CN106401015A - Fabricated hybrid coupled wall system with embedded joint steel beam sections and construction method of fabricated hybrid coupled wall system - Google Patents
Fabricated hybrid coupled wall system with embedded joint steel beam sections and construction method of fabricated hybrid coupled wall system Download PDFInfo
- Publication number
- CN106401015A CN106401015A CN201610866864.0A CN201610866864A CN106401015A CN 106401015 A CN106401015 A CN 106401015A CN 201610866864 A CN201610866864 A CN 201610866864A CN 106401015 A CN106401015 A CN 106401015A
- Authority
- CN
- China
- Prior art keywords
- wall unit
- wall
- buried seam
- girder steel
- steel section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/562—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with fillings between the load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
- E04B2/60—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
The invention discloses a fabricated hybrid coupled wall system with embedded joint steel beam sections and a construction method of the fabricated hybrid coupled wall system. The system comprises wall units respectively connected in horizontal and vertical directions, wherein floor slabs are arranged among the wall units connected in the vertical direction; each wall unit comprises a wall unit concrete wall and a wall unit steel reinforcement framework located inside the wall unit concrete wall; wall unit embedded joint columns are correspondingly embedded in the middles of the upper and lower sides of the wall unit steel reinforcement framework; the upper parts of the left and right sides of the wall unit steel reinforcement framework are symmetrically connected with the embedded joint steel beam sections; and the outer ends of both the wall unit embedded joint columns and the embedded joint steel beam sections exceed the side edges of the wall unit concrete walls. The fabricated hybrid coupled wall system is mechanically analyzed by establishing a finite element model to verify the structural reliability and has the advantages of good earthquake resistance and convenience in repair after a strong earthquake happens; the construction quality is easily guaranteed, and the green and environmental protection properties are good; and the fabricated hybrid coupled wall system is flexible in design, efficient in manufacture, convenient to transport, convenient and rapid to mount and good in economic benefit.
Description
Technical field
The present invention relates to the realm of building construction, particularly a kind of assembled wall limb structure and its construction method.
Background technology
High building structure be solve during Chinese Urbanization urban population constantly increase gradually short with urban land
The inevitable choice of contradiction, and coupled wall structural system is indispensable element in high building structure.According to conventional actual measurement money
Material, coupled wall system had both inherited the advantages of simple shear wall construction costs is cheap, anti-side rigidity is big, had embodied in macroseism again
Effect lower coupling beam surrender is consumed energy, is avoid or reduced the situation that a large amount of cracks concentrate on body of wall bottom, is repaired into after shake with reducing
This advantage.
But in actual application, it is limited to building and uses functional requirement, conventional concrete coupling beam is often difficult to meet cut
Face shearing resistance demand, causes certain difficulty to designer.Compared with traditional coupled wall, mixing coupled wall feature is to use
Steel coupling beam substitutes concrete connecting-beam, and applies accentric support in existing related specifications, code to consume energy beam theory so that the latter's ratio
The former possesses more preferable energy dissipation capacity and progressive collapse-resisting ability, and builds use requirement and simplification assembly process beneficial to meeting.
For new assembly-type RC structure, the type of attachment solving between its body of wall assembly unit becomes problem demanding prompt solution.
Content of the invention
It is an object of the invention to provide a kind of assembled mixing coupled wall system with pre-buried seam girder steel section and its apply
Work method, will solve traditional structure stress complexity, structural instability, annexation is unreliable, the technical problem of inconvenience of constructing.
For achieving the above object, the present invention adopts the following technical scheme that:
A kind of assembled mixing coupled wall system with pre-buried seam girder steel section, including respectively at horizontal direction, vertical direction
The wall unit connecting, is provided with floor between the wall unit connecting, described wall unit includes wall unit coagulation wherein on vertical direction
Cob wall body and be located at wall unit concrete wall within wall unit framework of steel reinforcement, in the both sides up and down of wall unit framework of steel reinforcement
Portion's correspondence is embedded with wall unit pre-buried seam post, and the top of the left and right sides of wall unit framework of steel reinforcement is symmetrically connected with pre-buried seam
Girder steel section, the outer end of the described pre-buried seam post of the wall unit and pre-buried seam girder steel section side all beyond wall unit concrete wall
Edge.
Connect by pre-buried seam girder steel section is corresponding between left and right wall unit in horizontal direction, described left and right wall unit
Between seam crossing be filled with implant;During if any window opening or door opening, another between the pre-buried seam girder steel section of left and right wall unit
A piece steel coupling beam of outer connection.
Pass through wall unit pre-buried seam post corresponding with wall unit framework of steel reinforcement even between upper and lower wall unit on vertical direction
Connect, the wall unit pre-buried seam post between described upper and lower wall unit docks and is cast in inside floor.
The both sides up and down of described wall unit concrete wall are symmetrically connected with the pre-buried seam post of two wall units, and the two of homonymy
The pre-buried seam post uniform intervals distribution of individual wall unit, the pre-buried seam column length of described wall unit is about 40cm, and its outer end exceeds
The length of the lateral edges of the first wall unit concrete wall is about the half of slab thickness.
Described pre-buried seam girder steel section along wall unit concrete wall length direction arrange, in pre-buried seam girder steel section,
Built-in fitting shear stud and auxiliary bar adapter are respectively welded on lower flange, described auxiliary bar adapter are connected with pre-buried
Seam beam-ends auxiliary bar.
The length range that the outer end of described pre-buried seam girder steel section exceeds the lateral edges of wall unit concrete wall is 5
Centimetre~10 centimetres, inner end is less than 1/3rd of the length of wall unit concrete wall.
The upper surface of described pre-buried seam girder steel section is concordant with wall unit concrete wall edge, be connected to pre-buried seam beam
The built-in fitting shear stud of upper surface end exceed wall unit concrete wall edge.
Described burying is bolted between seam girder steel section, is welded to connect or bolt and welding hybrid mode company
Connect.
One side in four sides or multiaspect are matsurface or in level side to described wall unit concrete wall up and down
To having wall unit keyway.
Described wall unit framework of steel reinforcement includes being made up of horizontal reinforcement, vertical reinforcing bar and drawknot tension rib between
Bar frame and be arranged on wall unit pre-buried seam post surrounding wall unit seam post construction muscle, described upper and lower wall unit
Pass through between the vertical reinforcing bar of wall unit framework of steel reinforcement to starch anchor docking sleeve.
Described floor is the xoncrete structure of cast in situs or prefabricated xoncrete structure.
The described pre-buried seam post of wall unit and pre-buried seam girder steel section are H profile steel or combined I-shaped steel.
It is vertically welded with pre-buried seam girder steel section stiffener between two edges of a wing of described pre-buried seam girder steel section, described pre-buried
Seam girder steel section stiffener is less than wall unit concrete wall edge, can flush with wall unit concrete wall edge.
A kind of construction method of the large span support system of subway foundation pit as mentioned is it is characterised in that include wall unit
Prefabricated operation and assembled in situ operation, comprise the following steps that:
The prefabricated operation of wall unit:
Step one, welds built-in fitting shear stud on wall unit pre-buried seam post.
Step 2, makes pre-buried seam girder steel section:Section steel beam or the upper and lower edge of a wing of truck welding bogie are respectively welded pre-
Then pre-buried seam beam-ends auxiliary bar is connected by embedded part shear stud, auxiliary bar adapter again with auxiliary bar adapter.
Step 3, is connected to corresponding with pre-buried seam girder steel section for pre-buried for wall unit seam post on design attitude.
Step 4, carries out colligation wall unit framework of steel reinforcement according to design requirement.
Step 5, and fix wall unit seam post construction muscle around wall unit pre-buried seam post.
Step 6, installs the formwork for placing of wall unit, and one side as needed, in up and down four faces or many
Face carries out horizontal keyway or matsurface is processed.
Step 7, pours the concrete of walling unit.
Step 8, to be poured build up type and maintenance after, sling and the demoulding by suspension ring, complete the prefabricated operation of wall unit.
The assembled in situ operation of mixing coupled wall:
Step one, prefabricated wall unit is transported to job site, starts on-site construction processes.
Step 2, carries out the connection of wall unit on vertical direction, by the wall unit pre-buried seam post of upper and lower wall unit and wall
Unit framework of steel reinforcement is connected respectively.
Step 3, carries out the connection of wall unit in horizontal direction, connects corresponding for the pre-buried seam girder steel section of left and right wall unit
Connect, and fill implant at vertical abutment joint;During if any window opening or door opening, between left and right wall unit, set up steel coupling beam.
Step 4, the reinforcing bar of colligation floor simultaneously installs the template of floor.
Step 5, pours the concrete of build floor.
Step 6, to be poured build up type, and carry out maintenance.
Step 7, repeats step one in this operation and, to step 6, completes the construction of whole assembled mixing coupled wall system
Operation.
Compared with prior art the invention has the characteristics that and beneficial effect:
The present invention is based on finite element theory, sets up FEM (finite element) model and carries out mechanical analyses to assembled mixing coupled wall system, tests
Demonstrate,prove its reliability of structure, this system, compared with concrete shear wall structure system, has that anti-seismic performance is good, is easy to after macroseism shake
The advantage repaired;Compared with using traditional cast-in-place mode, build guality easily ensures, environmental protection performance is good;With existing assembled
Shear wall is compared, have the advantages that flexible design, make efficiently, convenient transportation, install convenient, good in economic efficiency, concrete manifestation
In the following aspects:
1st, anti-seismic performance is good:The present invention relies on pre-buried seam girder steel section that each wall unit is connected into mixing coupled wall system,
Under earthquake repeated action, so that pre-buried seam beam exposed parts preferably form shearing-type surrender, it consumes this structural system
Energy mode is similar to the power consumption of accentric support energy dissipating beam section, has the characteristics that energy dissipation capacity is big, it is little to deform, pre-buried seam girder steel section can
Along structure overall height arrangement, just as being provided with a considerable number of " electric fuse " in the structure, to be consequently formed preferable power consumption mechanism;
Compared with concrete connecting-beam, the former shear yielding energy-dissipating property is better than concrete connecting-beam beam-ends plastic hinge and consumes energy, and the former cuts
Cut surrender energy consumption and distortion little, under severe earthquake action, progressive collapse-resisting ability is strong.
2nd, it is easily repaired after macroseism shake:The energy passing to structure under macroseism is mainly by pre-buried seam beam and coupling beam to mould
Property deformation form absorbed, under severe earthquake action, delay the development in crack, preferably avoid or decrease shear wall bottom
Crack extension.Therefore, repairing after macroseism only need to carry out exposing the replacing of pre-buried seam girder steel section or coupling beam and open on a small quantity
Split the reinforcement that body of wall does.
3rd, optimization of construction technology, build guality is easy to ensure:The making major part of body of wall is to complete in factory, therefore may be used
Effective field surveillance is concentrated on the connection between wall element, engineering construction quality is easy to ensure;With cast-in-place coagulation
Native shear wall is compared, and factory is made and carried out with in-site installation simultaneously, solves cast-in-place concrete shear wall situ wet operation amount big
Problem;Compared with existing general fabricated shear wall, pre-buried seam post can solve asking of upper wall construction process stability
Inscribe, for realizing constructing with the crossings on different level that pours of the splicing of layer coupled wall unit scene and floor, there is provided technical probability;
Steel coupling beam substitutes concrete connecting-beam, solves the problems, such as that cast-in-place concrete coupling beam situ wet operation amount is big.
4th, environmental protection performance is good:The major part that makes due to body of wall completes in factory, and template can effectively repeat
Using pre-buried seam girder steel section, coupling beam are again without using template and temporary support, therefore building course decreases the product of building waste
Raw.
5th, flexible design, make efficiently, convenient transportation, install convenient:In existing prefabricated fabricated shear wall design, often
Be coupling beam, the body of wall that is connected with coupling beam two ends be divided into an assembly unit, cause unit volume excessive, to transport, install
Bring inconvenience;In addition, this kind of cell cube design, not only bring inconvenience to designer, and body of wall assembly unit
Standard component should not be formed, lead to mould utilization ratio low.This patent proposes to adopt intersegmental, the pre-buried seam steel of pre-buried seam girder steel
The mode being connected between beam section and coupling beam to realize the effectively connection between wall limb, is that structure design personnel flexibly design prefabricated unit
Provide convenience, be also beneficial to body of wall assembly unit simultaneously and form standard component;Pre-buried seam girder steel section is connected at the scene with coupling beam, just
Need not consider that the body of wall coupling beam and its two ends pours and build up a cell cube, thus convenient transport and installation;This patent is also upper
The pre-buried seam post of the connect setting of lower wall unit, saves the operation of its live temporary support, real " playing with building blocks " formula realized
Mode of construction, convenient installation.In a word, compared with existing fabricated shear wall, have flexible design, make efficiently, convenient transportation,
The advantages of install convenient.
6th, good in economic efficiency:At this stage, fabricated shear wall cost remains high, and traces it to its cause, mainly the just company of being because
The body of wall at beam and its two ends pours and builds up a big unit body, thus being transport and installation brings inconvenience;In addition it is exactly irregular wall
Body assembly unit, is difficult to form standard component, mould utilization factor is low, using pre-buried seam girder steel intersegmental, pre-buried seam girder steel section with
Between coupling beam, connected mode realizes the effectively connection between wall limb, and the problems referred to above can be readily solved, and substantially can reduce cost, highlight
The economic advantages of fabricated construction.
Brief description
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the wall cellular construction schematic diagram of the present invention.
Fig. 2 is the A-A generalized section of Fig. 1.
Fig. 3 is the structural representation of the present invention.
Fig. 4 is the B-B generalized section of Fig. 3.
Reference:1- wall unit, 2- wall unit concrete wall, 3- wall unit pre-buried seam post, 4- wall unit
Seam post construction muscle, 5- wall unit keyway, 6- wall unit framework of steel reinforcement, 7- built-in fitting shear stud, 8- pre-buried seam girder steel
Section, 9- pre-buried seam girder steel section auxiliary bar, 10- auxiliary bar adapter, 11- pre-buried seam girder steel section stiffener, 12-
Implant, 13- floor, 14- steel coupling beam, 15- slurry anchor sleeve.
Specific embodiment
Embodiment referring to shown in Fig. 3, Fig. 4, this assembled mixing coupled wall system with pre-buried seam girder steel section,
Including the wall unit 1 connecting respectively at horizontal direction, vertical direction, described wall unit 1 is prefabricated components, strength grade of concrete
Not less than C30, not higher than C60, body of wall highly be about floor height deduct slab thickness, wherein on vertical direction connect wall unit it
Between be provided with floor 13, connect by pre-buried seam girder steel section 8 is corresponding between the left and right wall unit 1 in horizontal direction, described left and right
Seam crossing between wall unit is filled with implant 12, and described implant can select low intensive implant, for example hollow little
Building block, porous brick etc., during if any window opening or door opening, set up steel coupling beam between the pre-buried seam girder steel section 8 of left and right wall unit 1
14;Pass through between upper and lower wall unit 1 on vertical direction wall unit pre-buried seam post 3 through high-strength bolt or bolted and welded connection,
The vertical reinforcement of wall unit framework of steel reinforcement 6 connects through slurry anchor sleeve 15 is corresponding, and the wall unit between described upper and lower wall unit is pre-buried
Seam post 3 docks and is cast in inside floor 13.
Referring to shown in Fig. 1, Fig. 2, described wall unit 1 includes wall unit concrete wall 2 and is located at wall unit concrete walls
The wall unit framework of steel reinforcement 6 in internal portion, the middle part correspondence of the both sides up and down of wall unit framework of steel reinforcement is embedded with that wall unit is pre-buried to be connect
Seam post 3, the top of the left and right sides of wall unit framework of steel reinforcement is symmetrically connected with pre-buried seam girder steel section 8, and described wall unit is pre-buried
The lateral edges all beyond wall unit concrete wall 2 for the outer end of seam post 3 and pre-buried seam girder steel section 8.
The both sides up and down of described first wall unit concrete wall are symmetrically connected with the pre-buried seam post of two the first wall units,
Two the first wall units pre-buried seam post uniform intervals distribution of homonymy, the pre-buried seam column length of described first wall unit is about
40cm, the length range that its outer end exceeds the lateral edges of the first wall unit concrete wall is 5 centimetres~10 centimetres, about building
The half of plate thickness.
Described pre-buried seam girder steel section 8 is arranged along wall unit concrete wall 2 length direction, welds built-in fitting shearing resistance thereon
Peg 7 is simultaneously connected with pre-buried seam girder steel section auxiliary bar 9 by auxiliary bar adapter 10.Described pre-buried seam girder steel
The length range that the outer end of section 8 exceeds the lateral edges of wall unit concrete wall 2 is 5 centimetres~10 centimetres, and inner end does not surpass
Cross wall unit concrete wall length 1/3rd.
The upper surface of described pre-buried seam beam is concordant with wall unit concrete wall edge, be connected to the upper of pre-buried seam beam
The end of the built-in fitting shear stud on surface exceeds wall unit concrete wall edge.
It is bolted between described pre-buried seam girder steel section 8, be welded to connect or bolt and welding hybrid mode
Connect.
One side in four sides or multiaspect are matsurface or in level side to described wall unit concrete wall 2 up and down
To having wall unit keyway 5.
Described wall unit framework of steel reinforcement 6 includes the tension rib structure between by horizontal reinforcement, vertical reinforcing bar and drawknot
The bar frame becoming and the wall unit seam post construction muscle 4 being arranged on wall unit pre-buried seam post 3 surrounding.
The described pre-buried seam post 3 of wall unit and pre-buried seam girder steel section 8 are H profile steel or combined I-shaped steel, strength grade
It is not less than Q235, not higher than Q420.
It is vertically welded with pre-buried seam girder steel section stiffener 12 between two edges of a wing of described pre-buried seam beam 9, described pre-buried
Seam girder steel section stiffener 11 is flushed with wall unit concrete wall 2.
A kind of construction method carrying the assembled mixing coupled wall system of pre-buried seam girder steel section as mentioned, including wall
The prefabricated operation of unit and assembled in situ operation are it is characterised in that comprise the following steps that:
The prefabricated operation of wall unit:
Step one, is welded and fixed wall unit shear stud 4 on wall unit pre-buried seam post 3.
Step 2, makes pre-buried seam girder steel section 8:Section steel beam or the upper and lower edge of a wing of truck welding bogie are respectively welded
Built-in fitting shear stud, auxiliary bar adapter, then again by pre-buried seam beam-ends auxiliary bar and auxiliary bar adapter phase
Even.
Step 3, pre-buried for wall unit seam post 3 and pre-buried seam girder steel section 8 correspondence are connected on design attitude.
Step 4, carries out colligation wall unit framework of steel reinforcement 6 according to design requirement.
Step 5, and fixing wall unit seam post construction muscle 4 around wall unit pre-buried seam post 3.
Step 6, installs the formwork for placing of wall unit 1, and one side as needed, in up and down four faces or
Multiaspect carries out horizontal keyway or matsurface is processed.
Step 7, pours the concrete of walling unit 1.
Step 8, to be poured build up type and maintenance after, sling and the demoulding by suspension ring, complete the prefabricated operation of wall unit.
The assembled in situ operation of mixing coupled wall:
Step one, prefabricated wall unit is transported to job site, starts on-site construction processes.
Step 2, carries out the connection of wall unit on vertical direction, by the wall unit pre-buried seam post 3 of upper and lower wall unit with
Wall unit framework of steel reinforcement 6 is connected respectively, and passes through high-strength bolt or bolt weldering mixing connects wherein between wall unit pre-buried seam post 3
Connect, connected by starching anchor sleeve 15 between the vertical reinforcing bar of wall unit framework of steel reinforcement 6.
Step 3, carries out the connection of wall unit in horizontal direction, will be corresponding for the pre-buried seam girder steel section of left and right wall unit logical
Cross high-strength bolt or bolted and welded connection, and fill implant 12 at vertical abutment joint;During if any window opening or door opening, left and right
Steel coupling beam is set up between the pre-buried seam girder steel section of wall unit.
Step 4, the reinforcing bar of colligation floor 13 simultaneously installs the template of floor 13.
Step 5, pours the concrete of build floor 13.
Step 6, to be poured build up type, and carry out maintenance.
Step 7, repeats step one in this operation and, to step 6, completes the construction of whole assembled mixing coupled wall system
Operation.
Claims (10)
1. a kind of assembled mixing coupled wall system with pre-buried seam girder steel section, including respectively at horizontal direction, vertically side
To the wall unit connecting(1), between the wall unit connecting wherein on vertical direction, it is provided with floor(13)It is characterised in that:Described
Wall unit(1)Including wall unit concrete wall(2)With positioned at wall unit concrete wall within wall unit framework of steel reinforcement
(6), the middle part of the both sides up and down of wall unit framework of steel reinforcement is corresponding to be embedded with wall unit pre-buried seam post(3), wall unit reinforcing bar
The top of the left and right sides of frame is symmetrically connected with pre-buried seam girder steel section(8), the pre-buried seam post of described wall unit(3)Connect with pre-buried
Seam girder steel section(8)Outer end all beyond wall unit concrete wall(2)Lateral edges;
Left and right wall unit in horizontal direction(1)Between by pre-buried seam girder steel section(8)Corresponding connection, described left and right wall list
Seam crossing between unit is filled with implant(12);
Upper and lower wall unit on vertical direction(1)Between pass through wall unit pre-buried seam post(3)With wall unit framework of steel reinforcement(6)
Corresponding connection, the wall unit pre-buried seam post between described upper and lower wall unit(3)Dock and be cast in floor(13)Internal.
2. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 1 it is characterised in that:
Described pre-buried seam girder steel section(8)Along wall unit concrete wall(2)Length direction is arranged, welds built-in fitting shear stud thereon
(7), and pass through auxiliary bar adapter(10)It is connected with pre-buried seam girder steel section auxiliary bar(9).
3. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 2 it is characterised in that:
Described pre-buried seam girder steel section(8)Outer end exceed wall unit concrete wall(2)The length range of lateral edges be 5 centimetres
~10 centimetres, inner end is less than 1/3rd of the length of wall unit concrete wall.
4. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 3 it is characterised in that:
Described pre-buried seam girder steel section(8)Upper surface concordant with wall unit concrete wall edge, be connected to pre-buried seam girder steel section
Upper surface built-in fitting shear stud(7)End exceed wall unit concrete wall edge.
5. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 4 it is characterised in that:
Described pre-buried seam girder steel section(8)Between by be welded to connect or bolt with weld hybrid mode be connected.
6. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 1 it is characterised in that:
Described wall unit concrete wall(2)One side in four sides or multiaspect are matsurface or have in the horizontal direction up and down
Wall unit keyway 5.
7. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 1 it is characterised in that:
Described wall unit framework of steel reinforcement(6)Including the steel being made up of horizontal reinforcement, vertical reinforcing bar and drawknot tension rib between
Muscle rack and be arranged on wall unit pre-buried seam post(3)The wall unit seam post construction muscle of surrounding(4).
8. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 1 it is characterised in that:
The pre-buried seam post of described wall unit(3)With pre-buried seam girder steel section(8)For H profile steel or combined I-shaped steel.
9. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 8 it is characterised in that:
Described pre-buried seam girder steel section(8)Two edges of a wing between be vertically welded with pre-buried seam girder steel section stiffener(11), described pre-buried
Seam girder steel section stiffener(11)Less than wall unit concrete wall edge.
10. the construction method of the subway foundation pit large span support system as described in a kind of any one as claim 1 to 9, it is special
Levy and be, including wall unit prefabricated operation and assembled in situ operation it is characterised in that comprising the following steps that:
The prefabricated operation of wall unit:
Step one, in wall unit pre-buried seam post(3)Upper welding built-in fitting shear stud(7);
Step 2, makes pre-buried seam girder steel section(8);
Step 3, by pre-buried for wall unit seam post(3)With pre-buried seam girder steel section(8)Correspondence is connected on design attitude;
Step 4, carries out colligation wall unit framework of steel reinforcement according to design requirement(6);
Step 5, and in wall unit pre-buried seam post(3)Surrounding fixing wall unit seam post construction muscle(4);
Step 6, installs wall unit(1)Formwork for placing, and one side as needed, in up and down four faces or many
Face carries out horizontal keyway or matsurface is processed;
Step 7, pours walling unit(1)Concrete;
Step 8, to be poured build up type and maintenance after, sling and the demoulding by suspension ring, complete the prefabricated operation of wall unit;
The assembled in situ operation of mixing coupled wall:
Step one, prefabricated wall unit is transported to job site, starts on-site construction processes;
Step 2, carries out the connection of wall unit on vertical direction, by the wall unit pre-buried seam post of upper and lower wall unit(3)With wall
Unit framework of steel reinforcement(6)It is connected respectively;
Step 3, carries out the connection of wall unit in horizontal direction, by the pre-buried seam girder steel section of left and right wall unit(8)The company of correspondence
Connect, and fill implant at vertical abutment joint(12);
Step 4, colligation floor(13)Reinforcing bar and its template;
Step 5, pours build floor(13)Concrete;
Step 6, to be poured build up type, and carry out maintenance;
Step 7, repeats step one in this operation and, to step 6, completes the working procedure of whole assembled mixing coupled wall system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610866864.0A CN106401015B (en) | 2016-09-30 | 2016-09-30 | Assembled mixing coupled wall system and construction method with pre-buried seam girder steel section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610866864.0A CN106401015B (en) | 2016-09-30 | 2016-09-30 | Assembled mixing coupled wall system and construction method with pre-buried seam girder steel section |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106401015A true CN106401015A (en) | 2017-02-15 |
CN106401015B CN106401015B (en) | 2018-10-26 |
Family
ID=59229350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610866864.0A Expired - Fee Related CN106401015B (en) | 2016-09-30 | 2016-09-30 | Assembled mixing coupled wall system and construction method with pre-buried seam girder steel section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106401015B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000291181A (en) * | 1999-04-13 | 2000-10-17 | Taisei Corp | Construction method for precast earthquake resistant wall |
CN201991110U (en) * | 2011-01-19 | 2011-09-28 | 潍坊绿城低碳建筑科技有限公司 | Assembly-type building enveloping and filling energy-saving wallboard system |
CN104032861A (en) * | 2014-05-15 | 2014-09-10 | 中国建筑股份有限公司 | Hybrid coupled wall type steel column and non-energy-dissipation beam connection node structure and construction method thereof |
CN104895220A (en) * | 2015-06-17 | 2015-09-09 | 长春工程学院 | Connecting joint of assembled profile steel confined concrete shear wall structure |
CN206189653U (en) * | 2016-09-30 | 2017-05-24 | 中国建筑股份有限公司 | Assembled mixes even limb wall body system with pre -buried seam girder steel section |
-
2016
- 2016-09-30 CN CN201610866864.0A patent/CN106401015B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000291181A (en) * | 1999-04-13 | 2000-10-17 | Taisei Corp | Construction method for precast earthquake resistant wall |
CN201991110U (en) * | 2011-01-19 | 2011-09-28 | 潍坊绿城低碳建筑科技有限公司 | Assembly-type building enveloping and filling energy-saving wallboard system |
CN104032861A (en) * | 2014-05-15 | 2014-09-10 | 中国建筑股份有限公司 | Hybrid coupled wall type steel column and non-energy-dissipation beam connection node structure and construction method thereof |
CN104895220A (en) * | 2015-06-17 | 2015-09-09 | 长春工程学院 | Connecting joint of assembled profile steel confined concrete shear wall structure |
CN206189653U (en) * | 2016-09-30 | 2017-05-24 | 中国建筑股份有限公司 | Assembled mixes even limb wall body system with pre -buried seam girder steel section |
Also Published As
Publication number | Publication date |
---|---|
CN106401015B (en) | 2018-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107419824A (en) | The full precast shear wall structural system of regenerative steel skeleton and construction method | |
CN104032854B (en) | Assembled T-shaped mixing coupled wall and construction method thereof | |
CN105201071A (en) | Totally-prefabricated concrete structure | |
CN111218983A (en) | Lattice formula structure concrete frame house | |
CN203905214U (en) | Assembled type blend coupled wall system | |
CN111188457A (en) | Edge sealing beam structure of super high-rise steel structure building and construction method | |
CN107447873B (en) | Device for connecting prefabricated laminated connecting beam and prefabricated shear wall and installation method | |
CN104032855B (en) | Assembled cross mixing coupled wall and construction method thereof | |
CN104032861B (en) | Mixing coupled wall steel column and non-energy dissipating beam connecting node structure and construction method thereof | |
CN203834738U (en) | T-shaped prefabricated mixed coupled wall | |
CN210421568U (en) | Assembled beam and plate structure | |
CN210066817U (en) | Assembly integral vault is striden no post underground structure greatly | |
CN104032862B (en) | Assembled girder steel seam line L shape mixing coupled wall and construction method thereof | |
CN203834737U (en) | Cross-shaped prefabricated mixed coupled wall | |
CN206189653U (en) | Assembled mixes even limb wall body system with pre -buried seam girder steel section | |
CN106032705A (en) | Integrated casting molding construction method of reinforced concrete floor system | |
CN203834692U (en) | Connection node structure of section steel column and non-energy-dissipation section steel short beam of mixed coupled wall | |
CN111851318B (en) | Cantilever bridge side span formwork system and construction method thereof | |
CN203905215U (en) | Assembled type steel beam joint straight-line-shaped blend coupled wall | |
CN203834743U (en) | Prefabricated steel beam joint cross-shaped mixed coupled wall | |
CN106401015A (en) | Fabricated hybrid coupled wall system with embedded joint steel beam sections and construction method of fabricated hybrid coupled wall system | |
CN203834741U (en) | Prefabricated steel beam joint L-shaped mixed coupled wall | |
CN104032860B (en) | Assembled mixing coupled wall system and construction method thereof | |
CN104032859B (en) | Assembled L-shaped mixing coupled wall and construction method thereof | |
CN113356405A (en) | Prefabricated composite wall structure based on embedded profile steel and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181026 Termination date: 20200930 |