JP2012207371A JP2011071428A JP2011071428A JP2012207371A JP 2012207371 A JP2012207371 A JP 2012207371A JP 2011071428 A JP2011071428 A JP 2011071428A JP 2011071428 A JP2011071428 A JP 2011071428A JP 2012207371 A JP2012207371 A JP 2012207371A
Authority
JP
Japan
Prior art keywords
steel sheet
sheet pile
guide
pile
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2011071428A
Other languages
Japanese (ja)
Inventor
Hiroaki Morimoto
弘昭 森本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP2011071428A priority Critical patent/JP2012207371A/en
Publication of JP2012207371A publication Critical patent/JP2012207371A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for installing a steel sheet pile which can install a long steel sheet pile at a low cost and accurately without using a modified steel sheet pile and is hardly affected by meteorological and marine conditions.SOLUTION: When a plurality of permanent steel sheet piles 1,1... are driven into a foundation A so that the lengthwise direction is directed in the vertical direction and that the permanent steel sheet piles are arranged adjacent to each other in the width direction, a guiding steel sheet pile 2 shorter than the permanent steel sheet pile 1 is driven into a position in the foundation A into which the permanent steel sheet pile 1 is planned to be driven, directing the lengthwise direction in the vertical direction. Thereby guide holes 6,6... directed in the vertical direction are formed, after which the guiding steel sheet pile 2 is withdrawn, and in place of the withdrawn guiding steel sheet pile 2, the lower end side of the permanent steel sheet pile 1 is inserted in the guide hole 6 and installed, and the permanent steel sheet pile 1 is driven into a prescribed depth of the foundation A.

Description

本発明は、岸壁及び護岸の土留壁等に使用される長尺の鋼矢板を地盤中に打ち込むための鋼矢板の打設方法に関する。   The present invention relates to a steel sheet pile driving method for driving a long steel sheet pile used for a quay wall, a retaining wall of a revetment, and the like into a ground.

従来、河岸、海岸、港湾の岸壁及び護岸構造には、上下方向に向けた複数の鋼矢板を幅方向に互いに隣接した配置に並べて設置した鋼矢板壁を有するものが知られており、このような複数の鋼矢板を地盤に対し並べて打設する方法として、単独打ちによる施工方法及び幅方向に並べて設置した鋼矢板を多段打ち(屏風多段打ち)により施工する方法等が知られている(例えば、特許文献1)。   Conventionally, riverbanks, coasts, harbor quay walls and revetment structures have been known to have steel sheet pile walls in which a plurality of steel sheet piles oriented in the vertical direction are arranged side by side in the width direction. As a method for placing a plurality of steel sheet piles side by side on the ground, there are known a construction method by single punching and a method of constructing steel sheet piles arranged side by side in the width direction by multi-stage driving (folding screen multi-stage driving). Patent Document 1).

単独打ちによる施工方法では、最初に1又は2枚の鋼矢板を導枠に沿って設置し、それを杭打機又は杭打船により地盤中の所定の深さまで打ち込んだ後、次の鋼矢板を既設の鋼矢板と隣り合う配置に設置し、一方の側縁部を既設の鋼矢板にガイドさせつつ地盤中の所定深さまで打ち込む作業を行い、この作業を各鋼矢板について順次繰り返すことにより複数の鋼矢板を互いに幅方向に並べて打設するようにしている。   In the construction method by single hammering, first, one or two steel sheet piles are installed along the guide frame, and after it is driven to a predetermined depth in the ground by a pile driver or pile driver, the next steel sheet pile is Is installed adjacent to the existing steel sheet pile, and one side edge is guided to the existing steel sheet pile while driving to a predetermined depth in the ground, and this operation is repeated sequentially for each steel sheet pile. These steel sheet piles are arranged side by side in the width direction.

また、この方法では、鋼矢板の片側縁のみをガイドさせた状態で打設するため鋼矢板が傾いて打設され易く、その為、矢板壁の端部又は中央部において楔状の異形鋼矢板を打ち込み、鋼矢板間の隙間を埋めてその傾きを修正するようにしている。   Further, in this method, since the steel sheet pile is driven in a state in which only one side edge of the steel sheet pile is guided, the steel sheet pile is inclined and is easily driven. Therefore, a wedge-shaped deformed steel sheet pile is formed at the end portion or the central portion of the sheet pile wall. The gap between steel sheet piles is filled and the inclination is corrected.

一方、屏風多段打ちによる鋼矢板の打設方法では、所定の間隔を隔てて打設された鋼管矢板の上端部間に導枠を架設し、この導枠に沿って複数の鋼矢板を幅方向に並べて設置した後、両端側の鋼矢板を所定量打ち込み、その打ち込まれた鋼矢板に合わせて両端の鋼矢板間に配置された各鋼矢板を互いにガイドさせつつ同じ深さまで打ち込む作業を行い、調整を行いながらこの作業を数回に分けて繰り返し、各鋼矢板を互いにガイドさせつつ全体が所定深さに至るまで打設する。   On the other hand, in the method of placing steel sheet piles using folding screen multi-stage driving, a guide frame is installed between the upper ends of steel pipe sheet piles placed at a predetermined interval, and a plurality of steel sheet piles are arranged in the width direction along the guide frame. After placing the steel sheet piles on both ends, a predetermined amount of steel sheet piles are driven in, and the steel sheet piles arranged between both ends are guided to each other according to the driven steel sheet piles and driven to the same depth. This operation is repeated several times while making adjustments, and the steel sheet piles are guided to each other and are driven until the whole reaches a predetermined depth.

特開平6−294127号公報JP-A-6-294127

しかし上述の如き従来の単独打ちによる施工方法では、楔状の異形鋼矢板を各鋼矢板の傾き具合に合わせて施工現場において製作しなければならず製作に困難が伴うという問題があった。   However, the conventional method of single-handed construction as described above has a problem that a wedge-shaped deformed steel sheet pile has to be produced at the construction site in accordance with the inclination of each steel sheet pile, resulting in difficulty in production.

特に長尺の異形鋼矢板の製作は困難であり、製作時の反りや曲がりが打設精度に影響を及ぼすため、その製作には熟練した技術を必要とするという問題があった。   In particular, it is difficult to produce a long deformed steel sheet pile, and warping and bending at the time of production affect the placement accuracy.

一方、多段打ちによる施工方法では、複数の長尺の鋼矢板を並べて設置するために大規模な設置装置及び導枠を必要とし経費が嵩むという問題があった。   On the other hand, the multi-stage construction method has a problem that a large-scale installation device and a guide frame are required to install a plurality of long steel sheet piles side by side, which increases costs.

また、多段打ちによる施工では、各鋼矢板を均一且つ正確に打設するために調整を行いながら各鋼矢板の打ち込みを数回に分けて行うため、杭打ち機(又は杭打ち船)を数回に渡って移動させる必要があり、工期が長期化し、費用も嵩むという問題があった。   In addition, in construction by multi-stage driving, each steel sheet pile is driven in several times while making adjustments in order to place each steel sheet pile uniformly and accurately, so there are several pile driving machines (or pile driving ships). There was a problem that it was necessary to move it over time, the construction period was prolonged, and the cost was increased.

更に海上での作業において鋼矢板を途中まで打設した状態にあっては、一の鋼矢板の打設作業を行っている間、他の各鋼矢板は、その上側部分の大半が水面上に突出した状態のまま放置されるので風波を受けやすく、気象・海象条件に左右されやすいという問題があり、特に長尺の鋼矢板においては水面上に突出する部分が長い為に気象・海象条件による影響が大きいという問題があった。   Furthermore, in the state where the steel sheet pile was driven halfway during the work at sea, while the other steel sheet pile was being driven, most of the upper part of each other sheet pile was on the water surface. Because it is left in a protruding state, it is susceptible to wind waves and is subject to weather and sea conditions. In particular, long steel sheet piles have a long protruding part on the surface of the water. There was a problem that the influence was great.

更に又、両施工方法に共通して、最初に鋼矢板を設置する際に、地盤に対し鋼矢板の向きを鉛直方向に向けて位置合せすることは困難を伴い、この最初の位置合わせの精度が低いと後に打設する鋼矢板の打設精度にも影響するという問題があり、鋼矢板が長尺であるほどこの位置合わせの困難性が増すという問題があった。   Furthermore, common to both construction methods, when installing a steel sheet pile for the first time, it is difficult to align the direction of the steel sheet pile with respect to the ground in the vertical direction. If the steel sheet pile is low, there is a problem in that it affects the precision of the steel sheet pile to be cast later, and the longer the steel sheet pile is, the more difficult this alignment is.

そこで本発明は、上述の如き従来の問題を鑑み、異形鋼矢板を使用せず安価且つ正確に長尺の鋼矢板を打設することができるとともに、気象・海象条件にも左右され難い鋼矢板の打設方法の提供を目的としてなされたものである。   Therefore, in view of the conventional problems as described above, the present invention can place a long steel sheet pile inexpensively and accurately without using a deformed steel sheet pile, and is hardly affected by weather and sea conditions. It was made for the purpose of providing a placement method.

上述の如き従来の問題を解決し、所期の目的を達成するための請求項1に記載の発明の特徴は、複数の本設鋼矢板をその長さ方向を上下方向に向けるとともに、幅方向で互いに隣接する配置に地盤中に打ち込む鋼矢板の打設方法において、前記地盤の本設鋼矢板の打ち込み予定位置に前記本設鋼矢板より短いガイド用鋼矢板をその長さ方向を上下方向に向けて打ち込むことにより上下方向に向けたガイド穴を形成し、しかる後、前記ガイド用鋼矢板を引き抜き、該引き抜いたガイド用鋼矢板に代えて前記ガイド穴に前記本設鋼矢板の下端側を挿入して設置し、該設置された本設鋼矢板を地盤中の所定の深さまで打ち込むことにある。   The feature of the invention described in claim 1 for solving the conventional problems as described above and achieving the intended purpose is that a plurality of steel sheet piles are oriented in the vertical direction and in the width direction. In the method of placing steel sheet piles that are driven into the ground in positions adjacent to each other, guide steel sheet piles shorter than the steel steel sheet piles at the planned placement positions of the steel steel sheet piles in the ground in the vertical direction. Then, a guide hole directed in the vertical direction is formed by driving in, and then the guide steel sheet pile is pulled out, and the lower end side of the main steel sheet pile is placed in the guide hole instead of the extracted guide steel sheet pile. It is to insert and install, and to drive the installed steel sheet pile to a predetermined depth in the ground.

請求項2に記載の発明の特徴は、請求項1の構成に加え、複数の前記ガイド用鋼矢板を幅方向に並べて設置し、前記各ガイド用鋼矢板を互いにガイドさせつつ前記地盤中に打ち込んだ後、前記ガイド用鋼矢板を引き抜き、該ガイド用鋼矢板に代えて前記本設鋼矢板を設置することにある。   The invention according to claim 2 is characterized in that, in addition to the configuration of claim 1, a plurality of guide steel sheet piles are arranged side by side in the width direction and driven into the ground while guiding the guide steel sheet piles to each other. After that, the steel sheet pile for guide is pulled out and the steel sheet pile for guide is installed instead of the steel sheet pile for guide.

請求項3に記載の発明の特徴は、請求項2の構成に加え、幅方向に並べて打ち込まれた複数のガイド用鋼矢板の一部を引き抜き、該引き抜いたガイド用鋼矢板に代えて前記本設鋼矢板を、その両側縁を前記引き抜かれたガイド用鋼矢板の両側部に配置されていた前記本設鋼矢板又はガイド用鋼矢板にガイドさせつつ前記ガイド穴に挿入して設置することにある。   According to a third aspect of the present invention, in addition to the structure of the second aspect, a part of the plurality of guide steel sheet piles driven in parallel in the width direction is extracted, and the book is replaced with the extracted guide steel sheet pile. The installation steel sheet pile is inserted into the guide hole while being guided by the main steel sheet pile or guide steel sheet pile arranged on both sides of the drawn steel sheet pile for guide. is there.

本発明に係る鋼矢板の打設方法は、上述したように、複数の本設鋼矢板をその長さ方向を上下方向に向けるとともに、幅方向で互いに隣接する配置に地盤中に打ち込む鋼矢板の打設方法において、前記地盤の本設鋼矢板の打ち込み予定位置に前記本設鋼矢板より短いガイド用鋼矢板をその長さ方向を上下方向に向けて打ち込むことにより上下方向に向けたガイド穴を形成し、しかる後、前記ガイド用鋼矢板を引き抜き、該引き抜いたガイド用鋼矢板に代えて前記ガイド穴に前記本設鋼矢板の下端側を挿入して設置し、該設置された本設鋼矢板を地盤中の所定の深さまで打ち込むことにより、多段打ちでなくとも長尺の鋼矢板を正確に打ち込むことができ、工期を短縮し費用の低減を図ることができるとともに、楔状の異形鋼矢板を用いての傾斜の修正を行う必要がなく熟練工によらずとも施工することができる。また、本発明方法では、ガイド穴にガイドさせつつ本設鋼矢板を設置することができるので、長尺且つ重量の嵩む本設鋼矢板であっても、容易に位置決めを行うことができる。更に、本発明方法は、屏風多段打ちの如く本設鋼矢板を長期に亘って水上より突出させた状態で放置することがなく、気象・海象条件による影響が少ない。   As described above, the steel sheet pile driving method according to the present invention is a steel sheet pile that is driven into the ground in an arrangement adjacent to each other in the width direction while directing the length direction of the plurality of steel sheet piles in the vertical direction. In the placing method, a guide hole directed in the vertical direction is formed by driving a steel sheet pile for guide shorter than the permanent steel sheet pile in the planned placement position of the permanent steel sheet pile in the ground with the length direction thereof directed in the vertical direction. Then, the guide steel sheet pile is pulled out, and the lower end side of the permanent steel sheet pile is inserted into the guide hole in place of the extracted guide steel sheet pile, and the installed steel sheet is installed. By driving the sheet pile to a predetermined depth in the ground, it is possible to accurately drive long steel sheet piles without being multi-staged, shortening the construction period and reducing costs, and wedge-shaped deformed steel sheet piles Tilt using It can be necessary to carry out modifications to the construction without relying on skilled workers without. Further, according to the method of the present invention, since the permanent steel sheet pile can be installed while being guided by the guide hole, even the long and heavy permanent steel sheet pile can be easily positioned. Furthermore, the method according to the present invention does not leave the steel sheet piles protruding from the water over a long period of time, unlike the folding screen, and is less affected by weather and sea conditions.

また、本発明において、複数の前記ガイド用鋼矢板を幅方向に並べて設置し、前記各ガイド用鋼矢板を互いにガイドさせつつ前記地盤中に打ち込んだ後、前記ガイド用鋼矢板を引き抜き、該ガイド用鋼矢板に代えて前記本設鋼矢板を設置することにより、ガイド用鋼矢板の打ち込みに関しては、鋼矢板が短尺であるので、打込みを数回に分けることなく、或いは多段打ちであっても少ない回数で打ち込むことができるので杭打機等の移動を少なくすることができ工期の短縮を図ることができる一方、高い打設精度が得られるので、本設鋼矢板をガイドするガイド穴の傾斜を抑えることができ高い打設精度をもって本設鋼矢板の打ち込みをすることができる。   Further, in the present invention, a plurality of the guide steel sheet piles are arranged side by side in the width direction, and the guide steel sheet piles are driven into the ground while guiding each other, and then the guide steel sheet piles are pulled out. By installing the steel sheet piles instead of the steel sheet piles, the steel sheet piles for guides are short, so the steel sheet piles are short. Since it can be driven in a small number of times, it is possible to reduce the movement of the pile driving machine and shorten the construction period. On the other hand, since high driving accuracy is obtained, the inclination of the guide hole that guides the steel sheet pile The steel sheet pile can be driven with a high driving accuracy.

更に本発明において、幅方向に並べて打ち込まれた複数のガイド用鋼矢板の一部を引き抜き、該引き抜いたガイド用鋼矢板に代えて前記本設鋼矢板を、その両側縁を前記引き抜かれたガイド用鋼矢板の両側部に配置されていた前記本設鋼矢板又はガイド用鋼矢板にガイドさせつつ前記ガイド穴に挿入して設置することにより、本設鋼矢板を大規模な設備を必要とせず、且つ杭打ち機を数回に分けて移動させる必要のない単独打ちにより打設する一方、両側縁部をガイドさせたことにより多段打ちと同様に高い打設精度を得ることができる。   Further, in the present invention, a part of the plurality of guide steel sheet piles driven in parallel in the width direction is pulled out, the main steel sheet pile is replaced with the pulled-out guide steel sheet pile, and both side edges of the guide are pulled out. By installing the steel sheet pile in the guide hole while being guided by the steel sheet pile or the guide steel sheet pile arranged on both sides of the steel sheet pile, no large-scale equipment is required. In addition, the pile driving machine can be driven by single driving without having to move the pile driver several times. On the other hand, by guiding both side edges, high driving accuracy can be obtained as in the case of multi-stage driving.

本発明に係る鋼矢板の打設方法におけるガイド用鋼矢板打設工程の一例の概略を示す正面図である。It is a front view which shows the outline of an example of the steel sheet pile driving process for guides in the driving method of the steel sheet pile which concerns on this invention. 同上のガイド用鋼矢板の引き抜き工程の概略を示す正面図である。It is a front view which shows the outline of the drawing-out process of the steel sheet pile for a guide same as the above. 同上の本設鋼矢板の設置状態の一例を示す正面図である。It is a front view which shows an example of the installation state of a permanent steel sheet pile same as the above. 図3中の鋼矢板の連結状態を示す平面図である。It is a top view which shows the connection state of the steel sheet pile in FIG. 本発明に係る鋼矢板の打設方法における本設鋼矢板の打ち込み工程の状態を示す正面図である。It is a front view which shows the state of the driving | running process of the permanent steel sheet pile in the driving method of the steel sheet pile concerning this invention.

次に本発明に係る鋼矢板の打設方法の実施の形態を図1〜図5に示した実施例に基づいて説明する。尚、図中符号Aは水底地盤、符号1は水底地盤Aに打設される本設鋼矢板、符号2はガイド用鋼矢板である。   Next, an embodiment of a steel sheet pile driving method according to the present invention will be described based on the examples shown in FIGS. In the figure, reference numeral A is a water bottom ground, reference numeral 1 is a permanent steel sheet pile placed on the bottom bottom ground A, and reference numeral 2 is a steel sheet pile for guide.

本設鋼矢板1は、長さが25m以上の長尺であって、U字状(山形状)断面が長さ方向に連続した形状に形成され、その両側縁部に互いに隣り合う鋼矢板の側縁部同士を連結する継手部材3a,3aが形成されている。   The steel sheet pile 1 has a length of 25 m or more and is formed in a shape in which a U-shaped (mountain-shaped) cross section is continuous in the length direction. Joint members 3a and 3a for connecting the side edges are formed.

ガイド用鋼矢板2は、本設鋼矢板1と同一の断面形状を有し、その長さが長尺(本実施例では31m)の本設鋼矢板1よりも短く形成されたものであり、その両側縁部には、本設鋼矢板1と同形状の継手部材3a,3aが形成されている。尚、図中の実施例においては本設鋼矢板1の約1/2の長さのものを使用する。   The steel sheet pile for guide 2 has the same cross-sectional shape as the permanent steel sheet pile 1, and its length is shorter than the long steel sheet pile 1 (31 m in this embodiment). Joint members 3 a and 3 a having the same shape as the main steel sheet pile 1 are formed on both side edges. In addition, in the Example in a figure, the thing of about 1/2 length of this installation steel sheet pile 1 is used.

この本設鋼矢板1及びガイド用鋼矢板2に用いられる継手3は、隣り合う鋼矢板側縁部に形成された継手部材3a,3aを互いに係合させることにより連結され、且つ係合した状態で鋼矢板の長さ方向に各鋼矢板が互いにスライドできるように形成されている。   The joint 3 used for the steel sheet pile 1 for this construction and the steel sheet pile 2 for a guide is connected by engaging the joint members 3a and 3a formed on the adjacent steel sheet pile side edges with each other, and the engaged state. The steel sheet piles are formed so that they can slide with each other in the length direction of the steel sheet piles.

この本設鋼矢板1を打設するには、まず、鋼管矢板4,4の上端部間に導枠5を架設し、鋼矢板設置手段を形成する。尚、この鋼矢板設置手段は、本設鋼矢板1と同尺の鋼矢板を屏風多段打ちにより打設する場合の鋼矢板設置手段に比べ小さくなっている。   In order to drive this permanent steel sheet pile 1, first, the guide frame 5 is installed between the upper ends of the steel pipe sheet piles 4, 4 to form steel sheet pile installation means. In addition, this steel sheet pile installation means is small compared with the steel sheet pile installation means in the case of placing a steel sheet pile of the same scale as the main steel sheet pile 1 by folding screen multi-stage driving.

次に、図1に示すように、本設鋼矢板1の打ち込み予定位置に合わせて、地盤A上に導枠5に沿って複数のガイド用鋼矢板2,2...をその長さ方向を上下方向に向けると共に幅方向に並べて設置する。その際、隣り合うガイド用鋼矢板2,2の接合部は継手3を介して互いに上下方向にスライド可能な状態で連結され、各ガイド用鋼矢板2,2...は、上下方向の移動に関し互いにガイドされた状態になっている。   Next, as shown in FIG. 1, a plurality of guide steel sheet piles 2,... Along the guide frame 5 on the ground A according to the planned driving position of the steel sheet pile 1. Are installed side by side in the width direction. At that time, the joint portions of the adjacent guide steel sheet piles 2 and 2 are connected to each other through a joint 3 so as to be slidable in the vertical direction, and each of the guide steel sheet piles 2, 2. With respect to each other.

このガイド用鋼矢板2の設置作業は、ガイド用鋼矢板2が本設鋼矢板1に比べて短く且つ軽量であることから、各ガイド用鋼矢板2,2...を地盤に対し鉛直方向に向けて位置合わせすることや隣り合うガイド用鋼矢板2,2の継手部材3a,3aを係合させる等の作業が行い易くなっている。   Since the guide steel sheet pile 2 is shorter and lighter than the main steel sheet pile 1, the guide steel sheet pile 2 is installed in the vertical direction with respect to the ground. For example, it is easy to perform operations such as aligning the joint members 3a and 3a of the adjacent guide steel sheet piles 2 and 2 with each other.

そして、複数のガイド用鋼矢板2,2...の設置作業が完了したら、鋼管矢板4側に配置されたガイド用鋼矢板2を杭打ち機等の杭打手段により所定深さまで打ち込む。その際、ガイド用鋼矢板2は、一方の側縁部を鋼管矢板4に他方の側縁部を隣り合うガイド用鋼矢板2にそれぞれ継手3を介してガイドさせ、その状態で長さ方向を上下方向に向けて打ち込まれるようになっている。   When the installation work of the plurality of guide steel sheet piles 2, 2,... Is completed, the guide steel sheet pile 2 arranged on the steel pipe sheet pile 4 side is driven to a predetermined depth by a pile driving means such as a pile driving machine. In that case, the steel sheet pile 2 for a guide is made to guide one side edge part to the steel pipe sheet pile 4 to the steel sheet pile 2 for guides which adjoins the other side edge part via the coupling 3, respectively, and the length direction is changed in that state. It is designed to be driven in the vertical direction.

次に、打込まれたガイド用鋼矢板2,2間に配置された各ガイド用鋼矢板2,2...を順次、互いに隣り合うガイド用鋼矢板2にガイドさせつつ所定深さまで打ち込む。この場合、各ガイド用鋼矢板2,2...は、短尺であるので打込み作業を数回に分けることなく、或いは多段打ちであっても少ない回数で地盤中の所定深さまで打ち込むことができる。   Next, the guide steel sheet piles 2, 2... Arranged between the guide steel sheet piles 2, 2 that have been driven are sequentially driven to a predetermined depth while being guided by the guide steel sheet piles 2 adjacent to each other. In this case, the steel sheet piles for guide 2, 2,... Are short and can be driven to a predetermined depth in the ground without dividing the driving operation into several times or even with multiple steps. .

そして、各ガイド用鋼矢板2,2...を所定深さまで打ち込むことにより、地盤A中には、本設鋼矢板1の打ち込み予定位置に地盤表面に開口した上下方向に向けたガイド穴6,6...が形成される。   The guide steel sheet piles 2, 2... Are driven to a predetermined depth so that the guide holes 6 are opened in the ground A at the planned placement positions of the steel sheet piles 1 in the vertical direction. , 6 ... are formed.

このガイド穴6は、ガイド用鋼矢板2の断面形状、即ち本設鋼矢板1の断面形状が上下方向に連続した形状の中空部を有するように形成され、挿入された本設鋼矢板1の上下方向の移動をガイドするようになっている。   The guide hole 6 is formed such that the cross-sectional shape of the steel sheet pile 2 for guides, that is, the cross-sectional shape of the steel sheet pile 1 is continuous in the vertical direction, and the inserted steel sheet pile 1 is inserted. It is designed to guide the vertical movement.

次に、図2〜図3に示すように、ガイド用鋼矢板2をクレーン等により上向きに引き抜き、その引き抜いたガイド用鋼矢板2に代えて導枠5に沿って本設鋼矢板1をガイド穴6に挿入し、本設鋼矢板1を設置する。   Next, as shown in FIGS. 2 to 3, the guide steel sheet pile 2 is pulled upward by a crane or the like, and the main steel sheet pile 1 is guided along the guide frame 5 in place of the pulled guide steel sheet pile 2. Insert the steel sheet pile 1 into the hole 6.

この本設鋼矢板1の設置作業においては、図4に示すように、一方の側縁部を鋼管矢板4又は既設の本設鋼矢板1に継手3を介してガイドさせ、他方の側縁部を隣り合うガイド用鋼矢板2に継手3を介してガイドさせるとともに、一定深さを有する上下方向に向けたガイド穴6にガイドさせつつ地盤A中に挿入されるので長尺且つ重量の嵩む本設鋼矢板1であっても容易且つ正確にその長さ方向を鉛直方向に向けて設置することができる。   In the installation work of this permanent steel sheet pile 1, as shown in FIG. 4, one side edge is guided to the steel pipe sheet pile 4 or the existing permanent steel sheet pile 1 via the joint 3, and the other side edge is provided. Is inserted into the ground A while being guided by a guide hole 6 directed in the vertical direction having a certain depth while the adjacent guide steel sheet pile 2 is guided through the joint 3. Even the installed steel sheet pile 1 can be installed with the length direction in the vertical direction easily and accurately.

そして、この設置された本設鋼矢板1を杭打ち機等の杭打ち手段により所定の深さまで打ち込む。   And this installed steel sheet pile 1 is driven to a predetermined depth by a pile driving means such as a pile driving machine.

このように本設鋼矢板1は、その両側縁部を既設の本設鋼矢板1(鋼管矢板4)及びガイド用鋼矢板2にガイドさせつつ打ち込むことができ、多段打ちと同様に地盤に対する鉛直度を維持した状態で打ち込まれ、従って、打込み方向が傾斜し難く、楔型状の異形鋼矢板を使用する必要もない。   As described above, the steel sheet pile 1 can be driven while guiding both side edges thereof to the existing steel sheet pile 1 (steel pipe sheet pile 4) and the steel sheet pile 2 for guide, and is perpendicular to the ground in the same manner as multi-stage driving. Therefore, it is difficult to incline the driving direction, and it is not necessary to use a wedge-shaped deformed steel sheet pile.

そして、上述の一連の作業を一方の端側より順次繰り返し、両鋼管矢板4間に複数の本設鋼矢板1,1...をその長さ方向を上下方向に向けるとともに、幅方向に互いに隣接して並べた配置に打設し、鋼矢板壁が構築される。   Then, the above-described series of operations are sequentially repeated from one end side, and a plurality of permanent steel sheet piles 1, 1... The steel sheet pile walls are constructed by placing them in an adjacent arrangement.

尚、上述の実施例ではU字状断面を有する鋼矢板を使用した例について説明したが、その他の断面形状を有する鋼矢板にも適用することができる。   In addition, although the above-mentioned Example demonstrated the example which uses the steel sheet pile which has a U-shaped cross section, it is applicable also to the steel sheet pile which has another cross-sectional shape.

また、上述の実施例では、ガイド用鋼矢板の長さを本設鋼矢板の約1/2の長さとした例について説明したが、ガイド用鋼矢板の長さは、地盤強度や本設鋼矢板の長さ等の諸条件に基づき適宜決定することができる。   In the above-described embodiment, the example in which the length of the guide steel sheet pile is about ½ the length of the permanent steel sheet pile has been described. It can be appropriately determined based on various conditions such as the length of the sheet pile.

更に、上述の実施例では、ガイド用鋼矢板を引き抜き、それに代えて本設鋼矢板を設置し・打込む一連の作業を一方の端側より順次行う例について説明したが、両端側より同時に施工するようにしてもよく、並べられたガイド用鋼矢板を一つおきに引き抜き、その引き抜いたガイド用鋼矢板に代えて本設鋼矢板を打設するようにしてもよい。   Further, in the above-described embodiment, the example in which the steel sheet pile for the guide is pulled out and a series of operations for installing and driving the main steel sheet pile instead is sequentially performed from one end side, but construction is simultaneously performed from both end sides. Alternatively, every other guide steel sheet pile arranged may be pulled out, and a permanent steel sheet pile may be placed instead of the pulled out guide steel sheet pile.

A 水底地盤
1 本設鋼矢板
2 ガイド用鋼矢板
3 継手部材
4 鋼管矢板
5 導枠
6 ガイド穴
A Water bottom 1 Steel sheet pile 2 Guide steel sheet pile 3 Joint member 4 Steel pipe sheet pile 5 Guide frame 6 Guide hole

Claims (3)

複数の本設鋼矢板をその長さ方向を上下方向に向けるとともに、幅方向で互いに隣接する配置に地盤中に打ち込む鋼矢板の打設方法において、
前記地盤の本設鋼矢板の打ち込み予定位置に前記本設鋼矢板より短いガイド用鋼矢板をその長さ方向を上下方向に向けて打ち込むことにより上下方向に向けたガイド穴を形成し、しかる後、前記ガイド用鋼矢板を引き抜き、該引き抜いたガイド用鋼矢板に代えて前記ガイド穴に前記本設鋼矢板の下端側を挿入して設置し、該設置された本設鋼矢板を地盤中の所定の深さまで打ち込むことを特徴としてなる鋼矢板の打設方法。
In the method of placing steel sheet piles in which a plurality of steel sheet piles are oriented in the vertical direction in the length direction and driven into the ground in an arrangement adjacent to each other in the width direction,
A guide hole oriented in the vertical direction is formed by driving a steel sheet pile for guide shorter than the permanent steel sheet pile in the planned placement position of the permanent steel sheet pile on the ground, with its length direction directed in the vertical direction, and thereafter The guide steel sheet pile is pulled out, and the lower end side of the permanent steel sheet pile is inserted into the guide hole instead of the extracted guide steel sheet pile, and the installed permanent steel sheet pile is installed in the ground. A steel sheet pile driving method characterized by driving to a predetermined depth.
複数の前記ガイド用鋼矢板を幅方向に並べて設置し、前記各ガイド用鋼矢板を互いにガイドさせつつ前記地盤中に打ち込んだ後、前記ガイド用鋼矢板を引き抜き、該ガイド用鋼矢板に代えて前記本設鋼矢板を設置する請求項1に記載の鋼矢板の打設方法。   A plurality of the steel sheet piles for guides are arranged side by side in the width direction, and the steel sheet piles for guides are driven into the ground while guiding each other, and then the steel sheet piles for guides are pulled out and replaced with the steel sheet piles for guides. The method for placing a steel sheet pile according to claim 1, wherein the steel sheet pile is installed. 幅方向に並べて打ち込まれた複数のガイド用鋼矢板の一部を引き抜き、該引き抜いたガイド用鋼矢板に代えて前記本設鋼矢板を、その両側縁を前記引き抜かれたガイド用鋼矢板の両側部に配置されていた前記本設鋼矢板又はガイド用鋼矢板にガイドさせつつ前記ガイド穴に挿入して設置する請求項2に記載の鋼矢板の打設方法。   Pull out a part of the plurality of guide steel sheet piles that are driven side by side in the width direction, replace the pulled steel sheet pile for guide with the permanent steel sheet pile, and both sides of both sides of the guide steel sheet pile withdrawn The steel sheet pile placing method according to claim 2, wherein the steel sheet pile is installed by being inserted into the guide hole while being guided by the steel sheet pile or the guide steel sheet pile arranged in a section.
JP2011071428A 2011-03-29 2011-03-29 Method for installing steel sheet pile Pending JP2012207371A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011071428A JP2012207371A (en) 2011-03-29 2011-03-29 Method for installing steel sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011071428A JP2012207371A (en) 2011-03-29 2011-03-29 Method for installing steel sheet pile

Publications (1)

Publication Number Publication Date
JP2012207371A true JP2012207371A (en) 2012-10-25

Family

ID=47187342

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011071428A Pending JP2012207371A (en) 2011-03-29 2011-03-29 Method for installing steel sheet pile

Country Status (1)

Country Link
JP (1) JP2012207371A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368216A (en) * 2015-07-20 2017-02-01 上海思珂润机电有限公司 Construction method for precise closure of steel sheet piles
JP6288362B1 (en) * 2017-09-20 2018-03-07 Jfeエンジニアリング株式会社 Steel sheet pile placing method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01165819A (en) * 1987-12-22 1989-06-29 Nippon Steel Corp Construction of steel sheet pile wall
JPH01214615A (en) * 1988-02-23 1989-08-29 Ohbayashi Corp Piling method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01165819A (en) * 1987-12-22 1989-06-29 Nippon Steel Corp Construction of steel sheet pile wall
JPH01214615A (en) * 1988-02-23 1989-08-29 Ohbayashi Corp Piling method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368216A (en) * 2015-07-20 2017-02-01 上海思珂润机电有限公司 Construction method for precise closure of steel sheet piles
JP6288362B1 (en) * 2017-09-20 2018-03-07 Jfeエンジニアリング株式会社 Steel sheet pile placing method

Similar Documents

Publication Publication Date Title
KR100891949B1 (en) Temporary retaining wall structure for water supply and drainage works in low depth
CN102713074A (en) Connected wall structure consisting of steel pipe sheet piles and steel sheet pile, and method of constructing same
JP5257407B2 (en) Installation method and installation structure of angry material
JP2010156191A (en) L-shaped reinforcing structure, and reinforcing construction and method installed with the l-shaped reinforcing structure
JP2012207371A (en) Method for installing steel sheet pile
CN204456115U (en) A kind of crane barge pile driving barge with leading truck
JP2009108573A (en) Box body laying method
JP5525850B2 (en) Mountain fastening method
JP4459222B2 (en) Construction method of cut-off wall and cut-off wall
JP6288362B1 (en) Steel sheet pile placing method
JP2018178641A5 (en)
KR101983964B1 (en) Cofferdam structure and cofferdam method using the same
JP7301203B1 (en) Earth retaining device for shallow excavated trenches
CN107246003B (en) Device for improving radial perpendicularity of underground diaphragm wall reinforcement cage and construction method
CN103758155B (en) Underground diaphragm wall joint and construction method thereof
KR101584456B1 (en) Lining mat for pile on soft ground and construction method using the same
RU2012151227A (en) METHOD FOR ESTABLISHING THE PLAIN FENCING WHEN CARRYING OUT WORKS ON THE MAIN PIPELINE AND THE Dowel Collapsible Fencing For Equipping The Pitted
JP2016108818A (en) Construction method for preceding element of underground continuous wall, construction method for underground continuous wall, and construction device for preceding element of underground continuous wall
CN110593285A (en) Plugging structure for underwater pouring foundation for double-wall steel cofferdam construction and construction method
CN215593966U (en) Section butt joint device for reinforcement cage of ultra-long underground continuous wall
JP2019173312A (en) Earth retaining wall reinforcement structure
JP2015129372A (en) Sheet pile and cutoff method
JP7155790B2 (en) Pulling out method of grouting pipe and earth retaining member
JP2010037907A (en) Earth retaining wall reinforcing structure and reinforcing method
JP5021049B2 (en) Reaction device for bottom plate and method for constructing bottom plate

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140305

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141029

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20141031

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141217

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150520

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20151007