CN107975127A - 垂直顶升用外止水装置 - Google Patents

垂直顶升用外止水装置 Download PDF

Info

Publication number
CN107975127A
CN107975127A CN201711237492.6A CN201711237492A CN107975127A CN 107975127 A CN107975127 A CN 107975127A CN 201711237492 A CN201711237492 A CN 201711237492A CN 107975127 A CN107975127 A CN 107975127A
Authority
CN
China
Prior art keywords
jacking
pipe
sealing
oil immersion
sealing ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711237492.6A
Other languages
English (en)
Other versions
CN107975127B (zh
Inventor
施雨
王涛
陈永飞
徐玉夏
罗云峰
邹峰
陈敏
瞿彦忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201711237492.6A priority Critical patent/CN107975127B/zh
Publication of CN107975127A publication Critical patent/CN107975127A/zh
Priority to PCT/CN2018/106359 priority patent/WO2019105110A1/zh
Application granted granted Critical
Publication of CN107975127B publication Critical patent/CN107975127B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明一种垂直顶升用外止水装置,密封圈和油浸石棉盘根与设置顶升管上的油脂孔连通,顶升管上还设有连通外止水扎兰与顶升管之间间隙的聚氨酯孔,在垂直顶升初始阶段,所述顶升管盖子上安装放泥阀,通过打开放泥阀,破坏垂直顶升管上方土体,减小正面顶力;在垂直顶升过程中,通过油脂孔压入盾尾油脂至密封圈、油浸石棉盘根处,用于减小密封圈、油浸石棉盘根磨损。当渗水量较大时,所述聚氨酯孔压入水性聚氨酯至外止水扎兰与顶升管之间的间隙,用于强制止水。本发明可以在顶升过程中,为解决在高水压条件下穿墙管止水装置易漏水、难维修的问题和初始顶进顶力过大的问题,使垂直顶升施工技术可以在高水头、复杂地质条件下得到进一步的推广。

Description

垂直顶升用外止水装置
技术领域
本发明涉及一种垂直顶升用外止水装置,尤其是一种用于在高水头、复杂地质条件下的垂直顶升装置的外止水装置。
背景技术
随着国家对于环保要求的进一步提高,沿海地区工业废水和城市生活污水需进行深海排放,长距离管道排污作用愈加明显。采用常规水下开挖埋管的工艺铺设排污管道,其弊端为造价高、污染大、环境影响大;而采用顶管工艺+垂直顶升工艺,可有效减小对环境的破坏,同时,工程造价相对于水下埋管工艺也较低。为克服在沿海地区海域内复高水压、复杂地质条件下,垂直顶升施工时初始顶力过大、止水装置由于磨损而漏水的难点,必须对垂直顶升的外止水装置重新进行改进、研发。
常规垂直顶升装置采用1道止水密封,即1道牛油盘根。缺点是在高水头、复杂地质条件垂直顶升施工时,盘根由于磨损导致穿墙洞渗漏水情况严重,甚至影响正常的顶升施工。由于常规穿墙管止水装置设计缺陷,导致盘根无保护措施,同时止水装置也没有防止渗漏水措施,因此,会对后续正常垂直顶升施工造成很大影响。
发明内容
本发明是要提供一种垂直顶升用外止水装置,用于解决在高水头、复杂地质条件下,垂直顶升施工时初始顶力过大、止水装置由于磨损而漏水的问题。
为实现上述目的,本发明的技术方案是:一种垂直顶升用外止水装置,包括顶升管盖子、密封圈、油浸石棉盘根、外止水扎兰,所述外止水扎兰与顶升管之间设置密封圈和油浸石棉盘根,所述密封圈和油浸石棉盘根与设置顶升管上的油脂孔连通,顶升管上还设有连通外止水扎兰与顶升管之间间隙的聚氨酯孔,在垂直顶升初始阶段,所述顶升管盖子上安装放泥阀,通过打开放泥阀,破坏垂直顶升管上方土体,减小正面顶力;在垂直顶升过程中,通过油脂孔压入盾尾油脂至密封圈、油浸石棉盘根处,用于减小密封圈、油浸石棉盘根的磨损。
当渗水量较大时,所述聚氨酯孔压入水性聚氨酯至外止水扎兰与顶升管之间的间隙,用于强制止水。
本发明的有益效果是:
在垂直顶升初始阶段,在顶升管盖子上安装放泥阀,通过打开放泥阀,破坏垂直顶升管上方土体,减小正面顶力;在垂直顶升过程中,由于止水安装偏差、盘根磨损等情况导致的穿墙管漏水,可通过油脂孔压入盾尾油脂,帮助密封圈、油浸石棉盘根减小磨损,同时,在渗水量较大时,通过由聚氨酯孔压入水性聚氨酯加强止水效果。该装置解决了在高水头、复杂地质条件下,垂直顶升施工时初始顶力过大、止水装置由于磨损而漏水地问题。
附图说明
图1是本发明的垂直顶升用外止水装置结构示意图;
图2是本发明的垂直顶升用外止水装置结构的局部放大图。
具体实施方式
下面结合附图与实施例对本发明作进一步的说明。
如图1,2所示,一种垂直顶升用外止水装置,包括顶升管盖子1、密封圈2、油浸石棉盘根3、外止水扎兰4、外止水推板5、连接螺栓6、放泥阀7、连接螺栓8、油脂孔9和聚氨酯孔10。外止水扎兰4与顶升管之间设置密封圈2和油浸石棉盘根3,所述密封圈2和油浸石棉盘根3与设置顶升管上的油脂孔9连通,顶升管上还设有连通外止水扎兰4与顶升管之间间隙的聚氨酯孔10,油浸石棉盘根3下面连接有通过螺栓6固定在外止水扎兰4上的外止水推板5,在垂直顶升初始阶段,所述顶升管盖子1上安装放泥阀7,通过打开放泥阀7,破坏垂直顶升管上方土体,减小正面顶力;在垂直顶升过程中,通过油脂孔9压入盾尾油脂至密封圈2、油浸石棉盘根3处,用于减小密封圈2、油浸石棉盘根3磨损。
当渗水量较大时,所述聚氨酯孔10压入水性聚氨酯至外止水扎兰4与顶升管之间的间隙,用于强制止水。
现场施工流程如下:
在准备开始垂直顶升时,打开放泥阀7,对顶升管正上方的土体进行破坏,开始顶升施工,同时,观察顶力的变化情况。如顶力无增加或在减小,则关闭放泥阀7;如顶力继续增大,则在管节电焊完成后,继续打开放泥阀7,待顶力不再继续增大后,关闭放泥阀7。
在止水装置发生渗水、漏水等情况,首先可通过油脂孔9压入油脂,然后观察漏水情况是否减小,如仍然有渗水,可通过聚氨酯孔10压入聚氨酯,保证管节电焊作业时,止水装置无渗漏水的不良现象。
本发明应用实施实例
工程位于北部湾近海海域,工程实体为1条外径2000mm、壁厚22mm的污水钢管,污水管道长度3600m,共分为二段(2180m顶管段1+1420m顶管段2)顶进施工。设置2座沉井作为顶管始发井,近海岸侧设置1#沉井作为顶管段1的始发井,而2#沉井既是顶管段1的接收井又是顶管段2的始发井。在顶管段2的末端400m布置有29根Φ500的垂直顶升管用于污水排放,管节顶升高度达到12.5m。
29根垂直顶升管在顶管段2的末端400m区域,顶升管主要穿越的土层为中粗砂层和粉质黏土层。初始顶升阶段,顶升的顶力为土体承载力值的8~10倍,为降低初始顶力,在顶升管盖子1安装一个放泥阀7,打开放泥阀7,可有效破坏顶升管上方土体,降低顶力。在顶升过程中,顶升管外中粗砂会沿管道外壁进入止水装置内盘根中,逐步磨损盘根。为了使垂直顶升施工顺利进行,减小正面顶力、控制止水装置的渗漏水的情况,研发了新型垂直顶升用外止水装置,可有效地解决在高水头、复杂地层条件下,垂直顶升施工时初始顶力过大、止水装置由于磨损而漏水地问题,为工程带来了良好的效益。

Claims (2)

1.一种垂直顶升用外止水装置,包括顶升管盖子(1)、密封圈(2)、油浸石棉盘根(3)、外止水扎兰(4),其特征在于:所述外止水扎兰(4)与顶升管之间设置密封圈(2)和油浸石棉盘根(3),所述密封圈(2)和油浸石棉盘根(3)与设置顶升管上的油脂孔(9)连通,顶升管上还设有连通外止水扎兰(4)与顶升管之间间隙的聚氨酯孔(10),在垂直顶升初始阶段,所述顶升管盖子(1)上安装放泥阀(7),通过打开放泥阀(7),破坏垂直顶升管上方土体,减小正面顶力;在垂直顶升过程中,通过油脂孔(9)压入盾尾油脂至密封圈(2)、油浸石棉盘根(3)处,用于减小密封圈(2)、油浸石棉盘根(3)的磨损。
2.根据权利要求1所述的垂直顶升用外止水装置,其特征在于:当渗水量较大时,所述聚氨酯孔(10)压入水性聚氨酯至外止水扎兰(4)与顶升管之间的间隙,用于强制止水。
CN201711237492.6A 2017-11-30 2017-11-30 垂直顶升用外止水装置 Active CN107975127B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201711237492.6A CN107975127B (zh) 2017-11-30 2017-11-30 垂直顶升用外止水装置
PCT/CN2018/106359 WO2019105110A1 (zh) 2017-11-30 2018-09-19 垂直顶升用外止水装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711237492.6A CN107975127B (zh) 2017-11-30 2017-11-30 垂直顶升用外止水装置

Publications (2)

Publication Number Publication Date
CN107975127A true CN107975127A (zh) 2018-05-01
CN107975127B CN107975127B (zh) 2020-06-02

Family

ID=62008589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711237492.6A Active CN107975127B (zh) 2017-11-30 2017-11-30 垂直顶升用外止水装置

Country Status (2)

Country Link
CN (1) CN107975127B (zh)
WO (1) WO2019105110A1 (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019105110A1 (zh) * 2017-11-30 2019-06-06 上海市基础工程集团有限公司 垂直顶升用外止水装置
CN112412533A (zh) * 2020-11-09 2021-02-26 上海市基础工程集团有限公司 水下免切割在垂直顶升管中快速通水的施工方法
CN114382486A (zh) * 2021-12-10 2022-04-22 上海市基础工程集团有限公司 垂直顶升与套管法结合的骑马井施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200164510Y1 (ko) * 1997-04-18 2000-01-15 임정규 관로의 구조물벽체 접속부 수밀장치(joint area sealing device)
CN103161956A (zh) * 2011-12-13 2013-06-19 上海市基础工程有限公司 中继间防泥砂装置
CN103195158A (zh) * 2013-04-03 2013-07-10 济南城建集团有限公司 一种市政排水管线泥水平衡顶管施工方法
CN104265332A (zh) * 2014-08-06 2015-01-07 上海隧道工程有限公司 适应大断面矩形顶管始发的止水装置及止水施工方法
CN204984425U (zh) * 2015-09-29 2016-01-20 北京市市政四建设工程有限责任公司 一种盾尾密封组件及盾构机
CN106402505A (zh) * 2016-10-13 2017-02-15 上海市基础工程集团有限公司 可调节式穿墙洞止水装置
CN106837343A (zh) * 2016-12-16 2017-06-13 上海市政建设有限公司 顶管出洞口二次加固的施工方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975127B (zh) * 2017-11-30 2020-06-02 上海市基础工程集团有限公司 垂直顶升用外止水装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200164510Y1 (ko) * 1997-04-18 2000-01-15 임정규 관로의 구조물벽체 접속부 수밀장치(joint area sealing device)
CN103161956A (zh) * 2011-12-13 2013-06-19 上海市基础工程有限公司 中继间防泥砂装置
CN103195158A (zh) * 2013-04-03 2013-07-10 济南城建集团有限公司 一种市政排水管线泥水平衡顶管施工方法
CN104265332A (zh) * 2014-08-06 2015-01-07 上海隧道工程有限公司 适应大断面矩形顶管始发的止水装置及止水施工方法
CN204984425U (zh) * 2015-09-29 2016-01-20 北京市市政四建设工程有限责任公司 一种盾尾密封组件及盾构机
CN106402505A (zh) * 2016-10-13 2017-02-15 上海市基础工程集团有限公司 可调节式穿墙洞止水装置
CN106837343A (zh) * 2016-12-16 2017-06-13 上海市政建设有限公司 顶管出洞口二次加固的施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019105110A1 (zh) * 2017-11-30 2019-06-06 上海市基础工程集团有限公司 垂直顶升用外止水装置
CN112412533A (zh) * 2020-11-09 2021-02-26 上海市基础工程集团有限公司 水下免切割在垂直顶升管中快速通水的施工方法
CN112412533B (zh) * 2020-11-09 2022-07-08 上海市基础工程集团有限公司 水下免切割在垂直顶升管中快速通水的施工方法
CN114382486A (zh) * 2021-12-10 2022-04-22 上海市基础工程集团有限公司 垂直顶升与套管法结合的骑马井施工方法

Also Published As

Publication number Publication date
CN107975127B (zh) 2020-06-02
WO2019105110A1 (zh) 2019-06-06

Similar Documents

Publication Publication Date Title
CN103343543B (zh) 一种基坑降水井减压式封堵方法
CN104805854B (zh) 一种潮汐环境下深水超长钢板桩围堰施工方法
CN206128099U (zh) 一种新型降水井封井装置
CN107975127A (zh) 垂直顶升用外止水装置
CN103556644A (zh) 地下室底板降水井井口封堵套管及施工方法
CN203514333U (zh) 地下室底板降水井井口封堵套管
CN113668582B (zh) 一种可注浆式双壁承压降水管井装置及其施工方法
CN105780792B (zh) 一种基坑高水头减压降水井封井方法及封井结构
CN203939060U (zh) 一种地下连续墙轻微渗漏封堵结构
CN109025899B (zh) 一种封井装置
CN201794082U (zh) 局部深基坑降排水装置
CN210685919U (zh) 一种地下水防喷反压装置
CN204456228U (zh) 一种地下连续墙快速封堵装置
CN106402505A (zh) 可调节式穿墙洞止水装置
CN107975376B (zh) 隧道盾构顶管与竖向管道连接结构及施工方法
CN215669621U (zh) 一种高压降水井封堵装置
CN107956245A (zh) 垂直顶升平台
CN206928311U (zh) 一种底板泄水装置
CN113738444B (zh) 一种隧道突泥防治用双管填砾压入反刺式球阀装置
CN217872811U (zh) 一种淤泥质岩层的大口径顶管末端洞口止水装置
CN105350553A (zh) 用于盖挖法基坑施工的降水管井及基坑施工方法
CN205349342U (zh) 高水条件下泥水平衡顶管机接收装置
CN221218868U (zh) 一种降水井封堵结构
CN220598488U (zh) 一种建筑工程深井降低地下水位后封堵装置
CN220184065U (zh) 一种浅埋、涉水顶管区域的降水系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant