CN106402505A - 可调节式穿墙洞止水装置 - Google Patents

可调节式穿墙洞止水装置 Download PDF

Info

Publication number
CN106402505A
CN106402505A CN201610892385.6A CN201610892385A CN106402505A CN 106402505 A CN106402505 A CN 106402505A CN 201610892385 A CN201610892385 A CN 201610892385A CN 106402505 A CN106402505 A CN 106402505A
Authority
CN
China
Prior art keywords
water stop
packing
sealing
wall
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610892385.6A
Other languages
English (en)
Other versions
CN106402505B (zh
Inventor
陈永飞
王涛
徐玉夏
施雨
张云海
张龙
陈敏
瞿彦忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201610892385.6A priority Critical patent/CN106402505B/zh
Publication of CN106402505A publication Critical patent/CN106402505A/zh
Application granted granted Critical
Publication of CN106402505B publication Critical patent/CN106402505B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • F16L5/02Sealing

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种可调节式穿墙洞止水装置,包括外止水扎兰、外止水推板、密封圈、盘根,外止水扎兰、外止水推板设置在钢管与井壁之间,外止水扎兰与钢管之间设有盘根,所述盘根前面设有两道密封装置,每道密封装置由密封圈、调节螺栓、油脂孔、密封座组成,密封座上旋有调节螺栓,调节螺栓下面连接密封圈,通过调节螺栓,使密封圈作用于钢管外壁帮助止水,密封座上还设有油脂孔,通过油脂孔压入油脂加强止水效果。该装置可实现水压力2.5kg/cm2以上的穿墙洞止水功能并可根据使用需求进行密封调节,可有效的解决高水压条件下传统穿墙管止水装置易漏水、难维修的问题,使超长距离顶管施工技术可以在高水头、复杂地质条件下得到进一步的推广。

Description

可调节式穿墙洞止水装置
技术领域
本发明涉及一种顶管施工方法中止水装置,尤其是一种用于解决在高水头、复杂地质条件下超长距离顶管施工中盘根磨损致漏水、漏砂的问题的穿墙洞止水装置。
背景技术
顶管施工方法已逐渐发展成为埋入软土层内工业管道、天然气管道、自来水和污水管道的主要施工措施。随着国家对于环保要求的进一步提高,沿海地区工业废水和城市生活污水需进行深海排放,超长距离管道排污作用愈加明显。常规顶管穿墙洞止水装置采用“1+1”的密封形式,如图1所示,即1道牛油盘根+1道挡土橡胶圈的形式。缺点是在高水头、超长距离顶管施工时,由于橡胶圈和盘根磨损导致穿墙洞渗漏水情况严重。由于常规穿墙管止水装置设计缺陷,导致盘根无法进行更换,因此,对后续正常顶进施工造成很大影响。
为克服在沿海地区海域内复高水压、复杂地质条件下超长距离顶管施工穿墙洞易漏水的难点,必须对顶管施工的穿墙止水装置重新进行改进、研发。
发明内容
本发明提供一种可调节式穿墙洞止水装置,用于解决在高水头、复杂地质条件下超长距离顶管施工中穿墙管盘根磨损而产生漏水的技术问题。
为实现上述目的,本发明的技术方案是:一种可调节式穿墙洞止水装置,包括外止水扎兰、外止水推板、密封圈、盘根,所述外止水扎兰、外止水推板设置在钢管与井壁之间,外止水扎兰与钢管之间设有盘根,其特征在于:所述盘根前面设有两道密封装置,每道密封装置由密封圈、调节螺栓、油脂孔、密封座组成,密封座上旋有调节螺栓,调节螺栓下面连接密封圈,通过调节螺栓,使密封圈作用于钢管外壁帮助止水,密封座上还设有油脂孔,通过油脂孔压入油脂加强止水效果。
所述盘根旁设有盾尾油脂孔,当更换盘根时,通过盾尾油脂孔压入盾尾油脂。所述外止水推板与外止水扎兰之间通过螺栓连接。
本发明的有益效果是:在管道推进过程中,由于止水安装偏差、盘根磨损等情况导致的穿墙管漏水,通过调节螺栓,将密封圈作用管道外壁帮助止水,同时,通过由油脂孔压入油脂加强止水效果,最后将磨损的盘根进行更换,该装置解决了在高水头、复杂地质条件下超长距离顶管施工中穿墙管盘根磨损而产生漏水的问题。
附图说明
图1是常规顶管穿墙洞止水装置结构示意图;
图2是本发明的可调节式穿墙洞止水装置结构示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步的说明。
如图2所示,本发明的可调节式穿墙洞止水装置,包含油脂孔1、调节螺栓2、盾尾油脂孔3、外止水扎兰4、外止水推板5、密封圈6、盘根7、密封座8等。
外止水扎兰4、外止水推板5设置在钢管9与井壁10之间,外止水扎兰4与钢管之间设有盘根7,盘根7前面设有两道密封装置,每道密封装置由密封圈6、调节螺栓2、油脂孔1、密封座8组成,密封座8上旋有调节螺栓2,调节螺栓2下面连接密封圈6,通过调节螺栓2,使密封圈6作用于钢管外壁帮助止水,密封座8上还设有油脂孔1,通过油脂孔1压入油脂加强止水效果。盘根7旁设有盾尾油脂孔3,当更换盘根7时,通过盾尾油脂孔3压入盾尾油脂。外止水推板5与外止水扎兰4之间通过螺栓连接。
现场施工流程如下:
在穿墙洞发生渗水、漏水等情况,首先可通过油脂孔1压入油脂,然后通过调节螺栓2将密封圈6与管道外壁拧紧,观察漏水情况是否减小,如仍然有渗水,可通过盾尾油脂孔3压入盾尾油脂;接着,将外止水推板5与外止水扎兰4脱离(两者采用螺栓连接的方式),重新更换盘根7,完成后,重新用螺栓将外止水推板5与外止水扎兰4进行连接。
本发明应用实施实例
工程位于北部湾近海海域,工程实体为1条外径2000mm、壁厚22mm的污水钢管,污水管道长度3600m,共分为二段(2180m顶管段1+1420m顶管段2)顶进施工。设置2座沉井作为顶管始发井,近海岸侧设置1#沉井作为顶管段1的始发井,而2#沉井既是顶管段1的接收井又是顶管段2的始发井。
本工程2座沉井均位于海域内的2座人工岛上,管道外界水压力达到了2.5kg/cm2,且穿墙洞外侧土层为中粗砂层。在管道推进过程中,穿墙洞外中粗砂会沿管道外壁进入穿墙管内盘根中,逐步磨损盘根;同时,由于施工时穿墙管止水装置安装的精度问题,会导致盘根磨损加剧。为了使超长距离顶管顺利进行,控制穿墙管渗漏水的情况,减小对穿墙洞正上方土体“带土”效应,防止出现地面沉降、塌方等情况,研发了“可调节式”穿墙洞止水装置,可有效地解决在高水头、复杂地层条件下顶管穿墙洞止水装置漏水问题,为工程带来了良好的效益。

Claims (3)

1.一种可调节式穿墙洞止水装置,包括外止水扎兰(4)、外止水推板(5)、密封圈(6)、盘根(7),所述外止水扎兰(4)、外止水推板(5)设置在钢管与井壁之间,外止水扎兰(4)与钢管之间设有盘根(7),其特征在于:所述盘根(7)前面设有两道密封装置,每道密封装置由密封圈(6)、调节螺栓(2)、油脂孔(1)、密封座(8)组成,密封座(8)上旋有调节螺栓(2),调节螺栓(2)下面连接密封圈(6),通过调节螺栓(2),使密封圈(6)作用于钢管外壁帮助止水,密封座(8)上还设有油脂孔(1),通过油脂孔(1)压入油脂加强止水效果。
2.根据权利要求1所述的可调节式穿墙洞止水装置,其特征在于:所述盘根(7)旁设有盾尾油脂孔(3),当更换盘根(7)时,通过盾尾油脂孔(3)压入盾尾油脂。
3.根据权利要求1所述的可调节式穿墙洞止水装置,其特征在于:所述外止水推板(5)与外止水扎兰(4)之间通过螺栓连接。
CN201610892385.6A 2016-10-13 2016-10-13 可调节式穿墙洞止水装置 Active CN106402505B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610892385.6A CN106402505B (zh) 2016-10-13 2016-10-13 可调节式穿墙洞止水装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610892385.6A CN106402505B (zh) 2016-10-13 2016-10-13 可调节式穿墙洞止水装置

Publications (2)

Publication Number Publication Date
CN106402505A true CN106402505A (zh) 2017-02-15
CN106402505B CN106402505B (zh) 2019-11-12

Family

ID=59229583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610892385.6A Active CN106402505B (zh) 2016-10-13 2016-10-13 可调节式穿墙洞止水装置

Country Status (1)

Country Link
CN (1) CN106402505B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975127A (zh) * 2017-11-30 2018-05-01 上海市基础工程集团有限公司 垂直顶升用外止水装置
CN111878126A (zh) * 2020-08-06 2020-11-03 上海市基础工程集团有限公司 顶管井出洞组合式止水系统

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4441767A1 (de) * 1993-11-26 1995-06-08 Doyma Durchfuehrungstechnik Ha Dichtungseinsatz für Rohrleitungen
CN102748537A (zh) * 2011-04-19 2012-10-24 上海电缆研究所 用于从密闭容器中引出电缆的密封贯穿结构
CN103161956A (zh) * 2011-12-13 2013-06-19 上海市基础工程有限公司 中继间防泥砂装置
CN104265332A (zh) * 2014-08-06 2015-01-07 上海隧道工程有限公司 适应大断面矩形顶管始发的止水装置及止水施工方法
CN104633289A (zh) * 2013-11-06 2015-05-20 何建民 注油式穿墙止水热力管道
CN204879079U (zh) * 2015-07-21 2015-12-16 上海市政工程设计研究总院(集团)有限公司 一种顶管穿墙管止水结构
CN204984425U (zh) * 2015-09-29 2016-01-20 北京市市政四建设工程有限责任公司 一种盾尾密封组件及盾构机
CN205315003U (zh) * 2015-12-31 2016-06-15 中铁十八局集团第三工程有限公司 盾构机铰接密封的保护装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4441767A1 (de) * 1993-11-26 1995-06-08 Doyma Durchfuehrungstechnik Ha Dichtungseinsatz für Rohrleitungen
CN102748537A (zh) * 2011-04-19 2012-10-24 上海电缆研究所 用于从密闭容器中引出电缆的密封贯穿结构
CN103161956A (zh) * 2011-12-13 2013-06-19 上海市基础工程有限公司 中继间防泥砂装置
CN104633289A (zh) * 2013-11-06 2015-05-20 何建民 注油式穿墙止水热力管道
CN104265332A (zh) * 2014-08-06 2015-01-07 上海隧道工程有限公司 适应大断面矩形顶管始发的止水装置及止水施工方法
CN204879079U (zh) * 2015-07-21 2015-12-16 上海市政工程设计研究总院(集团)有限公司 一种顶管穿墙管止水结构
CN204984425U (zh) * 2015-09-29 2016-01-20 北京市市政四建设工程有限责任公司 一种盾尾密封组件及盾构机
CN205315003U (zh) * 2015-12-31 2016-06-15 中铁十八局集团第三工程有限公司 盾构机铰接密封的保护装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975127A (zh) * 2017-11-30 2018-05-01 上海市基础工程集团有限公司 垂直顶升用外止水装置
WO2019105110A1 (zh) * 2017-11-30 2019-06-06 上海市基础工程集团有限公司 垂直顶升用外止水装置
CN111878126A (zh) * 2020-08-06 2020-11-03 上海市基础工程集团有限公司 顶管井出洞组合式止水系统

Also Published As

Publication number Publication date
CN106402505B (zh) 2019-11-12

Similar Documents

Publication Publication Date Title
CN100480475C (zh) 可控式一井分层降水施工方法
CN206128099U (zh) 一种新型降水井封井装置
CN103225306B (zh) 一种邻近水源基坑开挖过程中防止基坑渗漏的方法
JP2008038543A (ja) 地下水排除工法及びその装置
CN203924137U (zh) 一种地下连续墙严重渗漏封堵结构
CN202380471U (zh) 一种基坑的复合止水帷幕结构
CN106402505A (zh) 可调节式穿墙洞止水装置
CN105780792B (zh) 一种基坑高水头减压降水井封井方法及封井结构
CN106088092A (zh) 管桩打桩过程出现拒锤状况的解决方法
CN107975127A (zh) 垂直顶升用外止水装置
CN100554597C (zh) 一种钻孔护壁封底和制做大直径空心砼桩的方法
CN107975376B (zh) 隧道盾构顶管与竖向管道连接结构及施工方法
CN112982364B (zh) 一种基础地质勘察孔涌水封堵装置及方法
CN211143179U (zh) 一种分次压入式回灌井结构
CN210087318U (zh) 一种水下竖井衬砌装置
CN106638644A (zh) 一种深厚砂砾石层灌浆装置以及利用该装置进行综合灌浆的方法
CN108824465B (zh) 基坑工程降水施工结构以及施工方法
CN102498771A (zh) 具有止回功能的排盐井及其施工方法
CN208346871U (zh) 阻塞式抬动变形观测装置
CN105350553A (zh) 用于盖挖法基坑施工的降水管井及基坑施工方法
CN111894001A (zh) 一种土坝注浆防渗与加固方法
CN206319330U (zh) 一种深厚砂砾石层灌浆装置
CN215801735U (zh) 一种用于深基坑裂隙带压涌水的止水系统
CN211498899U (zh) 一种基坑降水布置结构
CN217872811U (zh) 一种淤泥质岩层的大口径顶管末端洞口止水装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant