CN102787611A - 湿陷性黄土地区基坑开挖的降水方法 - Google Patents

湿陷性黄土地区基坑开挖的降水方法 Download PDF

Info

Publication number
CN102787611A
CN102787611A CN2012102828648A CN201210282864A CN102787611A CN 102787611 A CN102787611 A CN 102787611A CN 2012102828648 A CN2012102828648 A CN 2012102828648A CN 201210282864 A CN201210282864 A CN 201210282864A CN 102787611 A CN102787611 A CN 102787611A
Authority
CN
China
Prior art keywords
foundation pit
precipitation
excavation
collapsible loess
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102828648A
Other languages
English (en)
Inventor
任文军
胡长明
史爱军
梅源
才素平
刘伟利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN2012102828648A priority Critical patent/CN102787611A/zh
Publication of CN102787611A publication Critical patent/CN102787611A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种湿陷性黄土地区基坑开挖的降水方法,具体包括:在拟开挖场区基坑(8)围护结构(7)施工完毕后,在场区含水土层(2)施工悬挂式止水帷幕(6),后在基坑(8)中设置降水井(9),同时,在基坑(8)及周边建筑物(4)之间设置回灌井(5)。基坑开挖过程中,使用降水井(9)将水位降至设计标高,同时利用回灌井(5)进行回灌。本发明提供的技术方案既能满足湿陷性黄土地区基坑开挖的降水需要,又能防止降水导致的基坑周围土体沉降过大,较好的保护基坑周边建筑物的安全,最大限度的节约水资源和降低工程成本。

Description

湿陷性黄土地区基坑开挖的降水方法
技术领域
本发明涉及岩土工程基坑开挖降水技术领域,涉及一种适用于湿陷性黄土地区未穿越含水层的基坑降水方法,具体为一种湿陷性黄土地区基坑开挖的降水方法,该方法提供的技术方案既能满足湿陷性黄土地区基坑开挖的降水需要,又能防止降水导致的基坑周围土体沉降过大,较好的保护基坑周边建筑物的安全,最大限度的节约水资源和降低工程成本。 
背景技术
湿陷性黄土地区基坑开挖降水技术采用的基坑降水方式主要包括:1.基坑深度范围内设置止水帷幕,在坑外进行抽水,采用这种方式降水,止水帷幕的设置范围加大,施工质量要求较高,工程成本也相应增加,水资源浪费严重,同时,由于抽水导致的地面沉降一般较大,给周边建筑物的安全带来严重威胁;2.将止水帷幕从地面开始至不透水土层,在坑内进行降水,采用这种方式降水,止水帷幕施工质量要求高,不能出现孔洞,施工过程中很难控制,一旦出现透水现象,便很难堵住,所抽出的水全部排走,造成水资源严重浪费,工程造价较高。上述两种方法虽然能满足基坑施工的降水要求,但是,对施工要求较高,工程成本过大,水资源浪费严重,不能对周边建筑物的安全提供保障,极易发生工程事故。 
发明内容
针对现有技术存在的缺陷或不足,本发明的目的在于,提供一种湿陷性黄土地区基坑开挖的降水方法,该方法提供的技术方案既能满足湿陷性黄土地区基坑开挖的降水需要,又能防止降水导致的基坑周围土体沉降过大,较好的保护基坑周边建筑物的安全,最大限度的节约水资源和降低工程成本。 
为了实现上述技术任务,本发明采用如下技术解决方案: 
在基坑开挖过程中,采用降水井在基坑内部降水的同时,使用回灌井在建筑物与基坑之间进行回灌。基坑采用悬挂式止水帷幕,悬挂式止水帷幕设置于场区含水土层区间,其上部伸入湿陷性黄土土层,下部伸入基坑开挖深度以下,且不伸入不透水土层。回灌井穿透湿陷性黄土土层,其底部标高不低于悬挂式止水帷幕的底部标高。 
附图说明
图1是本发明的示意图; 
以下结合附图对本发明作进一步的详细说明。 
具体实施方式
下面参照说明书附图和实施例对本发明进行详细说明。 
如图1所示,基坑开挖前,先施工基坑围护结构,而后在场区含水土层区间施工悬挂式止水帷幕,其上部伸入湿陷性黄土土层,下部伸入基坑开挖深度以下,且不伸入不透水土层。最后施工降水井与回灌井,降水井深入基坑底部设计标高,但不穿透含水层,回灌井穿透湿陷性黄土土层,其底部标高不低于悬挂式止水帷幕的底部标高。在基坑开挖过程中,采用降水井在基坑内部降水的同时,使用回灌井在建筑物与基坑之间进行回灌。 
下面是对本发明的原理进行说明: 
在场区含水土层区间施工悬挂式止水帷幕,上部伸入湿陷性黄土土层,下部伸入基坑开挖深度以下,满足了基坑降水的止水要求,下部不伸入不透水土层,最大限度降低了工程量,节约成本;降水井深入基坑底部设计标高,且不穿透含水层,在满足基坑施工的降水要求的同时,降低了工程成本;回灌井穿透湿陷性黄土土层,避免了因地下水回灌造成的湿陷性黄土导致的地面沉降过大,保证了施工过程中基坑周边建筑物的安全;回灌井底部标高不低于悬挂式止水帷幕的底部标高,避免降水井与回灌井在同一标高连通,保证了基坑的降水效果;降水过程中,采用降水井降水的同时,在基坑周边建筑物与基坑之间 采用回灌井进行地下水回灌,避免了因地下水过度抽取导致的地面沉降过大,保证了建筑的安全,同时节约了水资源。 

Claims (3)

1.一种湿陷性黄土地区基坑开挖的降水方法,其特征在于:在基坑(8)开挖过程中,采用降水井(9)在基坑内部降水的同时,使用回灌井(5)在建筑物(4)与基坑(8)之间进行回灌。
2.如权利要求1所述的方法,其特征在于:基坑(8)采用悬挂式止水帷幕(6),悬挂式止水帷幕(6)设置于场区含水土层(2)区间,其上部伸入湿陷性黄土土层(1),下部伸入基坑(8)开挖深度以下,且不伸入不透水土层(3)。
3.如权利要求1所述的方法,其特征在于:回灌井(5)穿透湿陷性黄土土层(1),其底部标高不低于悬挂式止水帷幕(6)的底部标高。
CN2012102828648A 2012-08-10 2012-08-10 湿陷性黄土地区基坑开挖的降水方法 Pending CN102787611A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102828648A CN102787611A (zh) 2012-08-10 2012-08-10 湿陷性黄土地区基坑开挖的降水方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102828648A CN102787611A (zh) 2012-08-10 2012-08-10 湿陷性黄土地区基坑开挖的降水方法

Publications (1)

Publication Number Publication Date
CN102787611A true CN102787611A (zh) 2012-11-21

Family

ID=47153185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102828648A Pending CN102787611A (zh) 2012-08-10 2012-08-10 湿陷性黄土地区基坑开挖的降水方法

Country Status (1)

Country Link
CN (1) CN102787611A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979105A (zh) * 2012-12-15 2013-03-20 天津大学 一种井孔注浆隔渗的地下水控制方法
CN103866779A (zh) * 2014-02-26 2014-06-18 镇海建设集团有限公司 一种软土地基建筑基坑的止水围护结构的施工方法
CN106324226A (zh) * 2016-11-03 2017-01-11 山东大学 监测地下水渗流、沉降的灌注一体室内试验装置与方法
CN113373950A (zh) * 2021-05-20 2021-09-10 杭州交投建设工程有限公司 一种化学改良帷幕和井点降水的基坑止水结构及施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158938A (zh) * 1996-08-02 1997-09-10 北京市地下铁道建设公司 一种地下铁道排水施工方法
JP3445786B2 (ja) * 2001-02-28 2003-09-08 成幸工業株式会社 地下水を揚水して再び地下に返送する方法及び装置
JP3706368B2 (ja) * 2003-01-14 2005-10-12 有限会社アサヒテクノ 地下水を揚水して再び地下に返送する方法及び装置
DE102004017709A1 (de) * 2004-04-07 2005-10-27 Wils, Andrea Verfahren und Anlage zur lokalen und temporären Grundwasserabsenkung mittels neuartiger Filterlanzen
CN102108707A (zh) * 2011-03-15 2011-06-29 上海交通大学 超大超深基坑精确沉降及环保施工方法
CN102383412A (zh) * 2010-08-27 2012-03-21 中铁二十二局集团第三工程有限公司 采用降水回灌控制深基坑周边沉降的施工方法
CN102505677A (zh) * 2011-09-29 2012-06-20 上海隧道工程股份有限公司 工程地下水回灌控制沉降的方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158938A (zh) * 1996-08-02 1997-09-10 北京市地下铁道建设公司 一种地下铁道排水施工方法
JP3445786B2 (ja) * 2001-02-28 2003-09-08 成幸工業株式会社 地下水を揚水して再び地下に返送する方法及び装置
JP3706368B2 (ja) * 2003-01-14 2005-10-12 有限会社アサヒテクノ 地下水を揚水して再び地下に返送する方法及び装置
DE102004017709A1 (de) * 2004-04-07 2005-10-27 Wils, Andrea Verfahren und Anlage zur lokalen und temporären Grundwasserabsenkung mittels neuartiger Filterlanzen
CN102383412A (zh) * 2010-08-27 2012-03-21 中铁二十二局集团第三工程有限公司 采用降水回灌控制深基坑周边沉降的施工方法
CN102108707A (zh) * 2011-03-15 2011-06-29 上海交通大学 超大超深基坑精确沉降及环保施工方法
CN102505677A (zh) * 2011-09-29 2012-06-20 上海隧道工程股份有限公司 工程地下水回灌控制沉降的方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979105A (zh) * 2012-12-15 2013-03-20 天津大学 一种井孔注浆隔渗的地下水控制方法
CN103866779A (zh) * 2014-02-26 2014-06-18 镇海建设集团有限公司 一种软土地基建筑基坑的止水围护结构的施工方法
CN103866779B (zh) * 2014-02-26 2016-01-13 黄吉永 一种软土地基建筑基坑的止水围护结构的施工方法
CN106324226A (zh) * 2016-11-03 2017-01-11 山东大学 监测地下水渗流、沉降的灌注一体室内试验装置与方法
CN113373950A (zh) * 2021-05-20 2021-09-10 杭州交投建设工程有限公司 一种化学改良帷幕和井点降水的基坑止水结构及施工方法

Similar Documents

Publication Publication Date Title
CN103225306B (zh) 一种邻近水源基坑开挖过程中防止基坑渗漏的方法
CN202936799U (zh) 基于环控目标的基坑降水围护结构
CN103883796B (zh) 泥砂淤泥区手掘式顶管施工装置及方法
CN203569578U (zh) 一种能够防止井管堵塞涌水的回灌井
CN103967028A (zh) 一种沉管降水结构及其采用此结构处理突发性基坑水涌、喷泉的方法
CN103510528A (zh) 用于地下结构抗浮的盲沟排水结构
CN102787606B (zh) 一种基坑开挖降水过程中对周围环境的保护方法
CN104179201A (zh) 排水泄压抗浮系统
CN102787611A (zh) 湿陷性黄土地区基坑开挖的降水方法
CN213867881U (zh) 地墙渗漏抢险系统
CN105155564A (zh) 深基坑薄弱隔水层防突涌的施工方法
CN202202335U (zh) 深基坑内引流排水结构
JP4114944B2 (ja) 地盤の改良工法
CN205501983U (zh) 减压排水管桩
CN102425156A (zh) 变截面地下连续墙及其施工方法
JP5252225B2 (ja) 岩盤地下水取水施設およびその施工方法
CN105569062A (zh) 渗透弱化减排降水法
CN216615927U (zh) 一种应用于基坑单排围护的应急结构系统
CN211312564U (zh) 基于降压减渗的强透水地层深基坑地下水控制结构
CN203320576U (zh) 超限高层建筑地下室外墙防排水系统
CN205954646U (zh) 一种深基坑开挖降水装置
CN204676518U (zh) 基坑降水保护系统
CN105421498A (zh) 一种基于立体帷幕-井群体系的基坑防渗水及沉降控制方法
CN105625448A (zh) 一种地下建筑物地下水的排水方法和装置
CN106988330A (zh) 软土地基分层降水施工结构以及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121121