CN112609591A - 一种深水浅覆盖层全嵌岩桥梁基础施工方法 - Google Patents
一种深水浅覆盖层全嵌岩桥梁基础施工方法 Download PDFInfo
- Publication number
- CN112609591A CN112609591A CN202011522909.5A CN202011522909A CN112609591A CN 112609591 A CN112609591 A CN 112609591A CN 202011522909 A CN202011522909 A CN 202011522909A CN 112609591 A CN112609591 A CN 112609591A
- Authority
- CN
- China
- Prior art keywords
- water
- steel
- construction
- cofferdam
- pipe pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Architecture (AREA)
- Bridges Or Land Bridges (AREA)
- Foundations (AREA)
Abstract
本发明公开一种深水浅覆盖层全嵌岩桥梁基础施工方法,按照以下步骤顺序进行:首先在水上建立钢栈桥和钢平台,然后沿设计承台边线外施工锁扣钢管桩围堰。在钢平台上安装桩基设备,施工桩基础,同步对锁扣钢管桩围堰进行引孔、复振,并在管内和孔内将填充物填充一定高度,使围堰底部固结。利用钢栈桥和钢平台之间的空隙,搭设临时平台,安装注浆设备,对浅覆盖进行帷幕注浆止水。拆除钢围堰内钢平台,抽水逐级安装围檩支撑,直至在围堰内形成无水作业环境。割除桩基施工用钢护筒,下放开挖设备,对浅覆盖层和软石进行清理。施工截水沟用于截水,如果围堰内有漏水及时进行封堵,并在围堰内也进行帷幕注浆止水等。
Description
技术领域
本发明涉及桥梁基础施工技术领域,特别是一种深水浅覆盖层全嵌岩桥梁基础施工方法。
背景技术
我国桥梁工程建造水平已经跻身世界前列,能跨越山谷、江河、湖海等多种复杂的障碍物,并取得了辉煌的成就。当一些桥梁因结构限制,不能一跨过江的情况下,就需要在水中设置墩台基础,以满足跨度要求。而在水中设置墩台基础时,需要满足阻水、壅水、冲刷等防洪评估要求,如果跨越航道则还要满足通航保障要求。现有一种桥梁基础,为满足防洪和通航要求,将桥梁基础设计为低桩承台,全部嵌入河床基岩中,同时为防止冲刷,桥梁基础顶埋置在浅覆盖层以下,因此这是一种深水浅覆盖层全嵌岩桥梁基础,施工难度极大。在进行这种桥梁基础的施工时,通常先水下爆破岩石至封底混凝土标高底,再利用水上船机设备清理基坑,然后使用钢围堰创造无水施工环境,进而进行基础施工。但是水下爆破施工难度大,安全风险高,费用高,清理基坑时受回淤影响进度不可控,同时钢围堰用钢量大,材料周转性不强,需要拼装场地,封底混凝土用量大,整体成本高,整体浮运下放钢围堰对船机设备和通航条件要求高,而散拼钢围堰不仅材料用量大,而且施工进度慢。因此需要一种能够解决上述问题的施工方法。
发明内容
本发明是为了解决现有技术所存在的上述不足,提出一种施工简单、便捷,且能够保证深水浅覆盖层全嵌岩桥梁基础施工安全高效地进行的方法。
本发明的技术解决方案是:一种深水浅覆盖层全嵌岩桥梁基础施工方法,其特征在于:所述的施工方法按照以下步骤顺序进行:
a、首先在水上建立钢栈桥1和钢平台2,作为水上桥梁基础施工的临时设施,
b、在钢平台2上安装水上桩基施工用的钢护筒19,同时利用钢栈桥1沿设计承台18的边线外施工锁扣钢管桩围堰3,并在施工过程中采用导向架4做为施工辅助,
c、在所述钢平台2上安装桩基设备5,对锁扣钢管桩围堰3进行引孔、复振,并在管内和孔内灌注填充物6至标高,使锁扣钢管桩围堰3的底部固结,
d、在锁扣钢管桩围堰3底部固结后,在钢栈桥1和钢平台2之间的空隙处搭设临时平台7,并在临时平台7上安装注浆设备8,利用注浆设备8对浅覆盖层9进行帷幕注浆止水10,
e、所述桩基础20施工完毕后,拆除锁扣钢管桩围堰3内的钢平台2,对锁扣钢管桩围堰3内部抽水并逐级安装围檩支撑11,直至在锁扣钢管桩围堰3内形成无水作业环境,
f、割除桩基施工过程中所使用的钢护筒19,在锁扣钢管桩围堰3内下放开挖设备12,对浅覆盖层9和软石进行清理,采用提吊设备13出渣,
g、在锁扣钢管桩围堰3内施工截水沟14用于截水,如果锁扣钢管桩围堰3内有漏水则及时进行封堵,并在锁扣钢管桩围堰3内部也进行帷幕注浆止水10,
h、继续开挖坚硬基岩至承台底以下10-20cm,同时施工集水沟15,清理桩头后施工混凝土垫层16,
i、桩基础20检测合格后进行承台18的施工,承台18施工完毕后对两侧空隙进行填充,形成填充层17,形成整体工作场地后进行后续桥墩等施工,直至桥梁施工完毕后将锁扣钢管桩围堰3拆除。
所述步骤c中,填充物6可以是混凝土,也可以先填充砂卵石后再注浆,同时填充物6的顶面不能高于河床。
所述步骤d中,所述的帷幕注浆止水10,在锁扣钢管桩围堰3外2米范围内进行。
所述步骤h中,所述的开挖坚硬基岩步骤,采用机械破解、水钻、绳锯等常规非爆破方法进行。
本发明所述的施工方法,对比现有技术,至少具有以下有益效果:
1、本施工方法首先进行桩基础的施工,并同步施工围堰,缩短整体关键线路工期,有利于快速施工。
2、利用锁扣钢管桩进行围堰的施工,锁扣钢管取材方便,不用提前加工,可多次周转使用。不使用船机设备,常规设备即可施工。同时不用施工封底混凝土,节省工期、降低成本、安全可靠。
3、采用无爆破方法开挖坚硬基岩,对比水下爆破施工降低安全风险,同时减少超挖和回填工程量,在无水环境下清理基坑,没有回淤影响,同时也减少了清基船机设备,节省工期、降低成本。
4、相比筑岛围堰更环保,并且有利于通航安全和防洪要求。
利用本方法施工深水浅覆盖层全嵌岩桥梁基础,可以在深水浅覆盖层全嵌岩条件下提供无水作业环境,采用无爆破方法开挖坚硬基岩,安全、高效地组织桥梁基础施工。
附图说明
图1是本发明施工方法中步骤a的示意图。
图2是本发明施工方法中步骤b的示意图。
图3是本发明施工方法中步骤c的示意图。
图4是本发明施工方法中步骤d的示意图。
图5是本发明施工方法中步骤e的示意图。
图6是本发明施工方法中步骤f的示意图。
图7是本发明施工方法中步骤g的示意图。
图8是本发明施工方法中步骤h的示意图。
图9是本发明施工方法中步骤i的示意图。
图10是采用本发明提供的施工方法时的平面示意图。
具体实施方式
下面将结合附图说明本发明的具体实施方式。 如图1至图10所示:一种深水浅覆盖层全嵌岩桥梁基础施工方法,按照以下步骤顺序进行:
a、如图1所示,首先在水上建立钢栈桥1和钢平台2,作为水上桥梁基础施工的临时设施,
b、如图2所示,在钢平台2上安装水上桩基施工用的钢护筒19,同时利用钢栈桥1沿设计承台18的边线外施工锁扣钢管桩围堰3,为了确保施工精确,在施工过程中采用导向架4做为施工辅助,
c、如图3所示,在所述钢平台2上安装桩基设备5,施工桩基础20,为了满足锁扣钢管桩围堰3的底部入岩深度要求,在施工桩基础20的同时,还要对对锁扣钢管桩围堰3进行引孔、复振,并在管内和孔内灌注填充物6至标高,使锁扣钢管桩围堰3的底部固结,这里的填充物6可以是混凝土,也可以先填充砂卵石后再注浆,同时填充物6的顶面不能高于河床。
d、如图4所示,为防止锁扣钢管桩围堰3抽水开挖后可能产生管涌、渗流等情况而影响围堰整体稳定性,在锁扣钢管桩围堰3底部固结后,在钢栈桥1和钢平台2之间的空隙处搭设临时平台7,并在临时平台7上安装注浆设备8,利用注浆设备8对浅覆盖层9进行帷幕注浆止水10,并且帷幕注浆止水10在锁扣钢管桩围堰3外2米范围内进行。
e、如图5所示,所述桩基础20施工完毕后,拆除锁扣钢管桩围堰3内的钢平台2,对锁扣钢管桩围堰3内部抽水并逐级安装围檩支撑11,直至在锁扣钢管桩围堰3内形成无水作业环境,
f、如图6所示,割除桩基施工过程中所使用的钢护筒19,在锁扣钢管桩围堰3内下放开挖设备12,对浅覆盖层9和软石进行清理,采用提吊设备13出渣,
g、如图7所示,在锁扣钢管桩围堰3内施工截水沟14用于截水,同时检查止水效果,如果锁扣钢管桩围堰3内有漏水则及时进行封堵,并在锁扣钢管桩围堰3内部也进行帷幕注浆止水10,
h、如图8所示,继续开挖坚硬基岩至承台底以下10-20cm,同时施工集水沟15,清理桩头后施工混凝土垫层16,并且开挖过程中采用机械破解、水钻、绳锯等常规非爆破方法进行。
i、如图9所示,桩基础20检测合格后进行承台18的施工,承台18施工完毕后对两侧空隙进行填充,形成填充层17,形成整体工作场地后进行后续桥墩等施工,直至桥梁施工完毕后将锁扣钢管桩围堰3拆除。
Claims (4)
1.一种深水浅覆盖层全嵌岩桥梁基础施工方法,其特征在于:所述的施工方法按照以下步骤顺序进行:
a、首先在水上建立钢栈桥(1)和钢平台(2),作为水上桥梁基础施工的临时设施,
b、在钢平台(2)上安装水上桩基施工用的钢护筒(19),同时利用钢栈桥(1)沿设计承台(18)的边线外施工锁扣钢管桩围堰(3),并在施工过程中采用导向架(4)做为施工辅助,
c、在所述钢平台(2)上安装桩基设备(5),对锁扣钢管桩围堰(3)进行引孔、复振,并在管内和孔内灌注填充物(6)至标高,使锁扣钢管桩围堰(3)的底部固结,
d、在锁扣钢管桩围堰(3)底部固结后,在钢栈桥(1)和钢平台(2)之间的空隙处搭设临时平台(7),并在临时平台(7)上安装注浆设备(8),利用注浆设备(8)对浅覆盖层(9)进行帷幕注浆止水(10),
e、所述桩基础(20)施工完毕后,拆除锁扣钢管桩围堰(3)内的钢平台(2),对锁扣钢管桩围堰(3)内部抽水并逐级安装围檩支撑(11),直至在锁扣钢管桩围堰(3)内形成无水作业环境,
f、割除桩基施工过程中所使用的钢护筒(19),在锁扣钢管桩围堰(3)内下放开挖设备(12),对浅覆盖层(9)和软石进行清理,采用提吊设备(13)出渣,
g、在锁扣钢管桩围堰(3)内施工截水沟(14)用于截水,如果锁扣钢管桩围堰(3)内有漏水则及时进行封堵,并在锁扣钢管桩围堰(3)内部也进行帷幕注浆止水(10),
h、继续开挖坚硬基岩至承台底以下10-20cm,同时施工集水沟(15),清理桩头后施工混凝土垫层(16),
i、桩基础(20)检测合格后进行承台(18)的施工,承台(18)施工完毕后对两侧空隙进行填充,形成填充层(17),形成整体工作场地后进行后续桥墩等施工,直至桥梁施工完毕后将锁扣钢管桩围堰(3)拆除。
2.根据权利要求1所述的一种深水浅覆盖层全嵌岩桥梁基础施工方法,其特征在于:
所述步骤c中,填充物(6)可以是混凝土,也可以先填充砂卵石后再注浆,同时填充物(6)的顶面不能高于河床。
3.根据权利要求1所述的一种深水浅覆盖层全嵌岩桥梁基础施工方法,其特征在于:所述步骤d中,所述的帷幕注浆止水(10),在锁扣钢管桩围堰(3)外2米范围内进行。
4.根据权利要求1所述的一种深水浅覆盖层全嵌岩桥梁基础施工方法,其特征在于:所述步骤h中,所述的开挖坚硬基岩步骤,采用机械破解、水钻、绳锯等常规非爆破方法进行。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011522909.5A CN112609591A (zh) | 2020-12-22 | 2020-12-22 | 一种深水浅覆盖层全嵌岩桥梁基础施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011522909.5A CN112609591A (zh) | 2020-12-22 | 2020-12-22 | 一种深水浅覆盖层全嵌岩桥梁基础施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112609591A true CN112609591A (zh) | 2021-04-06 |
Family
ID=75243937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011522909.5A Pending CN112609591A (zh) | 2020-12-22 | 2020-12-22 | 一种深水浅覆盖层全嵌岩桥梁基础施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112609591A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356248A (zh) * | 2021-06-11 | 2021-09-07 | 中铁二十局集团有限公司 | 一种跨海桥建造过程的钢围堰堵缝处理方法 |
CN113957881A (zh) * | 2021-11-11 | 2022-01-21 | 中铁大桥局武汉桥梁特种技术有限公司 | 一种适用于山区河流岩层面桥梁基础的施工方法 |
CN114809020A (zh) * | 2022-05-27 | 2022-07-29 | 中铁大桥局第九工程有限公司 | 一种水中裸岩深埋承台二级基坑支护结构及施工方法 |
Citations (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3234768A1 (de) * | 1982-09-20 | 1984-03-22 | Fritz 8399 Griesbach Sterzl | Verfahren zum herstellen von wand- bzw. pfeilerscheiben oder pfahlfundamenten |
FR2657633A1 (fr) * | 1990-01-30 | 1991-08-02 | Doris Engineering | Structure gravitaire de plate-forme marine resistant aux icebergs. |
JPH10147942A (ja) * | 1996-11-20 | 1998-06-02 | Ohbayashi Corp | 仮締切工用構造体 |
CN101974913A (zh) * | 2010-10-15 | 2011-02-16 | 中铁三局集团有限公司 | 桥梁深水基础钻孔桩与围堰平行施工的方法 |
CN102363961A (zh) * | 2011-11-11 | 2012-02-29 | 中交四航局第一工程有限公司 | 一种入土深度小的深水单壁钢板桩围堰结构及其施工方法 |
CN103882881A (zh) * | 2014-04-11 | 2014-06-25 | 山东黄河工程集团有限公司 | 水下深入岩承台施工方法 |
CN105133558A (zh) * | 2015-09-21 | 2015-12-09 | 中铁建大桥工程局集团第一工程有限公司 | 深水裸岩平台及其施工方法 |
CN105133506A (zh) * | 2015-09-11 | 2015-12-09 | 中铁四局集团有限公司 | 冲击钻限位成孔植入结合履带吊的钢栈桥施工方法及设施 |
CN105421474A (zh) * | 2015-11-03 | 2016-03-23 | 中铁大桥局集团有限公司 | 用于岩石地层低桩承台的植桩围堰平台一体化施工方法 |
CN106638640A (zh) * | 2017-01-23 | 2017-05-10 | 中铁七局集团有限公司勘测设计院 | 岩层地质条件下无封底混凝土组合式围堰的施工方法 |
CN106958254A (zh) * | 2017-05-08 | 2017-07-18 | 中铁七局集团第四工程有限公司 | 锁扣钢管和钢筋混凝组合桩围堰及其施工方法 |
CN107034907A (zh) * | 2017-06-09 | 2017-08-11 | 中铁十七局集团第五工程有限公司 | 深水基础浅埋覆盖软岩地质锁扣钢管桩围堰施工方法 |
CN107059914A (zh) * | 2017-06-19 | 2017-08-18 | 中铁第四勘察设计院集团有限公司 | 一种用于水中浅覆盖层或裸岩地区的环状嵌入式设置基础 |
CN108193698A (zh) * | 2017-12-11 | 2018-06-22 | 上海市基础工程集团有限公司 | 浅覆盖层深水承台止水维护体系 |
CN108442395A (zh) * | 2018-05-14 | 2018-08-24 | 中铁八局集团第二工程有限公司 | 锁扣钢管桩围堰施工方法 |
CN108729457A (zh) * | 2018-06-27 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | 一种用于桥梁深水基础的钢管桩围堰及其施工方法 |
CN108824471A (zh) * | 2018-06-29 | 2018-11-16 | 浙江中交通力工程设计有限公司 | 一种深水裸岩群桩基础及其施工方法 |
CN109083167A (zh) * | 2018-08-27 | 2018-12-25 | 中铁二十三局集团第工程有限公司 | 一种深水高桩承台钢吊箱围堰的施工方法 |
CN109113086A (zh) * | 2018-10-24 | 2019-01-01 | 湖北工业大学 | 一种深水基岩裸露河床区的钢混组合围堰施工方法 |
CN109469085A (zh) * | 2018-08-13 | 2019-03-15 | 中建三局第三建设工程有限责任公司 | 一种深水嵌岩承台基础施工方法 |
CN109469084A (zh) * | 2018-09-21 | 2019-03-15 | 中交武汉港湾工程设计研究院有限公司 | 深水硬质岩嵌入式承台施工方法 |
CN210482343U (zh) * | 2019-08-20 | 2020-05-08 | 中建协和建设有限公司 | 一种双层钢板桩组合围护结构 |
CN111980019A (zh) * | 2020-08-21 | 2020-11-24 | 中铁四局集团有限公司 | 特大桥主桥承台锁口钢管桩围堰施工方法 |
-
2020
- 2020-12-22 CN CN202011522909.5A patent/CN112609591A/zh active Pending
Patent Citations (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3234768A1 (de) * | 1982-09-20 | 1984-03-22 | Fritz 8399 Griesbach Sterzl | Verfahren zum herstellen von wand- bzw. pfeilerscheiben oder pfahlfundamenten |
FR2657633A1 (fr) * | 1990-01-30 | 1991-08-02 | Doris Engineering | Structure gravitaire de plate-forme marine resistant aux icebergs. |
JPH10147942A (ja) * | 1996-11-20 | 1998-06-02 | Ohbayashi Corp | 仮締切工用構造体 |
CN101974913A (zh) * | 2010-10-15 | 2011-02-16 | 中铁三局集团有限公司 | 桥梁深水基础钻孔桩与围堰平行施工的方法 |
CN102363961A (zh) * | 2011-11-11 | 2012-02-29 | 中交四航局第一工程有限公司 | 一种入土深度小的深水单壁钢板桩围堰结构及其施工方法 |
CN103882881A (zh) * | 2014-04-11 | 2014-06-25 | 山东黄河工程集团有限公司 | 水下深入岩承台施工方法 |
CN105133506A (zh) * | 2015-09-11 | 2015-12-09 | 中铁四局集团有限公司 | 冲击钻限位成孔植入结合履带吊的钢栈桥施工方法及设施 |
CN105133558A (zh) * | 2015-09-21 | 2015-12-09 | 中铁建大桥工程局集团第一工程有限公司 | 深水裸岩平台及其施工方法 |
CN105421474A (zh) * | 2015-11-03 | 2016-03-23 | 中铁大桥局集团有限公司 | 用于岩石地层低桩承台的植桩围堰平台一体化施工方法 |
CN106638640A (zh) * | 2017-01-23 | 2017-05-10 | 中铁七局集团有限公司勘测设计院 | 岩层地质条件下无封底混凝土组合式围堰的施工方法 |
CN106958254A (zh) * | 2017-05-08 | 2017-07-18 | 中铁七局集团第四工程有限公司 | 锁扣钢管和钢筋混凝组合桩围堰及其施工方法 |
CN107034907A (zh) * | 2017-06-09 | 2017-08-11 | 中铁十七局集团第五工程有限公司 | 深水基础浅埋覆盖软岩地质锁扣钢管桩围堰施工方法 |
CN107059914A (zh) * | 2017-06-19 | 2017-08-18 | 中铁第四勘察设计院集团有限公司 | 一种用于水中浅覆盖层或裸岩地区的环状嵌入式设置基础 |
CN108193698A (zh) * | 2017-12-11 | 2018-06-22 | 上海市基础工程集团有限公司 | 浅覆盖层深水承台止水维护体系 |
CN108442395A (zh) * | 2018-05-14 | 2018-08-24 | 中铁八局集团第二工程有限公司 | 锁扣钢管桩围堰施工方法 |
CN108729457A (zh) * | 2018-06-27 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | 一种用于桥梁深水基础的钢管桩围堰及其施工方法 |
CN108824471A (zh) * | 2018-06-29 | 2018-11-16 | 浙江中交通力工程设计有限公司 | 一种深水裸岩群桩基础及其施工方法 |
CN109469085A (zh) * | 2018-08-13 | 2019-03-15 | 中建三局第三建设工程有限责任公司 | 一种深水嵌岩承台基础施工方法 |
CN109083167A (zh) * | 2018-08-27 | 2018-12-25 | 中铁二十三局集团第工程有限公司 | 一种深水高桩承台钢吊箱围堰的施工方法 |
CN109469084A (zh) * | 2018-09-21 | 2019-03-15 | 中交武汉港湾工程设计研究院有限公司 | 深水硬质岩嵌入式承台施工方法 |
CN109113086A (zh) * | 2018-10-24 | 2019-01-01 | 湖北工业大学 | 一种深水基岩裸露河床区的钢混组合围堰施工方法 |
CN210482343U (zh) * | 2019-08-20 | 2020-05-08 | 中建协和建设有限公司 | 一种双层钢板桩组合围护结构 |
CN111980019A (zh) * | 2020-08-21 | 2020-11-24 | 中铁四局集团有限公司 | 特大桥主桥承台锁口钢管桩围堰施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356248A (zh) * | 2021-06-11 | 2021-09-07 | 中铁二十局集团有限公司 | 一种跨海桥建造过程的钢围堰堵缝处理方法 |
CN113356248B (zh) * | 2021-06-11 | 2022-07-05 | 中铁二十局集团有限公司 | 一种跨海桥建造过程的钢围堰堵缝处理方法 |
CN113957881A (zh) * | 2021-11-11 | 2022-01-21 | 中铁大桥局武汉桥梁特种技术有限公司 | 一种适用于山区河流岩层面桥梁基础的施工方法 |
CN114809020A (zh) * | 2022-05-27 | 2022-07-29 | 中铁大桥局第九工程有限公司 | 一种水中裸岩深埋承台二级基坑支护结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112609591A (zh) | 一种深水浅覆盖层全嵌岩桥梁基础施工方法 | |
Ni et al. | Characterising the failure pattern of a station box of Taipei Rapid Transit System (TRTS) and its rehabilitation | |
CN113266392B (zh) | 一种穿越既有锚索群的顶管施工方法 | |
KR101256265B1 (ko) | 임시 물막이공정이 생략된 교각의 수중설치공법. | |
CN109339079A (zh) | 一种紧邻河流透水地层的基坑止水系统及其施工工艺 | |
CN114033388B (zh) | 富水粉砂层地下隧道顶管用竖井施工方法 | |
CN108755719A (zh) | 跨海海底市政隧道围堰明挖施工方法 | |
CN209260739U (zh) | 一种紧邻河流透水地层的基坑止水系统 | |
Burke et al. | Jet grouting | |
KR100621410B1 (ko) | 수밀케이션을 이용한 수중 구조물의 건식 시공방법 | |
CN108086163A (zh) | 混凝土沉井高压旋喷防渗围堰施工方法 | |
CN114809106B (zh) | 一种既有隧道的组合式保护结构的施工方法 | |
CN216515675U (zh) | 用于盾构下穿河道驳岸时侵入管桩清除的防护结构 | |
Arora et al. | Jet Grouting for the Re-support of Pier 11A in San Diego, CA | |
Davidson et al. | Seepage cutoff wall for mud mountain dam | |
Fang et al. | Rehabilitation of damaged soft ground tunnels | |
Bauer | Dewatering, hydraulic failure and subsequent analysis of a sheeted excavation | |
Grice et al. | Design and construction of the Thames Barrier Cofferdams. | |
Tatsuoka et al. | Geotechnical engineering aspects of Trans-Tokyo bay highway project | |
Davidson¹ et al. | Design and construction of a plastic concrete cutoff wall for the Island Copper Mine | |
CN115538463A (zh) | 一种深水急流状态下的锁口钢围堰及施工方法 | |
Chen et al. | Research on Cofferdam Construction Technology in Water Conservancy and Hydropower Engineering | |
CN117552447A (zh) | 一种抗滑桩方桩挖圆孔施工工艺 | |
Powell | Defects due to water | |
Liu et al. | The construction and field monitoring of a deep excavation in soft soils |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210406 |