CN106086263B - A kind of collaboration hanging method of blast furnace cooling stave - Google Patents

A kind of collaboration hanging method of blast furnace cooling stave Download PDF

Info

Publication number
CN106086263B
CN106086263B CN201610631905.8A CN201610631905A CN106086263B CN 106086263 B CN106086263 B CN 106086263B CN 201610631905 A CN201610631905 A CN 201610631905A CN 106086263 B CN106086263 B CN 106086263B
Authority
CN
China
Prior art keywords
blast furnace
cooling stave
stove
furnace cooling
coaster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610631905.8A
Other languages
Chinese (zh)
Other versions
CN106086263A (en
Inventor
刘文海
闫凤龙
张耀东
高真航
张晓强
王海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron and Steel Group Co Ltd Chengde Branch
Original Assignee
Hebei Iron and Steel Group Co Ltd Chengde Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Iron and Steel Group Co Ltd Chengde Branch filed Critical Hebei Iron and Steel Group Co Ltd Chengde Branch
Priority to CN201610631905.8A priority Critical patent/CN106086263B/en
Publication of CN106086263A publication Critical patent/CN106086263A/en
Application granted granted Critical
Publication of CN106086263B publication Critical patent/CN106086263B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/10Cooling; Devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Blast Furnaces (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A kind of collaboration hanging method of blast furnace cooling stave, belongs to blast furnace cooling stave installation and repair method technical field, for carrying out maintenance lifting to blast furnace cooling stave.Its technical solution is:The present invention sets top hoist and layback hoist engine respectively in blast furnace roof and stokehold, blast furnace cooling stave is drawn to stove using top hoist and coaster, installation is fixed in traction blast furnace cooling stave to mount point with chain block outside chain block in layback hoist engine and stove, stove, contact in installation process uses wireless connections mode, keeps in touch unobstructed.The present invention is the innovation of blast furnace cooling stave mounting technique, is solved using simple apparatus long-term without the problem that blast furnace cooling stave is lifted in medium and small blast furnace maintenance solved.The present invention can reduce traditional work mode crane, set the facility expenses such as auxiliary ring beam, be not required to remove furnace top equipment, reduce operating personnel's labor intensity, operating flexibility is safe, effectively increases operating efficiency.

Description

A kind of collaboration hanging method of blast furnace cooling stave
Technical field
The present invention relates to a kind of method that lifting is carried out maintenance to blast furnace cooling stave, belongs to blast furnace cooling stave installation and maintenance Method and technology field.
Background technology
The important content that blast furnace cooling stave is blast furnace maintenance is replaced, the method for replacement blast furnace cooling stave mainly has following at present Two kinds:One kind is directly to lift blast furnace cooling stave using hanging devices such as crane, tower cranes to be replaced, and another kind is in blast furnace The annular electric hoist beam of installation is constructed.When first method is constructed, it is necessary to remove furnace top equipment so that furnace roof does not have obstacle Thing;Second method is suitable for large blast furnace, and preparation is complicated, auxiliary material consumption costs is high, and small furnace is due to stove Interior space is relatively narrow and small, and there are the problem of constructional difficulties.
When replacing blast furnace cooling stave due to blast furnace, if furnace top equipment is not removed or furnace roof has barrier, just not Can take it is general be mounted directly method using equipment such as crane, tower cranes, and install the arrangement and method for construction of annular electric hoist beam for Small blast furnace is not suitable for, therefore blast furnace small-sized at present replaces the method that blast furnace cooling stave is not adapted to, and becomes blast furnace dimension Repair it is medium-term and long-term do not put the axe in the helve, directly affects blast furnace maintenance construction.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of collaboration hanging method of blast furnace cooling stave, and this collaboration is hung Dress method by stove, hanging apparatus is laid outside stove respectively, easily blast furnace cooling stave can be lifted, be not required to remove Furnace top equipment, operating flexibility is safe, can mitigate operating personnel's labor intensity, effectively improve operating efficiency.
Solving the technical solution of above-mentioned technical problem is:
A kind of collaboration hanging method of blast furnace cooling stave, it is carried out using following steps:
A., inspection platform in blast furnace is installed, diameter and the furnace shell internal diameter of inspection platform match, and stove is installed in blast furnace roof Hoist engine, furnace roof coaster are pushed up, layback hoist engine is installed on the outside of State of Blast Furnace, coaster outside stove is installed outside State of Blast Furnace, in State of Blast Furnace Coaster in interior installation stove, the steel wire rope of layback hoist engine are connected with coaster in stove by coaster outside stove, are installed in State of Blast Furnace Chain block in stove, installs chain block outside stove outside State of Blast Furnace;
B. one piece of blast furnace cooling stave is hung in blast furnace from furnace roof using top hoist and furnace roof coaster, by layback elevator The steel wire rope of machine is connected by coaster in coaster outside stove, stove with the blast furnace cooling stave hung in, and then starting layback hoist engine will Blast furnace cooling stave is drawn to position to be installed;
C. blast furnace cooling stave is lifted using chain block in stove, then unclamps the steel wire of top hoist and layback hoist engine Rope;
D. cooling wall water pipe hole and the cooling wall on blast furnace furnace wall are passed through using chain block outside two stoves outside blast furnace The parallel pulling blast furnace cooling stave of bolt hole, the cooling water pipe of blast furnace cooling stave pass through cooling wall bolt after entering cooling wall water pipe hole Blast furnace cooling stave is fixed in hole;
E. top hoist lifting is drawn next piece of blast furnace cooling stave and is entered in State of Blast Furnace, repeat step b, step c, step D, next piece of blast furnace cooling stave is installed in place, and is completed one by one to blast furnace cooling stave integral installation according to above-mentioned steps.
The collaboration hanging method of above-mentioned blast furnace cooling stave, coaster has 4 in the stove in State of Blast Furnace in the step a, point An Zhuan not be on the circumference of blast furnace inner wall, their spacing is equal.
The collaboration hanging method of above-mentioned blast furnace cooling stave, chain block is more in the stove in State of Blast Furnace in the step a A, they are respectively above the installation site of every piece of blast furnace cooling stave, and chain block is distinguished outside the stove installed outside State of Blast Furnace It is opposite with the cooling wall water pipe hole of every piece of blast furnace cooling stave and cooling wall bolt hole.
The collaboration hanging method of above-mentioned blast furnace cooling stave, operating personnel is scattered in blast furnace and the outer different work of blast furnace is put down Platform, operating personnel are kept in touch at any time using wireless communication contact information, ensure that operation is smooth.
The beneficial effects of the invention are as follows:
The present invention in blast furnace roof and stokehold sets top hoist and layback hoist engine respectively, using top hoist and Coaster draws blast furnace cooling stave to stove, is drawn with chain block outside chain block in layback hoist engine and stove, stove high Stove cooling wall to mount point is fixed installation, and the contact in installation process uses wireless connections mode, keeps in touch unobstructed.
The present invention is the innovation of blast furnace cooling stave mounting technique, solves existing for long-term no solution using simple apparatus The problem of blast furnace cooling stave is lifted in medium and small blast furnace maintenance.The present invention can reduce traditional work mode crane, set subring The facility expense such as beam, is not required to remove furnace top equipment, reduces operating personnel's labor intensity, operating flexibility is safe, effectively improves Operating efficiency.
Brief description of the drawings
Fig. 1 is the lifting schematic diagram of the blast furnace cooling stave of the present invention;
Fig. 2 is the traction scheme of installation of the blast furnace cooling stave of the present invention.
Marked in figure as follows:Top hoist 1, furnace roof coaster 2, layback hoist engine 3, coaster 4, stove outer coaster 5, stove in stove Shell 6, inspection platform 7, cooling wall water pipe hole 8, cooling wall bolt hole 9, chain block 10, stove outer chain block 11, blast furnace in stove Cooling wall 12.
Embodiment
Shown in figure, the present invention is carried out using following steps:
The first step, installation lifting and pulling equipment
Inspection platform 7, the diameter dimension of inspection platform 7 need to be determined according to 6 inside diameter of furnace shell in installation blast furnace first, Match with 6 internal diameter of furnace shell.
Then do not have to remove furnace top equipment in blast furnace roof installation top hoist 1, furnace roof coaster 2, installation.
Coaster 5 outside layback hoist engine 3 and stove is installed on the outside of State of Blast Furnace again, coaster 4 in stove, layback are installed in State of Blast Furnace The steel wire rope of hoist engine 3 is connected by coaster outside stove 5 with coaster in stove 4.Coaster 4 has 4 in stove, is separately mounted in blast furnace On the circumference of wall, their spacing is equal.
Chain block 10 in stove is finally installed in State of Blast Furnace, chain block 11 outside stove is installed outside State of Blast Furnace.Hand in stove Cucurbit 10 is drawn to be multiple, respectively above the installation site of every piece of blast furnace cooling stave 12, the outer chain block 11 of stove is distinguished for they It is opposite with the cooling wall water pipe hole 8 of every piece of blast furnace cooling stave 12 and cooling wall bolt hole 9.
Second step, lifts blast furnace cooling stave 12
One piece of blast furnace cooling stave 12 is hung in blast furnace from furnace roof using top hoist 1 and furnace roof coaster 2, then by side Draw the steel wire rope of hoist engine 3 to be connected by coaster 4 in coaster outside stove 5, stove with the blast furnace cooling stave 12 hung in, start layback volume Machine 3 is raised to draw blast furnace cooling stave 12 to position to be installed.
3rd step, traction, fixed blast furnace cooling stave 12
Blast furnace cooling stave 12 is lifted using chain block in stove 10, then unclamps top hoist 1 and layback hoist engine 3 Steel wire rope.Using chain block 11 outside two stoves through the cooling wall water pipe hole 8 on blast furnace furnace wall and cooling wall outside the blast furnace Bolt hole 9 is parallel to pull blast furnace cooling stave 12, and the cooling water pipe of blast furnace cooling stave 12 passes through cooling after entering cooling wall water pipe hole 8 Wall bolt hole 9 fixes blast furnace cooling stave 12.
4th step, repeats above-mentioned lifting and traction installation steps, installs whole blast furnace cooling staves 12 one by one.
In above-mentioned installation exercise, operating personnel is scattered in blast furnace and the outer different work platform of blast furnace, operating personnel make Kept in touch at any time with wireless communication contact information, ensure that operation is smooth.

Claims (1)

  1. A kind of 1. collaboration hanging method of blast furnace cooling stave, it is characterised in that:It is carried out using following steps:
    A., inspection platform in blast furnace is installed(7), inspection platform(7)Diameter and furnace shell(6)Internal diameter matches, and pacifies in blast furnace roof Fill top hoist(1), furnace roof coaster(2), layback hoist engine is installed on the outside of State of Blast Furnace(3), installed outside State of Blast Furnace outside stove Coaster(5), coaster in stove is installed in State of Blast Furnace(4), layback hoist engine(3)Steel wire rope pass through coaster outside stove(5)In stove Coaster(4)It is connected, chain block in stove is installed in State of Blast Furnace(10), chain block outside stove is installed outside State of Blast Furnace(11);
    B. top hoist is used(1)With furnace roof coaster(2)By one piece of blast furnace cooling stave(12)Hung in from furnace roof in blast furnace, by side Draw hoist engine(3)Steel wire rope pass through coaster outside stove(5), coaster in stove(4)With the blast furnace cooling stave hung in(12)It is connected, so Start layback hoist engine afterwards(3)By blast furnace cooling stave(12)Draw to position to be installed;
    C. using chain block in stove(10)Lift blast furnace cooling stave(12), then unclamp top hoist(1)With layback elevator Machine(3)Steel wire rope;
    D. chain block outside two stoves is used outside blast furnace(11)Through the cooling wall water pipe hole on blast furnace furnace wall(8)And cooling Wall bolt hole(9)Parallel pulling blast furnace cooling stave(12), blast furnace cooling stave(12)Cooling water pipe enter cooling wall water pipe hole (8), then pass through cooling wall bolt hole(9)Fixed blast furnace cooling stave(12);
    E. top hoist(1)Lifting next piece of blast furnace cooling stave of traction(12)Into in State of Blast Furnace, repeat step b, step c, Step d, by next piece of blast furnace cooling stave(12)It is installed in place, is completed one by one to blast furnace cooling stave according to above-mentioned steps(12)It is overall Installation.
CN201610631905.8A 2016-08-04 2016-08-04 A kind of collaboration hanging method of blast furnace cooling stave Expired - Fee Related CN106086263B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610631905.8A CN106086263B (en) 2016-08-04 2016-08-04 A kind of collaboration hanging method of blast furnace cooling stave

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610631905.8A CN106086263B (en) 2016-08-04 2016-08-04 A kind of collaboration hanging method of blast furnace cooling stave

Publications (2)

Publication Number Publication Date
CN106086263A CN106086263A (en) 2016-11-09
CN106086263B true CN106086263B (en) 2018-04-13

Family

ID=57455129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610631905.8A Expired - Fee Related CN106086263B (en) 2016-08-04 2016-08-04 A kind of collaboration hanging method of blast furnace cooling stave

Country Status (1)

Country Link
CN (1) CN106086263B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107686055A (en) * 2017-08-31 2018-02-13 中国二十二冶集团有限公司 Blast-furnace body builds interior hanging method by laying bricks or stones and realizes the Lift-on/Lift-off System of this method
CN107699650B (en) * 2017-11-28 2019-04-26 武汉钢铁有限公司 A kind of installation method of blast furnace cooling stave
CN108384909B (en) * 2018-04-17 2023-09-08 中冶天工集团天津有限公司 Blast furnace cooling wall mounting device and application method thereof
CN114507773A (en) * 2020-11-15 2022-05-17 上海梅山钢铁股份有限公司 Online quick replacement method for W-shaped radiant tube of continuous annealing furnace
CN113564289A (en) * 2021-06-21 2021-10-29 中国三冶集团有限公司 Installation method of large bulk boiler water-cooled wall

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266192A (en) * 2013-05-17 2013-08-28 中国十七冶集团有限公司 Hoisting method for replacing cooling wall in overhauling of blast furnace

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266192A (en) * 2013-05-17 2013-08-28 中国十七冶集团有限公司 Hoisting method for replacing cooling wall in overhauling of blast furnace

Also Published As

Publication number Publication date
CN106086263A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106086263B (en) A kind of collaboration hanging method of blast furnace cooling stave
CN103266192B (en) Hoisting method for replacing cooling wall in overhauling of blast furnace
CN108625884B (en) Construction method for dismantling negative ring pipe piece of closed type middle air shaft
CN203064994U (en) Lifting device for disassembling negative ring segments
CN104444909A (en) Trolley type cable well lid opener
CN109097516A (en) The construction method of blast furnace overhaul engineering replacement last furnace shell
CN106015729A (en) Reverse in-position method for vaporization flue in closed plant
CN203613779U (en) Device for mounting sleeve type chimney interior overhaul platform
CN201334306Y (en) Hoisting machine for upright post member
CN204324787U (en) A kind of trolley type cable manhole cover opener
CN103342321A (en) Integral replacing and hoisting method of steam generator of in-service nuclear power plant
CN208763693U (en) A kind of mobile check device of mine shaft
CN104058333B (en) A kind of underground nuclear power station reactor building circular crane crossbeam hanging method
CN106016233A (en) Boiler roof with long span and fewer welding spots and hoisting method for boiler roof
CN104555833B (en) Method for hoisting steel inner cylinder of chimney
CN104773645A (en) Tool for lifting bearing end cover of permanent magnet directly-driven wind generator
CN1536185A (en) Method for examining and repairing boiler
CN205802821U (en) A kind of heating furnace water beam is lifted the device having bad luck
CN203187370U (en) Inner mast hoisting device
CN204022864U (en) The hanging ladder of welding converter flue
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
CN106829727A (en) Pitch-controlled system part replacement attending device
CN203432271U (en) Overhauling device of copper smelting steam drying machine
CN205688822U (en) Heavy component transportation system after reverse construction method disassembly
CN204324689U (en) Blast furnace cooling stave changes hoisting tool special

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413