CN105155564A - 深基坑薄弱隔水层防突涌的施工方法 - Google Patents
深基坑薄弱隔水层防突涌的施工方法 Download PDFInfo
- Publication number
- CN105155564A CN105155564A CN201510480085.2A CN201510480085A CN105155564A CN 105155564 A CN105155564 A CN 105155564A CN 201510480085 A CN201510480085 A CN 201510480085A CN 105155564 A CN105155564 A CN 105155564A
- Authority
- CN
- China
- Prior art keywords
- water
- construction
- deep foundation
- weak
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及深基坑薄弱隔水层防突涌的施工方法,承压水水压很大,地下连墙未完全隔断承压水,基坑底部隔水层很薄,无法满足承压水抗突涌要求;本施工方法按照以下步骤进行:首先进行地下连续墙施工,地下连续墙施工至含承压水圆砾层;其次在地下连续墙施工完成后再进行承压水降水管井减压施工,承压水降水管井伸入至承压水圆砾层,通过抽取承压水对承压水进行减压;最后在电梯井位置下方进行土体高压旋喷桩加固施工,对薄弱隔水层部位进行土体加固处理。本发明可以有效防止薄弱隔水层特性深基坑工程承压水水压过大产生深基坑突涌问题,施工周期短、成本低、安全性好,能最大限度的减少对地下水的抽取和污染,保证深基坑施工安全。
Description
技术领域
本发明属于建筑施工技术领域,尤其涉及深基坑薄弱隔水层防突涌的施工方法。
背景技术
随着城市地下空间的快速发展,深基坑工程越来越多,深基坑工程越来越深,很多深基坑工程施工中不可避免的要遇到承压水隔水层薄弱的问题,处理不慎会发生承压水突涌。解决承压水突涌问题需要的投入大、工期长、处理不当会造成数以亿计的损失。
薄弱隔水层深基坑工程隔水设计及施工方法是一种地下连续墙未完全隔断圆砾层承压水、承压水降水管井减压、电梯井位置土体高压旋喷桩加固的组合方式,解决深基坑工程地层条件不能满足承压水抗渗流稳定要求的问题。与深基坑工程目前普遍采用的地下连续墙完全隔断圆砾层承压水、辅助承压水降水管井降水减压的方法相比,在工期、质量、造价、环保等方面具有明显的先进性和新颖性。
发明内容
为解决上述技术问题,本发明目的是提供一种深基坑薄弱隔水层防突涌的施工方法,该方法可以有效解决薄弱隔水层深基坑工程地层条件不能满足承压水抗渗流稳定要求的问题,从而防止承压水突涌,该方法较目前普遍采用的地下连续墙完全隔断圆砾层承压水、承压水降水管井降水减压的方法施工的施工周期短、施工成本低、环保性好。
本发明的方案如下:
深基坑薄弱隔水层防突涌的施工方法,按照以下步骤施工:
(1)首先进行深基坑周边施工封闭的地下连续墙,用来阻隔部分承压水;
(2)在地下连续墙施工完成后再进行承压水降水管井减压施工,承压水降水管井伸入至含承压水圆砾层,通过抽取承压水对含承压水圆砾层进行减压;
(3)最后在电梯井位置下方进行土体高压旋喷桩加固施工,对薄弱隔水层部位进行土体加固处理。
深基坑薄弱隔水层防突涌的施工方法的进一步方案,步骤(1)中地下连续墙施工至含承压水圆砾层。
深基坑薄弱隔水层防突涌的施工方法的进一步方案,步骤(2)中开挖部分深基坑内土方后,在承压水静止水头以上不少于0.5m标高处施工承压水降水管井。
深基坑薄弱隔水层防突涌的施工方法的进一步方案,所述电梯井位置下方的土体进行高压旋喷桩加固处理时,待土方开挖至一定深度后,施工高压旋喷桩对薄弱隔水层部位进行下部土体加固,后续根据深基坑内承压水水位高度,适时启动降水管井内水泵进行持续降水,待已施工的高压旋喷桩桩芯检测达到设计强度后才可进行下道土方开挖。
深基坑薄弱隔水层防突涌的施工方法的进一步方案,具体包括以下步骤:
(1)先在深基坑四周施工封闭的地下连续墙,采用成槽机施工地下连续墙,阻隔部分承压水;
(2)地下连续墙施工完成后,对工程桩施工完成区域进行承压水降水管井施工,先采用工程钻机钻进清孔,再下井管伸入承压水圆砾层,井管采用圆孔滤水管;待土方开挖至一定深度后进行降水减压;
(3)土方开挖至一定深度后,采用高压旋喷机施工高压旋喷桩,对薄弱隔水层部位进行土体加固处理;高压旋喷桩施工必须保证水灰比、水泥浆液流和高压水射流的压力,同时保证成桩半径,待高压旋喷桩达到一定强度后进行薄弱隔水层位置土方开挖。
本施工方法具有如下优点与有益效果:该方法为在地下连续墙未完全隔断圆砾层承压水的情况下,采用承压水降水管井减压和对电梯井位置土体进行高压旋喷桩加固的组合方式来防止深基坑工程承压水突涌,施工后效果好,能满足承压水抗渗流稳定要求的问题,而且施工周期短、施工成本低、环保性好。
附图说明
图1为本发明原状土层;
图2为本发明连续墙阻隔部分承压水;
图3为本发明承压水降水管井施工;
图4为本发明高压旋喷桩土体加固施工图;
图5为本发明施工完成后的剖面图。
其中:1、地下连续墙;2、承压水降水管井;3、高压旋喷桩加固;4、含承压水圆砾层;5、圆砾层上方土体。
具体实施方式
下面结合附图对本发明做进一步说明;
如图1至图5所示,深基坑薄弱隔水层防突涌的施工方法,按照以下步骤施工:
(1)首先进行深基坑周边施工封闭的地下连续墙1,用来阻隔部分承压水;
(2)在地下连续墙1施工完成后再进行承压水降水管井2减压施工,承压水降水管井2伸入至含承压水圆砾层4,通过抽取承压水对含承压水圆砾层4进行减压;
(3)最后在电梯井位置下方进行土体高压旋喷桩加固3施工,对薄弱隔水层部位进行土体加固处理。
深基坑薄弱隔水层防突涌的施工方法的进一步方案,步骤(1)中地下连续墙1施工至含承压水圆砾层4。
深基坑薄弱隔水层防突涌的施工方法的进一步方案,步骤(2)中开挖部分深基坑内土方后,在承压水静止水头以上不少于0.5m标高处施工承压水降水管井2。
深基坑薄弱隔水层防突涌的施工方法的进一步方案,所述电梯井位置下方的土体进行高压旋喷桩加固3处理时,待土方开挖至一定深度后,施工高压旋喷桩对薄弱隔水层部位进行下部土体加固,后续根据深基坑内承压水水位高度,适时启动降水管井内水泵进行持续降水,待已施工的高压旋喷桩桩芯检测达到设计强度后才可进行下道土方开挖。
深基坑薄弱隔水层防突涌的施工方法的进一步方案,具体包括以下步骤:
(1)先在深基坑四周施工封闭的地下连续墙1,采用成槽机施工地下连续墙1,阻隔部分承压水;
(2)地下连续墙1施工完成后,对工程桩施工完成区域进行承压水降水管井2施工,先采用工程钻机钻进清孔,再下井管伸入承压水圆砾层4,井管采用圆孔滤水管;待土方开挖至一定深度后进行降水减压;
(3)土方开挖至一定深度后,采用高压旋喷机施工高压旋喷桩,对薄弱隔水层部位进行土体加固处理;高压旋喷桩施工必须保证水灰比、水泥浆液流和高压水射流的压力,同时保证成桩半径,待高压旋喷桩达到一定强度后进行薄弱隔水层位置土方开挖。由于在深基坑电梯井位置的承压水隔水顶板较薄,仅采用承压水降水管井减压难满足基坑安全要求,而采用高压旋喷桩对该部分土体进行加固,可以很好的解决这个问题。该施工方法能满足承压水抗渗流稳定要求的问题,有效防止承压水突涌。
尽管上文对本发明的具体实施方式给予了详细描述和说明,但是应该指明的是,我们可以依据本发明的构想对上述实施方式进行各种等效改变和修改,其所产生的功能作用仍未超出说明书所涵盖的精神时,均应在本发明的保护范围之内。
Claims (5)
1.深基坑薄弱隔水层防突涌的施工方法,其特征在于按照以下步骤施工:
(1)首先进行深基坑周边施工封闭的地下连续墙,用来阻隔部分承压水;
(2)在地下连续墙施工完成后再进行承压水降水管井减压施工,承压水降水管井伸入至含承压水圆砾层,通过抽取承压水对含承压水圆砾层进行减压;
(3)最后在电梯井位置下方进行土体高压旋喷桩加固施工,对薄弱隔水层部位进行土体加固处理。
2.根据权利要求1所述的深基坑薄弱隔水层防突涌的施工方法,其特征在于:步骤(1)中地下连续墙施工至含承压水圆砾层。
3.根据权利要求1所述的深基坑薄弱隔水层防突涌的施工方法,其特征在于:步骤(2)中开挖部分深基坑内土方后,在承压水静止水头以上不少于0.5m标高处施工承压水降水管井。
4.根据权利要求1所述的深基坑薄弱隔水层防突涌的施工方法,其特征在于:所述电梯井位置下方的土体进行高压旋喷桩加固处理时,待土方开挖至一定深度后,施工高压旋喷桩对薄弱隔水层部位进行下部土体加固,后续根据深基坑内承压水水位高度,适时启动降水管井内水泵进行持续降水,待已施工的高压旋喷桩桩芯检测达到设计强度后才可进行下道土方开挖。
5.根据权利要求1至4任一所述的深基坑薄弱隔水层防突涌的施工方法,具体包括以下步骤:
(1)先在深基坑四周施工封闭的地下连续墙,采用成槽机施工地下连续墙,阻隔部分承压水;
(2)地下连续墙施工完成后,对工程桩施工完成区域进行承压水降水管井施工,先采用工程钻机钻进清孔,再下井管伸入承压水圆砾层,井管采用圆孔滤水管;待土方开挖至一定深度后进行降水减压;
(3)土方开挖至一定深度后,采用高压旋喷机施工高压旋喷桩,对薄弱隔水层部位进行土体加固处理;高压旋喷桩施工必须保证水灰比、水泥浆液流和高压水射流的压力,同时保证成桩半径,待高压旋喷桩达到一定强度后进行薄弱隔水层位置土方开挖。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510480085.2A CN105155564A (zh) | 2015-08-07 | 2015-08-07 | 深基坑薄弱隔水层防突涌的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510480085.2A CN105155564A (zh) | 2015-08-07 | 2015-08-07 | 深基坑薄弱隔水层防突涌的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105155564A true CN105155564A (zh) | 2015-12-16 |
Family
ID=54796582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510480085.2A Pending CN105155564A (zh) | 2015-08-07 | 2015-08-07 | 深基坑薄弱隔水层防突涌的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105155564A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105780793A (zh) * | 2016-04-06 | 2016-07-20 | 中建交通建设集团有限公司 | 一种高承压水地层基坑突涌应急处理方法 |
CN106522251A (zh) * | 2016-10-28 | 2017-03-22 | 广州机施建设集团有限公司 | 地质钻孔承压水喷涌水头平衡施工方法 |
CN110387884A (zh) * | 2019-06-18 | 2019-10-29 | 上海隧道工程有限公司 | 用于超深基坑防突涌的施工方法 |
CN112813985A (zh) * | 2021-01-04 | 2021-05-18 | 上海市机械施工集团有限公司 | 一种基坑的浅层气防护方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101736732A (zh) * | 2009-12-17 | 2010-06-16 | 上海隧道工程股份有限公司 | 超深基坑承压水的减压降水施工方法 |
JP2012087501A (ja) * | 2010-10-18 | 2012-05-10 | Ohbayashi Corp | 井戸、井戸の構築方法、地下水位低下工法、土留め壁の構築方法、及び矢板 |
CN202936799U (zh) * | 2012-11-20 | 2013-05-15 | 上海长凯岩土工程有限公司 | 基于环控目标的基坑降水围护结构 |
CN204098050U (zh) * | 2014-09-22 | 2015-01-14 | 中南勘察设计院(湖北)有限责任公司 | 一种控制承压水降水系统 |
-
2015
- 2015-08-07 CN CN201510480085.2A patent/CN105155564A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101736732A (zh) * | 2009-12-17 | 2010-06-16 | 上海隧道工程股份有限公司 | 超深基坑承压水的减压降水施工方法 |
JP2012087501A (ja) * | 2010-10-18 | 2012-05-10 | Ohbayashi Corp | 井戸、井戸の構築方法、地下水位低下工法、土留め壁の構築方法、及び矢板 |
CN202936799U (zh) * | 2012-11-20 | 2013-05-15 | 上海长凯岩土工程有限公司 | 基于环控目标的基坑降水围护结构 |
CN204098050U (zh) * | 2014-09-22 | 2015-01-14 | 中南勘察设计院(湖北)有限责任公司 | 一种控制承压水降水系统 |
Non-Patent Citations (1)
Title |
---|
叶向前: ""杭州钱江新城区域承压水特征及工程应用"", 《中国优秀硕士学位论文全文数据库基础科学辑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105780793A (zh) * | 2016-04-06 | 2016-07-20 | 中建交通建设集团有限公司 | 一种高承压水地层基坑突涌应急处理方法 |
CN106522251A (zh) * | 2016-10-28 | 2017-03-22 | 广州机施建设集团有限公司 | 地质钻孔承压水喷涌水头平衡施工方法 |
CN110387884A (zh) * | 2019-06-18 | 2019-10-29 | 上海隧道工程有限公司 | 用于超深基坑防突涌的施工方法 |
CN110387884B (zh) * | 2019-06-18 | 2021-11-19 | 上海隧道工程有限公司 | 用于超深基坑防突涌的施工方法 |
CN112813985A (zh) * | 2021-01-04 | 2021-05-18 | 上海市机械施工集团有限公司 | 一种基坑的浅层气防护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103114599B (zh) | 深基坑封闭降水装置及其施工方法 | |
CN103114609B (zh) | 新、旧地下连续墙的连接装置及施工方法 | |
CN103883796B (zh) | 泥砂淤泥区手掘式顶管施工装置及方法 | |
CN103225306B (zh) | 一种邻近水源基坑开挖过程中防止基坑渗漏的方法 | |
CN105155564A (zh) | 深基坑薄弱隔水层防突涌的施工方法 | |
CN108086296B (zh) | 动静联合注浆地基加固工法 | |
CN104404974A (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺 | |
CN102051885A (zh) | 一种深基础砼下吸排水技术 | |
CN104895118A (zh) | 地下连续墙阴角部位管涌封堵结构及其注浆处理方法 | |
CN103321233B (zh) | 滑坡深层排水及滑坡体内地下水资源回收装置的制作方法 | |
CN104929135A (zh) | 深基坑地下连续墙围护结构及其旋喷桩止水施工方法 | |
CN105239577A (zh) | 一种高压水枪实施地下墙体结构沉降的方法 | |
CN104695457B (zh) | 一种新型竖井水平旋喷桩基坑封底隔水层的施工方法 | |
CN103572764A (zh) | 超深人工挖孔桩护壁止水结构及其施工方法 | |
CN105569062A (zh) | 渗透弱化减排降水法 | |
CN103643690A (zh) | 一种深基坑勘探孔涌水处理方法 | |
CN108104144A (zh) | 基于降压减渗的强透水地层深基坑地下水控制方法及结构 | |
CN102912789A (zh) | 喀斯特地貌下机械成孔技术 | |
CN103343534A (zh) | 基坑施工封闭降水方法 | |
CN102787606A (zh) | 一种基坑开挖降水过程中对周围环境的保护方法 | |
CN102787611A (zh) | 湿陷性黄土地区基坑开挖的降水方法 | |
CN204703180U (zh) | 一种基坑降水封井装置 | |
CN204252148U (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构 | |
CN211312564U (zh) | 基于降压减渗的强透水地层深基坑地下水控制结构 | |
CN203113361U (zh) | 深基坑封闭降水装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151216 |
|
WD01 | Invention patent application deemed withdrawn after publication |