CN203834741U - Prefabricated steel beam joint L-shaped mixed coupled wall - Google Patents

Prefabricated steel beam joint L-shaped mixed coupled wall Download PDF

Info

Publication number
CN203834741U
CN203834741U CN201420248264.4U CN201420248264U CN203834741U CN 203834741 U CN203834741 U CN 203834741U CN 201420248264 U CN201420248264 U CN 201420248264U CN 203834741 U CN203834741 U CN 203834741U
Authority
CN
China
Prior art keywords
wall unit
wall
seam
unit
short beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420248264.4U
Other languages
Chinese (zh)
Inventor
卢海陆
苏明周
孙建运
刘康
金晓飞
杨晓杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201420248264.4U priority Critical patent/CN203834741U/en
Application granted granted Critical
Publication of CN203834741U publication Critical patent/CN203834741U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

A prefabricated steel beam joint L-shaped mixed coupled wall comprises a first wall unit and a second wall unit which are perpendicularly connected to form the L shape, wherein the first wall unit and the second wall unit are respectively a prefabricated part, and the first wall unit and the second wall unit are connected through a joint post-cast strip. According to the prefabricated steel beam joint L-shaped mixed coupled wall, a steel beam is used for replacing a concrete beam, a section steel column is used for replacing an edge-constraining reinforced concrete embedded column, and therefore the mixed coupled wall has better energy dissipation capacity and continuous collapse preventing capacity than a traditional coupled wall, prefabrication and filed installation are performed synchronously, the problems that wet construction quantity is large on a construction site, and much building waste is generated are solved, and the assembly working procedures are simplified; after short beams of joints are in butt welding, large rigidity is formed between the wall units, stability of the wall is facilitated in the constructing process, the working procedure that a prefabricated wall serves as a temporary support is omitted, and construction efficiency is guaranteed. The prefabricated steel beam joint L-shaped mixed coupled wall can be widely applied to construction of mixed coupled walls in constructional engineering.

Description

Assembling girder steel seam line L shape is mixed coupled wall
Technical field
The utility model relates to a kind of coupled wall and construction method thereof of construction work, particularly a kind of assembling mixing coupled wall and construction method thereof.
Background technology
High building structure is in Chinese Urbanization process, to solve urban population constantly to increase and the urban land inevitable choice of short contradiction gradually, and coupled wall structural system is indispensable element in high building structure.According to field data in the past, coupled wall system had both been inherited the advantages such as cheap, the anti-side rigidity of simple shear wall construction costs is large, embody again under severe earthquake action coupling beam surrender power consumption, reduced a large amount of cracks and concentrate on body of wall bottom, to reduce the advantage of rehabilitation cost after shake.But in actual application, be limited to building and use functional requirement, conventional concrete coupling beam is often difficult to meet cross section shearing resistance demand, has caused certain difficulty to designer.And in project construction process, Contraction in Site amount is large and need a large amount of template and temporary supporting, not only affect construction speed, also can produce a large amount of building wastes, pollute.
Utility model content
The purpose of this utility model is to provide a kind of assembling girder steel seam line L shape and mixes coupled wall, solve large, the inefficient technical problem of coupled wall construction operation amount; And solve and in construction, produce the problem of a large amount of building wastes.
For achieving the above object, the utility model adopts following technical scheme:
A kind of assembling girder steel seam line L shape is mixed coupled wall, comprises and is mutually vertically connected on together, forms the first L shaped wall unit and the second wall unit, and described the first wall unit and the second wall unit are prefabricated units, connect between the two by seam ater-casting.
Described the first wall unit comprises the first wall unit concrete wall, is erected in the first wall unit steel column and the first wall unit seam post at the first inner two ends of wall unit concrete wall and is positioned at the first wall unit cage of reinforcement of the first concrete wall inside, wall unit respectively; The two ends up and down of described the first wall unit steel column all exceed the first wall unit concrete wall, the length direction that is positioned at the upper end edge first wall unit concrete wall of the first wall unit steel column of the first wall unit concrete wall is connected with the first non-energy dissipating short beam in wall unit, and the other end of described the first non-energy dissipating short beam in wall unit exceeds the first wall unit concrete wall; The two ends up and down of described the first wall unit seam post all exceed the first wall unit concrete wall, the upper, middle, and lower part that is arranged in the first wall unit seam post of the first wall unit concrete wall is connected with the first wall unit seam short beam along the length direction of the first wall unit concrete wall respectively, and the other end of described the first wall unit seam short beam exceeds the first wall unit concrete wall; On described the first wall unit steel column, the first non-energy dissipating short beam in wall unit, the first wall unit seam post and the first wall unit seam short beam, be all fixed with the first wall unit shearing resistance peg.
Described the second wall unit comprises the second wall unit concrete wall, is erected in the second wall unit steel column and the second wall unit seam post at the second inner two ends of wall unit concrete wall and is positioned at the second wall unit cage of reinforcement of the second concrete wall inside, wall unit respectively; The two ends up and down of described the second wall unit steel column all exceed the second wall unit concrete wall, the length direction that is positioned at the upper end edge second wall unit concrete wall of the second wall unit steel column of the second wall unit concrete wall is connected with the second non-energy dissipating short beam in wall unit, and the other end of described the second non-energy dissipating short beam in wall unit exceeds the second wall unit concrete wall; The two ends up and down of described the second wall unit seam post all exceed the second wall unit concrete wall, the length direction that is arranged in the upper end edge second wall unit concrete wall of the second wall unit seam post of the second wall unit concrete wall be connected with the second non-energy dissipating short beam in wall unit,, upper, middle, and lower part is connected with the second wall unit seam short beam in the same way along the width of the second wall unit concrete wall, the other end of described the second wall unit seam short beam and the second non-energy dissipating short beam in wall unit all exceeds the second wall unit concrete wall; On described the second wall unit steel column, the second non-energy dissipating short beam in wall unit, the second wall unit seam post and the second wall unit seam short beam, be all fixed with the second wall unit shearing resistance peg.
Described the first wall unit seam short beam and the second wall unit seam short beam docking are cast in inside, seam ater-casting, and inside, described seam ater-casting is also provided with seam ater-casting vertical reinforcement and seam ater-casting stirrup.
Described the first wall unit concrete wall up and down four sides in one side or multiaspect be matsurface or have in the horizontal direction keyway.
Described the second wall unit concrete wall up and down four sides in one side or multiaspect be matsurface or have in the horizontal direction keyway.
The length range that described the first wall unit seam short beam exceeds the first concrete wall edge, wall unit is 5 centimetres~10 centimetres.
The length range that described the second wall unit seam short beam exceeds the second concrete wall edge, wall unit is 5 centimetres~10 centimetres.
Described the first wall unit cage of reinforcement comprises the first wall unit horizontal reinforcing bar of being connected between the first wall unit steel column and the first wall unit seam post, and the first wall unit horizontal reinforcing bar the first vertical reinforcing bar in wall unit connected vertically and be connected to the first wall unit tension rib between the first vertical reinforcing bar in wall unit.
Described the second wall unit cage of reinforcement comprises the second wall unit horizontal reinforcing bar of being connected between the second wall unit steel column and the second wall unit seam post, and the second wall unit horizontal reinforcing bar the second vertical reinforcing bar in wall unit connected vertically and be connected to the second wall unit tension rib between the second vertical reinforcing bar in wall unit.
Described the first wall unit cage of reinforcement also comprises the first wall unit seam post structure muscle that is arranged on the first wall unit steel column structure muscle of the first wall unit steel column surrounding and is arranged on the first wall unit seam post surrounding.
Described the second wall unit cage of reinforcement also comprises the second wall unit seam post structure muscle that is arranged on the second wall unit steel column structure muscle of the second wall unit steel column surrounding and is arranged on the second wall unit seam post surrounding.
Described the first wall unit steel column, the first non-energy dissipating short beam in wall unit and the first wall unit seam post are H shaped steel or combined I-shaped steel, and described the first wall unit seam short beam is H shaped steel, combined I-shaped steel or steel plate.
The non-energy dissipating short beam of described the second wall unit steel column and the second wall unit is H shaped steel or combined I-shaped steel, and described the second wall unit seam post is cross-shaped profile steel, and described the second wall unit seam short beam is H shaped steel, combined I-shaped steel or steel plate.
Assembling girder steel seam line L shape of the present utility model is mixed coupled wall, to adopt assembling combining structure, for L shaped connected node design studies in assembling mixing coupled wall system, based on finite element theory, set up FEM (finite element) model assembling girder steel seam line L shape mixing coupled wall system is carried out to mechanical analysis, verify the reliability of its node, bonding strength is high, node quality is good: first, wall unit is reinforcing bar, shaped steel and concrete combination construction, between wall unit, fix by the butt welding of seam short beam, seam short beam after butt welding forms shaped steel short beam in seam ater-casting, this is the important channel of node power transmission, and weldquality more easily detects, also more easily guarantee quality of connection, like this, just between wall unit, form reliable connection, formation is similar to Shu Zhuti system, individual layer wall unit is provided with multiple tracks seam short beam, increase the strength and ductility of seam horizontal direction, in addition, seam short beam is divided into original whole surface concrete wall some parts, concrete has been played to cuff effect, increase concrete compressive strength, rear pouring concrete has diagonal bracing effect to class Shu Zhuti system, simultaneously, in seam ater-casting, be also provided with the vertical muscle in seam ater-casting and seam ater-casting stirrup, this all has obvious effect to improving concrete crushing strength, increase the strength and ductility of seam vertical direction, therefore, the utility model assembling girder steel seam line L shape is mixed the node strength of coupled wall higher than component strength, meets anti-seismic construction requirement.
The construction method that assembling girder steel seam line L shape of the present utility model is mixed coupled wall is also easier, fast, efficiently, be included in prefabrication, assemble at the scene, after the butt welding of seam short beam, between wall unit, form larger rigidity, be conducive to the stable of body of wall in work progress, and two procedures can be carried out simultaneously, improve speed of application, for completing of work items provides guarantee on schedule, considering to mix coupled wall unit makes, what lift and transport is convenient, member is classified into standard component wall unit by fractionation, be transported to behind job site, with be connected reliable, the node structure of constructability carries out supporting assembling, in project construction process, assembly between structure, reduce the wet trade amount at concrete scene, thereby reduce template, the input amount of temporary supporting, and then reduce the generation of building waste.
The utility model has met mixing coupled wall system antidetonation needs, has realized the form of construction work that prefabrication, on-site consolidation synchronously carry out, and seam ater-casting has ensured the reliability that node connects.
Compared with traditional cast-in-situ concrete coupled wall, use girder steel to substitute concrete beam, use steel column to substitute edge constraint steel concrete sleeper, make to mix coupled wall and have better energy dissipation capacity and progressive collapse-resisting ability than traditional coupled wall, use seam beam to substitute embedded bar, because seam beam is larger than reinforcing bar rigidity, in transportation, there will not be bending phenomenon, ensure the quality of products, and prefabrication and on-the-spot installation are carried out simultaneously, solve the problem that job site wet trade amount is large, building waste is many, be convenient to meet building instructions for use and simplify assembly process; Compared with existing general assembling coupled wall, after the butt welding of seam short beam, between wall unit, form larger rigidity, be conducive to the stable of body of wall in work progress, save the operation that precast shear wall does temporary supporting, ensure efficiency of construction, reduced the input amount of template temporary supporting, reduced the generation of building waste.
The utility model can be widely used in mixing in construction work the construction of coupled wall structural system.
Brief description of the drawings
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is the structural representation of the utility model the first wall unit.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the structural representation of the utility model the second wall unit.
Fig. 4 is the B-B sectional view of Fig. 3.
Fig. 5 is structural representation of the present utility model.
Fig. 6 is the C-C sectional view of Fig. 5.
Reference numeral: 1-the first wall unit, 1.1-the first wall unit concrete wall, 1.2-the first wall unit steel column, 1.3-the first non-energy dissipating short beam in wall unit, 1.4-the first wall unit seam post, 1.5-the first wall unit seam short beam, 1.6-the first wall unit shearing resistance peg, 1.7-the first wall unit steel column structure muscle, 1.8-the first wall unit cage of reinforcement, 1.9-the first wall unit seam post structure muscle, 1.10-keyway;
2-the second wall unit, 2.1-the second wall unit concrete wall, 2.2-the second wall unit steel column, 2.3-the second non-energy dissipating short beam in wall unit, 2.4-the second wall unit seam post, 2.5-the second wall unit seam short beam, 2.6-the second wall unit shearing resistance peg, 2.7-the second wall unit steel column structure muscle, 2.8-the second wall unit cage of reinforcement, 2.9-the second wall unit seam post structure muscle, 2.10-keyway;
3-seam ater-casting, 3.1-seam ater-casting vertical reinforcement, 3.2-seam ater-casting stirrup.
Detailed description of the invention
Embodiment is referring to shown in Fig. 5, Fig. 6, a kind of assembling girder steel seam line L shape is mixed coupled wall, comprise and be mutually vertically connected to form the first L shaped wall unit 1 and the second wall unit 2, wherein the first wall unit 1 is symmetrically distributed in the both sides of the second wall unit 2, described the first wall unit 1 and the second wall unit 2 are prefabricated units, strength grade of concrete is not less than C30, not higher than C60, connects between the two by seam ater-casting 3; Described the first wall unit seam short beam 1.5 and second wall unit seam short beam 2.5 both docking are cast in 3 inside, seam ater-casting, 3 inside, described seam ater-casting are also provided with seam ater-casting vertical reinforcement 3.1 and are placed in the seam ater-casting stirrup 3.2 in vertical reinforcement 3.1 outsides, seam ater-casting, when described seam ater-casting vertical reinforcement 3.1 is two rows, seam ater-casting vertical reinforcement 3.1 is placed in outside the first wall unit seam short beam 1.5 and the second wall unit seam short beam 2.5; When seam ater-casting vertical reinforcement 3.1 is that three rows or three rows are when above, at the relevant position welded reinforcement connector of the first wall unit seam short beam 1.5 and the second wall unit seam short beam 2.5, the strength grade of concrete of described seam ater-casting 3 should higher than two grades of the strength grade of concrete of the first wall unit 1 and the second wall unit 2 or more than.
Shown in Fig. 1, Fig. 2, described the first wall unit 1 comprises the first wall unit concrete wall 1.1, the first wall unit steel column 1.2 that is erected in respectively the first concrete wall 1.1 inner two ends, wall unit and the first wall unit seam post 1.4 and is positioned at the first wall unit cage of reinforcement 1.8 of the first concrete wall 1.1 inside, wall unit; Described the first wall unit cage of reinforcement 1.8 comprises the first wall unit horizontal reinforcing bar of being connected between the first wall unit steel column 1.2 and the first wall unit seam post 1.4, and the first wall unit horizontal reinforcing bar the first vertical reinforcing bar in wall unit connected vertically and be connected to the first wall unit tension rib between the first vertical reinforcing bar in wall unit; Described the first wall unit concrete wall 1.1 upper and lower faces and in abutting connection with the keyway 1.10 that all has horizontal direction on the face of seam ater-casting 3; The steel column length of described the first wall unit steel column 1.2 and the first wall unit seam post 1.4 is about floor height.
Described the first wall unit cage of reinforcement 1.8 also comprises the first wall unit seam post structure muscle 1.9 that is arranged on the first wall unit steel column structure muscle 1.7 of the first wall unit steel column 1.2 surroundings and is arranged on the first wall unit seam post 1.4 surroundings.
The two ends up and down of described the first wall unit steel column 1.2 all exceed the first wall unit concrete wall 1.1, the length direction that is positioned at the upper end edge first wall unit concrete wall 1.1 of the first wall unit steel column 1.2 of the first wall unit concrete wall 1.1 is connected with the first non-energy dissipating short beam 1.3 in wall unit, and the other end of described the first non-energy dissipating short beam 1.3 in wall unit exceeds the first wall unit concrete wall 1.1.
The two ends up and down of described the first wall unit seam post 1.4 all exceed the first wall unit concrete wall 1.1, the upper, middle, and lower part that is arranged in the first wall unit seam post 1.4 of the first wall unit concrete wall 1.1 is connected with the first wall unit seam short beam 1.5 along the length direction of the first wall unit concrete wall 1.1 respectively, and the length range that described the first wall unit seam short beam 1.5 exceeds the first concrete wall 1.1 edges, wall unit is 5 centimetres~10 centimetres.
Described the first wall unit steel column 1.2, the first non-energy dissipating short beam 1.3 in wall unit and the first wall unit seam post 1.4 are H shaped steel or combined I-shaped steel, strength grade is Q345, the first wall unit seam short beam 1.5, for H shaped steel, combined I-shaped steel or steel plate, strength grade are Q345, is all fixed with the first wall unit shearing resistance peg 1.6 on the edge of a wing outward flange of shaped steel or steel plate edge.
Shown in Fig. 3, Fig. 4, described the second wall unit 1 comprises the second wall unit concrete wall 2.1, the second wall unit steel column 2.2 that is erected in respectively the second concrete wall 2.1 inner two ends, wall unit and the second wall unit seam post 2.4 and is positioned at the second wall unit cage of reinforcement 2.8 of the second concrete wall 2.1 inside, wall unit; Described the second wall unit cage of reinforcement 2.8 comprises the second wall unit horizontal reinforcing bar of being connected between the second wall unit steel column 2.2 and the second wall unit seam post 2.4, and the second wall unit horizontal reinforcing bar the second vertical reinforcing bar in wall unit connected vertically and be connected to the second wall unit tension rib between the second vertical reinforcing bar in wall unit; On described the second wall unit concrete wall 2.1 upper and lower faces, have the keyway 2.10 of horizontal direction; The steel column length of described the second wall unit steel column 2.2 and the second wall unit seam post 2.4 is about floor height.
Described the second wall unit cage of reinforcement 2.8 also comprises the second wall unit seam post structure muscle 2.9 that is arranged on the second wall unit steel column structure muscle 2.7 of the second wall unit steel column 2.2 surroundings and is arranged on the second wall unit seam post 2.4 surroundings.
The two ends up and down of described the second wall unit steel column 2.2 all exceed the second wall unit concrete wall 2.1, the length direction that is positioned at the upper end edge second wall unit concrete wall 2.1 of the second wall unit steel column 2.2 of the second wall unit concrete wall 2.1 is connected with the second non-energy dissipating short beam 2.3 in wall unit, and the other end of described the second non-energy dissipating short beam 2.3 in wall unit exceeds the second wall unit concrete wall 2.1.
The two ends up and down of described the second wall unit seam post 2.4 all exceed the second wall unit concrete wall 2.1, the length direction that is arranged in the upper end edge second wall unit concrete wall 2.1 of the second wall unit seam post 2.4 of the second wall unit concrete wall 2.1 is connected with the second non-energy dissipating short beam 2.3 in wall unit, , on, in, lower three parts are connected with the second wall unit seam short beam 2.5 in the same way along the width of the second wall unit concrete wall 2.1, the other end of described the second wall unit seam short beam 2.5 and the second non-energy dissipating short beam 2.3 in wall unit all exceeds the second wall unit concrete wall 2.1, the length range that described the second wall unit seam short beam 2.5 exceeds the second concrete wall 2.1 edges, wall unit is 5 centimetres~10 centimetres.
Described the second wall unit steel column 2.2 and the non-energy dissipating short beam 2.3 in the second wall unit are H shaped steel or combined I-shaped steel, strength grade is Q345, described the second wall unit seam post 2.4 is that L shaped shaped steel, strength grade are Q345, described the second wall unit seam short beam 2.5, for H shaped steel, combined I-shaped steel or steel plate, strength grade are Q345, is all fixed with the second wall unit shearing resistance peg 2.6 on the edge of a wing outward flange of above-mentioned shaped steel or steel plate edge.
Assembling girder steel seam line L shape is mixed a construction method for coupled wall, and concrete steps are as follows:
The prefabricated operation of the first wall unit 1 and the second wall unit 2:
Step 1 is welded and fixed the first wall unit shearing resistance peg 1.6 on the first wall unit steel column 1.2, the first non-energy dissipating short beam 1.3 in wall unit, the first wall unit seam post 1.4 and the first wall unit seam short beam 1.5.
Step 2, is welded and fixed the non-energy dissipating short beam 1.6 of the first wall unit steel column 1.2 and the first wall unit, and the first wall unit seam post 1.4 and the first wall unit seam short beam 1.5 are welded and fixed.
Step 3, fixes respectively the first wall unit steel column 1.2 and the first wall unit seam post 1.4.
Step 4, colligation the first wall unit horizontal reinforcing bar, the first vertical reinforcing bar in wall unit and the first wall unit tension rib form the first wall unit cage of reinforcement 1.8.
Step 5 is fixed the first wall unit steel column structure muscle 1.7 around the first wall unit steel column 1.2, fixes the first wall unit seam post structure muscle 1.9 around the first wall unit seam post 1.4.
Step 6, installs the template of the first wall unit 1, and carries out horizontal keyway or matsurface processing at four faces up and down.
Step 7, builds the concrete of the first wall unit 1.
Step 8, to be poured building up after type and maintenance, carries out the demoulding, completes the prefabricated operation of the first wall unit 1, and the prefabricated operation of the second wall unit 2 is identical with the first wall unit 1, completes the prefabricated operation of the second wall unit 2 simultaneously.
The site assembly operation of the first wall unit 1 and the second wall unit 2:
Step 1, is transported to job site by the first prefabricated wall unit 1 and the second wall unit 2, starts on-site construction processes.
Step 2, by the second wall unit seam short beam 2.5 correspondences of the first wall unit seam short beam 1.5 of the first wall unit 1 and the second wall unit 2 and carry out butt welding and fix.
Step 3, colligation seam ater-casting vertical reinforcement 3.1 and seam ater-casting stirrup 3.2.
Step 4, installs the template of seam ater-casting 3.
Step 5, builds the concrete of seam ater-casting 3.
Step 6, carries out maintenance, completes the site assembly construction of the L shaped mixing coupled wall of individual layer.
The site assembly operation of multilayer the first wall unit 1 and/or the second wall unit 2:
Step 1, lifts by crane the first wall unit 1, upper strata with lower floor the first wall unit 1 and docks, by the first two-layer wall unit steel column and soldered the connecing of the first wall unit seam post corresponding points.
Step 2, sloughs suspension hook, to the first wall unit steel column corresponding to two-layer the first wall unit and the first wall unit seam post penetration welding.
Step 3, arranges cage of reinforcement in the seam areas up and down of double-deck the first wall unit, and installs the concrete-pouring template of upper and lower seam areas.
Step 4, builds the concrete of upper and lower seam areas.
Step 5, carries out maintenance, completes the site assembly construction of double-deck the first wall unit, and the construction of double-deck the second wall unit is identical with the first wall unit.
Step 6, repeating step one, to step 5, completes the site assembly construction of the L shaped mixing coupled wall of multilayer.
Be prefabricated in the factory the first wall unit 1 and the second wall unit 2, carry out erection at the scene, and two procedures can be carried out simultaneously, improves efficiency of construction, for completing of work items provides guarantee on schedule.

Claims (8)

1. an assembling girder steel seam line L shape is mixed coupled wall, comprise and be mutually vertically connected on together, form the first L shaped wall unit (1) and the second wall unit (2), it is characterized in that: described the first wall unit (1) and the second wall unit (2) are prefabricated units, connect by seam ater-casting (3) between the two;
Described the first wall unit (1) comprises the first wall unit concrete wall (1.1), the first wall unit steel column (1.2) that is erected in respectively the first inner two ends of wall unit concrete wall (1.1) and the first wall unit seam post (1.4) and is positioned at the first inner wall unit cage of reinforcement (1.8) of the first wall unit concrete wall (1.1); The two ends up and down of described the first wall unit steel column (1.2) all exceed the first wall unit concrete wall (1.1), the length direction that is positioned at the upper end edge first wall unit concrete wall (1.1) of the first wall unit steel column (1.2) of the first wall unit concrete wall (1.1) is connected with the first non-energy dissipating short beam in wall unit (1.3), and the other end of described the first non-energy dissipating short beam in wall unit (1.3) exceeds the first wall unit concrete wall (1.1); The two ends up and down of described the first wall unit seam post (1.4) all exceed the first wall unit concrete wall (1.1), the upper, middle, and lower part that is arranged in the first wall unit seam post (1.4) of the first wall unit concrete wall (1.1) is connected with the first wall unit seam short beam (1.5) along the length direction of the first wall unit concrete wall (1.1) respectively, and the other end of described the first wall unit seam short beam (1.5) all exceeds the first wall unit concrete wall (1.1); On described the first wall unit steel column (1.2), the first non-energy dissipating short beam in wall unit (1.3), the first wall unit seam post (1.4) and the first wall unit seam short beam (1.5), be all fixed with the first wall unit shearing resistance peg (1.6);
Described the second wall unit (2) comprises the second wall unit concrete wall (2.1), the second wall unit steel column (2.2) that is erected in respectively the second inner two ends of wall unit concrete wall (2.1) and the second wall unit seam post (2.4) and is positioned at the second inner wall unit cage of reinforcement (2.8) of the second wall unit concrete wall (2.1), the two ends up and down of described the second wall unit steel column (2.2) all exceed the second wall unit concrete wall (2.1), the length direction that is positioned at the upper end edge second wall unit concrete wall (2.1) of the second wall unit steel column (2.2) of the second wall unit concrete wall (2.1) is connected with the second non-energy dissipating short beam in wall unit (2.3), and the other end of described the second non-energy dissipating short beam in wall unit (2.3) exceeds the second wall unit concrete wall (2.1), the two ends up and down of described the second wall unit seam post (2.4) all exceed the second wall unit concrete wall (2.1), the length direction that is arranged in the upper end edge second wall unit concrete wall (2.1) of the second wall unit seam post (2.4) of the second wall unit concrete wall (2.1) is connected with the second non-energy dissipating short beam in wall unit (2.3), on, in, lower three parts are connected with the second wall unit seam short beam (2.5) in the same way along the width of the second wall unit concrete wall (2.1), the other end of described the second wall unit seam short beam (2.5) and the non-energy dissipating short beam in the second wall unit (2.3) all exceeds the second wall unit concrete wall (2.1), on described the second wall unit steel column (2.2), the second non-energy dissipating short beam in wall unit (2.3), the second wall unit seam post (2.4) and the second wall unit seam short beam (2.5), be all fixed with the second wall unit shearing resistance peg (2.6),
Described the first wall unit seam short beam (1.5) and second both docking of wall unit seam short beam (2.5) are cast in inside, seam ater-casting (3), and inside, described seam ater-casting (3) is also provided with seam ater-casting vertical reinforcement (3.1) and seam ater-casting stirrup (3.2).
2. assembling girder steel seam line L shape according to claim 1 is mixed coupled wall, it is characterized in that: described the first wall unit concrete wall (1.1) up and down one side or the multiaspect in four sides is matsurface or has in the horizontal direction keyway (1.10).
3. assembling girder steel seam line L shape according to claim 2 is mixed coupled wall, it is characterized in that: described the second wall unit concrete wall (2.1) up and down one side or the multiaspect in four sides is matsurface or has in the horizontal direction keyway (2.10).
4. assembling girder steel seam line L shape according to claim 3 is mixed coupled wall, it is characterized in that: the length range that described the first wall unit seam short beam (1.5) exceeds the first wall unit concrete wall (1.1) edge is 5 centimetres~10 centimetres;
The length range that described the second wall unit seam short beam (2.5) exceeds the second wall unit concrete wall (2.1) edge is 5 centimetres~10 centimetres.
5. assembling girder steel seam line L shape according to claim 4 is mixed coupled wall, it is characterized in that: described the first wall unit cage of reinforcement (1.8) comprises the first wall unit horizontal reinforcing bar of being connected between the first wall unit steel column (1.2) and the first wall unit seam post (1.4), and the first wall unit horizontal reinforcing bar the first vertical reinforcing bar in wall unit connected vertically and be connected to the first wall unit tension rib between the first vertical reinforcing bar in wall unit;
Described the second wall unit cage of reinforcement (2.8) comprises the second wall unit horizontal reinforcing bar of being connected between the second wall unit steel column (2.2) and the second wall unit seam post (2.4), and the second wall unit horizontal reinforcing bar the second vertical reinforcing bar in wall unit connected vertically and be connected to the second wall unit tension rib between the second vertical reinforcing bar in wall unit.
6. assembling girder steel seam line L shape according to claim 5 is mixed coupled wall, it is characterized in that: described the first wall unit cage of reinforcement (1.8) also comprises the first wall unit steel column structure muscle (1.7) that is arranged on the first wall unit steel column (1.2) surrounding and the first wall unit seam post structure muscle (1.9) that is arranged on the first wall unit seam post (1.4) surrounding;
Described the second wall unit cage of reinforcement (2.8) also comprises the second wall unit steel column structure muscle (2.7) that is arranged on the second wall unit steel column (2.2) surrounding and the second wall unit seam post structure muscle (2.9) that is arranged on the second wall unit seam post (2.4) surrounding.
7. mix coupled wall according to the assembling girder steel seam line L shape one of claim 1-6 Suo Shu, it is characterized in that: described the first wall unit steel column (1.2), the first non-energy dissipating short beam in wall unit (1.3) and the first wall unit seam post (1.4) are H shaped steel or combined I-shaped steel, described the first wall unit seam short beam (1.5) is H shaped steel, combined I-shaped steel or steel plate.
8. assembling girder steel seam line L shape according to claim 7 is mixed coupled wall, it is characterized in that: described the second wall unit steel column (2.2) and the non-energy dissipating short beam in the second wall unit (2.3) are H shaped steel or combined I-shaped steel, described the second wall unit seam post (2.4) is cross-shaped profile steel, and described the second wall unit seam short beam (2.5) is H shaped steel, combined I-shaped steel or steel plate.
CN201420248264.4U 2014-05-15 2014-05-15 Prefabricated steel beam joint L-shaped mixed coupled wall Withdrawn - After Issue CN203834741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420248264.4U CN203834741U (en) 2014-05-15 2014-05-15 Prefabricated steel beam joint L-shaped mixed coupled wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420248264.4U CN203834741U (en) 2014-05-15 2014-05-15 Prefabricated steel beam joint L-shaped mixed coupled wall

Publications (1)

Publication Number Publication Date
CN203834741U true CN203834741U (en) 2014-09-17

Family

ID=51512601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420248264.4U Withdrawn - After Issue CN203834741U (en) 2014-05-15 2014-05-15 Prefabricated steel beam joint L-shaped mixed coupled wall

Country Status (1)

Country Link
CN (1) CN203834741U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032862A (en) * 2014-05-15 2014-09-10 中国建筑股份有限公司 Assembly-type steel beam joint L-shaped mixed coupled wall and construction method thereof
CN104652654A (en) * 2015-02-11 2015-05-27 沈阳建筑大学 Novel assembled shear wall structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032862A (en) * 2014-05-15 2014-09-10 中国建筑股份有限公司 Assembly-type steel beam joint L-shaped mixed coupled wall and construction method thereof
CN104032862B (en) * 2014-05-15 2016-06-15 中国建筑股份有限公司 Assembled girder steel seam line L shape mixing coupled wall and construction method thereof
CN104652654A (en) * 2015-02-11 2015-05-27 沈阳建筑大学 Novel assembled shear wall structure
CN104652654B (en) * 2015-02-11 2017-04-26 沈阳建筑大学 Assembled shear wall structure

Similar Documents

Publication Publication Date Title
CN104032854A (en) Assembly-type T-shaped mixed coupled wall and construction method thereof
CN203834738U (en) T-shaped prefabricated mixed coupled wall
CN103938549B (en) The construction method of the oblique web combination beam of assembled waveform steel
CN108179809A (en) The connection method of assembled steel tendon concrete frame structure component
CN102733606A (en) Construction method of high large cantilever structure
CN109680835B (en) Self-supporting precast concrete wallboard, concrete wall, structural system and construction method
CN106760036A (en) A kind of prefabricated steel combined concrete shear wall
CN104032855A (en) Assembly-type cross-shaped mixed coupled wall and construction method thereof
CN203834737U (en) Cross-shaped prefabricated mixed coupled wall
CN203905214U (en) Assembled type blend coupled wall system
CN110670732A (en) Connection node of steel truss with inverted V-shaped section and reinforced concrete structure and construction method
CN104032862B (en) Assembled girder steel seam line L shape mixing coupled wall and construction method thereof
CN203834741U (en) Prefabricated steel beam joint L-shaped mixed coupled wall
CN203834743U (en) Prefabricated steel beam joint cross-shaped mixed coupled wall
CN104018521B (en) Subway twin columns overhead station steel reinforced concrete transformational structure reinforcing bar and construction method thereof
CN203905215U (en) Assembled type steel beam joint straight-line-shaped blend coupled wall
CN203961055U (en) Assembling in-line mixing coupled wall
CN104032861A (en) Hybrid coupled wall type steel column and non-energy-dissipation beam connection node structure and construction method thereof
CN104047380B (en) Assembled girder steel seam T-shaped mixing coupled wall and construction method thereof
CN203834742U (en) L-shaped prefabricated mixed coupled wall
CN104032859A (en) Assembly-type L-shaped mixed coupled wall and construction method thereof
CN203834740U (en) Assembly type steel beam joint T-shaped mixed limb wall
CN103669193A (en) Laterally spliced combination T beam with wavy steel webs and construction method thereof
CN104032857B (en) Assembled girder steel seam cross mixing coupled wall and construction method thereof
CN104032858B (en) Assembled girder steel seam in-line mixing coupled wall and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140917

Effective date of abandoning: 20160615

C25 Abandonment of patent right or utility model to avoid double patenting