CN106351428A - Suite of floor tile paving tool and paving process - Google Patents

Suite of floor tile paving tool and paving process Download PDF

Info

Publication number
CN106351428A
CN106351428A CN201610748531.8A CN201610748531A CN106351428A CN 106351428 A CN106351428 A CN 106351428A CN 201610748531 A CN201610748531 A CN 201610748531A CN 106351428 A CN106351428 A CN 106351428A
Authority
CN
China
Prior art keywords
paving
behaviour
floor tile
mortar
flatrack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610748531.8A
Other languages
Chinese (zh)
Other versions
CN106351428B (en
Inventor
韩强
张卫星
陈丽芳
缪洁
代东华
钱冬
余红超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jia Yang Hualian Building Decoration Ltd By Share Ltd
Original Assignee
Jiangsu Jia Yang Hualian Building Decoration Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jia Yang Hualian Building Decoration Ltd By Share Ltd filed Critical Jiangsu Jia Yang Hualian Building Decoration Ltd By Share Ltd
Priority to CN201610748531.8A priority Critical patent/CN106351428B/en
Publication of CN106351428A publication Critical patent/CN106351428A/en
Application granted granted Critical
Publication of CN106351428B publication Critical patent/CN106351428B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/22Implements for finishing work on buildings for laying flooring of single elements, e.g. flooring cramps ; flexible webs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a suite of floor tile paving tool and paving process, wherein the suite of floor tile paving tool comprises a sand rake, a bed board and a starching frame; the sand rake comprises a handle, end body and multiple spike teeth, the end body is vertically set on one end of the handle, the multiple spike teeth are uniformly set on one side of the end body; the length of the end body is 350-550mm; the bed board comprises a board body and grip, the grip is set in the middle of any big end face of the board body, the thickness of the board body is 5-10mm; the starching frame comprises a leveling frame and support frame, the leveling frame is set on the support frame, the bottom of the leveling frame is provided with four drivepipes, outer side of the four legs of the support frame are provided with four lugs, and the drivepipes and lugs match with each other. Through the above way, the suite of floor tile paving tool and paving process can labor density of workers and improve paving quality and efficiency.

Description

A kind of floor tile paving suite of tools and its paving technique
Technical field
The present invention relates to building field, more particularly to a kind of floor tile paving suite of tools and its paving technique.
Background technology
Existing floor tile paving technological process is: preparation of construction → base treatment → select brick → tile work → maintenance → jointing.Its Middle tile work specific operation process is: operator shovel qualified for mixing, the 1:4 stiff mortar spade as bed course in paving On ground, then squat down and with trowel, stiff mortar is flattened;Stand up again and the floor tile of paving will remove to squat down to paving position and carry out Examination paving;Dig floor tile and check whether the bedding mortar after examination paving is uniform, closely knit consistent;Stand again and brick is removed to operating board, The sticking mortar (for preventing floor tile hollowing, sticking mortar also requires that uniformly) of thick about 10-12mm smeared by its back side trowel, then will Brick is removed to paving, squats down and carries out paving.
In terms of this operating process of tile work, either leveling bedding mortar or applied sticking mortar, operator all make Trowel.And no controlled mortar flatness, the device of the uniformity on trowel, mortar quality is entirely because of the level height of operator And there is deviation;Separately, one piece of brick of paving it can be seen that operator need repeatedly to squat down,.Floor tile also will repeatedly be moved, work Make that step is many, high labor intensive, work efficiency is low.
Content of the invention
The invention mainly solves the technical problem of providing a kind of floor tile paving suite of tools and its paving technique, can drop Low labor strength, improves paving quality and efficiency.
For solving above-mentioned technical problem, one aspect of the present invention is: provides a kind of floor tile paving tool cover Part, comprising: behaviour's pricker is harrowed, tried bed board and scrape crutch, described behaviour's pricker rake includes: handle, end body and Duo Gen spike-tooth, described end body It is vertically installed in one end of handle, described many spike-tooths are uniformly arranged on the side of end body, the length of described end body is set to 350 ~550mm;Described examination bed board includes: plate body and handle, described handle is arranged in the middle part of any one large end face of plate body, described plate The thickness of body is set to 5 ~ 10mm;Described crutch of scraping includes: behaviour's flatrack and bearing support, and described behaviour's flatrack is arranged on bearing support Side, the bottom of described behaviour's flatrack is provided with four sleeve pipes, and four leg outer sides of described bearing support are provided with four journal stirrups, wherein Sleeve pipe and journal stirrup match, and the planar dimension of described behaviour's flatrack is set to 900mm*900mm, and the planar dimension of described bearing support sets Be set to 300mm*300mm, the height of bearing support is set to 650 ~ 850mm, the housing height of described behaviour's flatrack be higher than bearing support 22 ~ 24mm.
Preferably, the upper surface in described behaviour's flatrack is provided with a rotating handle, and rotating shaft is passed through admittedly in one end of described rotating handle One end due to behaviour's flatrack.
Preferably, it is symmetrically arranged with a pair of reinforcing plate between the handle of described behaviour's pricker rake and end body.
For solving above-mentioned technical problem, another technical solution used in the present invention is: a kind of floor tile paving technique is provided, It is characterized in that, the main several steps as follows that include:
First, early-stage preparations: in-site measurement unwrapping wire, and tile work typesetting is carried out according to actual size, draw cad construction drawing;
2nd, base treatment: flooring cleans, wet water;
3rd, live tile work
One), mortar mixing: mixing is laid on dry cement mortar and the stickup sand for the floor tile back side that flooring is used as bed course Slurry;
Two), draw control line: according to typesetting figure, draw vertical, horizontal paving finished surface control line in shown position;
Three), matting layer mortar: place mat dry cement mortar bedding cushion on flooring, disposably will need the same row ground of paving The bedding mortar of brick is transported to paving position, and mortar thickness need to be slightly above longitudinal and transverse horizontal absolute altitude control line;
Four), bedding mortar behaviour is smooth even: operator are in slightly stooped over position of standing, and harrow longitudinal and transverse to screed two with behaviour's pricker Direction is harrowed one time one by one, phaeodium therein is broken up rake even, and is bulldozed mortar face so as to substantially concordant with control line;
Five), examination spreads and adjusts: spreads point according to rising of typesetting figure, carries out examination paving with examination bed board, during examination paving, rubber hammer to be used is from examination Touch to surrounding in the middle of bed board, check flatness and the density of plate foot mat mortar after examination paving, to local out-of-flatness or not close Real position, is suitably adjusted with behaviour's pricker rake, is allowed to meet requirement;
Six), slurry is scraped at the floor tile back side: the floor tile back side is positioned in the behaviour's flatrack scraping crutch upward, takes appropriate stickup sand with trowel Slurry is placed on it, and tentatively grasps flat;Rotate behaviour flatrack on rotating handle, make sticking mortar face smooth, closely knit, to local out-of-flatness, Closely knit place, carry out mend slurry, grasp again flat;
Seven), floor tile paving: floor tile be aligned paving position is gently put down, face rubber hammer raps to fully horizontal, and make its with Longitudinal and transverse control line is concordant, the level of adjacent floor tile is it is ensured that gap size is consistent, and checks integral level degree with horizon rule;
4th, removing surface: dust and the mortar of tile surface after the completion of paving, will be cleared up immediately, to prevent mortar in floor tile table Face bonding;
5th, jointing and finished product protection: after paving completes 24 hours, the dust impurity in cleaning floor tile brickwork joint, carries out jointing in time And finished product protection.
The invention has the beneficial effects as follows: 1, with behaviour's pricker rake operation bedding mortar, will with the studded one side of behaviour's pricker rake Phaeodium rake in bedding mortar dissipates, and the concordance using its tooth pitch, makes dry mortar density evenly;Also pricker will can be grasped The tooth mouth of rake upward, pushes away mortar so as to surface more smooth using its end body is counter, using behaviour's pricker rake, operator can stand Operation, both than trowel operation more easily, and each operating surface is big, and work efficiency is high;2nd, replace floor tile examination paving with examination bed board, it is to avoid floor tile is removed To remove, to decrease operation sequence and labor intensity;Again because examination bed board carries handle, examination paving is convenient, fast, be difficult disturbance bottom Bedding mortar and surrounding floor tile, improve construction quality and work efficiency;3rd, paste sand using scraping crutch and batch scrape the floor tile back side Slurry, had both alleviated floor tile at ordinary times and had been put in ground or temporarily every bending over to operate easily tired problem in lower positions such as buckets, improved again The density of sticking mortar and flatness, reduce the quality problems of floor tile paving hollowing.
Brief description
Fig. 1 is the vertical of behaviour's pricker rake in a kind of present invention floor tile paving suite of tools and its paving technique one preferred embodiment Body structural representation;
Fig. 2 is the perspective view of shown examination bed board;
Fig. 3 is the described top view scraping crutch;
Fig. 4 is the a-a schematic cross-section of shown Fig. 3;
Fig. 5 is the b-b schematic cross-section of shown Fig. 3;
Fig. 6 is the front view of described bearing support;
Fig. 7 is the front view of described behaviour's flatrack;
In accompanying drawing, the labelling of each part is as follows: 1, behaviour's pricker rake, and 11, handle, 12, end body, 13, spike-tooth, 14, reinforcing plate, 2, examination Bed board, 21, plate body, 22, handle, 3, scrape crutch, 31, behaviour's flatrack, 32, bearing support, 33, rotating handle, 34, rotating shaft, 35, journal stirrup, 36th, sleeve pipe, 4, floor tile.
Specific embodiment
Below in conjunction with the accompanying drawings presently preferred embodiments of the present invention is described in detail, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, thus protection scope of the present invention is made apparent clearly defining.
Refer to Fig. 1 to Fig. 7, the embodiment of the present invention 1 includes:
A kind of floor tile paving suite of tools, comprising: behaviour's pricker is harrowed 1, examination bed board 2 and scraped crutch 3, described behaviour's pricker rake 1 includes: handss Handle 11, end body 12 and Duo Gen spike-tooth 13, described end body 12 is vertically installed in one end of handle 11, and described many spike-tooths 13 uniformly set It is placed in the side of end body 12, the length of described end body 12 is set to 550mm;Described examination bed board 2 includes: plate body 21 and handle 22, Described handle 22 is arranged in the middle part of any one large end face of plate body 21, and the thickness of described plate body 21 is set to 8mm;Described scrape crutch 3 include: behaviour's flatrack 31 and bearing support 32, and described behaviour's flatrack 31 is arranged above bearing support 32, and the bottom of described behaviour's flatrack 31 sets It is equipped with four sleeve pipes 36, four leg outer sides of described bearing support 32 are provided with four journal stirrups 35, its middle sleeve 36 and journal stirrup 35 Match, the planar dimension of described behaviour's flatrack 31 is set to 900mm*900mm, and the planar dimension of described bearing support 32 is set to 300mm*300mm, the height of bearing support 32 is set to 700mm, and the housing height of described behaviour's flatrack 31 is higher than bearing support 22mm.
Further, the upper surface in described behaviour's flatrack 31 is provided with a rotating handle 33, and one end of described rotating handle 33 leads to Cross one end that behaviour's flatrack 31 is fixed in rotating shaft 34, between the handle 11 of described behaviour's pricker rake 1 and end body 12, be symmetrically arranged with a pair Reinforcing plate 14.
The invention also discloses a kind of floor tile paving technique, the main several steps as follows that include:
First, early-stage preparations: in-site measurement unwrapping wire, and tile work typesetting is carried out according to actual size, draw cad construction drawing;
2nd, base treatment: flooring cleans, wet water;
3rd, live tile work
One), mortar mixing: mixing is laid on dry cement mortar and the stickup sand for the floor tile back side that flooring is used as bed course Slurry;
Two), draw control line: according to typesetting figure, draw vertical, horizontal paving finished surface control line in shown position;
Three), matting layer mortar: place mat dry cement mortar bedding cushion on flooring, disposably will need the same row ground of paving The bedding mortar of brick is transported to paving position, and mortar thickness need to be slightly above longitudinal and transverse horizontal absolute altitude control line;
Four), bedding mortar behaviour is smooth even: operator are in slightly stooped over position of standing, and harrow longitudinal and transverse to screed two with behaviour's pricker Direction is harrowed one time one by one, phaeodium therein is broken up rake even, and is bulldozed mortar face so as to substantially concordant with control line;
Five), examination spreads and adjusts: spreads point according to rising of typesetting figure, carries out examination paving with examination bed board, during examination paving, rubber hammer to be used is from examination Touch to surrounding in the middle of bed board, check flatness and the density of plate foot mat mortar after examination paving, to local out-of-flatness or not close Real position, is suitably adjusted with behaviour's pricker rake, is allowed to meet requirement;
Six), slurry is scraped at the floor tile back side: the floor tile back side is positioned in the behaviour's flatrack scraping crutch upward, takes appropriate stickup sand with trowel Slurry is placed on it, and tentatively grasps flat;Rotate behaviour flatrack on rotating handle, make sticking mortar face smooth, closely knit, to local out-of-flatness, Closely knit place, carry out mend slurry, grasp again flat;
Seven), floor tile paving: floor tile be aligned paving position is gently put down, face rubber hammer raps to fully horizontal, and make its with Longitudinal and transverse control line is concordant, the level of adjacent floor tile is it is ensured that gap size is consistent, and checks integral level degree with horizon rule;
4th, removing surface: dust and the mortar of tile surface after the completion of paving, will be cleared up immediately, to prevent mortar in floor tile table Face bonding;
5th, jointing and finished product protection: after paving completes 24 hours, the dust impurity in cleaning floor tile brickwork joint, carries out jointing in time And finished product protection.
In embodiment 1, the length of described handle is set to 1200mm, and end body 12 length of described behaviour's pricker rake 1 is set to 550mm, is relatively suitable for the floor tile paving of big region.
Embodiment 2, a kind of floor tile paving suite of tools, comprising: behaviour's pricker is harrowed 1, examination bed board 2 and scraped crutch 3, described behaviour's sand Rake 1 includes: handle 11, end body 12 and Duo Gen spike-tooth 13, and described end body 12 is vertically installed in one end of handle 11, described many Spike-tooth 13 is uniformly arranged on the side of end body 12, and the length of described end body 12 is set to 350mm;Described examination bed board 2 includes: plate body 21 and handle 22, described handle 22 is arranged in the middle part of any one large end face of plate body 21, and the thickness of described plate body 21 is set to 10mm;Described crutch 3 of scraping includes: behaviour's flatrack 31 and bearing support 32, and described behaviour's flatrack 31 is arranged above bearing support 32, described behaviour The bottom of flatrack 31 is provided with four sleeve pipes 36, and four leg outer sides of described bearing support 32 are provided with four journal stirrups 35, wherein Sleeve pipe 36 and journal stirrup 35 match, and the planar dimension of described behaviour's flatrack 31 is set to 900mm*900mm, described bearing support 32 flat Face is sized to 300mm*300mm, and the height of bearing support 32 is set to 800mm, and the housing height of described behaviour's flatrack 31 is higher than Bearing support 24mm.
Its tile work mode is same as Example 1, and except for the difference that, the length of described handle 11 is set to 300mm, described end body 12 length are set to 350mm, compare the floor tile paving of suitable cell domain.
Routine use trowel instrument, can only squat down grasp in floor tile put down bed course below it is impossible to stand, rapidly entire row Behaviour is smooth even in advance, especially for large area, large space floor tile paving, and adopts behaviour's pricker rake 1 of the present invention, behaviour is flat The advantage of bed course becomes apparent from, its surface more smooth, and using behaviour's pricker rake 1, operator both can be operated than trowel with standing operation Easily, and each operating surface is big, work efficiency is high.
The foregoing is only embodiments of the invention, not thereby limit the present invention the scope of the claims, every using this Equivalent structure or equivalent flow conversion that bright description and accompanying drawing content are made, or directly or indirectly it is used in other related skills Art field, is included within the scope of the present invention.

Claims (4)

1. a kind of floor tile paving suite of tools is it is characterised in that include: behaviour's pricker is harrowed, tried bed board and scrape crutch, described behaviour's pricker Rake includes: handle, end body and Duo Gen spike-tooth, and described end body is vertically installed in one end of handle, and described many spike-tooths are uniformly arranged The side of Yu Duanshen, the length of described end body is set to 350 ~ 550mm;Described examination bed board includes: plate body and handle, described handle It is arranged in the middle part of any one large end face of plate body, the thickness of described plate body is set to 5 ~ 10mm;Described crutch of scraping includes: behaviour's flatrack And bearing support, described behaviour's flatrack is arranged above bearing support, and the bottom of described behaviour's flatrack is provided with four sleeve pipes, described bearing support Four leg outer sides be provided with four journal stirrups, its middle sleeve and journal stirrup match, and the planar dimension of described behaviour's flatrack is set to 900mm*900mm, the planar dimension of described bearing support is set to 300mm*300mm, and the height of bearing support is set to 650 ~ 850mm, the housing height of described behaviour's flatrack is higher than bearing support 22 ~ 24mm.
2. a kind of floor tile paving suite of tools according to claim 1 it is characterised in that described behaviour flatrack upper surface It is provided with a rotating handle, one end of behaviour's flatrack is fixed in one end of described rotating handle by rotating shaft.
3. a kind of floor tile paving suite of tools according to claim 1 it is characterised in that described behaviour's pricker rake handle with It is symmetrically arranged with a pair of reinforcing plate between the body of end.
4. a kind of utilization a kind of paving technique of floor tile paving suite of tools as described in any one of claim 1-3, its feature exists In the main several steps as follows that include:
First, early-stage preparations: in-site measurement unwrapping wire, and tile work typesetting is carried out according to actual size, draw cad construction drawing;
2nd, base treatment: flooring cleans, wet water;
3rd, live tile work
One), mortar mixing: mixing is laid on dry cement mortar and the stickup sand for the floor tile back side that flooring is used as bed course Slurry;
Two), draw control line: according to typesetting figure, draw vertical, horizontal paving finished surface control line in shown position;
Three), matting layer mortar: place mat dry cement mortar bedding cushion on flooring, disposably will need the same row ground of paving The bedding mortar of brick is transported to paving position, and mortar thickness need to be slightly above longitudinal and transverse horizontal absolute altitude control line;
Four), bedding mortar behaviour is smooth even: operator are in slightly stooped over position of standing, and harrow longitudinal and transverse to screed two with behaviour's pricker Direction is harrowed one time one by one, phaeodium therein is broken up rake even, and is bulldozed mortar face so as to substantially concordant with control line;
Five), examination spreads and adjusts: spreads point according to rising of typesetting figure, carries out examination paving with examination bed board, during examination paving, rubber hammer to be used is from examination Touch to surrounding in the middle of bed board, check flatness and the density of plate foot mat mortar after examination paving, to local out-of-flatness or not close Real position, is suitably adjusted with behaviour's pricker rake, is allowed to meet requirement;
Six), slurry is scraped at the floor tile back side: the floor tile back side is positioned in the behaviour's flatrack scraping crutch upward, takes appropriate stickup sand with trowel Slurry is placed on it, and tentatively grasps flat;Rotate behaviour flatrack on rotating handle, make sticking mortar face smooth, closely knit, to local out-of-flatness, Closely knit place, carry out mend slurry, grasp again flat;
Seven), floor tile paving: floor tile be aligned paving position is gently put down, face rubber hammer raps to fully horizontal, and make its with Longitudinal and transverse control line is concordant, the level of adjacent floor tile is it is ensured that gap size is consistent, and checks integral level degree with horizon rule;
4th, removing surface: dust and the mortar of tile surface after the completion of paving, will be cleared up immediately, to prevent mortar in floor tile table Face bonding;
5th, jointing and finished product protection: after paving completes 24 hours, the dust impurity in cleaning floor tile brickwork joint, carries out jointing in time And finished product protection.
CN201610748531.8A 2016-08-30 2016-08-30 A kind of floor tile paving suite of tools and its paving technique Active CN106351428B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610748531.8A CN106351428B (en) 2016-08-30 2016-08-30 A kind of floor tile paving suite of tools and its paving technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610748531.8A CN106351428B (en) 2016-08-30 2016-08-30 A kind of floor tile paving suite of tools and its paving technique

Publications (2)

Publication Number Publication Date
CN106351428A true CN106351428A (en) 2017-01-25
CN106351428B CN106351428B (en) 2018-10-09

Family

ID=57855477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610748531.8A Active CN106351428B (en) 2016-08-30 2016-08-30 A kind of floor tile paving suite of tools and its paving technique

Country Status (1)

Country Link
CN (1) CN106351428B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794061A (en) * 2020-07-17 2020-10-20 济南园林开发建设集团有限公司 Trial paving device for stone paving and stone paving method
CN113379917A (en) * 2021-06-30 2021-09-10 杭州群核信息技术有限公司 Space joint method and device for 3D cloud design, electronic equipment and medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US988457A (en) * 1909-07-06 1911-04-04 Winfield Scott Glasscock Sidewalk-tool.
CA1223750A (en) * 1986-03-05 1987-07-07 Roger Rouillard Concrete levelling screed
US4702641A (en) * 1986-05-01 1987-10-27 Atlanta Concrete Accessories Inc. Multi-purpose concrete working tool
US5605415A (en) * 1995-05-25 1997-02-25 Michael A. Marshall Screed bar attachment
CN102900224A (en) * 2012-04-28 2013-01-30 郭卫康 Device and method for fixing floor tiles quickly and accurately
CN202787910U (en) * 2012-08-31 2013-03-13 包德彬 Plate-type plaster hawk
CN203320915U (en) * 2013-06-06 2013-12-04 王海浪 Tool for paving floor tiles
CN103726642A (en) * 2013-11-25 2014-04-16 成都市翻鑫家科技有限公司 Plastering trowel

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US988457A (en) * 1909-07-06 1911-04-04 Winfield Scott Glasscock Sidewalk-tool.
CA1223750A (en) * 1986-03-05 1987-07-07 Roger Rouillard Concrete levelling screed
US4702641A (en) * 1986-05-01 1987-10-27 Atlanta Concrete Accessories Inc. Multi-purpose concrete working tool
US5605415A (en) * 1995-05-25 1997-02-25 Michael A. Marshall Screed bar attachment
CN102900224A (en) * 2012-04-28 2013-01-30 郭卫康 Device and method for fixing floor tiles quickly and accurately
CN202787910U (en) * 2012-08-31 2013-03-13 包德彬 Plate-type plaster hawk
CN203320915U (en) * 2013-06-06 2013-12-04 王海浪 Tool for paving floor tiles
CN103726642A (en) * 2013-11-25 2014-04-16 成都市翻鑫家科技有限公司 Plastering trowel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794061A (en) * 2020-07-17 2020-10-20 济南园林开发建设集团有限公司 Trial paving device for stone paving and stone paving method
CN111794061B (en) * 2020-07-17 2021-09-28 济南园林开发建设集团有限公司 Trial paving device for stone paving and stone paving method
CN113379917A (en) * 2021-06-30 2021-09-10 杭州群核信息技术有限公司 Space joint method and device for 3D cloud design, electronic equipment and medium

Also Published As

Publication number Publication date
CN106351428B (en) 2018-10-09

Similar Documents

Publication Publication Date Title
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN208009855U (en) A kind of floor tile construction brick paving machine
CN105133466A (en) Automatic paver for cobblestone road
CN106351428A (en) Suite of floor tile paving tool and paving process
CN211473275U (en) Construction of wall is built in room is with floating device
CN110397291A (en) A kind of fast placing box-shaped spatula tool
CN107401276A (en) A kind of tile laying machine easy to remove
CN109098464A (en) A kind of renovation technology of old tile floor
CN104372916A (en) Lime-sand mortar tiling device for floor tiling
CN109057272B (en) Floor tile gap filling equipment for construction site
CN207829495U (en) Control the combination tool of building wall level, vertical mortar joint plumpness and thickness
CN205712151U (en) A kind of concrete foundation precoated plate
CN209837621U (en) Ash leveling device for building construction
CN110735493B (en) Anti-leakage composite waterproof method for flat roof
CN108316659A (en) A kind of building concrete floating device
CN206503342U (en) One kind laying floor tile leveling unit
CN207959983U (en) A kind of paving slurry tool of control building wall gray seam thickness
CN206581624U (en) A kind of seat slurry device built by laying bricks or stones for solid block
CN106401103A (en) Wall surface large-size vitrified tile comprehensive method construction technology
CN204326481U (en) The sand-lime tiling device of paving brick
CN102535493B (en) Method for constructing inverted type foundation beam
CN210798338U (en) Mortar laying and seam scraping integrated construction device for wall masonry
CN212535125U (en) High-precision low-power-consumption simple masonry tool
CN111335578B (en) Cement pea stone building ground construction process
CN110469131A (en) The building wall grey raking integrative construction device of paving and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant