CN103233453B - A kind of original position soil body surveying method - Google Patents

A kind of original position soil body surveying method Download PDF

Info

Publication number
CN103233453B
CN103233453B CN201310135806.7A CN201310135806A CN103233453B CN 103233453 B CN103233453 B CN 103233453B CN 201310135806 A CN201310135806 A CN 201310135806A CN 103233453 B CN103233453 B CN 103233453B
Authority
CN
China
Prior art keywords
soil body
pressure gauge
hollow rod
original position
surveying method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310135806.7A
Other languages
Chinese (zh)
Other versions
CN103233453A (en
Inventor
丁红岩
练继建
张浦阳
刘润
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201310135806.7A priority Critical patent/CN103233453B/en
Publication of CN103233453A publication Critical patent/CN103233453A/en
Application granted granted Critical
Publication of CN103233453B publication Critical patent/CN103233453B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of original position soil body prospecting device and surveying method, prospecting device comprises the hollow rod that bottom is installed with cone gauge head, hollow rod and cone gauge head sidewall are all provided with earth pressure gauge and pore pressure gauge, the bottom tip of cone gauge head offers intake-outlet, and intake-outlet is sealedly connected with the water route pipeline passing hollow rod top; Surveying method first will reconnoitre device press-in and pick-up transducers data by certain speed; Then open water pump, sink to reconnoitring device, again pick-up transducers data by same speed; Finally provide the penetration resistance that deadweight is sunk and suction sinks respectively.Prospecting device of the present invention and surveying method simulate the perturbation process in suction type foundation sinking watching suffered by the soil body, consider suction type foundation sinking construction technique to the impact of soil strength, measuredly can reflect the penetration resistance of suction type foundation under special construction technique more accurately to soil body end resistance and side form resistance.

Description

A kind of original position soil body surveying method
Technical field
The present invention relates to a kind of site survey techniques of foundation soil, specifically, relate to a kind of can original position exploration Soil Parameters method.
Background technology
Soil body prospecting is steps necessary before works basic engineering, can based on design necessary soil parameter is provided, the accuracy of soil body prospecting directly has influence on the degree of safety on works basis.
At present in ocean engineering, soil body surveying method mainly comprises the methods such as core sample method, four-bladed vane method and CPT static sounding.The soil sample that core sample method obtains generally will carry out the determination of Soil Parameters in soil mechanics laboratory, used soil body constraints and the actual forced status of the on-the-spot soil body often have bigger difference.Although four-bladed vane method and CPT method are site inspection methods, survey tools used and method and practical structures thing immerge are constructed very not identical with the stressing conditions of using state, and the parameter obtained need be obtained by empirical coefficient conversion toward contact.
In sum, the exploring equipment that existing soil body investigation method uses and the investigation method foundation pattern difference usually and in ocean engineering is comparatively far away, often occurs the accurate not problem of exploration result.Particularly work as suction type foundation, such as, after bucket foundation, box-type suction foundation, suction anchor etc. occur, its special construction method by suction sinking can produce certain influence to basic surrounding soil.Suction type foundation work progress generally includes deadweight and to sink and suction sinks two processes, and it is rely on construction weight to sink certain degree of depth and reach the process of gravity and resistance balance that deadweight is sunk, and is formed and the airtight condition of the soil body simultaneously; Then take out water/gas by equipment such as submersible pumps and carry out suction sinking, make basis inside and outside generation pressure differential overcome penetration resistance continuation sinking and put in place.
Take out by basic internal the basic external and internal pressure difference that water/gas causes due to suction type foundation to sink, therefore basic surrounding soil can produce percolation phenomenon under suction, destroy soil body original state structure, and after sinking to terminating, the soil body can produce remodelling phenomenon again.If do not consider effect of constructing, the investigation method for undisturbed soil is directly utilized to instruct suction type foundation design will occur comparatively big error.
Summary of the invention
The present invention is to solve when the soil body investigation method in existing ocean engineering is applied to suction type foundation, the accurate not technical problem of exploration result, provides a kind of original position soil body surveying method.
In order to solve the problems of the technologies described above, the present invention is achieved by following technical scheme:
A kind of original position soil body surveying method, the prospecting device that the method utilizes comprises the hollow rod of top closure, the bottom of described hollow rod is installed with the cone gauge head of hollow-core construction, described hollow rod and described cone gauge head sidewall are all provided with the earth pressure gauge of radial equipartition and the pore pressure gauge of radial equipartition, described earth pressure gauge and described pore pressure gauge aligned and spacing is equal from top to bottom respectively; The bottom tip of described cone gauge head offers intake-outlet, and described intake-outlet is sealedly connected with the water route pipeline passing described hollow rod top, and described water route pipeline is connected with described hollow rod top seal;
Comprise the steps:
(1) sunk by described prospecting device by the speed of 0.01mm/s ~ 10mm/s, simultaneously described earth pressure gauge gathers the first soil pressure data, described pore pressure gauge gathers the first water pressure data;
According to described first soil pressure data and described first water pressure data, determine the end resistance recommended value q of basis deadweight sinking watching according to geotechnical investigation code 1with side form resistance recommended value f 1, draw deadweight penetration resistance Qd 1=f 1as 1+ q 1ap, wherein As 1bury lateral area on basis for sinking watching of conducting oneself with dignity, bottom end area based on Ap;
(2) water pump is opened, current are made to flow out along described intake-outlet or suck, by the speed of 0.01mm/s ~ 10mm/s, described prospecting device is sunk, utilize that described earth pressure gauge gathers the second soil pressure data, described pore pressure gauge gathers the second water pressure data, the pressure of described water pump is set to the hydraulic pressure identical with basic suction sinking construction process;
According to described second soil pressure data and described second water pressure data, determine the end resistance recommended value q of basic suction sinking watching according to geotechnical investigation code 2with side form resistance recommended value f 2, suction penetration resistance Qd 2=f 2as 2+ q 2ap, wherein As 2bury lateral area on basis for suction sinking watching, bottom end area based on Ap.
The degree of depth that in step (1), prospecting device sinks is at least the height of foundation of a times.
The degree of depth that in step (2), prospecting device sinks is at least the height of foundation of two times.
Water-aspirator pressure in step (2) is-10m ~ 10m head.
The length of described hollow rod is 10m ~ 60m, external diameter is 10cm ~ 30cm.
Every at least four described earth pressure gauges and the sustained height radial equipartition of every at least four described pore pressure gauges at hollow rod, and the described earth pressure gauge of sustained height and described pore pressure gauge interval are arranged.
The distance between the upper and lower of the described earth pressure gauge on described hollow rod and the distance between the upper and lower of described pore water pressure are 0.5m ~ 1m.
The distance between the upper and lower of the described earth pressure gauge on described cone gauge head and the distance between the upper and lower of described pore water pressure are 5cm ~ 10cm.
The diameter of described intake-outlet is 1 ~ 10mm.
Described intake-outlet is provided with reinforced geotextile.
The invention has the beneficial effects as follows:
Surveying method of the present invention simulates the perturbation process in suction type foundation sinking watching suffered by the soil body, consider suction type foundation sinking construction technique to the impact of soil strength, measuredly can reflect the penetration resistance of suction type foundation under special construction technique more accurately to soil body end resistance and side form resistance.
Accompanying drawing explanation
Fig. 1 is the structural representation of the original position soil body provided by the present invention prospecting device;
Fig. 2 is the A-A sectional view of Fig. 1.
In figure: 1, hollow rod; 2, cone gauge head; 3, earth pressure gauge; 4, pore pressure gauge; 5, intake-outlet; 6, water route pipeline.
Detailed description of the invention
For summary of the invention of the present invention, feature and effect can be understood further, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
As shown in Figure 1 to Figure 2, this embodiment discloses herein a kind of original position soil body prospecting device, form primarily of hollow rod 1, cone gauge head 2, earth pressure gauge 3, pore pressure gauge 4 and water route pipeline 6.
Hollow rod 1 is the Hollow circular beam of top closure, and under normal circumstances, its length is 10m ~ 60m, and external diameter is 10cm ~ 30cm.When depth of investigation exceedes the length of single hollow rod 1, lengthen by other hollow rod 1 of continued access.
Hollow rod 1 sidewall is provided with multiple earth pressure gauge 3 and pore pressure gauge 4, every four earth pressure gauges 3 and every four pore pressure gauges 4 are at the sustained height radial equipartition of hollow rod 1, and the earth pressure gauge 3 of sustained height and pore pressure gauge 4 interval are arranged.Earth pressure gauge 3 aligned from top to bottom; Pore pressure gauge 4 aligned from top to bottom, and the spacing of neighbouring two earth pressure gauges 3 and neighbouring two pore pressure gauges 4 is equal, and spacing is 0.5m ~ 1m.
Cone gauge head 2 is similarly hollow-core construction, and its cone tip is down installed on hollow rod 1 lower port, can be fixedly connected with by thread or bolt with hollow rod 1.Cone gauge head 2 sidewall is also provided with earth pressure gauge 3 and pore pressure gauge 4 radial equipartition, earth pressure gauge 3 on it and pore pressure gauge 4 respectively with the earth pressure gauge 3 on hollow rod 1 and pore pressure gauge 4 alignment, and neighbouring two earth pressure gauges 3 on cone gauge head 2 are equal with the spacing of neighbouring two pore pressure gauges 4, spacing is 5cm.
The tip of cone gauge head 2 offers intake-outlet 5, intake-outlet 5 typically have a diameter from 1 ~ 10mm.Intake-outlet 5 has been bolted reinforced geotextile, enters into cone gauge head 2 and hollow rod 1 inner chamber for preventing the soil body.Intake-outlet 5 and water route pipeline 6 are tightly connected, and water route pipeline 6 is extended to hollow rod 1 top by intake-outlet 5 along cone gauge head 2 and hollow rod 1 and passes, and is connected with water pump; Water route pipeline 6 and hollow rod 1 top are also tightly connected.
Utilize the original position soil body surveying method of above-mentioned prospecting device, concrete steps are as follows:
(1) first time prospecting: by the speed of 0.01mm/s ~ 10mm/s, utilizes hydraulic loaded equipment by this prospecting device press-in sea bed, while earth pressure gauge 3 gathers the first soil pressure data, pore pressure gauge 4 gathers the first water pressure data.The prospecting depth of prospecting device press-in is at least the height of foundation of a times, and prospecting depth refers to the distance on prospecting device cone gauge head bottom to sea bed surface.
According to the first soil pressure data and the first water pressure data, according to the computational methods of existing geotechnical investigation code (as China's ocean engineering or Norske Veritas are correlated with soil test and basic norm), the end resistance recommended value q of basis deadweight sinking watching can be determined 1with side form resistance recommended value f 1, thus draw the deadweight penetration resistance Qd on basis 1=f 1as 1+ q 1ap, wherein As 1bury lateral area on basis for sinking watching of conducting oneself with dignity, bottom end area based on Ap.
(2) second time prospecting: open water pump, current flow out along the intake-outlet 5 of cone gauge head 2 bottom or suck, this prospecting device sinks by the speed of still pressing 0.01mm/s ~ 10mm/s again, utilizes that earth pressure gauge 3 gathers the second soil pressure data, pore pressure gauge 4 gathers the second water pressure data again.The prospecting depth reconnoitring device press-in in second time prospecting is at least the height of foundation of two times, and prospecting depth refers to the distance on prospecting device cone gauge head bottom to sea bed surface.
Wherein the pressure of water pump is set to the hydraulic pressure identical with the suction sinking construction process of suction type foundation, and this pressure is generally-10m ~ 10m head.
According to the second soil pressure data and the second water pressure data, according to the computational methods of existing geotechnical investigation code (as China's ocean engineering or Norske Veritas are correlated with soil test and basic norm), the end resistance recommended value q of basic suction sinking watching can be determined 2with side form resistance recommended value f 2, thus draw the suction penetration resistance Qd on basis 2=f 2as 2+ q 2ap, wherein As 2bury lateral area on basis for suction sinking watching, bottom end area based on Ap.
Although be described the preferred embodiments of the present invention by reference to the accompanying drawings above; but the present invention is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; do not departing under the ambit that present inventive concept and claim protect, can also make the concrete conversion of a lot of form, these all belong within protection scope of the present invention.

Claims (10)

1. an original position soil body surveying method, the prospecting device that the method utilizes comprises the hollow rod of top closure, the bottom of described hollow rod is installed with the cone gauge head of hollow-core construction, described hollow rod and described cone gauge head sidewall are all provided with the earth pressure gauge of radial equipartition and the pore pressure gauge of radial equipartition, described earth pressure gauge and described pore pressure gauge aligned and spacing is equal from top to bottom respectively; The bottom tip of described cone gauge head offers intake-outlet, and described intake-outlet is sealedly connected with the water route pipeline passing described hollow rod top, and described water route pipeline is connected with described hollow rod top seal;
It is characterized in that, comprise the steps:
(1) sunk by described prospecting device by the speed of 0.01mm/s ~ 10mm/s, simultaneously described earth pressure gauge gathers the first soil pressure data, described pore pressure gauge gathers the first water pressure data;
According to described first soil pressure data and described first water pressure data, determine the end resistance recommended value q of basis deadweight sinking watching according to geotechnical investigation code 1with side form resistance recommended value f 1, draw deadweight penetration resistance Qd 1=f 1as 1+ q 1ap, wherein As 1bury lateral area on basis for sinking watching of conducting oneself with dignity, bottom end area based on Ap;
(2) water pump is opened, current are made to flow out along described intake-outlet or suck, by the speed of 0.01mm/s ~ 10mm/s, described prospecting device is sunk, utilize that described earth pressure gauge gathers the second soil pressure data, described pore pressure gauge gathers the second water pressure data, the pressure of described water pump is set to the hydraulic pressure identical with basic suction sinking construction process;
According to described second soil pressure data and described second water pressure data, determine the end resistance recommended value q of basic suction sinking watching according to geotechnical investigation code 2with side form resistance recommended value f 2, suction penetration resistance Qd 2=f 2as 2+ q 2ap, wherein As 2bury lateral area on basis for suction sinking watching, bottom end area based on Ap.
2. a kind of original position soil body surveying method according to claim 1, is characterized in that, the degree of depth that in step (1), prospecting device sinks is at least the height of foundation of a times.
3. a kind of original position soil body surveying method according to claim 1, is characterized in that, the degree of depth that in step (2), prospecting device sinks is at least the height of foundation of two times.
4. a kind of original position soil body surveying method according to claim 1, is characterized in that, the water-aspirator pressure in step (2) is-10m ~ 10m head.
5. a kind of original position soil body surveying method according to claim 1, is characterized in that, the length of described hollow rod is 10m ~ 60m, external diameter is 10cm ~ 30cm.
6. a kind of original position soil body surveying method according to claim 1, it is characterized in that, every at least four described earth pressure gauges and the sustained height radial equipartition of every at least four described pore pressure gauges at hollow rod, and the described earth pressure gauge of sustained height and described pore pressure gauge interval are arranged.
7. a kind of original position soil body surveying method according to claim 1, is characterized in that, the distance between the upper and lower of the described earth pressure gauge on described hollow rod and the distance between the upper and lower of described pore water pressure are 0.5m ~ 1m.
8. a kind of original position soil body surveying method according to claim 1, is characterized in that, the distance between the upper and lower of the described earth pressure gauge on described cone gauge head and the distance between the upper and lower of described pore water pressure are 5cm ~ 10cm.
9. a kind of original position soil body surveying method according to claim 1, is characterized in that, the diameter of described intake-outlet is 1 ~ 10mm.
10. a kind of original position soil body surveying method according to claim 1, it is characterized in that, described intake-outlet is provided with reinforced geotextile.
CN201310135806.7A 2013-04-18 2013-04-18 A kind of original position soil body surveying method Expired - Fee Related CN103233453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310135806.7A CN103233453B (en) 2013-04-18 2013-04-18 A kind of original position soil body surveying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310135806.7A CN103233453B (en) 2013-04-18 2013-04-18 A kind of original position soil body surveying method

Publications (2)

Publication Number Publication Date
CN103233453A CN103233453A (en) 2013-08-07
CN103233453B true CN103233453B (en) 2015-08-19

Family

ID=48881517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310135806.7A Expired - Fee Related CN103233453B (en) 2013-04-18 2013-04-18 A kind of original position soil body surveying method

Country Status (1)

Country Link
CN (1) CN103233453B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107871026A (en) * 2016-09-26 2018-04-03 天津大学 One kind bucket foundation malleation sinking drag computation method suitable for sand

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105200971B (en) * 2015-10-22 2017-01-18 青岛理工大学 Device and method for testing pile-soil interface soil pressure and pore water pressure
CN105258824B (en) * 2015-11-05 2018-04-13 白云 A kind of shield tunnel Water And Earth Pressures monitoring rod
CN106351248B (en) * 2016-10-17 2018-06-15 天津大学 A kind of seat bottom device with Yu Haiyang static sounding
CN108426746A (en) * 2018-06-14 2018-08-21 秀盛源(天津)水运工程技术有限公司 Underwater mud scum measures sampler
CN109030774A (en) * 2018-06-28 2018-12-18 贵州大学 A kind of fishery lake soil reconnoitres detection device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3435380A1 (en) * 1984-09-27 1986-04-03 Glötzl, Gesellschaft für Baumeßtechnik mbH, 7512 Rheinstetten Borehole probe for measuring water pressures in foundation soil
CN2139953Y (en) * 1991-04-06 1993-08-11 中国有色金属工业总公司西安勘察院 Forced water testing device for engineering geological prospecting
CN1532547A (en) * 2003-03-25 2004-09-29 中国海洋大学 Detector for solibody in-situ hole pressure and affecting depth under wave action
CN1955380A (en) * 2006-06-12 2007-05-02 铁道第三勘察设计院 Testing method of rock-soil engineering in-situ rotation touch investigating and its special equipment
EP1939605A1 (en) * 2005-10-17 2008-07-02 National University Corporation Nagoya University Coupled calculator of water and soil skeleton and coupled calculation method of water and soil skeleton
CN101358449A (en) * 2008-09-11 2009-02-04 中国科学院武汉岩土力学研究所 Pore water pressure measuring device in foundation stabilization zone
CN101761311A (en) * 2009-12-29 2010-06-30 清华大学 Underwater geotechnical drilling equipment and underwater geotechnical exploration method
CN101775792A (en) * 2010-01-26 2010-07-14 化学工业岩土工程有限公司 Triaxial shear test system of soil sample and drainage fixing method
CN102011389A (en) * 2010-11-11 2011-04-13 广东永基建筑基础有限公司 Soil body in situ test device and test method applying same

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3435380A1 (en) * 1984-09-27 1986-04-03 Glötzl, Gesellschaft für Baumeßtechnik mbH, 7512 Rheinstetten Borehole probe for measuring water pressures in foundation soil
CN2139953Y (en) * 1991-04-06 1993-08-11 中国有色金属工业总公司西安勘察院 Forced water testing device for engineering geological prospecting
CN1532547A (en) * 2003-03-25 2004-09-29 中国海洋大学 Detector for solibody in-situ hole pressure and affecting depth under wave action
EP1939605A1 (en) * 2005-10-17 2008-07-02 National University Corporation Nagoya University Coupled calculator of water and soil skeleton and coupled calculation method of water and soil skeleton
CN1955380A (en) * 2006-06-12 2007-05-02 铁道第三勘察设计院 Testing method of rock-soil engineering in-situ rotation touch investigating and its special equipment
CN101358449A (en) * 2008-09-11 2009-02-04 中国科学院武汉岩土力学研究所 Pore water pressure measuring device in foundation stabilization zone
CN101761311A (en) * 2009-12-29 2010-06-30 清华大学 Underwater geotechnical drilling equipment and underwater geotechnical exploration method
CN101775792A (en) * 2010-01-26 2010-07-14 化学工业岩土工程有限公司 Triaxial shear test system of soil sample and drainage fixing method
CN102011389A (en) * 2010-11-11 2011-04-13 广东永基建筑基础有限公司 Soil body in situ test device and test method applying same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107871026A (en) * 2016-09-26 2018-04-03 天津大学 One kind bucket foundation malleation sinking drag computation method suitable for sand
CN107871026B (en) * 2016-09-26 2019-11-15 天津大学 One kind bucket foundation positive pressure sinking drag computation method suitable for sand

Also Published As

Publication number Publication date
CN103233453A (en) 2013-08-07

Similar Documents

Publication Publication Date Title
CN103233453B (en) A kind of original position soil body surveying method
CN106814407B (en) The method for determining Three-dimensional Rock crustal stress based on single borehole deformation measurement
CN110005407B (en) Salt cavern gas storage stability evaluation method
CN106437698A (en) Underwater platform for exploration sampling or in-situ test and using method thereof
CN110929390B (en) Numerical simulation detection method based on groundwater hydrogeology test
CN110705095A (en) Karst ground collapse analysis method
CN206428688U (en) A kind of static sounding probe
CN109556653A (en) A kind of pipeclay in situ effect test macro and its test method with hydraulic suction cylinder basis
CN103643668A (en) Method for monitoring construction engineering foundation pit
CN109359373B (en) Method for predicting surface subsidence caused by pressure reduction and precipitation of confined aquifer
CN111695228A (en) Multi-scale fracture modeling method for fracture-cave carbonate reservoir
CN204676517U (en) The in situ shear wave testing arrangement of ocean formation
CN108678672A (en) Deep water superficial part complex lithology formation conduit is efficiently placed in and well head stability forecast method
CN107908901A (en) The computational methods that artesian water precipitation influences surrounding enviroment in a kind of foundation pit construction
Haimson The effect of lithology, inhomogeneity, topography, and faults, on in situ stress measurements by hydraulic fracturing, and the importance of correct data interpretation and independent evidence in support of results
CN104776818A (en) Ultrasonic measurement instrument for pile bottom sediment thickness
CN102562052A (en) Method for recognizing harm bodies of casing failure of shallow layer of close well spacing
CN112309088A (en) Device for monitoring and early warning karst collapse by utilizing soil cave gas and working method
Sparrevik Offshore wind turbine foundations state of the art
CN108343431B (en) Method for exploring flow network of bedrock fracture underground water system
CN106646668B (en) A kind of method for building up of radar logging standard well model
Zhao et al. A field test data research based on a new hydraulic parameters quick test technology
CN204439038U (en) A kind of ultrasound wave pile bottom sediment thickness measurement equipment
CN212389325U (en) Device for monitoring tunnel excavation surface void
CN208379577U (en) A kind of bead string type solution cavity development area fender post

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

CF01 Termination of patent right due to non-payment of annual fee