- CN112412533B CN112412533B CN202011240203.XA CN202011240203A CN112412533B CN 112412533 B CN112412533 B CN 112412533B CN 202011240203 A CN202011240203 A CN 202011240203A CN 112412533 B CN112412533 B CN 112412533B
- Authority
- CN
- China
- Prior art keywords
- water
- vertical jacking
- construction
- cover plate
- shield
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
本发明涉及一种在水下免切割在垂直顶升管中快速通水的施工方法,其步骤:根据垂直顶升顶部封盖板的结构图纸,结合盾构隧道正常掘进、拼装设备的使用状况,选定可预设通水孔的位置;根据选定可设置通水孔的位置,决定通水孔的大小尺寸、布置数量,根据以上复核结构受力情况,确定是否满足盾构掘进期间、垂直顶升期间受力的要求;开始施工,在盾构垂直顶升管片加工时,完成通水孔开孔、攻丝、防锈处理,在盖板外侧加盖六角凸出闷头;正常进行隧道施工及后续垂直顶升施工;最后根据通水的要求,对每个垂直顶升管顶部封盖板处微突的六角闷头进行拆除工作,即可满足隧道内部通水的需求。本发明施工装置简化施工步骤和工序,加快施工速度,且降低安全风险等级。
Description
技术领域
本发明涉及一种垂直顶升管的施工方法,尤其涉及一种在水下免切割在垂直顶升管中快速通水的施工方法。
背景技术
垂直顶升工艺是上海地区工程技术人员在上世纪70、80年代创新发明的取排水施工工艺。此工艺在已施工完成的水平隧道上部预留顶升口,并用液压设备将立管逐节向上顶升穿过土层,顶部封盖板由潜水员水下拆除后,再安装取、排水头。
垂直顶升工艺在软土地层中运用具有:①施工受气候变化、风浪、潮汐等自然条件的影响小;②施工速度快;③对船机设备需求低,可避免大量水上开挖及吊装作业;④施工造价相对较低等优点。目前临江、滨海的大型火电厂和水厂、污水处理等取排水工程中已得到广泛应用,近年来,部分滨海核电站开始用盾构隧道取排水替代传统的明渠取排水设计。
传统的垂直顶升通水通常为:潜水员对顶部封盖板进行水下切割,开出一个10cm左右的圆孔,待隧道内部充满水后,再由潜水员水下拆除螺栓和盖板。此法需潜水员水下定点切割,施工安全难度大、危险系数高,且对于整个隧道的灌满水时间长。为此,需要提出一种水下免切割在垂直顶升管中快速通水的施工方法。
发明内容
本发明是要提出一种水下免切割在垂直顶升管中快速通水的施工方法,以解决上诉背景技术中提出的问题。
本发明的技术方案是:一种水下免切割在垂直顶升管中快速通水的施工方法,包括以下步骤:
第一步骤:施工准备,根据垂直顶升顶部封盖板的结构图纸,结合盾构隧道正常掘进、拼装设备的使用状况,选定可预设通水孔的位置;
第二步骤:根据选定可设置通水孔的位置,决定通水孔的大小尺寸、布置数量,根据以上复核结构受力情况,确定是否满足盾构掘进期间、垂直顶升期间受力的要求;
第三步骤:以上均确定后,在盾构垂直顶升管片加工时,即完成通水孔开孔、攻丝、防锈处理,在该区间垂直顶升顶部封盖板使用前,再次进行防锈、防水和润滑处理后,在垂直顶升顶部封盖板的外侧与土体接触面加盖铸铁六角凸出闷头;
第四步骤:在以上工序完成后,正常进行隧道的施工及后续的垂直顶升施工;
第五步骤:根据通水的要求,对每个垂直顶升管顶部封盖板处的铸铁六角闷头进行拆除工作,即可满足隧道内部通水的需求。
进一步的,在第一步骤中预先设定好通水孔的位置,确保不影响后续的盾构掘进和垂直顶升施工,以及满足结构的功能。
进一步的,在第三步骤中选用的铸铁六角闷头,需微突出垂直顶升顶部封盖板处,方便潜水员在水下采用手工拧出。
本发明的有益效果在于:本发明将原来需潜水员水下定点切割的施工方法,变更为潜水员下水仅需拧开闷头即可,减少且简化施工工序,不仅可以保证通水的功能,又可以降低安全风险的同时加快施工,最后拆解出的顶部封盖板还可以重复利用,不损坏原有结构。
附图说明
图1为本发明实施例1中的免切割孔结构示意图。
具体实施方式
下面结合具体实施例来对本发明做进一步说明。
实施例1:
参照图1,本发明提出的水下免切割在垂直顶升管中快速通水的施工方法,包括以下步骤:
S1:施工准备,根据垂直顶升顶部封盖板的结构图纸,结合盾构隧道正常掘进、拼装设备的使用状况,选定可预设通水孔的位置;
S2:根据选定可设置通水孔的位置,决定通水孔的大小尺寸、布置数量,根据以上复核结构受力情况,确定是否满足盾构掘进期间、垂直顶升期间受力的要求;
S3:以上均确定后,在盾构垂直顶升管片加工时,即完成通水孔开孔、攻丝、防锈处理等,在该区间垂直顶升顶部封盖板1使用前,再次进行防锈、防水和润滑处理后,在垂直顶升顶部封盖板1的外侧(与土体接触面)加盖铸铁六角凸出闷头2;
S4:在以上工序完成后,正常进行隧道的施工及后续的垂直顶升施工;
S5:根据通水的要求,对每个垂直顶升管顶部封盖板1处微突的铸铁六角凸出闷头2进行拆除工作,即可满足隧道内部通水的需求。
在S1中预先设定好通水孔的位置,确保不影响后续的盾构掘进和垂直顶升施工,以及满足结构的功能。
在S3中选用的铸铁六角凸出闷头2,需微突出垂直顶升管顶部封盖板1处,方便潜水员在水下采用手工拧出。
以上所述,仅为本发明有效的具体使用方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。
Claims (3)
1.一种水下免切割在垂直顶升管中快速通水的施工方法,其特征在于,包括以下步骤:
第一步骤:施工准备,根据垂直顶升顶部封盖板的结构图纸,结合盾构隧道正常掘进、拼装设备的使用状况,选定可预设通水孔的位置;
第二步骤:根据选定可设置通水孔的位置,决定通水孔的大小尺寸、布置数量,根据以上复核结构受力情况,确定是否满足盾构掘进期间、垂直顶升期间受力的要求;
第三步骤:以上均确定后,在盾构垂直顶升管片加工时,即完成通水孔开孔、攻丝、防锈处理,在该区间垂直顶升顶部封盖板使用前,再次进行防锈、防水和润滑处理后,在垂直顶升顶部封盖板的外侧与土体接触面加盖铸铁六角凸出闷头;
第四步骤:在以上工序完成后,正常进行隧道的施工及后续的垂直顶升施工;
第五步骤:根据通水的要求,对每个垂直顶升管顶部封盖板处的铸铁六角闷头进行拆除工作,即可满足隧道内部通水的需求。
2.根据权利要求1所述的水下免切割在垂直顶升管中快速通水的施工方法,其特征在于:在第一步骤中预先设定好通水孔的位置,确保不影响后续的盾构掘进和垂直顶升施工,以及满足结构的功能。
3.根据权利要求1所述的水下免切割在垂直顶升管中快速通水的施工方法,其特征在于:在第三步骤中选用的铸铁六角闷头,需微突出垂直顶升顶部封盖板处,方便潜水员在水下采用手工拧出。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011240203.XA CN112412533B (zh) | 2020-11-09 | 2020-11-09 | 水下免切割在垂直顶升管中快速通水的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011240203.XA CN112412533B (zh) | 2020-11-09 | 2020-11-09 | 水下免切割在垂直顶升管中快速通水的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112412533A CN112412533A (zh) | 2021-02-26 |
CN112412533B true CN112412533B (zh) | 2022-07-08 |
Family
ID=74780791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011240203.XA Active CN112412533B (zh) | 2020-11-09 | 2020-11-09 | 水下免切割在垂直顶升管中快速通水的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112412533B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204899932U (zh) * | 2015-08-28 | 2015-12-23 | 中铁十四局集团第四工程有限公司 | 取水隧道内取水立管洞内垂直顶升设备 |
CN107190776A (zh) * | 2017-06-13 | 2017-09-22 | 中交二航局第三工程有限公司 | 排水隧洞立管栽管施工装置及方法 |
CN107975127A (zh) * | 2017-11-30 | 2018-05-01 | 上海市基础工程集团有限公司 | 垂直顶升用外止水装置 |
CN209907415U (zh) * | 2019-01-21 | 2020-01-07 | 中亿丰隧道工程股份有限公司 | 一种顶管垂直顶升洞口装置 |
CN111577977A (zh) * | 2020-06-16 | 2020-08-25 | 上海市机械施工集团有限公司 | 管节连接结构 |
-
2020
- 2020-11-09 CN CN202011240203.XA patent/CN112412533B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204899932U (zh) * | 2015-08-28 | 2015-12-23 | 中铁十四局集团第四工程有限公司 | 取水隧道内取水立管洞内垂直顶升设备 |
CN107190776A (zh) * | 2017-06-13 | 2017-09-22 | 中交二航局第三工程有限公司 | 排水隧洞立管栽管施工装置及方法 |
CN107975127A (zh) * | 2017-11-30 | 2018-05-01 | 上海市基础工程集团有限公司 | 垂直顶升用外止水装置 |
CN209907415U (zh) * | 2019-01-21 | 2020-01-07 | 中亿丰隧道工程股份有限公司 | 一种顶管垂直顶升洞口装置 |
CN111577977A (zh) * | 2020-06-16 | 2020-08-25 | 上海市机械施工集团有限公司 | 管节连接结构 |
Non-Patent Citations (1)
Title |
---|
水平钢顶管内预留垂直顶升洞口施工技术;吴艳辉;《建筑施工》;20191231;第2186-2187页 * |
Also Published As
Publication number | Publication date |
---|---|
CN112412533A (zh) | 2021-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109629568A (zh) | 海上风电导管架基础钢管桩用浮式稳桩平台的沉桩工艺 | |
CN108842806B (zh) | 一种海上风电基础非嵌岩单桩的施工工艺 | |
CN103741725B (zh) | 一种沉管隧道最终接头及其岸边干作施工方法 | |
GB2172635A (en) | Offshore drilling system | |
JPS589206B2 (ja) | 陸上プラント建設方法 | |
CN101289864A (zh) | 在水下进行钢沉井的定位下沉方法 | |
CN112609591A (zh) | 一种深水浅覆盖层全嵌岩桥梁基础施工方法 | |
CN112412533B (zh) | 水下免切割在垂直顶升管中快速通水的施工方法 | |
CN102322074A (zh) | 一种导管架基础结构及施工方法 | |
CN106400822B (zh) | 深基坑降水井封井施工方法 | |
CN110847209A (zh) | 一种先桩法海上风电导管架基础吊装水下辅助定位装置及安装方法 | |
CN102286986B (zh) | 一种五脚架基础结构及施工方法 | |
CN110284908B (zh) | 一种盾构接收井内环向注浆堵漏方法 | |
CN112267846A (zh) | 一种水下大直径钢圆筒沉井井口防护装置及其实施方法 | |
CN109208624B (zh) | 一种海上升压站导管架调平施工工艺 | |
CN110644521A (zh) | 海上风电抗冰结构单桩加固处理方法以及加固基础 | |
US3556210A (en) | Deep sea well drilling structure | |
DE2514910A1 (de) | Verfahren und vorrichtung zum anschluss einer unterseeischen erdoelquelle an eine flexible ablaufleitung | |
CN202913431U (zh) | 沉管底端千斤顶式纠偏精调系统 | |
CN210134446U (zh) | 一种辅助钢护筒与复合钢管桩间的止水结构 | |
CN220117247U (zh) | 建构筑物地下室侧墙中浅层长期观测兼应急疏干井结构 | |
CN220598488U (zh) | 一种建筑工程深井降低地下水位后封堵装置 | |
CN210002348U (zh) | 一种新型浮体闸 | |
CN219240536U (zh) | 一种水下截桩装置 | |
CN217438838U (zh) | 一种高水头封堵条件下的导流洞封堵段防渗结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |