CN106086263A - A kind of collaborative hanging method of blast furnace cooling stave - Google Patents

A kind of collaborative hanging method of blast furnace cooling stave Download PDF

Info

Publication number
CN106086263A
CN106086263A CN201610631905.8A CN201610631905A CN106086263A CN 106086263 A CN106086263 A CN 106086263A CN 201610631905 A CN201610631905 A CN 201610631905A CN 106086263 A CN106086263 A CN 106086263A
Authority
CN
China
Prior art keywords
blast furnace
stove
cooling stave
furnace cooling
coaster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610631905.8A
Other languages
Chinese (zh)
Other versions
CN106086263B (en
Inventor
刘文海
闫凤龙
张耀东
高真航
张晓强
王海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron and Steel Group Co Ltd Chengde Branch
Original Assignee
Hebei Iron and Steel Group Co Ltd Chengde Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Iron and Steel Group Co Ltd Chengde Branch filed Critical Hebei Iron and Steel Group Co Ltd Chengde Branch
Priority to CN201610631905.8A priority Critical patent/CN106086263B/en
Publication of CN106086263A publication Critical patent/CN106086263A/en
Application granted granted Critical
Publication of CN106086263B publication Critical patent/CN106086263B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/10Cooling; Devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Blast Furnaces (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The collaborative hanging method of a kind of blast furnace cooling stave, belongs to blast furnace cooling stave and installs and repair method technical field, for blast furnace cooling stave carries out maintenance lifting.Its technical scheme is: the present invention is respectively provided with top hoist and layback hoist engine at blast furnace roof and stokehold, utilize top hoist and coaster by blast furnace cooling stave traction to stove, in layback hoist engine and stove, draw blast furnace cooling stave with chain block, the outer chain block of stove be fixed installation to mount point, contact in installation process uses wireless connections mode, keeps in touch unobstructed.The present invention is the innovation of blast furnace cooling stave mounting technique, uses simple apparatus to solve the difficult problem lifting blast furnace cooling stave in medium and small blast furnace keeps in repair not solved for a long time.The present invention can be not required to remove furnace top equipment to reduce traditional work mode crane, to arrange the facility expenses such as auxiliary ring beam, reduce operating personnel's labor intensity, operating flexibility, and safety is high, is effectively increased working performance.

Description

A kind of collaborative hanging method of blast furnace cooling stave
Technical field
The present invention relates to a kind of method that blast furnace cooling stave is carried out maintenance lifting, belong to blast furnace cooling stave and install and maintenance Method and technology field.
Background technology
Changing the important content that blast furnace cooling stave is blast furnace maintenance, the method changing blast furnace cooling stave at present mainly has following Two kinds: one is to use the hanging device such as crane, tower crane directly to lift blast furnace cooling stave to be replaced, and another kind is in blast furnace Annular electric hoist beam is installed construct.During first method construction, it is necessary to furnace top equipment is removed so that furnace roof does not has obstacle Thing;Second method is applicable to large blast furnace, and preparation is complicated, assist material consumption costly, and small furnace is due to stove Interior space is the narrowest and small, the problem that there is constructional difficulties.
When changing blast furnace cooling stave due to blast furnace, if furnace top equipment is not removed or furnace roof has barrier, the most not The equipment such as general use crane, tower crane can be taked to be mounted directly method, and install the arrangement and method for construction of annular electric hoist beam for Small blast furnace is not suitable for, and the most small-sized blast furnace changes the method that blast furnace cooling stave is not suitable for, and becomes blast furnace dimension Repair and medium-term and long-term do not put the axe in the helve, directly affects blast furnace maintenance construction.
Summary of the invention
The technical problem to be solved is to provide the collaborative hanging method of a kind of blast furnace cooling stave, and this working in coordination with is hung Blast furnace cooling stave, by laying hanging apparatus in stove, outside stove respectively, can be lifted by dress method easily, is not required to remove Furnace top equipment, operating flexibility, safety is high, can alleviate operating personnel's labor intensity, be effectively improved working performance.
The technical scheme solving above-mentioned technical problem is:
A kind of collaborative hanging method of blast furnace cooling stave, its employing following steps is carried out:
A. installing inspection platform in blast furnace, the diameter of inspection platform matches with furnace shell internal diameter, installs furnace roof volume at blast furnace roof Raise machine, furnace roof coaster, layback hoist engine is installed outside State of Blast Furnace, the outer coaster of stove is installed outside State of Blast Furnace, pacifies in State of Blast Furnace Coaster in shove charge, the steel wire rope of layback hoist engine is connected with coaster in stove by the outer coaster of stove, installs in stove in State of Blast Furnace Chain block, installs the outer chain block of stove outside State of Blast Furnace;
B. top hoist and furnace roof coaster is used to hang in blast furnace by one piece of blast furnace cooling stave from furnace roof, by layback hoist engine Steel wire rope is connected with the blast furnace cooling stave hung in by coaster in stove outer coaster, stove, then starts layback hoist engine by blast furnace Cooling wall traction is to position to be installed;
C. use chain block lifting blast furnace cooling stave in stove, then unclamp top hoist and the steel wire rope of layback hoist engine;
D. use the outer chain block of two stoves through the cooling wall water pipe hole on blast furnace furnace wall and cooling wall bolt outside blast furnace The parallel pulling in hole blast furnace cooling stave, the cooling water pipe of blast furnace cooling stave is solid by cooling wall bolt hole after entering cooling wall water pipe hole Determine blast furnace cooling stave;
E., in next block blast furnace cooling stave entrance State of Blast Furnace is drawn in top hoist lifting, step b, step c, step d are repeated, will Next block blast furnace cooling stave is installed and is put in place, completes one by one blast furnace cooling stave integral installation according to above-mentioned steps.
The collaborative hanging method of above-mentioned blast furnace cooling stave, in the stove in State of Blast Furnace in described step a, coaster has 4, point Not being arranged on the circumference of blast furnace inwall, their spacing is equal.
The collaborative hanging method of above-mentioned blast furnace cooling stave, in the stove in State of Blast Furnace in described step a, chain block is many Individual, they lay respectively at above the installation site of every piece of blast furnace cooling stave, and the outer chain block of the stove installed outside State of Blast Furnace is respectively Relative with the cooling wall water pipe hole of every piece of blast furnace cooling stave and cooling wall bolt hole.
The collaborative hanging method of above-mentioned blast furnace cooling stave, puts down with the outer different work of blast furnace in operating personnel is scattered in blast furnace Platform, operating personnel uses radio communication contact information to keep in touch at any time, it is ensured that operation is smooth and easy.
The invention has the beneficial effects as follows:
The present invention is respectively provided with top hoist and layback hoist engine at blast furnace roof and stokehold, utilizes top hoist and coaster By in blast furnace cooling stave traction to stove, in layback hoist engine and stove, draw blast furnace cold with chain block, the outer chain block of stove But wall to mount point is fixed installation, and the contact in installation process uses wireless connections mode, keeps in touch unobstructed.
The present invention is the innovation of blast furnace cooling stave mounting technique, use simple apparatus to solve for a long time not solve Medium and small blast furnace maintenance lifts a difficult problem for blast furnace cooling stave.The present invention can be to reduce traditional work mode crane, to arrange subring The facility expenses such as beam, are not required to remove furnace top equipment, reduce operating personnel's labor intensity, operating flexibility, and safety is high, is effectively improved Working performance.
Accompanying drawing explanation
Fig. 1 is the lifting schematic diagram of the blast furnace cooling stave of the present invention;
Fig. 2 is the traction scheme of installation of the blast furnace cooling stave of the present invention.
In figure, labelling is as follows: coaster 4, stove outer coaster 5, stove in top hoist 1, furnace roof coaster 2, layback hoist engine 3, stove Chain block 10, stove outer chain block 11, blast furnace in shell 6, inspection platform 7, cooling wall water pipe hole 8, cooling wall bolt hole 9, stove Cooling wall 12.
Detailed description of the invention
Showing in figure, the present invention uses following steps to carry out:
The first step, installs lifting and pulling equipment
First inspection platform 7 in installing blast furnace, the diameter dimension of inspection platform 7 need to determine according to furnace shell 6 inside diameter, with stove Shell 6 internal diameter matches.
Then at blast furnace roof, top hoist 1, furnace roof coaster 2 are installed, furnace top equipment during installation, need not be removed.
Layback hoist engine 3 and the outer coaster 5 of stove are installed outside State of Blast Furnace again, coaster 4 in stove, layback are installed in State of Blast Furnace The steel wire rope of hoist engine 3 is connected with coaster in stove 4 by the outer coaster 5 of stove.In stove, coaster 4 has 4, is separately mounted in blast furnace On the circumference of wall, their spacing is equal.
Chain block 10 in stove is finally installed in State of Blast Furnace, the outer chain block 11 of stove is installed outside State of Blast Furnace.Hands in stove Drawing calabash 10 for multiple, they lay respectively at above the installation site of every piece of blast furnace cooling stave 12, and the outer chain block 11 of stove is respectively Relative with the cooling wall water pipe hole 8 of every piece of blast furnace cooling stave 12 and cooling wall bolt hole 9.
Second step, lifts blast furnace cooling stave 12
Use top hoist 1 and furnace roof coaster 2 to hang in blast furnace by one piece of blast furnace cooling stave 12 from furnace roof, then layback is rolled up The steel wire rope raising machine 3 is connected with the blast furnace cooling stave 12 hung in by coaster 4 in stove outer coaster 5, stove, starts layback hoist engine Blast furnace cooling stave 12 is drawn to position to be installed by 3.
3rd step, draws, fixes blast furnace cooling stave 12
In using stove, chain block 10 lifts blast furnace cooling stave 12, then unclamps top hoist 1 and the steel wire of layback hoist engine 3 Rope.Use the outer chain block 11 of two stoves through the cooling wall water pipe hole 8 on blast furnace furnace wall and cooling wall bolt outside blast furnace The parallel pulling in hole 9 blast furnace cooling stave 12, the cooling water pipe of blast furnace cooling stave 12 passes through cooling wall spiral shell after entering cooling wall water pipe hole 8 Keyhole 9 fixes blast furnace cooling stave 12.
4th step, repeats above-mentioned lifting and traction installation steps, installs whole blast furnace cooling stave 12 one by one.
In above-mentioned installation exercise, operating personnel is different work platform outer with blast furnace in being scattered in blast furnace, and operating personnel makes Keep in touch at any time by radio communication contact information, it is ensured that operation is smooth and easy.

Claims (4)

1. the collaborative hanging method of a blast furnace cooling stave, it is characterised in that: it uses following steps to carry out:
A. installing inspection platform (7) in blast furnace, the diameter of inspection platform (7) matches with furnace shell (6) internal diameter, pacifies at blast furnace roof Dress top hoist (1), furnace roof coaster (2), install layback hoist engine (3) outside State of Blast Furnace, install outside stove outside State of Blast Furnace Coaster (5), installs coaster (4) in stove in State of Blast Furnace, and the steel wire rope of layback hoist engine (3) is by the outer coaster (5) of stove and stove Coaster (4) is connected, and installs chain block (10) in stove in State of Blast Furnace, installs the outer chain block (11) of stove outside State of Blast Furnace;
B. top hoist (1) and furnace roof coaster (2) is used to hang in blast furnace from furnace roof, by side by one piece of blast furnace cooling stave (12) The steel wire rope drawing hoist engine (3) is connected, so with the blast furnace cooling stave (12) hung in by coaster (4) in stove outer coaster (5), stove Rear startup layback hoist engine (3) is by blast furnace cooling stave (12) traction extremely position to be installed;
C. use chain block (10) lifting blast furnace cooling stave (12) in stove, then unclamp top hoist (1) and layback elevator The steel wire rope of machine (3);
D. use the outer chain block (11) of two stoves through the cooling wall water pipe hole (8) on blast furnace furnace wall and cooling outside blast furnace Wall bolt hole (9) parallel pulling blast furnace cooling stave (12), the cooling water pipe of blast furnace cooling stave (12) enters cooling wall water pipe hole (8), then by the fixing blast furnace cooling stave (12) of cooling wall bolt hole (9);
E. top hoist (1) lifting is drawn next block blast furnace cooling stave (12) and is entered in State of Blast Furnace, repeat step b, step c, Step d, installs next block blast furnace cooling stave (12) and puts in place, complete according to above-mentioned steps blast furnace cooling stave (12) overall one by one Install.
The collaborative hanging method of blast furnace cooling stave the most according to claim 1, it is characterised in that: the height in described step a In stove in stove stove, coaster (4) has 4, is separately mounted on the circumference of blast furnace inwall, and their spacing is equal.
The collaborative hanging method of blast furnace cooling stave the most according to claim 2, it is characterised in that: the height in described step a In stove in stove stove, chain block (10) is multiple, and they lay respectively at above the installation site of every piece of blast furnace cooling stave (12), The outer chain block (11) of stove installed outside State of Blast Furnace respectively with the cooling wall water pipe hole (8) of every piece of blast furnace cooling stave (12) and cold But wall bolt hole (9) is relative.
The collaborative hanging method of blast furnace cooling stave the most according to claim 3, it is characterised in that: operating personnel is scattered in height Different work platform outer with blast furnace in stove, operating personnel uses radio communication contact information to keep in touch at any time, it is ensured that operation is suitable Freely.
CN201610631905.8A 2016-08-04 2016-08-04 A kind of collaboration hanging method of blast furnace cooling stave Expired - Fee Related CN106086263B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610631905.8A CN106086263B (en) 2016-08-04 2016-08-04 A kind of collaboration hanging method of blast furnace cooling stave

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610631905.8A CN106086263B (en) 2016-08-04 2016-08-04 A kind of collaboration hanging method of blast furnace cooling stave

Publications (2)

Publication Number Publication Date
CN106086263A true CN106086263A (en) 2016-11-09
CN106086263B CN106086263B (en) 2018-04-13

Family

ID=57455129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610631905.8A Expired - Fee Related CN106086263B (en) 2016-08-04 2016-08-04 A kind of collaboration hanging method of blast furnace cooling stave

Country Status (1)

Country Link
CN (1) CN106086263B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107686055A (en) * 2017-08-31 2018-02-13 中国二十二冶集团有限公司 Blast-furnace body builds interior hanging method by laying bricks or stones and realizes the Lift-on/Lift-off System of this method
CN107699650A (en) * 2017-11-28 2018-02-16 武汉钢铁有限公司 A kind of installation method of blast furnace cooling stave
CN108384909A (en) * 2018-04-17 2018-08-10 中冶天工集团天津有限公司 A kind of blast furnace cooling stave mounting device and its application method
CN113564289A (en) * 2021-06-21 2021-10-29 中国三冶集团有限公司 Installation method of large bulk boiler water-cooled wall
CN114507773A (en) * 2020-11-15 2022-05-17 上海梅山钢铁股份有限公司 Online quick replacement method for W-shaped radiant tube of continuous annealing furnace

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266192A (en) * 2013-05-17 2013-08-28 中国十七冶集团有限公司 Hoisting method for replacing cooling wall in overhauling of blast furnace

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266192A (en) * 2013-05-17 2013-08-28 中国十七冶集团有限公司 Hoisting method for replacing cooling wall in overhauling of blast furnace

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107686055A (en) * 2017-08-31 2018-02-13 中国二十二冶集团有限公司 Blast-furnace body builds interior hanging method by laying bricks or stones and realizes the Lift-on/Lift-off System of this method
CN107699650A (en) * 2017-11-28 2018-02-16 武汉钢铁有限公司 A kind of installation method of blast furnace cooling stave
CN108384909A (en) * 2018-04-17 2018-08-10 中冶天工集团天津有限公司 A kind of blast furnace cooling stave mounting device and its application method
CN108384909B (en) * 2018-04-17 2023-09-08 中冶天工集团天津有限公司 Blast furnace cooling wall mounting device and application method thereof
CN114507773A (en) * 2020-11-15 2022-05-17 上海梅山钢铁股份有限公司 Online quick replacement method for W-shaped radiant tube of continuous annealing furnace
CN113564289A (en) * 2021-06-21 2021-10-29 中国三冶集团有限公司 Installation method of large bulk boiler water-cooled wall

Also Published As

Publication number Publication date
CN106086263B (en) 2018-04-13

Similar Documents

Publication Publication Date Title
CN106086263A (en) A kind of collaborative hanging method of blast furnace cooling stave
CN108625884B (en) Construction method for dismantling negative ring pipe piece of closed type middle air shaft
CN104444909A (en) Trolley type cable well lid opener
CN109097516A (en) The construction method of blast furnace overhaul engineering replacement last furnace shell
CN106015729A (en) Reverse in-position method for vaporization flue in closed plant
CN110760634A (en) Blast furnace shell installation method
CN201647834U (en) Device for mounting tower equipment in narrow spaces
CN203613779U (en) Device for mounting sleeve type chimney interior overhaul platform
CN108342532A (en) A kind of device and its replacing options for not destroying furnace shell and replacing blast furnace cooling stave
CN204324787U (en) A kind of trolley type cable manhole cover opener
CN103375022B (en) Multi-functional dynamic rail attached lifting scaffold
CN202542676U (en) Special lifting tool used for guide plate rotary cylinder device in hot rolled coil furnace
CN201999638U (en) Hoisting device for ascending pipe and bridge pipe of coke oven
CN105438982A (en) A rapid replacing method of a grate of a hot-blast stove of a blast furnace
CN208763693U (en) A kind of mobile check device of mine shaft
CN103342321A (en) Integral replacing and hoisting method of steam generator of in-service nuclear power plant
CN106016233A (en) Boiler roof with long span and fewer welding spots and hoisting method for boiler roof
CN201777796U (en) Omnibearing hoisting device in blast furnace hearth
CN204224123U (en) A kind of suspension hoisting device installing base husband Saite stove
CN201138725Y (en) Door type frame for indoor equipment repair
CN204848915U (en) Blast furnace stave overhauls conveyer
CN206799031U (en) A kind of installation system of boiler water wall
CN101823067A (en) Telescopic environment-friendly gas hood
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
CN206827837U (en) The cable windings timber of hydraulic elevator platform is installed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413