CN110174503A - A method of determining that country rock weakens development range based on tunnel deformation - Google Patents

A method of determining that country rock weakens development range based on tunnel deformation Download PDF

Info

Publication number
CN110174503A
CN110174503A CN201910382854.3A CN201910382854A CN110174503A CN 110174503 A CN110174503 A CN 110174503A CN 201910382854 A CN201910382854 A CN 201910382854A CN 110174503 A CN110174503 A CN 110174503A
Authority
CN
China
Prior art keywords
tunnel
surrounding
rock
country rock
measuring point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910382854.3A
Other languages
Chinese (zh)
Other versions
CN110174503B (en
Inventor
刘学增
桑运龙
杨昕
孙州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Same Rock Civil Engineering Polytron Technologies Inc
Tongji University
Original Assignee
Shanghai Same Rock Civil Engineering Polytron Technologies Inc
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Same Rock Civil Engineering Polytron Technologies Inc, Tongji University filed Critical Shanghai Same Rock Civil Engineering Polytron Technologies Inc
Priority to CN201910382854.3A priority Critical patent/CN110174503B/en
Publication of CN110174503A publication Critical patent/CN110174503A/en
Application granted granted Critical
Publication of CN110174503B publication Critical patent/CN110174503B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Pathology (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a kind of methods for determining country rock reduction development range based on tunnel deformation, comprising: step S1: acquisition tunnel-liner data Lj;Step S2: the tunnel-liner data L under different surrounding rock pressure is calculated with load structure methods;Step S3: the tunnel-liner data L with acquisition is establishedjWith the tunnel-liner data L calculated with load structure methodsWhen related objective function S, objective function S meet setting condition, the pressure from surrounding rock P of record load structure method application;Step S4: loosening area of surrounding rocks h is calculated according to the pressure from surrounding rock Pj;Step S5: the loosening area of surrounding rocks h under design pressure from surrounding rock is calculateds;Step S6: the loosening area of surrounding rocks h calculated according to pressure from surrounding rock PjWith the loosening area of surrounding rocks h under design pressure from surrounding rocksObtain country rock reduction development range hr.Compared with prior art, the present invention has the advantages that quick, lossless, with high accuracy that the implementation cost is low, can be widely applied in the other similar underground engineering such as piping lane pipe trench, pipe jacking tunnel.

Description

A method of determining that country rock weakens development range based on tunnel deformation
Technical field
The present invention relates to tunnel safety technical fields, determine country rock reduction development based on tunnel deformation more particularly, to a kind of The method of range.
Background technique
During tunnel operation, influence the effects of due to high-ground stress, underground heat, underground water changes coffer mechanics spy Property, country rock is weakened, country rock load-carrying properties are reduced, has broken the metastable state of original country rock-lining cutting, threatens tunnel Structure safety.Range and degree are weakened to verify country rock, generallys use drill hole sampling, the method for carrying out laboratory test, but it is this Method has the following deficiencies:
(1) since drilling hole amount is limited, range is weakened generally according to the non-boring sites in curing country rock of boring test resulting estimate, it is difficult Accurately to obtain tunnel surrounding reduction range.
(2) drilling is bored sample departing from original environmental effect, and test result can not accurately reflect rock mass mechanics spy Property.
(3) this method whole flow process time is longer, easily misses the best opportunity of Tunnel Repair reinforcing.
(4) it is also a kind of destruction to lining cutting self structure in the drilling of existing liner structure, reduces liner structure load Energy.
Therefore, range and trend that quick, the lossless method of one kind determines country rock reduction development are needed.
It is determining that Chinese invention patent CN108278109A specification discloses a kind of underground engineering reduction surrounding rock consolidation opportunity Method, comprising: scene obtains under different periods, the Surrounding Rock Strength of different depth at the setting observation area for excavating body, and counts Calculate the country rock mean intensity of different periods;The corresponding relationship that fitting country rock mean intensity changes over time;According to the corresponding pass System calculates when country rock mean intensity reduction to time corresponding when setting intensity.This method further include: scene, which obtains, excavates body In the initial Surrounding Rock Strength for setting different depth when not weakening at observation area, initial country rock is calculated by initial Surrounding Rock Strength Mean intensity, the corresponding relationship are fitted using the initial country rock mean intensity as the data of initial time.It obtains at scene It takes away and digs body Surrounding Rock Strength includes: in the observation after the initial Surrounding Rock Strength of different depth and/or reduction at the observation area It drills at region, reflects the drilling parameter of Surrounding Rock Strength in drilling process by obtaining drilling machine, obtain at different depth Corresponding Surrounding Rock Strength.The invention is got parms by the drilling process of drilling machine, destroys self structure.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind to be based on tunnel deformation The method for determining country rock reduction development range.
The purpose of the present invention can be achieved through the following technical solutions:
A method of determining that country rock weakens development range based on tunnel deformation, comprising the following steps:
Step S1: acquisition tunnel-liner data Lj
Step S2: the tunnel-liner data L under different surrounding rock pressure is calculated with load structure methods
Step S3: the tunnel-liner data L with acquisition is establishedjWith the tunnel-liner data L calculated with load structure methods When related objective function S, objective function S meet setting condition, the pressure from surrounding rock P of record load structure method application;
Step S4: loosening area of surrounding rocks h is calculated according to the pressure from surrounding rock Pj
Step S5: the loosening area of surrounding rocks h under design pressure from surrounding rock is calculateds
Step S6: the loosening area of surrounding rocks h calculated according to pressure from surrounding rock PjWith the wall rock loosening model under design pressure from surrounding rock Enclose hsObtain country rock reduction development range hr
The tunnel-liner data include Vault settlement aggregate-value and clearance convergence aggregate-value.
The step S3 objective function S are as follows:
The setting condition is objective function S less than 10%.
In the step S4, loosening area of surrounding rocks hjAre as follows:
Wherein, γ is country rock severe.
In the step S4, loosening area of surrounding rocks h is calculated according to pressure from surrounding rock PjWhen, setting vault calculates measuring point, the One haunch calculates measuring point, the first abutment wall calculates measuring point, the first arch springing calculates measuring point, the second haunch calculates measuring point, the second abutment wall meter Calculate measuring point, the second arch springing calculates measuring point and arch bottom calculates measuring point.
In the step S5, loosening area of surrounding rocks hsAre as follows:
Wherein, a be tunnel hair hole half across, h is tunnel hair height of holes,For country rock internal friction angle, f is the firm system of country rock Number.
In the step S6, country rock weakens development range hrAre as follows:
hr=hj-hs
Compared with prior art, the invention has the following advantages that
(1) without drilling, loosening area of surrounding rocks h is calculated according to pressure from surrounding rock PjWhen, setting vault calculates measuring point, the first arch Waist calculates measuring point, the first abutment wall calculates measuring point, the first arch springing calculates measuring point, the second haunch calculates measuring point, the second abutment wall is calculated and surveyed Point, the second arch springing calculate measuring point and arch bottom calculates measuring point, can obtain each position tunnel surrounding reduction range.
(2) implementation process can react rock mass mechanics characteristic without departing from site environment, calculated result well.
(3) it is fast to implement speed, the best opportunity of Tunnel Repair reinforcing can be controlled.
(4) protect existing lining cutting without damage.
(5) the implementation cost is low, can be widely applied to underground engineering.
(6) measurement Vault settlement aggregate-value and clearance convergence aggregate-value are only needed, method is simple, facilitates implementation.
(7) setting condition of objective function S is adjustable, can meet the requirement of different accuracy.
Detailed description of the invention
Fig. 1 is flow chart of the invention;
Fig. 2 is lining cutting point position schematic diagram;
Fig. 3 is to calculate loosening area of surrounding rocks hjWhen calculating measuring point;
Fig. 4 is that country rock weakens development range schematic diagram;
Appended drawing reference:
1 is Vault settlement measuring point;2 be the first perimeter convergence measuring point;3 be the second perimeter convergence measuring point;4 calculate survey for vault Point;5 calculate measuring point for the first haunch;6 calculate measuring point for the first abutment wall;7 calculate measuring point for the first arch springing;8 calculate survey for arch bottom Point;9 calculate measuring point for the second arch springing;10 calculate measuring point for the second abutment wall;11 calculate measuring point for the second haunch.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to Following embodiments.
Embodiment
A method of determining that country rock weakens development range based on tunnel deformation, method includes the following steps:
Step S1: acquisition tunnel-liner data Lj
Step S2: the tunnel-liner data L under different surrounding rock pressure is calculated with load structure methods
Step S3: the tunnel-liner data L with acquisition is establishedjWith the tunnel-liner data L calculated with load structure methods When related objective function S, objective function S meet setting condition, the pressure from surrounding rock P of record load structure method application;
Step S4: loosening area of surrounding rocks h is calculated according to the pressure from surrounding rock Pj
Step S5: the loosening area of surrounding rocks h under design pressure from surrounding rock is calculateds
Step S6: the loosening area of surrounding rocks h calculated according to pressure from surrounding rock PjWith the wall rock loosening model under design pressure from surrounding rock Enclose hsObtain country rock reduction development range hr
Tunnel-liner data include Vault settlement aggregate-value and clearance convergence aggregate-value.
Step S3 objective function S are as follows:
Objective function S should be less than 10%, and Vault settlement aggregate-value and clearance convergence aggregate-value should meet the target letter simultaneously Said conditions.
Step S4 is according to loose load theoretical calculation loosening area of surrounding rocks hjAre as follows:
Wherein, γ is country rock severe, which can calculate loosening area of surrounding rocks at tunnel different parts.
Step S4 calculates loosening area of surrounding rocks h according to pressure from surrounding rock PjWhen, setting vault calculates measuring point 4, the first haunch meter Calculate measuring point 5, the first abutment wall calculates measuring point 6, the first arch springing calculates measuring point 7, the second haunch calculates measuring point 11, the second abutment wall is calculated and surveyed The 10, second arch springing of point calculates measuring point 9 and arch bottom calculates measuring point 8, applies pressure from surrounding rock, can by each frequency for increasing 0.5kPa by Grade applies pressure from surrounding rock.
Step S5 loosening area of surrounding rocks hsAre as follows:
Wherein, a be tunnel hair hole half across, h is tunnel hair height of holes,For country rock internal friction angle, f is the firm system of country rock Number.
Step S6 country rock weakens development range hrAre as follows:
hr=hj-hs
The present invention has the advantages that quick, lossless, with high accuracy, and the implementation cost is low, can be widely applied to piping lane pipe trench, top In the other similar underground engineering such as pipe tunnel.
Fig. 1 illustrates the process that country rock reduction development is determined according to Tunnel Lining Deformation.
Fig. 2 is tunnel-liner point position schematic diagram.Each monitoring section arranges that three measuring points, respectively Vault settlement are surveyed The 1, first perimeter convergence measuring point 2 of point and the second perimeter convergence measuring point 3;First perimeter convergence measuring point 2 and the second perimeter convergence measuring point 3 Between horizontal distance L23Changing value be tunnel clearance convergence, 2 to the second perimeter convergence measuring point of the first perimeter convergence of measuring point measuring point 3, the vertical range L of 1 line of Vault settlement measuring point1Changing value be tunnel vault sedimentation.
Fig. 3 is to calculate loosening area of surrounding rocks hjWhen calculating measuring point;Loosening area of surrounding rocks h is calculated according to pressure from surrounding rock PjWhen, Tunnel different parts can be chosen according to required precision and calculate measuring point, but should include that vault calculates measuring point 4, the first haunch is calculated and surveyed The 5, first abutment wall of point calculates measuring point 6, the first arch springing calculates measuring point 7, the second haunch calculates measuring point 11, the second abutment wall calculates measuring point 10, the second arch springing calculates measuring point 9 and arch bottom calculates measuring point 8.
Fig. 4 is that country rock weakens development range schematic diagram;Loosening area of surrounding rocks hjWith loosening area of surrounding rocks hsBetween be country rock Weaken development range hr

Claims (8)

1. a kind of method for determining country rock reduction development range based on tunnel deformation, which is characterized in that this method includes following step It is rapid:
Step S1: acquisition tunnel-liner data Lj
Step S2: the tunnel-liner data L under different surrounding rock pressure is calculated with load structure methods
Step S3: the tunnel-liner data L with acquisition is establishedjWith the tunnel-liner data L calculated with load structure methodsIt is related Objective function S, objective function S meet impose a condition when, record load structure method apply pressure from surrounding rock P;
Step S4: loosening area of surrounding rocks h is calculated according to the pressure from surrounding rock Pj
Step S5: the loosening area of surrounding rocks h under design pressure from surrounding rock is calculateds
Step S6: the loosening area of surrounding rocks h calculated according to pressure from surrounding rock PjWith the loosening area of surrounding rocks h under design pressure from surrounding rocks? Development range h is weakened to country rockr
2. a kind of method for determining country rock reduction development range based on tunnel deformation according to claim 1, feature exist In the tunnel-liner data include Vault settlement aggregate-value and clearance convergence aggregate-value.
3. a kind of method for determining country rock reduction development range based on tunnel deformation according to claim 1, feature exist In the step S3 objective function S are as follows:
4. a kind of method for determining country rock reduction development range based on tunnel deformation according to claim 3, feature exist In the setting condition is objective function S less than 10%.
5. a kind of method for determining country rock reduction development range based on tunnel deformation according to claim 1, feature exist In the step S4 loosening area of surrounding rocks hjAre as follows:
Wherein, γ is country rock severe.
6. a kind of method for determining country rock reduction development range based on tunnel deformation according to claim 1, feature exist In in the step S4, according to pressure from surrounding rock P calculating loosening area of surrounding rocks hjWhen, setting vault calculates measuring point, the first haunch Calculating measuring point, the first abutment wall calculate measuring point, the first arch springing calculates measuring point, the second haunch calculates measuring point, the second abutment wall calculates measuring point, Second arch springing calculates measuring point and arch bottom calculates measuring point.
7. a kind of method for determining country rock reduction development range based on tunnel deformation according to claim 1, feature exist In, in the step S5, loosening area of surrounding rocks hsAre as follows:
Wherein, a be tunnel hair hole half across, h is tunnel hair height of holes,For country rock internal friction angle, f is country rock firmness coefficient.
8. a kind of method for determining country rock reduction development range based on tunnel deformation according to claim 1, feature exist In in the step S6, country rock weakens development range hrAre as follows:
hr=hj-hs
CN201910382854.3A 2019-05-09 2019-05-09 Method for determining weakening development range of surrounding rock based on tunnel deformation Active CN110174503B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910382854.3A CN110174503B (en) 2019-05-09 2019-05-09 Method for determining weakening development range of surrounding rock based on tunnel deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910382854.3A CN110174503B (en) 2019-05-09 2019-05-09 Method for determining weakening development range of surrounding rock based on tunnel deformation

Publications (2)

Publication Number Publication Date
CN110174503A true CN110174503A (en) 2019-08-27
CN110174503B CN110174503B (en) 2020-11-27

Family

ID=67690649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910382854.3A Active CN110174503B (en) 2019-05-09 2019-05-09 Method for determining weakening development range of surrounding rock based on tunnel deformation

Country Status (1)

Country Link
CN (1) CN110174503B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111596375A (en) * 2020-04-23 2020-08-28 上海同岩土木工程科技股份有限公司 Method and device for detecting occurrence state of underground water behind lining
CN112924059A (en) * 2021-01-26 2021-06-08 上海同岩土木工程科技股份有限公司 Strip-type surrounding rock pressure monitoring device, monitoring method and installation method
CN115859444A (en) * 2022-12-21 2023-03-28 交通运输部公路科学研究所 Method for predicting road tunnel collapse

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103728374A (en) * 2014-01-07 2014-04-16 山东理工大学 Underground engineering wall surrounding rock disaster non-drilling ultrasonic wave lossless real-time monitoring method
CN104749255A (en) * 2015-03-31 2015-07-01 无锡市崇安区科技创业服务中心 Ultrasonic longitudinal wave based lithosphere-state real-time detection system
CN104880544A (en) * 2015-04-02 2015-09-02 山东大学 Method for detecting and evaluating reinforcing effect on weak surrounding rock grouting during underground construction
CN106570276A (en) * 2016-11-04 2017-04-19 长安大学 Method for determining surrounding rock pressure of tunnel having cavity behind lining
CN107024183A (en) * 2017-06-01 2017-08-08 安徽理工大学 Exploring Loose Rock Country in Tunnels range test method and system
CN108268703A (en) * 2017-12-28 2018-07-10 山东天勤工程科技有限公司 The quantitative detection of country rock time-varying reduction is with reinforcing prediction scheme design method, system and equipment
CN108278109A (en) * 2017-12-28 2018-07-13 山东天勤工程科技有限公司 Underground engineering reduction surrounding rock consolidation opportunity determines method, apparatus and system
CN108414724A (en) * 2017-12-28 2018-08-17 山东天勤工程科技有限公司 Underground engineering wall rock subregion weakens fast quantitative measurement method for detecting, system and equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103728374A (en) * 2014-01-07 2014-04-16 山东理工大学 Underground engineering wall surrounding rock disaster non-drilling ultrasonic wave lossless real-time monitoring method
CN104749255A (en) * 2015-03-31 2015-07-01 无锡市崇安区科技创业服务中心 Ultrasonic longitudinal wave based lithosphere-state real-time detection system
CN104880544A (en) * 2015-04-02 2015-09-02 山东大学 Method for detecting and evaluating reinforcing effect on weak surrounding rock grouting during underground construction
CN106570276A (en) * 2016-11-04 2017-04-19 长安大学 Method for determining surrounding rock pressure of tunnel having cavity behind lining
CN107024183A (en) * 2017-06-01 2017-08-08 安徽理工大学 Exploring Loose Rock Country in Tunnels range test method and system
CN108268703A (en) * 2017-12-28 2018-07-10 山东天勤工程科技有限公司 The quantitative detection of country rock time-varying reduction is with reinforcing prediction scheme design method, system and equipment
CN108278109A (en) * 2017-12-28 2018-07-13 山东天勤工程科技有限公司 Underground engineering reduction surrounding rock consolidation opportunity determines method, apparatus and system
CN108414724A (en) * 2017-12-28 2018-08-17 山东天勤工程科技有限公司 Underground engineering wall rock subregion weakens fast quantitative measurement method for detecting, system and equipment

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
汤能见: "《水工建筑物》", 31 August 2005, 中国水利水电出版社 *
白浪峰等: "软弱破碎连拱隧道松动区模型试验与分析 ", 《岩石力学与工程学报》 *
白浪峰等: "软弱破碎连拱隧道松动区模型试验与分析", 《岩石力学与工程学报》 *
肖明清等: "《高速铁路水下隧道研究与设计》", 31 August 2015, 中国铁道出版社 *
郭磊等: "小净距隧道围岩松动范围的测试与分析 ", 《山西建筑》 *
郭磊等: "小净距隧道围岩松动范围的测试与分析", 《山西建筑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111596375A (en) * 2020-04-23 2020-08-28 上海同岩土木工程科技股份有限公司 Method and device for detecting occurrence state of underground water behind lining
CN111596375B (en) * 2020-04-23 2023-03-28 上海同岩土木工程科技股份有限公司 Method and device for detecting occurrence state of underground water behind lining
CN112924059A (en) * 2021-01-26 2021-06-08 上海同岩土木工程科技股份有限公司 Strip-type surrounding rock pressure monitoring device, monitoring method and installation method
CN112924059B (en) * 2021-01-26 2022-09-23 上海同岩土木工程科技股份有限公司 Strip-type surrounding rock pressure monitoring device, monitoring method and installation method
CN115859444A (en) * 2022-12-21 2023-03-28 交通运输部公路科学研究所 Method for predicting road tunnel collapse
CN115859444B (en) * 2022-12-21 2023-06-16 交通运输部公路科学研究所 Highway tunnel collapse prediction method

Also Published As

Publication number Publication date
CN110174503B (en) 2020-11-27

Similar Documents

Publication Publication Date Title
Mair et al. Pressuremeter testing: methods and interpretation
KR101162918B1 (en) Method of measuring underground displacement using inclinometer
CN110174503A (en) A method of determining that country rock weakens development range based on tunnel deformation
CN104329076B (en) A kind of deviational survey hole osmotic pressure counter device and installation method
CN103410516B (en) Minor diameter tunnel full face tunneling surrouding rock deformation early warning engineering method
CN102519790B (en) Method for determining support pressure on excavation face of slurry shield tunnel
CN205636706U (en) Normal position soil pressure test device
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
JP6391010B2 (en) Evaluation method and evaluation system for water permeability characteristics in front of tunnel face
CN106871866A (en) A kind of excavation face bottom sinking deformation monitoring device and its application method
CN103541339A (en) Pull rod type testing device and method for unsaturated undisturbed loess slope soil pressure
CN104831743B (en) A kind of appraisal procedure to rich water wall rock grouting control water effect
CN204252103U (en) A kind of deviational survey hole osmometer device
CN113431016A (en) Soft rock large deformation section tunnel shallow-buried underground surface-penetrating building surface monitoring method
CN106592654A (en) Monitoring method for perpendicularity of steel pipe pile
CN107169224A (en) Great diameter and long pile tube pile drivability analysis method is carried out based on CPTU tests
CN107703055B (en) Surrounding rock relaxation monitoring device and relaxation depth judging method thereof
Hwan Cho et al. Laterally loaded drilled shafts embedded in soft rock
JP2010222805A (en) Method for evaluating stability of excavated surface against sump water
CN114818082A (en) Method for evaluating influence of over excavation of deep tunnel on collapse of arch part
Lunardi et al. Tunnel monitoring system—a contribution for the preparation of guidelines
CN110528522B (en) Accurate tracking grouting construction method
CN206772279U (en) A kind of excavation face bottom sinking deformation monitoring device
CN110568477A (en) Time-lag type rock burst space-time early warning method for tunnel construction
Ganesharatnam et al. Large-diameter piles in chalk–part 2, design and construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant