CN106368216A - Construction method for precise closure of steel sheet piles - Google Patents

Construction method for precise closure of steel sheet piles Download PDF

Info

Publication number
CN106368216A
CN106368216A CN201510423732.6A CN201510423732A CN106368216A CN 106368216 A CN106368216 A CN 106368216A CN 201510423732 A CN201510423732 A CN 201510423732A CN 106368216 A CN106368216 A CN 106368216A
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
pile
adjacent
sample
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510423732.6A
Other languages
Chinese (zh)
Other versions
CN106368216B (en
Inventor
李红业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Think Of Jade-Like Stone Moistens Dynamo-Electric Co Ltd
Original Assignee
Shanghai Think Of Jade-Like Stone Moistens Dynamo-Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Think Of Jade-Like Stone Moistens Dynamo-Electric Co Ltd filed Critical Shanghai Think Of Jade-Like Stone Moistens Dynamo-Electric Co Ltd
Priority to CN201510423732.6A priority Critical patent/CN106368216B/en
Publication of CN106368216A publication Critical patent/CN106368216A/en
Application granted granted Critical
Publication of CN106368216B publication Critical patent/CN106368216B/en
Active - Reinstated legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a construction method for precise closure of steel sheet piles. The method comprises the steps that (1) a shape formed through enclosing of the steel sheet piles and related dimensions are measured, steel sheet pile pit slots are excavated at measured positions, and prepared short steel sheet pile samples are placed at the measured positions; (2) a level gauge and a theodolite are prepared on the pit slots and the ground, and a level degree and perpendicularity are adjusted at the same time; (3) one short steel sheet pile sample is drawn out from the placement position when the first steel sheet pile is driven, lock catches of two adjacent steel sheet pile samples are aligned, and the first steel sheet pile can be pressed in, so that the position of the steel sheet pile can be found accurately, and the perpendicularity of the steel sheet pile can be ensured; and (4) in the same way, the steel sheet pile sample adjacent to the first steel sheet pile is drawn out when the second steel sheet pile is driven, a catching groove of the second steel sheet pile is aligned with the lock catch of the first steel sheet pile and the adjacent steel sheet pile lock catch, then the second sheet pile can be inserted completely, and the same method is applied to the subsequent steel sheet piles till the precise closure of the last steel sheet pile is completed.

Description

The construction method that a kind of steel sheet pile precisely closes
Technical field
The invention belongs to construction technology in geotechnical engineering field, the construction method that more particularly to a kind of steel sheet pile precisely closes.
Background technology
Steel sheet pile has that intensity is high, lightweight, stable performance, construction transport and easy to maintenance, speed of application fast, quality is easily controlled, short time limit, and scene is clean and tidy.In addition, steel sheet pile can be reused, reduce investment outlay, thus obtained extensive utilization in Geotechnical Engineering.But steel sheet pile is in work progress, also can run into some problems, such as be difficult precisely to close in enclosed type steel sheet pile construction process Steel Sheet Pile, need to carry out last closure by modes such as artificial welding;During press-in steel sheet pile, the more difficult rectification of perpendicularity of steel sheet pile, steel sheet pile head is susceptible to displacement.
In the prior art, the problem being difficult for steel sheet pile precisely to close, is that method squeezed into by screen, abnormity pile construction method carries out enclosed type steel sheet pile construction by the way of generally adopting.
Screen-type squeezes into method, is in a row to insert 10-20 root steel sheet pile in saddle, in screen shape, then injection in batches again.First the steel sheet pile at screen panel two ends is beaten to designed elevation or certain depth during injection, become positioning sheet pile, then divide in centre that l/3,1/2 sheet pile are highly stepped to be squeezed in order.The advantage that screen-type squeezes into method is: can reduce heeling error accumulation, prevent excessive inclination, and be easily achieved closing and close up, can guarantee that the construction quality of sheet pile wall.Its shortcoming is: the Self-standing height of pitching pile is larger, and during pitching pile, stability is bad, and working security is not high.
Special-shaped pile construction method, is to be difficult, for steel sheet pile, the problem that precisely closes, and with techniques such as cutting, polishing, welding, whole steel sheet pile is closed by the profile of the off-gauge steel sheet pile of field fabrication.Deformed steel flats pile construction method, though making flexibly, targetedly steel sheet pile can be processed, but the crudy of special-shaped sheet pile is relatively difficult to ensure card, and squeeze into and extract also more difficult, the special-shaped sheet pile closing up especially for closing, is usually processed before closing is closed up as needed, often affects construction speed.
The problem being difficult to for steel plate pile verticality correct, the solution generally adopting is the perpendicularity checking, correcting steel sheet pile in work progress with instrument at any time, and progressively correction steel wire rope pulling pile body Bian Labian beats for run-off the straight.This kind of correcting method is calibrated using instrument and the artificial perpendicularity to steel sheet pile and is detected.This kind of construction method process is complicated, easily produces deviation, needs to readjust, waste time and energy after having deviation.
Content of the invention
The purpose of the present invention is the problems referred to above existing for prior art it is proposed that a kind of construction method of the accurate closure of steel sheet pile.
A kind of construction method of the accurate closure of steel sheet pile, mainly comprises the steps that 1) measure the shape surrounding of steel sheet pile and relative dimensions and dig out steel sheet pile pit surveying measured position, ready short steel sheet pile sample is positioned over the measured position of survey;2) level indicator is prepared on pit and ground and adjust level with perpendicularity with theodolite simultaneously;3) when beating first steel sheet pile, a short steel sheet pile sample is extracted out from the position placed, the lock of be aligned two adjacent steel sheet pile samples, first steel sheet pile is pressed into, can either accurately find the position of steel sheet pile, and the perpendicularity ensureing steel sheet pile can be grasped.4) likewise, second steel sheet pile, extract out with the first adjacent steel sheet pile sample of steel sheet pile, second steel sheet pile catching groove is directed at first steel sheet pile lock and adjacent steel sheet pile lock, completely insert second sheet pile, steel sheet pile equally uses this kind of method afterwards, and to the last a steel sheet pile precisely closes.
The invention has the beneficial effects as follows: this engineering method solve the last steel sheet pile often occurring during steel sheet pile construction closing close up problem and when being pressed into steel sheet pile steel sheet pile the perpendicularity problem that is difficult to control, completely can quickly close each steel sheet pile, the steel sheet pile of this kind of construction method press-in has very strong water resistance and compressive resistance performance, can be widely applied to the construction field of steel sheet pile.
Brief description
Fig. 1 is the schematic side view after first steel sheet pile press-in.
In figure: 1, the ground enclosed construction that short steel sheet pile sample surrounds;2nd, pit;3rd, first steel sheet pile.
Specific embodiment
For content of the invention, feature and effect of the present invention can be further appreciated that, hereby enumerate following examples, and it be as follows to coordinate accompanying drawing to describe in detail:
1) measured the shape surrounding of steel sheet pile and relative dimensions have dug out steel sheet pile pit 2 in the measured position of survey, ready short steel sheet pile sample 1 has been positioned over the measured position of survey, surrounds a ground enclosed construction 1;
2) level indicator is prepared on pit 2 and ground and adjust level with perpendicularity with theodolite simultaneously;
3), when beating first steel sheet pile 3, a short steel sheet pile sample is extracted from the position placed.It is directed at the lock of two adjacent steel sheet pile samples, first steel sheet pile 3 is pressed into, can either accurately find the position of steel sheet pile, can guarantee that the perpendicularity of steel sheet pile again;
4) likewise, second steel sheet pile, extract out with the first adjacent steel sheet pile sample of steel sheet pile 3, second steel sheet pile catching groove is directed at first steel sheet pile lock and adjacent steel sheet pile lock, completely insert second sheet pile, steel sheet pile equally uses this kind of method afterwards, and to the last a steel sheet pile precisely closes.

Claims (1)

1. a kind of steel sheet pile precisely closure construction method it is characterised in that:
Described steel sheet pile precisely closes construction and comprises the following steps:
1) measured the shape surrounding of steel sheet pile and relative dimensions have dug out steel sheet pile pit in the measured position of survey, ready short steel sheet pile sample has been positioned over the measured position of survey, surrounds ground closing means;
2) level indicator is prepared on pit and ground and adjust level with perpendicularity with theodolite simultaneously;
3) when beating first steel sheet pile, a short steel sheet pile sample is extracted out from the position placed, the lock of be aligned two adjacent steel sheet pile samples, first steel sheet pile is pressed into, can either accurately find the position of steel sheet pile, and the perpendicularity ensureing steel sheet pile can be grasped;4) likewise, second steel sheet pile, extract out with the first adjacent steel sheet pile sample of steel sheet pile, second steel sheet pile catching groove is directed at first steel sheet pile lock and adjacent steel sheet pile lock, completely insert second sheet pile, steel sheet pile equally uses this kind of method afterwards, and to the last a steel sheet pile precisely closes.
CN201510423732.6A 2015-07-20 2015-07-20 The construction method that a kind of steel sheet pile precisely closes Active - Reinstated CN106368216B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510423732.6A CN106368216B (en) 2015-07-20 2015-07-20 The construction method that a kind of steel sheet pile precisely closes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510423732.6A CN106368216B (en) 2015-07-20 2015-07-20 The construction method that a kind of steel sheet pile precisely closes

Publications (2)

Publication Number Publication Date
CN106368216A true CN106368216A (en) 2017-02-01
CN106368216B CN106368216B (en) 2018-04-03

Family

ID=57879795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510423732.6A Active - Reinstated CN106368216B (en) 2015-07-20 2015-07-20 The construction method that a kind of steel sheet pile precisely closes

Country Status (1)

Country Link
CN (1) CN106368216B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1837512A (en) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same
CN201704691U (en) * 2010-07-02 2011-01-12 中国海洋石油总公司 Position-limiting pile follower of steel sheet pile
CN102619215A (en) * 2012-05-05 2012-08-01 中铁十六局集团第五工程有限公司 Lock catch type steel pipe pile structure and construction method thereof
JP2012207371A (en) * 2011-03-29 2012-10-25 Penta Ocean Construction Co Ltd Method for installing steel sheet pile
CN104652434A (en) * 2014-12-23 2015-05-27 广州机施建设集团有限公司 Pile planting construction method for steel sheet piles

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1837512A (en) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same
CN201704691U (en) * 2010-07-02 2011-01-12 中国海洋石油总公司 Position-limiting pile follower of steel sheet pile
JP2012207371A (en) * 2011-03-29 2012-10-25 Penta Ocean Construction Co Ltd Method for installing steel sheet pile
CN102619215A (en) * 2012-05-05 2012-08-01 中铁十六局集团第五工程有限公司 Lock catch type steel pipe pile structure and construction method thereof
CN104652434A (en) * 2014-12-23 2015-05-27 广州机施建设集团有限公司 Pile planting construction method for steel sheet piles

Also Published As

Publication number Publication date
CN106368216B (en) 2018-04-03

Similar Documents

Publication Publication Date Title
CN109281328A (en) The accurate construction method of steel cofferdam guide pile
CN103122636A (en) Superficial layer groove wall reinforcing method of feeble stratum underground continuous wall
CN108442421A (en) Large-diameter tubular pile centrifugal test modelling equipment and its working method
CN104695448A (en) Construction method for water jet cutter Larsen steel sheet pile
CN104912528A (en) Method for identifying inflection point of water flooding characteristic curve in extra-high water cut stage
CN106871882B (en) Hole digging pile verticality and flatness laser guiding device and construction method thereof
CN208309659U (en) A kind of soil layer excavation face pawl nail type activity sedimentometer
CN104849766A (en) Electrical imaging logging image stratum attitude identification method
CN105586994A (en) Monitoring device and monitoring method for horizontal displacement of pile tip of retaining pile for foundation pit
CN103233453B (en) A kind of original position soil body surveying method
CN103541339A (en) Pull rod type testing device and method for unsaturated undisturbed loess slope soil pressure
CN105118363A (en) Method and model for simulated testing antiseepage curtain between concrete and bedrock
CN110321576A (en) Partially-penetrated well precipitation makes the outer earth's surface settlement calculation method of foundation pit in diving stratum foundation pit
CN110174503A (en) A method of determining that country rock weakens development range based on tunnel deformation
CN104652439A (en) Auxiliary mounting device of pre-embedment grouting pipe in impervious wall slot
CN106368216A (en) Construction method for precise closure of steel sheet piles
CN104060624A (en) Method for arranging pile foundations in complex soft soil foundation
CN204461908U (en) A kind of soft clay undrained shear strength proving installation
CN114016489A (en) Datum point fixing device for settlement monitoring
CN107326889A (en) A kind of bar shaped probe and computational methods for detecting bury shear stress
CN207176660U (en) A kind of bar shaped probe for detecting bury shear stress
CN203569569U (en) Auxiliary installation device for pre-burying of grout pipe in cut-off wall slot
CN216694963U (en) Manual and automatic integrated surcharge preloading earth surface settlement monitoring device
CN202730734U (en) Unsaturation original state loess side slope soil pressure pull rod type testing device
CN106545012B (en) Steel column guide pipe insertion technique

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403

Termination date: 20210720

CF01 Termination of patent right due to non-payment of annual fee
RR01 Reinstatement of patent right

Former decision: Termination of patent rights for unpaid annual fees

Former decision publication date: 20220708

RR01 Reinstatement of patent right