3 and refractory brick 4, bustle pipe 1 by several groups be hung vertically 6 and girt pass through that bustle pipe hangs platform 7 and furnace body steelframe 10 is fixed. A kind of blast furnace bustle pipe dismounting suspender, suspender is by hydraulic pressure lift Oil cylinder 12, cylinder support 13, steel hinge line 14 and 15 groups of conduit saddle At.Hydraulic pressure lift Oil cylinder 12 is fixed on bustle pipe by cylinder support 13 and hangs on platform 7, and 12 position of hydraulic pressure lift Oil cylinder exists Right above bustle pipe 1, it was uniformly distributed along bustle pipe 1 one weeks.From suspender in this present embodiment be with method for dismounting use, dismantle Method requires first to take off the weight reduction half that bustle pipe is hung vertically 6 receivings by brick, so above-mentioned suspender quantity is set as vertical Hang the half of 6 quantity.
Through-hole on bustle pipe 1 is opened up so that 12 axis of hydraulic pressure lift Oil cylinder is vertical centered on the intersection point of bustle pipe 1, liquid The position that pressure promotes Oil cylinder 12 is right above bustle pipe 1, and it is most suitable recently that this contact point, which opens up through-hole,.Hydraulic pressure lift Oil cylinder 12 is connected with steel hinge line 14, and steel hinge line 14 passes perpendicularly through the bustle pipe 1 for offering through-hole, 15 phase of conduit saddle with mating production Even, while conduit saddle 15 and 1 spot welding of bustle pipe being fixed, so that suspender and bustle pipe 1 are fixed to pull bustle pipe in subsequent construction.
In conjunction with above-mentioned suspender, a kind of blast furnace bustle pipe dismounting method for dismounting of suspender, steps are as follows:
1) blowpipe between bustle pipe 1 and last furnace shell 11 is removed;
2) brick hole is outputed below bustle pipe 1, is prepared for subsequent brick of taking off;
3) by the quantity for being hung vertically half on bustle pipe 1, be arranged on bustle pipe hanging platform 7 hydraulic pressure lift Oil cylinder 12 and Matched cylinder support 13,12 position of hydraulic pressure lift Oil cylinder were substantially evenly distributed right above bustle pipe 1 along bustle pipe 1 one weeks;
4) centered on the intersection point of 12 axis of hydraulic pressure lift Oil cylinder and bustle pipe 1, vertical through-hole is outputed on bustle pipe 1, First open the hole of upper diameter about 700mm, hole below blocked by brick in bustle pipe to wait take off brick after open again;
5) after the brick in bustle pipe 1 is cooling, worker enters in bustle pipe, takes off brick from upper half toward lower half, removes the brick of bustle pipe The weight that measuring will make bustle pipe be hung vertically 6 receivings reduces more than half;
The purpose of this step is, when the hydraulic pressure lift Oil cylinder 12 for being hung vertically the setting of 6 half quantity by bustle pipe works, The stress of bustle pipe hanging 7 beam of platform does not increase, and reduces the workload for reinforcing landing beam.
6) through-hole below bustle pipe 1 is outputed, the resistance to material of position of opening is removed before aperture, the clear size of opening opened is with elevator Whole steel hinge lines 14 of oil cylinder can pass through;
7) steel hinge line 14 for wearing elevator, the steel hinge line 14 for promoting Oil cylinder passes through the bustle pipe 1 of vertical open pores, with mating system The conduit saddle 15 of work is connected;
8) conduit saddle 15 is fixed with 1 spot welding of bustle pipe, pre-tightens steel hinge line 14, bustle pipe girt and bustle pipe 1 are disengaged, then removes It is hung vertically conduit saddle 9;
9) pull suspender that 1 entirety of bustle pipe is fallen to tuyere platform 8 by numerical control hydraulic elevator;
10) bustle pipe 1 is segmented on tuyere platform 8, clears out or directly have bad luck to cast house after broken and is crushed again.
It is hung vertically conduit saddle 9 due to having removed in step 8), transport reaches wind to hoister control suspender downwards by bustle pipe 1 Mouthful platform 8 does not need disassembly in whole process and is hung vertically remaining part, without the aerial bustle pipe platform and thereon removed Water supply and sewage endless tube, without reinforcing bustle pipe hanging platform, the spray paint in bustle pipe is not removed, and refractory brick does not need all to remove, Entire demolishing process rapid and convenient is not take up main line duration, construction safety.
Embodiment 2
Using the suspender and method for dismounting in embodiment 1, certain 4000m3Blast furnace overhaul, bustle pipe 1 are hung vertically 6 for totally 8 groups, enclose Pipe 1, bustle pipe hanging platform 7, pipeline weight 110t, spray paint 90t, refractory brick 680t always weigh about 880t, the side halved according to weight Method need to take off brick 2/3.By lifting weight 440t, 8 groups are hung vertically the elevator that choosing has 4 hydraulic pressure lift Oil cylinders, and consider to pacify Overall coefficient need to select the numerical control hydraulic elevator of 4*200t.
Because unit in charge of construction only has the cable-styled numerical control hydraulic elevator of TS100B-250 fashioned iron, when specific implementation take off be over it is all resistance to Firebrick, practical to lift weight 300t, after bustle pipe integrally drops down onto tuyere platform, directly segmentation is had bad luck to cast house, without influence on The normal dismounting of furnace body.
Embodiment 3
Using the suspender and method for dismounting in embodiment 1, certain 1080m3Blast furnace overhaul, bustle pipe are hung vertically for 8 groups, enclose totally Pipe, bustle pipe hanging platform, pipeline weight 50t, spray paint 45t, refractory brick 285t always weigh about 380t, the method halved according to weight, Brick 190t need to be taken off.Because there is a cable-styled numerical control hydraulic elevator of TS100B-250 fashioned iron in unit in charge of construction, when construction, has only taken off the brick of half, Practical lifting weight 240t, bustle pipe are integrally dropped down onto disintegrate after tuyere platform and be transported, and do not influence the normal dismounting of furnace body.
The above-mentioned description to embodiment is for the ease of those skilled in the art it will be appreciated that and using this Case technology, person skilled in the art obviously can make various modifications to these examples easily, and described herein one As principle be applied in other embodiments without having to go through creative labor.Therefore, this case is not limited to above embodiments, ability According to the disclosure of this case, the improvement and modification made for this case all should be in the protection scopes of this case by the technical staff in domain.

Claims (4)

1. a kind of blast furnace bustle pipe, which is removed, uses suspender, bustle pipe (1) is the polygonal structure being spliced by plate rolling tube (2), internal There are spray paint (3) and refractory brick (4), bustle pipe (1) is hung vertically (6) and girt by several groups and hangs platform by bustle pipe (7) and furnace body steel frame columns (10) are fixed, characterized in that the suspender is by hydraulic pressure lift Oil cylinder (12), cylinder support (13), steel Line (14) and conduit saddle (15) composition are cut with scissors, the hydraulic pressure lift Oil cylinder (12) is fixed on bustle pipe hanging by cylinder support (13) On platform (7), hydraulic pressure lift Oil cylinder (12) position was uniformly distributed right above bustle pipe (1) along bustle pipe (1) one week;Described Hydraulic pressure lift Oil cylinder (12) is connected with steel hinge line (14), and steel hinge line (14) passes perpendicularly through the bustle pipe (1) for offering through-hole, and is matched The conduit saddle (15) of set production is connected.
2. a kind of blast furnace bustle pipe according to claim 1, which is removed, uses suspender, characterized in that the suspender quantity is vertical Hang the half of (6) quantity.
3. a kind of blast furnace bustle pipe according to claim 1, which is removed, uses suspender, characterized in that logical on the bustle pipe (1) Hole is opened up so that hydraulic pressure lift Oil cylinder (12) axis is vertical centered on the intersection point of bustle pipe (1).
4. a kind of blast furnace bustle pipe according to claim 1, which is removed, uses suspender, characterized in that the conduit saddle (15) and bustle pipe (1) spot welding is fixed.
CN201920444337.XU 2019-04-03 2019-04-03 Suspender is used in a kind of dismounting of blast furnace bustle pipe Expired - Fee Related CN209702791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920444337.XU CN209702791U (en) 2019-04-03 2019-04-03 Suspender is used in a kind of dismounting of blast furnace bustle pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920444337.XU CN209702791U (en) 2019-04-03 2019-04-03 Suspender is used in a kind of dismounting of blast furnace bustle pipe

Publications (1)

Publication Number Publication Date
CN209702791U true CN209702791U (en) 2019-11-29

Family

ID=68646751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920444337.XU Expired - Fee Related CN209702791U (en) 2019-04-03 2019-04-03 Suspender is used in a kind of dismounting of blast furnace bustle pipe

Country Status (1)

Country Link
CN (1) CN209702791U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868334A (en) * 2019-04-03 2019-06-11 安徽马钢设备检修有限公司 A kind of dismounting of blast furnace bustle pipe suspender and method for dismounting
CN111824931A (en) * 2020-06-30 2020-10-27 中冶天工集团有限公司 Mounting tool for gas return pipeline of reheating coke oven and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868334A (en) * 2019-04-03 2019-06-11 安徽马钢设备检修有限公司 A kind of dismounting of blast furnace bustle pipe suspender and method for dismounting
CN109868334B (en) * 2019-04-03 2023-11-21 安徽马钢设备检修有限公司 Lifting appliance for dismantling blast furnace surrounding pipe and dismantling method
CN111824931A (en) * 2020-06-30 2020-10-27 中冶天工集团有限公司 Mounting tool for gas return pipeline of reheating coke oven and construction method thereof
CN111824931B (en) * 2020-06-30 2022-07-05 中冶天工集团有限公司 Mounting tool for gas return pipeline of reheating coke oven and construction method thereof

Similar Documents

Publication Publication Date Title
CN209702791U (en) Suspender is used in a kind of dismounting of blast furnace bustle pipe
CN106435087B (en) A kind of converter vaporization flue piecewise combination installation method
CN105177202B (en) A kind of blast furnace overhaul method
CN105420432B (en) A kind of replacing options of blast furnace cooling stave
CN107699650A (en) A kind of installation method of blast furnace cooling stave
CN109868334A (en) A kind of dismounting of blast furnace bustle pipe suspender and method for dismounting
CN203380357U (en) Covering and uncovering device for high-temperature melt container
CN102399925A (en) Method for replacing cooling wall of blast furnace
CN102443666B (en) Device for rapid replacement of blast furnace cooling wall through external jacking without lowering stockline and construction method thereof
CN109055638A (en) A kind of method of last furnace shell and cooled bottom water crossed construction
CN204075183U (en) A kind of electric furnace steel ladle gas toast burner
CN207987275U (en) A kind of blast furnace replaces rock drill and lifts trolley
CN211386886U (en) Online hot patching device of ladle external mounted air brick cup
CN208038480U (en) A kind of trolley for replacing blast furnace front tapping machine rock drill
CN108015519A (en) The drawing process covered in blast furnace
CN206512241U (en) The fast replacement system of converter tapping-hole gate valve skimming device
CN207857843U (en) A kind of ladle capping device with lifting structure
CN211539455U (en) Tilting ladle with purification device
CN211522244U (en) Improved high manganese steel refining equipment
CN104911285B (en) The processing method of slag more than a kind of casting
CN110806106A (en) Method and structure for repairing collapse of refractory material at top of heating furnace
CN211546605U (en) Hand ladle for smelting chromium molybdenum steel
CN211516065U (en) Pouring equipment for refining high manganese steel
CN203682861U (en) Special lifting device for recycling continuous casting tundish
CN211645289U (en) Heat-stewing cover with lifting lugs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129

CF01 Termination of patent right due to non-payment of annual fee