CN103225306B - 一种邻近水源基坑开挖过程中防止基坑渗漏的方法 - Google Patents

一种邻近水源基坑开挖过程中防止基坑渗漏的方法 Download PDF

Info

Publication number
CN103225306B
CN103225306B CN201310098929.8A CN201310098929A CN103225306B CN 103225306 B CN103225306 B CN 103225306B CN 201310098929 A CN201310098929 A CN 201310098929A CN 103225306 B CN103225306 B CN 103225306B
Authority
CN
China
Prior art keywords
foundation ditch
foundation pit
excavation
water source
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310098929.8A
Other languages
English (en)
Other versions
CN103225306A (zh
Inventor
胡长明
李家涛
梅源
赵楠
张文萃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201310098929.8A priority Critical patent/CN103225306B/zh
Publication of CN103225306A publication Critical patent/CN103225306A/zh
Application granted granted Critical
Publication of CN103225306B publication Critical patent/CN103225306B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种邻近水源基坑开挖过程中防止基坑渗漏的方法,首先沿邻近基坑的水源边设置隔水帷幕,该隔水帷幕的设计深度与基底开挖面平齐,然后进行基坑周围的地下连续墙施工;在基坑内、外分别设置降压井,降压井的深度穿透承压水层上覆土层,位于承压水层;在基坑内还设有疏干井,该疏干井的深度大于基底开挖面的深度。在深基坑开挖过程中,先利用基坑内的疏干井降低基坑内地下水位,再进行基坑内土体开挖,当基坑开挖到一定深度,再利用基坑外降压井和基坑内降压井对基坑进行降压处理。能提高邻近水源地下连续墙施工质量,增强隔水帷幕与地下连续墙之间土体承载能力,满足邻近水源深基坑降、止水要求,提高施工效率和降低工程成本。

Description

一种邻近水源基坑开挖过程中防止基坑渗漏的方法
技术领域
本发明涉及岩土工程邻近水源深基坑开挖施工技术领域,具体为一种邻近水源基坑开挖过程中防止基坑渗漏的方法。
背景技术
目前,邻近水源深基坑开挖采用的基坑降、止水施工方式主要包括:
1、将高压旋喷桩设置在基坑周围围护结构(支护桩)之间,高压旋喷桩与支护桩共同形成隔水帷幕,然后进行基坑内降水、基坑开挖、基坑内降压。采用这种方法的前提是支护桩作为基坑的围护结构,施工质量要求较高,施工工序较多,成本也相应增加,一旦出现透水现象,便很难封堵,当基坑周边有车载时还要在水源边设置堤坝提高地基承载力。
2、在地下连续墙与水源之间设置两级降水井,先采用基坑外两级降水井降低基坑周围地下水位,然后再进行地下连续墙施工,最后进行基坑内降水、基坑开挖、基坑内降压。采用这种方式的前提是水源与基坑有一定的距离要求(不适用于水源和基坑距离较小的深基坑工程),施工工序较多,井点管布置较多,成本费用较大。
上述两种方法虽然能满足深基坑施工的降、止水要求,但是,其对施工要求较高,工程成本过大,且止水能力较弱。
发明内容
针对现有技术存在的缺陷或不足,本发明的目的在于,提供一种邻近水源基坑开挖过程中防止基坑渗漏的方法。
为了实现上述技术任务,本发明采用如下技术解决方案:
一种邻近水源基坑开挖过程中防止基坑渗漏的方法,其特征在于,按以下步骤实施:
1)首先沿邻近基坑的水源边设置一道隔水帷幕,该隔水帷幕的深度与基坑底部开挖面平齐,然后进行基坑周围的地下连续墙施工;
2)在基坑内、外分别设置降压井,降压井的深度穿透含承压水层上覆土层位于承压水层;在基坑内还有疏干井,该疏干井的深度大于基底开挖面的深度;
3)在基坑开挖过程中,先利用基坑内的疏干井降低基坑内地下水位,再进行基坑内土体开挖,当基坑开挖到一定深度,即承压水层的承压水顶托力即将等于基坑内的承压水层上覆土压力后,再利用基坑外降压井和基坑内降压井对基坑进行降压处理。
该方法能提高邻近水源地下连续墙施工质量,增强隔水帷幕与地下连续墙之间土体承载能力,满足邻近水源深基坑降、止水要求,为后期基坑开挖提供安全、稳定、干燥的施工环境,最大限度的提高施工效率和降低工程成本。
附图说明
图1是本发明的施工示意图;图中的标记分别表示:1、承压水层上覆土层,2、承压水层,3、隔水帷幕,4、水源,5、地下连续墙,6、基坑外降压井,7、基坑底部开挖面,8、基坑内降压井,9、疏干井。
以下结合附图和实施例对本发明作进一步的详细说明。
具体实施方式
如图1所示,本实施例给出一种邻近水源基坑开挖过程中防止基坑渗漏的具体施工方法,按以下步骤实施:
1)首先在沿邻近基坑的水源边设置一道隔水帷幕3(施工参数根据具体土质和设计要求确定),该隔水帷幕3的深度与基坑底部开挖面7平齐,然后进行基坑周围的地下连续墙5施工(具体设置深度必须根据现场实际条件及设计要求来确定,注意地下连续墙接头质量控制)。
2)在基坑内、外分别设置深度相等的基坑外降压井6和基坑内降压井8,基坑外降压井6和基坑内降压井8穿透承压水层上覆土层1位于承压水层2;在基坑内还有疏干井9,疏干井9的深度大于基底开挖面7的深度;
3)基坑开挖过程中,先利用基坑内的疏干井9降低基坑内地下水位,再进行基坑内土体开挖;当基坑开挖到一定深度,即承压水层2的承压水顶托力即将等于基坑内的承压水层上覆土压力后,再利用基坑外降压井6和基坑内降压井8对基坑进行降压处理。
下面是对本发明的原理进行说明:
(1)沿邻近基坑的水源4边设置一道隔水帷幕3,可以减小水源4对基坑周边地下水渗透压力的影响,提高地下连续墙5的质量,同时可作为河堤提高基坑边土体的稳定性;隔水帷幕3的设置深度与基底开挖面7平齐,主要考虑经济和适用两方面因素,即若隔水帷幕3设置太深则不经济,而隔水帷幕3设置太浅则达不到效果;
(2)基坑周围的地下连续墙5可在各种地质条件下成型,并且施工深度大,具有挡土、防水抗渗和承重等多种功能,可以减少工程施工时对环境的影响,施工振动小,噪音低,对周围相邻的工程结构和地下管线的影响较小,且沉降及变位较易控制,地下连续墙5刚度大、整体性好,因而结构和地基变形都较小,既可以用于围护结构,也可用于主体结构;
(3)隔水帷幕3与地下连续墙5之间土体受到两个方向的约束,提高了土体承载能力。
(4)当基坑开挖到一定深度,即承压水层2的承压水顶托力即将等于基坑内的承压水上覆土压力后,再利用基坑外降压井6和基坑内降压井8对基坑进行降压处理,在满足基坑施工降水要求的同时,降低了工程成本。

Claims (1)

1.一种邻近水源基坑开挖过程中防止基坑渗漏的方法,其特征在于,按以下步骤实施:
1)首先沿邻近基坑的水源(4)边设置一道隔水帷幕(3),该隔水帷幕(3)的深度与基坑底部开挖面(7)平齐,然后进行基坑周围的地下连续墙(5)施工;
2)在基坑内、外分别设置深度相等的基坑内降压井(8)和基坑外降压井(6),所述的基坑内降压井(8)和基坑外降压井(6)穿透承压水层上覆土层(1)位于承压水层(2);在基坑内还有疏干井(9),该疏干井(9)的深度大于基坑底部开挖面(7)的深度;
3)在基坑开挖过程中,先利用基坑内的疏干井(9)降低基坑内地下水位,再进行基坑内土体开挖;当基坑开挖到一定深度,即承压水层(2)的承压水顶托力即将等于基坑内的承压水层上覆土压力后,再利用基坑外降压井(6)和基坑内降压井(8)对基坑进行降压处理。
CN201310098929.8A 2013-03-26 2013-03-26 一种邻近水源基坑开挖过程中防止基坑渗漏的方法 Expired - Fee Related CN103225306B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310098929.8A CN103225306B (zh) 2013-03-26 2013-03-26 一种邻近水源基坑开挖过程中防止基坑渗漏的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310098929.8A CN103225306B (zh) 2013-03-26 2013-03-26 一种邻近水源基坑开挖过程中防止基坑渗漏的方法

Publications (2)

Publication Number Publication Date
CN103225306A CN103225306A (zh) 2013-07-31
CN103225306B true CN103225306B (zh) 2015-02-25

Family

ID=48835931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310098929.8A Expired - Fee Related CN103225306B (zh) 2013-03-26 2013-03-26 一种邻近水源基坑开挖过程中防止基坑渗漏的方法

Country Status (1)

Country Link
CN (1) CN103225306B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106609508A (zh) * 2015-10-22 2017-05-03 中铁十四局集团有限公司 一种黄河漫滩强透水环境下大粒径卵石层超深基坑施工技术及施工方法
CN106436717A (zh) * 2016-07-22 2017-02-22 江苏科兴项目管理有限公司 一种采用降水井的防渗帷幕临河基坑及设计方法
CN107938678A (zh) * 2017-10-09 2018-04-20 北京市轨道交通建设管理有限公司 一种地铁基坑水下开挖方法
CN108661064A (zh) * 2018-05-28 2018-10-16 郑林 一种基坑内局部帷幕止水方法
EP3708715B1 (de) * 2019-03-15 2022-01-19 BAUER Spezialtiefbau GmbH Verfahren zur herstellung einer baugrubenumschliessung im boden
CN109811778A (zh) * 2019-03-27 2019-05-28 中建四局第一建筑工程有限公司 一种超深基坑围护止水结构及方法
CN111910665B (zh) * 2020-08-10 2021-11-02 徐州市城市轨道交通有限责任公司 一种急倾斜条带状互层复合地层基坑的降水处理方法
CN113089702A (zh) * 2021-04-15 2021-07-09 安徽水安建设集团股份有限公司 泵站基坑一体化排水体系及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002659A (ja) * 2003-06-11 2005-01-06 East Japan Railway Co 地盤掘削時の地下水循環システム、及び地盤掘削時の地下水対策工法
CN101775810A (zh) * 2010-02-04 2010-07-14 天津大学 一种基坑降水工程中的地下水控制施工方法
CN102787606A (zh) * 2012-08-10 2012-11-21 中国二冶集团有限公司 一种基坑开挖降水过程中对周围环境的保护方法
CN202730778U (zh) * 2012-07-02 2013-02-13 上海长凯岩土工程有限公司 一种基坑内降压井封井结构
CN102926392A (zh) * 2012-10-15 2013-02-13 中国建筑第六工程局有限公司 一种基坑降水系统及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002659A (ja) * 2003-06-11 2005-01-06 East Japan Railway Co 地盤掘削時の地下水循環システム、及び地盤掘削時の地下水対策工法
CN101775810A (zh) * 2010-02-04 2010-07-14 天津大学 一种基坑降水工程中的地下水控制施工方法
CN202730778U (zh) * 2012-07-02 2013-02-13 上海长凯岩土工程有限公司 一种基坑内降压井封井结构
CN102787606A (zh) * 2012-08-10 2012-11-21 中国二冶集团有限公司 一种基坑开挖降水过程中对周围环境的保护方法
CN102926392A (zh) * 2012-10-15 2013-02-13 中国建筑第六工程局有限公司 一种基坑降水系统及其施工方法

Also Published As

Publication number Publication date
CN103225306A (zh) 2013-07-31

Similar Documents

Publication Publication Date Title
CN103225306B (zh) 一种邻近水源基坑开挖过程中防止基坑渗漏的方法
CN103882881B (zh) 水下深入岩承台施工方法
CN104120710B (zh) 一种真空预压联合吹填泥浆的软基加固处理方法
CN104404974B (zh) 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺
CN203174616U (zh) 一种粘土地基降水节水系统
CN107023026A (zh) 一种封底式沉井井壁及施工方法
CN102051885A (zh) 一种深基础砼下吸排水技术
CN110984200B (zh) 二元地质结构层的基坑降排水的方法
CN207143981U (zh) 第三系富水半成岩砂岩段地铁车站基坑排水结构
CN102787606B (zh) 一种基坑开挖降水过程中对周围环境的保护方法
CN203939036U (zh) 一种适用于河道的钢板桩围堰结构
CN107190709B (zh) 新近疏浚土吹填成陆围区内建设河道的方法
CN206800431U (zh) 一种封底式沉井井壁
CN105220701A (zh) 垂直插膜防渗方法
CN102787608B (zh) 真空作用重力式基坑支护体系及施工方法
CN204252148U (zh) 高承压水厚砂卵石地层深基坑注浆封底结构
CN211312564U (zh) 基于降压减渗的强透水地层深基坑地下水控制结构
CN102787611A (zh) 湿陷性黄土地区基坑开挖的降水方法
CN110144871A (zh) 一种暗浜处理施工方法
CN204435321U (zh) 一种火力发电厂取水明渠
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺
CN105586978A (zh) 基于砾石的换土搅拌止水帷幕施工方法
CN104727325A (zh) 一种海涂围垦用海堤的建造方法
CN103866779A (zh) 一种软土地基建筑基坑的止水围护结构的施工方法
CN113047236A (zh) 土石坝基础深厚软土处理方法及土石坝

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225