CN206189653U - Assembled mixes even limb wall body system with pre -buried seam girder steel section - Google Patents
Assembled mixes even limb wall body system with pre -buried seam girder steel section Download PDFInfo
- Publication number
- CN206189653U CN206189653U CN201621094962.9U CN201621094962U CN206189653U CN 206189653 U CN206189653 U CN 206189653U CN 201621094962 U CN201621094962 U CN 201621094962U CN 206189653 U CN206189653 U CN 206189653U
- Authority
- CN
- China
- Prior art keywords
- wall
- wall unit
- buried seam
- girder steel
- steel section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides an assembled mixes even limb wall body system with pre -buried seam girder steel section, this system is including respectively in the horizontal direction, vertical direction of connection's wall unit, be equipped with the floor in the vertical direction between the wall unit wherein connected, the wall unit includes the wall unit concrete wall wall unit steel bones RACK inside with being located wall unit concrete wall, the middle part of wall unit steel bones RACK's upper and lower both sides corresponds the pre -buried pre -buried seam post of wall unit that has, the upper portion symmetric connection of wall unit steel bones RACK's the left and right sides has pre -buried seam girder steel section, the outer tip of pre -buried seam post of wall unit and pre -buried seam girder steel section all exceeds wall unit concrete wall's side reason. The utility model discloses finite element model mixes even to the assembled that limb wall body system carries out mechanical analysis, verifies its structural reliability, has that anti -seismic performance is good, prosthetic advantage is convenient for after shaking to the macroseism, building quality ensures easily that the green performance is good, the design is nimble, the preparation is high -efficient, the transportation is convenient, the installation is convenient, economic benefits good.
Description
Technical field
The utility model is related to the realm of building construction, particularly a kind of assembled wall limb structure.
Background technology
High building structure is to solve urban population during Chinese Urbanization constantly to increase gradually short with urban land
The inevitable choice of contradiction, and coupled wall structural system is indispensable element in high building structure.According to actual measurement money in the past
Material, coupled wall system had both inherited the advantages of simple shear wall construction costs is cheap, anti-side rigidity is big, had embodied again in macroseism
The lower coupling beam surrender of effect consumes energy, avoid or reduces the situation that a large amount of cracks concentrate on wall bottom, to be repaired into after reducing shake
This advantage.
But in actual application, it is limited to building and uses functional requirement, conventional concrete coupling beam is often difficult to meet and cuts
Face shearing resistance demand, certain difficulty is caused to designer.Compared with traditional coupled wall, mixing coupled wall feature is to use
Steel coupling beam substitutes the accentric support power consumption beam theory in concrete connecting-beam, and the existing related specifications of application, code so that the latter's ratio
The former possesses more preferable energy dissipation capacity and progressive collapse-resisting ability, and builds use requirement and simplified assembly process beneficial to meeting.
For new assembly-type RC structure, the type of attachment solved between its wall assembly unit becomes problem demanding prompt solution.
Utility model content
The purpose of this utility model is to provide a kind of assembled mixing coupled wall system with pre-buried seam girder steel section,
Solve the technical problem that traditional structure stress complexity, structural instability, annexation are unreliable, construction is inconvenient.
To achieve the above object, the utility model is adopted the following technical scheme that:
A kind of assembled mixing coupled wall system with pre-buried seam girder steel section, including respectively at horizontal direction, vertical
The wall unit of direction connection, is provided with floor between the wall unit connected wherein on vertical direction, the wall unit includes wall unit
Concrete wall and the wall unit framework of steel reinforcement inside wall unit concrete wall, the both sides up and down of wall unit framework of steel reinforcement
Middle part correspondence be embedded with the pre-buried seam post of wall unit, the top of the left and right sides of wall unit framework of steel reinforcement is symmetrically connected with pre-buried
The outer end of seam girder steel section, the pre-buried seam post of wall unit and pre-buried seam girder steel section exceeds wall unit concrete wall
Lateral edges.
By the section correspondence connection of pre-buried seam girder steel, the left and right wall unit between left and right wall unit in horizontal direction
Between seam crossing be filled with filler;It is another between the pre-buried seam girder steel section of left and right wall unit during if any window opening or door opening
A piece steel coupling beam of outer connection.
Connect by the way that the pre-buried seam post of wall unit is corresponding with wall unit framework of steel reinforcement between upper and lower wall unit on vertical direction
Connect, the pre-buried seam post of wall unit between the upper and lower wall unit is docked and is cast in inside floor.
The both sides up and down of the wall unit concrete wall are symmetrically connected with two pre-buried seam posts of wall unit, the two of homonymy
The individual pre-buried seam post uniform intervals distribution of wall unit, the pre-buried seam column length of wall unit is about 40cm, and its outer end exceeds
The length of the lateral edges of the first wall unit concrete wall is about the half of slab thickness.
The pre-buried seam girder steel section along wall unit concrete wall length direction arrangement, in pre-buried seam girder steel section,
Built-in fitting shear stud and auxiliary bar connector are respectively welded on lower flange, are connected with the auxiliary bar connector pre-buried
Seam beam-ends auxiliary bar.
The outer end of the upper pre-buried seam girder steel section is 5 beyond the length range of the lateral edges of wall unit concrete wall
Centimetre~10 centimetres, 1/3rd of inner end no more than the length of wall unit concrete wall.
The upper surface of the pre-buried seam girder steel section is concordant with wall unit concrete wall edge, be connected to pre-buried seam beam
Upper surface built-in fitting shear stud end exceed wall unit concrete wall edge.
It is described bury seam girder steel section between be bolted, be welded to connect or bolt with welding hybrid mode connect
Connect.
One side or multiaspect of the wall unit concrete wall up and down in four sides are mat surface or in level side
To being provided with wall unit keyway.
The wall unit framework of steel reinforcement includes being made up of horizontal reinforcement, vertical reinforcing bar and drawknot tension rib therebetween
Bar frame and be arranged on the pre-buried seam post surrounding of wall unit wall unit seam post construction muscle, the upper and lower wall unit
By starching anchor docking sleeve between the vertical reinforcing bar of wall unit framework of steel reinforcement.
The floor is the concrete structure or prefabricated concrete structure of cast in situs.
The pre-buried seam post of wall unit and pre-buried seam girder steel section are H profile steel or combined I-shaped steel.
Pre-buried seam girder steel section stiffener is vertically welded between two edges of a wing of the pre-buried seam girder steel section, it is described pre-buried
Seam girder steel section stiffener is no more than wall unit concrete wall edge, can be flushed with wall unit concrete wall edge.
The utility model has the characteristics that and beneficial effect compared with prior art:
The utility model is based on finite element theory, and set up FEM model carries out mechanics to assembled mixing coupled wall system
Analysis, verifies its reliability of structure, the system compared with concrete shear wall structure system, with anti-seismic performance is good, macroseism
The advantage being easily repaired after shake;Compared with using traditional cast-in-place mode, build guality is easily ensured, environmental protection performance is good;With it is existing
There is fabricated shear wall to compare, have the advantages that flexible design, make efficiently, it is convenient transportation, install convenient, good in economic efficiency,
It is in particular in the following aspects:
1st, anti-seismic performance is good:Each wall unit is connected into mixing coupled wall by the utility model by pre-buried seam girder steel section
System, under earthquake repeated action, the structural system can cause that pre-buried seam beam exposed parts preferably form shearing-type and bend
Clothes, its power consumption mode it is similar to the power consumption of accentric support energy dissipating beam section, with energy dissipation capacity greatly, deformation it is small the characteristics of, pre-buried seam
Girder steel section can be arranged along structure overall height, just as being provided with a considerable number of " fuse " in the structure, is consequently formed preferably
Power consumption mechanism;Compared with concrete connecting-beam, the former shear yielding energy-dissipating property consumes energy better than concrete connecting-beam beam-ends plastic hinge,
And the former shear yielding energy consumption and distortion is small, under severe earthquake action, progressive collapse-resisting ability is strong.
2nd, it is easily repaired after macroseism shake:The energy that structure is passed under macroseism is mainly by pre-buried seam beam and coupling beam to mould
Property deformation form absorbed, under severe earthquake action, delay the development in crack, preferably avoid or reduce shear wall bottom
Crack extension.Therefore, repairing after macroseism only need to carry out exposing the replacing of pre-buried seam girder steel section or coupling beam and open on a small quantity
Split the reinforcement that wall does.
3rd, optimization of construction technology, build guality is easy to ensure:The making major part of wall is completed in factory, therefore can
Effective field surveillance concentrated on the connection between wall element, engineering construction quality is easy to ensure;With cast-in-place coagulation
Native shear wall is compared, and factory makes to be carried out simultaneously with in-site installation, solves cast-in-place concrete shear wall situ wet operation amount big
Problem;Compared with existing general fabricated shear wall, pre-buried seam post can solve asking for upper wall construction process stability
Topic, to realize that the splicing of same layer coupled wall unit scene is constructed with the crossings on different level that pours of floor, there is provided technical possibility;
Steel coupling beam substitutes concrete connecting-beam, solves the problems, such as that cast-in-place concrete coupling beam situ wet operation amount is big.
4th, environmental protection performance is good:Because the making major part of wall is completed in factory, template can be repeated effectively
Utilize, pre-buried seam girder steel section, coupling beam are again without using template and temporary support, therefore building course reduces the product of building waste
It is raw.
5th, flexible design, make efficiently, convenient transportation, install convenient:In existing prefabricated assembled shear walls design, often
It is that the wall that coupling beam is connected with coupling beam two ends is divided into an assembly unit, causes unit volume excessive, to transport, installs
Bring inconvenience;In addition, this kind of cell cube design, not only brings inconvenience to designer, and wall assembly unit
Standard component should not be formed, causes mould utilization ratio low.This patent proposition pre-buried seam girder steel of use is intersegmental, pre-buried seam steel
The mode connected between beam section and coupling beam realizes the effective connection between wall limb, is structure design personnel flexibly design prefabricated unit
Provide convenience, while also forming standard component beneficial to wall assembly unit;Pre-buried seam girder steel section is connected at the scene with coupling beam, just
The wall of coupling beam and its two ends need not be considered to pour and to build up a cell cube, so that convenient transport and installation;This patent is also upper
The pre-buried seam post of the connect setting of lower wall unit, saves the operation of its live temporary support, real " playing with building blocks " formula realized
Mode of construction, it is convenient to install.In a word, compared with existing fabricated shear wall, with flexible design, make efficiently, convenient transportation,
The advantages of install convenient.
6th, it is good in economic efficiency:At this stage, fabricated shear wall cost remains high, to find out its cause, main just because even
Beam is poured with the wall at its two ends and builds up a big unit body, so as to be that transport and installation bring inconvenience;It is exactly in addition irregular wall
Body assembly unit, is difficult to form standard component, and mould utilization factor is low, using pre-buried seam girder steel is intersegmental, pre-buried seam girder steel section with
Effective connection between connected mode realizes wall limb between coupling beam, above mentioned problem can be readily solved, and can substantially reduce cost, highlight
The economic advantages of fabricated construction.
Brief description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is wall cellular construction schematic diagram of the present utility model.
Fig. 2 is the A-A generalized sections of Fig. 1.
Fig. 3 is structural representation of the present utility model.
Fig. 4 is the B-B generalized sections of Fig. 3.
Reference:1- walls unit, 2- wall units concrete wall, the pre-buried seam post of 3- wall units, 4- wall units
Seam post construction muscle, 5- wall units keyway, 6- wall units framework of steel reinforcement, 7- built-in fittings shear stud, the pre-buried seam girder steels of 8-
The pre-buried seam girder steel section auxiliary bar of section, 9-, 10- auxiliary bars connector, the pre-buried seam girder steel section stiffeners of 11-, 12- are filled out
Fill thing, 13- floors, 14- steel coupling beam, 15- slurry anchor sleeves.
Specific embodiment
Embodiment referring to shown in Fig. 3, Fig. 4, wrap by this assembled mixing coupled wall system with pre-buried seam girder steel section
The wall unit 1 connected respectively at horizontal direction, vertical direction is included, the wall unit 1 is prefabricated components, and strength grade of concrete is not
Less than C30, not higher than C60, wall is highly about floor height and subtracts slab thickness, between the wall unit connected wherein on vertical direction
Floor 13 is provided with, by the correspondence connection of pre-buried seam girder steel section 8, the left and right wall between the left and right wall unit 1 in horizontal direction
Such as seam crossing between unit is filled with filler 12, and the filler 12 can select low intensive filler, hollow small
Building block, porous brick etc., during if any window opening or door opening, steel coupling beam are set up between the pre-buried seam girder steel section 8 of left and right wall unit 1
14;Between upper and lower wall unit 1 on vertical direction by the pre-buried seam post 3 of wall unit through high-strength bolt or bolted and welded connection,
The vertical reinforcement of wall unit framework of steel reinforcement 6 is pre-buried through starching the correspondence connection of anchor sleeve 15, the wall unit between the upper and lower wall unit
Seam post 3 is docked and is cast in inside floor 13.
Referring to shown in Fig. 1, Fig. 2, the wall unit 1 includes wall unit concrete wall 2 and positioned at wall unit concrete walls
The wall unit framework of steel reinforcement 6 in internal portion, the middle part correspondence of the both sides up and down of wall unit framework of steel reinforcement is embedded with that wall unit is pre-buried to be connect
Seam post 3, the top of the left and right sides of wall unit framework of steel reinforcement is symmetrically connected with pre-buried seam girder steel section 8, and the wall unit is pre-buried
The outer end of seam post 3 and pre-buried seam girder steel section 8 is beyond the lateral edges of wall unit concrete wall 2.
The both sides up and down of the first wall unit concrete wall are symmetrically connected with two pre-buried seam posts of the first wall unit,
The pre-buried seam post uniform intervals distribution of two the first wall units of homonymy, the pre-buried seam column length of the first wall unit is about
40cm, its outer end beyond the length range of the lateral edges of the first wall unit concrete wall be 5 centimetres~10 centimetres, about building
The half of plate thickness.
The pre-buried seam girder steel section 8 welds built-in fitting shearing resistance thereon along the length direction of wall unit concrete wall 2 arrangement
Peg 7 is simultaneously connected by auxiliary bar connector 10 with pre-buried seam girder steel section auxiliary bar 9.The upper pre-buried seam girder steel
The outer end of section 8 is 5 centimetres~10 centimetres beyond the length range of the lateral edges of wall unit concrete wall 2, and inner end does not surpass
Cross 1/3rd of the length of wall unit concrete wall.
The upper surface of the pre-buried seam beam is concordant with wall unit concrete wall edge, be connected to the upper of pre-buried seam beam
The end of the built-in fitting shear stud on surface exceeds wall unit concrete wall edge.
It is bolted between the pre-buried seam girder steel section 8, is welded to connect or bolt and welding hybrid mode
Connection.
One side or multiaspect of the wall unit concrete wall 2 up and down in four sides are mat surface or in level side
To being provided with wall unit keyway 5.
The wall unit framework of steel reinforcement 6 includes the tension rib structure by horizontal reinforcement, vertical reinforcing bar and drawknot therebetween
Into bar frame and be arranged on the pre-buried surrounding of seam post 3 of wall unit wall unit seam post construct muscle 4.
The pre-buried seam post 3 of wall unit and pre-buried seam girder steel section 8 are H profile steel or combined I-shaped steel, strength grade
It is not less than Q235, not higher than Q420.
Pre-buried seam girder steel section stiffener 12 is vertically welded between two edges of a wing of the pre-buried seam beam 9, it is described pre-buried
Seam girder steel section stiffener 11 is flushed with wall unit concrete wall 2.
A kind of construction method of assembled mixing coupled wall system as mentioned with pre-buried seam girder steel section, including wall
The prefabricated operation and assembled in situ operation of unit, it is characterised in that comprise the following steps that:
The prefabricated operation of wall unit:
Step one, wall unit shear stud 4 is welded and fixed on the pre-buried seam post 3 of wall unit.
Step 2, makes pre-buried seam girder steel section 8:It is respectively welded on section steel beam or the upper and lower edge of a wing of truck welding bogie
Built-in fitting shear stud, auxiliary bar connector, then again by pre-buried seam beam-ends auxiliary bar and auxiliary bar connector phase
Even.
Step 3, the pre-buried seam post 3 of wall unit and the correspondence of pre-buried seam girder steel section 8 are connected on design attitude.
Step 4, colligation wall unit framework of steel reinforcement 6 is carried out according to design requirement.
Step 5, and wall unit seam post construction muscle 4 is fixed around the pre-buried seam post 3 of wall unit.
Step 6, installs the formwork for placing of wall unit 1, and one side as needed, in four faces up and down or
Multiaspect carries out horizontal keyway or mat surface treatment.
Step 7, pours the concrete of walling unit 1.
Step 8, it is to be poured build up type and maintenance after, sling and the demoulding by suspension ring, complete the prefabricated operation of wall unit.
Mix the assembled in situ operation of coupled wall:
Step one, job site is transported to by prefabricated wall unit, starts on-site construction processes.
Step 2, carries out the connection of wall unit on vertical direction, by the pre-buried seam post 3 of the wall unit of upper and lower wall unit with
Wall unit framework of steel reinforcement 6 is connected respectively, and welding mixing by high-strength bolt or bolt wherein between the pre-buried seam post 3 of wall unit connects
Connect, connected by starching anchor sleeve 15 between the vertical reinforcing bar of wall unit framework of steel reinforcement 6.
Step 3, carries out the connection of wall unit in horizontal direction, and the pre-buried seam girder steel section correspondence of left and right wall unit is logical
High-strength bolt or bolted and welded connection are crossed, and filler 12 is filled at vertical abutment joint;It is left and right during if any window opening or door opening
Steel coupling beam is set up between the pre-buried seam girder steel section of wall unit.
Step 4, the reinforcing bar of colligation floor 13 simultaneously installs the template of floor 13.
Step 5, pours the concrete of build floor 13.
Step 6, it is to be poured to build up type, and conserved.
Step 7, step one completes the construction of whole assembled mixing coupled wall system to step 6 in repeating this operation
Operation.
Claims (10)
1. it is a kind of with pre-buried seam girder steel section assembled mixing coupled wall system, including respectively at horizontal direction, vertically just
To the wall unit of connection(1), floor is provided between the wall unit connected wherein on vertical direction(13), it is characterised in that:It is described
Wall unit(1)Including wall unit concrete wall(2)With the wall unit framework of steel reinforcement inside wall unit concrete wall
(6), the middle part of the both sides up and down of wall unit framework of steel reinforcement is corresponding to be embedded with the pre-buried seam post of wall unit(3), wall unit reinforcing bar
The top of the left and right sides of frame is symmetrically connected with pre-buried seam girder steel section(8), the pre-buried seam post of wall unit(3)Connect with pre-buried
Seam girder steel section(8)Outer end exceed wall unit concrete wall(2)Lateral edges;
Left and right wall unit in horizontal direction(1)Between by pre-buried seam girder steel section(8)Correspondence connection, the left and right wall list
Seam crossing between unit is filled with filler(12);
Upper and lower wall unit on vertical direction(1)Between pass through the pre-buried seam post of wall unit(3)With wall unit framework of steel reinforcement(6)
Correspondence connection, the pre-buried seam post of wall unit between the upper and lower wall unit(3)Dock and be cast in floor(13)It is internal.
2. it is according to claim 1 with pre-buried seam girder steel section assembled mixing coupled wall system, it is characterised in that:
The pre-buried seam girder steel section(8)Along wall unit concrete wall(2)Length direction arrangement, welds built-in fitting shear stud thereon
(7)And by auxiliary bar connector(10)It is connected with pre-buried seam girder steel section auxiliary bar(9).
3. it is according to claim 2 with pre-buried seam girder steel section assembled mixing coupled wall system, it is characterised in that:
The pre-buried seam girder steel section(8)Outer end exceed wall unit concrete wall(2)The length range of lateral edges be 5 centimetres
~10 centimetres, 1/3rd of inner end no more than the length of wall unit concrete wall.
4. it is according to claim 3 with pre-buried seam girder steel section assembled mixing coupled wall system, it is characterised in that:
The pre-buried seam girder steel section(8)Upper surface it is concordant with wall unit concrete wall edge, be connected to pre-buried seam girder steel section
Upper surface built-in fitting shear stud(7)End exceed wall unit concrete wall edge.
5. it is according to claim 4 with pre-buried seam girder steel section assembled mixing coupled wall system, it is characterised in that:
The pre-buried seam girder steel section(8)Between by be welded to connect or bolt with weld hybrid mode be connected.
6. it is according to claim 1 with pre-buried seam girder steel section assembled mixing coupled wall system, it is characterised in that:
The wall unit concrete wall(2)The one side or multiaspect in four sides are mat surface or are provided with the horizontal direction up and down
Wall unit keyway 5.
7. it is according to claim 1 with pre-buried seam girder steel section assembled mixing coupled wall system, it is characterised in that:
The wall unit framework of steel reinforcement(6)Including the steel being made up of horizontal reinforcement, vertical reinforcing bar and drawknot tension rib therebetween
Muscle rack and it is arranged on the pre-buried seam post of wall unit(3)The wall unit seam post construction muscle of surrounding(4).
8. it is according to claim 1 with pre-buried seam girder steel section assembled mixing coupled wall system, it is characterised in that:
The pre-buried seam post of wall unit(3)With pre-buried seam girder steel section(8)It is H profile steel or combined I-shaped steel.
9. it is according to claim 8 with pre-buried seam girder steel section assembled mixing coupled wall system, it is characterised in that:
The pre-buried seam girder steel section(8)Two edges of a wing between be vertically welded with pre-buried seam girder steel section stiffener(11), it is described pre-buried
Seam girder steel section stiffener(11)No more than wall unit concrete wall edge.
10. the assembled mixing coupled wall system with pre-buried seam girder steel section according to claim 1, its feature exists
In:The floor is the concrete structure or prefabricated concrete structure of cast in situs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621094962.9U CN206189653U (en) | 2016-09-30 | 2016-09-30 | Assembled mixes even limb wall body system with pre -buried seam girder steel section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621094962.9U CN206189653U (en) | 2016-09-30 | 2016-09-30 | Assembled mixes even limb wall body system with pre -buried seam girder steel section |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206189653U true CN206189653U (en) | 2017-05-24 |
Family
ID=58730328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621094962.9U Withdrawn - After Issue CN206189653U (en) | 2016-09-30 | 2016-09-30 | Assembled mixes even limb wall body system with pre -buried seam girder steel section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206189653U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401015A (en) * | 2016-09-30 | 2017-02-15 | 中国建筑股份有限公司 | Fabricated hybrid coupled wall system with embedded joint steel beam sections and construction method of fabricated hybrid coupled wall system |
-
2016
- 2016-09-30 CN CN201621094962.9U patent/CN206189653U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401015A (en) * | 2016-09-30 | 2017-02-15 | 中国建筑股份有限公司 | Fabricated hybrid coupled wall system with embedded joint steel beam sections and construction method of fabricated hybrid coupled wall system |
CN106401015B (en) * | 2016-09-30 | 2018-10-26 | 中国建筑股份有限公司 | Assembled mixing coupled wall system and construction method with pre-buried seam girder steel section |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107419824A (en) | The full precast shear wall structural system of regenerative steel skeleton and construction method | |
CN106567458B (en) | Assembled steel-is mixed to combine Beam-post Frame Structure system | |
CN109680835B (en) | Self-supporting precast concrete wallboard, concrete wall, structural system and construction method | |
CN107476470A (en) | Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method | |
CN104294920B (en) | The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method | |
CN203834738U (en) | T-shaped prefabricated mixed coupled wall | |
CN203905214U (en) | Assembled type blend coupled wall system | |
CN206189653U (en) | Assembled mixes even limb wall body system with pre -buried seam girder steel section | |
CN113027021A (en) | Support-free prefabricated floor slab with bracket | |
CN104032861A (en) | Hybrid coupled wall type steel column and non-energy-dissipation beam connection node structure and construction method thereof | |
CN210066817U (en) | Assembly integral vault is striden no post underground structure greatly | |
CN207892021U (en) | A kind of novel fabricated steel-regeneration concrete combination frame structural system | |
CN104032862B (en) | Assembled girder steel seam line L shape mixing coupled wall and construction method thereof | |
CN203834737U (en) | Cross-shaped prefabricated mixed coupled wall | |
CN109610707A (en) | A kind of design and rapid constructing method of prefabricated girder steel and floor fit flush | |
CN106401015B (en) | Assembled mixing coupled wall system and construction method with pre-buried seam girder steel section | |
CN203905215U (en) | Assembled type steel beam joint straight-line-shaped blend coupled wall | |
CN203834692U (en) | Connection node structure of section steel column and non-energy-dissipation section steel short beam of mixed coupled wall | |
CN203834743U (en) | Prefabricated steel beam joint cross-shaped mixed coupled wall | |
CN211714016U (en) | Assembled underground pipe gallery | |
CN106401017B (en) | L-shaped flexible joint coupled wall with pre-buried seam beam section and its construction method | |
CN104047380B (en) | Assembled girder steel seam T-shaped mixing coupled wall and construction method thereof | |
CN203834741U (en) | Prefabricated steel beam joint L-shaped mixed coupled wall | |
CN210066818U (en) | Assembled flat top has post underground structure | |
CN104032860B (en) | Assembled mixing coupled wall system and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170524 Effective date of abandoning: 20181026 |