CN106337648A - Suspension tower insulator climbing tool - Google Patents

Suspension tower insulator climbing tool Download PDF

Info

Publication number
CN106337648A
CN106337648A CN201510389748.XA CN201510389748A CN106337648A CN 106337648 A CN106337648 A CN 106337648A CN 201510389748 A CN201510389748 A CN 201510389748A CN 106337648 A CN106337648 A CN 106337648A
Authority
CN
China
Prior art keywords
mobile jib
screw
bar
short
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510389748.XA
Other languages
Chinese (zh)
Inventor
许子涛
任金柱
卢绍强
齐光平
李卫东
庄洲
李振东
金阿龙
贾本伟
蔡六
蔡六一
崔世凯
王聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510389748.XA priority Critical patent/CN106337648A/en
Publication of CN106337648A publication Critical patent/CN106337648A/en
Pending legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Abstract

The invention discloses a suspension tower insulator climbing tool, which includes a main rod. Pedal levers are arranged at an interval evenly on the left side and right side of the main rod, decurved fixation hooks are fixedly disposed at the upper end of the main rod, movable hooks are hinged to the tail ends of the fixation hooks, movable holes are disposed at the ends of the movable hooks, locking plates corresponding to the movable hooks are fixedly arranged outside the main rod, and the locking plates are equipped with locking holes cooperating with the movable holes, locking bolts are inserted into the movable holes and the locking holes. The climbing tool has the characteristics of small volume, convenient carrying, and small space occupation, during climbing of tower crossarms, the length can be combined freely according to the crossarm height, thus meeting the requirements for climbing different heights. The tool can be assembled quickly, the upper end is connected firmly, the lower end is non-slip, assistance of other people is unnecessary, the climbing and construction safety is high, also the tool is easy to disassemble, and is conducive to improving the work efficiency.

Description

Straight line pole insulator climbing tool
Technical field
The present invention relates to a kind of straight line pole insulator climbing tool.
Background technology:
Power grid construction paces are accelerated at present, and with the continuous improvement of transmission line of electricity operation stability and reliability, the insulator of straight line pole has all been replaced by composite insulator.Because the water-repellent layer of surface of composite insulator must not arbitrarily be trampled, climb (if the water-repellent layer of surface of composite insulator is worn, dielectric strength and the service life of composite insulator will be substantially reduced), the defect work processing for us on wire brings great inconvenience, and developing the instrument being easy to assist climbing for this is extremely urgent.And traditional climbing aid is livewire work rope ladder, climbs sling, day font cat ladder, general climbing task can be completed with auxiliary power attendant, such as climb metope wiring etc., bring facility to workman, application is widely.
Although these three conventional tradition climbing aids have above advantage, but there is also following defect: when using cooperatively with cross arm of tower, it is required for being connected with cross arm of tower with special rope, cause the problem that installation process is complicated, dismounting is inconvenient, inconvenient to carry.Specifically, livewire work rope ladder, climbing sling material therefor softer, upper end fixation not firm it is desirable to operating personnel has preferable balance, significantly consume the muscle power of operating personnel, be unfavorable for safe construction.During using day font cat ladder, operating personnel's bipod is placed on a beam simultaneously, is unfavorable for controlling the angle of ladder, easily causes personnel's layback, lower end easily and skids, needs other staff to buttress, and carry inconvenience during use.
Content of the invention:
The present invention is aiming at above-mentioned deficiency, proposes a kind of rational in infrastructure, compact, easy to carry, deposit take up room little, climb tower bar cross-arm when can be according to cross-arm height independent assortment length, climbing differing heights requirement can be met, assembling is quick, and it is firm that upper end connects, and lower end is non-slip, without other people auxiliary, climbing and working security are high, and dismounting is simple, and is favorably improved the straight line pole insulator climbing tool of operating efficiency.
For solving the above problems, being structurally characterized in that of this straight line pole insulator climbing tool: include mobile jib, mobile jib left and right sides uniform intervals are provided with pedal rod, mobile jib upper end is installed with reclinate stay hook, stay hook end is hinged with movable hook by hinge, and movable hook end is provided with movable span, is installed with latch corresponding with movable hook outside mobile jib, latch is provided with the locking hole with movable span cooperation, is fitted with clamping screw in movable span and locking hole.
This straight line pole insulator climbing tool is by realizing compact by locking type hooking structure, easy to carry, deposit take up room little, can be according to cross-arm height independent assortment length when climbing tower bar cross-arm, climbing differing heights requirement can be met, assembling is quick, climbing and working security are high, dismounting is simple, and is favorably improved operating efficiency.
A mobile jib vertically extending can mainly be included by locking type hooking structure, for convenience of narration, the four direction of mobile jib periphery is referred to as four direction all around, four avris of corresponding mobile jib are respectively front side, rear side, left side and right side.Mobile jib upper end is installed with stay hook, and then stay hook is first bent downwardly to front curve, thus by stay hook, mobile jib can be hooked on tower bar cross-arm, very convenient.Stay hook end is hinged with movable hook by hinge, because hinge is left and right directions being extended, therefore movable hook can swing around hinge fore-and-aft direction.Movable hook end is provided with movable span, and movable span is extended in left-right direction.It is installed with latch, the position that latch and movable hook swing near mobile jib is corresponding on front side of mobile jib upper end.Latch is provided with locking hole, and locking hole is also extended in left-right direction.When movable hook swings to locking Board position, movable span is just alignd with locking hole.The Main Function of setting movable hook, it is after stay hook being hooked on tower bar cross-arm, by movable hook, from cross-arm, direction latch is swung and so that movable span is alignd with locking hole, then and locked with locking in the hole with clamping screw insertion movable span, so cross-arm is just surrounded by stay hook, movable hook, mobile jib top, latch, cross-arm and mobile jib is made to become inseparable integrative-structure, therefore installation and maintenance personnel fix, without having to worry about climbing tool upper end, the problems such as not firm, skid, need other staff to buttress in lower end when climbing tower bar.In this patent, the mobile jib left and right sides is uniformly installed with laterally extending pedal rod, and therefore, installation and maintenance personnel can step on pedal rod one-level one-level with pin and be climbed, very simply.The pedal rod of mobile jib both sides is spaced setting, so not only conforms to pin about human body and alternates the rule ascended a height, improve efficiency of ascending a height, and can save pedal rod, mitigates this patent weight, carry more convenient.
As improvement, the quantity of described stay hook is two sets, is installed in the both sides of mobile jib respectively.
Stay hook quantity is set to be installed in two sets of the mobile jib left and right sides, in the both direction of left and right, hook can be carried out to tower bar cross-arm, make mobile jib keep vertical state, attendant is so installed and is easier when climbing, stepping on bar operation to keep balancing, work is more laborsaving, security is also secure.
As improvement, mobile jib lower end is coaxially provided with the main screw that Open Side Down, also includes secondary bar, and secondary bar left and right sides uniform intervals are provided with secondary pedal rod, secondary bar upper end is coaxially installed with the secondary stud with main screw threaded, and secondary bar lower end is installed with the secondary screw with secondary stud threaded.
Because the secondary bar left and right sides is also spaced is installed with secondary pedal rod, therefore, climbing can also be carried out by secondary bar and step on bar.By being installed in the secondary stud on secondary bar top and being arranged on the main screw of mobile jib lower end, secondary bar can be screwed together with mobile jib fixation.Again because secondary stud and main screw are all coaxially disposed with secondary bar and mobile jib respectively, so secondary bar be spirally connected with mobile jib after by affixed become an axially extending stock, thus with hand-held secondary bar, the stay hook on mobile jib can be hooked on higher tower bar cross-arm, also higher tower bar cross-arm can just be climbed, range of application is wider.Secondary bar bottom is provided with the secondary screw with secondary stud threaded, therefore can coaxially be spirally connected a secondary bar, namely the secondary bar of the requirement that highly can be spirally connected successively according to actual climbing in secondary bar lower end again, just can climb the tower bar cross-arm of arbitrary height in theory.
As improvement, also include quarter butt, quarter butt top both sides are installed with a horizon bar respectively, and horizon bar end is fixed together with quarter butt lower end by brace, quarter butt upper end is installed with the short stud with main screw and secondary screw all threaded, and quarter butt lower end is installed with the short screw with secondary stud threaded.
Because the short stud of quarter butt upper end coaxially can be spirally connected with any one in main screw and secondary screw, therefore quarter butt coaxially can be screwed to mobile jib or secondary bar lower end, and structure is integral therewith.The quarter butt left and right sides is installed with a horizon bar respectively, two horizon bars are generally aligned in the same plane interior and are coaxially disposed, so both feet can be pedaled and be installed on the horizon bar step down in quarter butt both sides or keep in repair by installation attendant, contour and left and right setting two horizon bars can provide balanced support power for both feet, more conform to human body natural's standing state, make more comfortable during installation and maintenance person works.Also can be spirally connected with secondary bar because quarter butt can be spirally connected with mobile jib, the position setting position that is spirally connected between mobile jib and secondary bar for the quarter butt of work of therefore can standing according to actual needs, not only practical but also general.The brace Main Function of horizon bar end setting is that horizon bar end is supported on quarter butt obliquely, so horizon bar can be made to be always maintained at horizontality with the support force of enhancing level bar.
As improvement, on mobile jib, the side away from movable hook is provided with a main safety pole be arrangeding in parallel with mobile jib, and it is corresponding with mobile jib two ends affixed that master connecting-rod is passed through at main safety pole two ends.
Safety pole two ends are fixed on mobile jib by master connecting-rod is parallel, strip gap forming a closing therefore between safety pole and mobile jib, extending up and down.The effect arranging this gap is, attendant is installed when stepping on bar, the seat belt hanger that can be bound itself is hooked on safety pole by gap it is possible to follow the climbing lifting installing attendant and automatic lifting, so it is ensured that installing attendant's being perfectly safe in climbing.
As improvement, on rear side of secondary bar, it is provided with a secondary safety pole be arrangeding in parallel with secondary bar, it is corresponding with secondary bar two ends affixed that slave connecting rod is passed through at secondary safety pole two ends.
Secondary safety pole two ends are fixed in secondary bar by slave connecting rod is parallel, strip gap forming a closing between therefore secondary safety pole and secondary bar, extending up and down.The effect arranging this gap is, attendant is installed when stepping on bar, the seat belt hanger that can be bound itself is hooked on secondary safety pole by gap it is possible to follow the climbing lifting installing attendant and automatic lifting, so it is ensured that installing attendant's being perfectly safe in climbing.When installation and maintenance personnel climb mobile jib from secondary bar, or when secondary bar is dropped to by mobile jib, only seat belt hanger need to be switched between secondary safety pole and main safety pole, can guarantee that the whole safety climbed or decline process, operation is very simple.
As improvement, mobile jib lower end is provided with the main underport extending transversely through main screw, it is fitted with bottom fastening bolt in main underport, secondary stud is provided with the secondary apical pore of lateral direction penetrating, secondary bar lower end is provided with the secondary bottom outlet of lateral direction penetrating pair screw, it is fitted with secondary bolt in secondary bottom outlet, short apical pore has been extended transversely through on short stud, quarter butt lower end is provided with the short bottom outlet extending transversely through short screw, it is fitted with lag bolt in short bottom outlet, when secondary stud is fully screwed into main screw, secondary apical pore is perfectly aligned with main underport, when short stud is fully screwed into main screw, short apical pore is perfectly aligned with main underport, when secondary stud is fully screwed in short screw, secondary apical pore is perfectly aligned with short bottom outlet, when short stud is fully screwed into secondary screw, short apical pore is perfectly aligned with secondary bottom outlet.
In normal use, the connection of mobile jib and quarter butt is to be spirally connected realization by main screw and short stud, the connection of mobile jib and secondary bar is the realization that is spirally connected by main screw and secondary stud, and secondary bar is realized by secondary screw and the realization of short stud or by short screw and pair stud with the connection of quarter butt.But, after long-term use, the screw thread of threaded can wear and tear, and it is unreliable to lead to be spirally connected.Plug-in mounting bottom fastening bolt therefore in the main underport and short apical pore of mobile jib and quarter butt is it is ensured that the definitely reliability that connects of mobile jib and quarter butt and safety.In the same manner, in the main underport and secondary apical pore of mobile jib and secondary bar plug-in mounting bottom fastening bolt it is ensured that the definitely reliability that connects of mobile jib and secondary bar and safety;Plug-in mounting pair bolt in the secondary bottom outlet and short apical pore of secondary bar and quarter butt is it is ensured that the definitely reliability that connects of secondary bar and quarter butt and safety;Plug-in mounting lag bolt in the short bottom outlet and secondary apical pore of quarter butt and secondary bar is it is ensured that the definitely reliability that connects of quarter butt and secondary bar and safety.
As improvement, pedal rod end is installed with the main diagonal extending obliquely, and main diagonal lower end is corresponding with mobile jib affixed, and secondary pedal rod end is installed with the subdiagonal extending obliquely, and subdiagonal lower end is corresponding with secondary bar affixed.
Main diagonal is fixedly supported between pedal rod end and the mobile jib of lower section, can provide reliable support force for pedal rod it is ensured that still holding level when pedal rod is trampled.In the same manner, subdiagonal can also provide reliable support force it is ensured that still holding level when secondary pedal rod is trampled by secondary pedal rod.
In sum, this straight line pole insulator climbing tool is rational in infrastructure, compact, easy to carry, deposit take up room little, climb tower bar cross-arm when can be according to cross-arm height independent assortment length, climbing differing heights requirement can be met, assembling is quick, and it is firm that upper end connects, and lower end is non-slip, without other people auxiliary, climbing and working security are high, and dismounting is simple, and is favorably improved operating efficiency.
Brief description:
For ease of explanation, the present invention is embodied as and accompanying drawing is described in detail by following.
Fig. 1 is the structural representation of primary stem portion when movable hook is unlatched;
Fig. 2 is the structural representation of primary stem portion during movable hook locking;
Fig. 3 is the structural representation of quarter butt part;
Fig. 4 is the structural representation of secondary bar part;
Fig. 5 is the assembling schematic diagram of this patent;
Fig. 6 structural representation when unlatched for movable hook after this patent assembling;
Fig. 7 is the structural representation after movable hook locking after this patent assembling.
Specific embodiment:
As shown in the figure, this straight line pole insulator climbing tool includes mobile jib 1, mobile jib left and right sides uniform intervals are provided with pedal rod 2, mobile jib upper end is installed with reclinate stay hook 3, stay hook end is hinged with movable hook 5 by hinge 4, and movable hook end is provided with movable span 6, is installed with latch 7 corresponding with movable hook outside mobile jib, latch is provided with the locking hole 8 with movable span cooperation, is fitted with clamping screw 9 in movable span and locking hole.
This straight line pole insulator climbing tool is by realizing compact by locking type hooking structure, easy to carry, deposit take up room little, can be according to cross-arm height independent assortment length when climbing tower bar cross-arm, climbing differing heights requirement can be met, assembling is quick, climbing and working security are high, dismounting is simple, and is favorably improved operating efficiency.
A mobile jib vertically extending can mainly be included by locking type hooking structure, for convenience of narration, the four direction of mobile jib periphery is referred to as four direction all around, four avris of corresponding mobile jib are respectively front side, rear side, left side and right side.Mobile jib upper end is installed with stay hook, and then stay hook is first bent downwardly to front curve, thus by stay hook, mobile jib can be hooked on tower bar cross-arm, very convenient.Stay hook end is hinged with movable hook by hinge, because hinge is left and right directions being extended, therefore movable hook can swing around hinge fore-and-aft direction.Movable hook end is provided with movable span, and movable span is extended in left-right direction.It is installed with latch, the position that latch and movable hook swing near mobile jib is corresponding on front side of mobile jib upper end.Latch is provided with locking hole, and locking hole is also extended in left-right direction.When movable hook swings to locking Board position, movable span is just alignd with locking hole.The Main Function of setting movable hook, it is after stay hook being hooked on tower bar cross-arm, by movable hook, from cross-arm, direction latch is swung and so that movable span is alignd with locking hole, then and locked with locking in the hole with clamping screw insertion movable span, so cross-arm is just surrounded by stay hook, movable hook, mobile jib top, latch, cross-arm and mobile jib is made to become inseparable integrative-structure, therefore installation and maintenance personnel fix, without having to worry about climbing tool upper end, the problems such as not firm, skid, need other staff to buttress in lower end when climbing tower bar.In this patent, the mobile jib left and right sides is uniformly installed with laterally extending pedal rod, and therefore, installation and maintenance personnel can step on pedal rod one-level one-level with pin and be climbed, very simply.The pedal rod of mobile jib both sides is spaced setting, so not only conforms to pin about human body and alternates the rule ascended a height, improve efficiency of ascending a height, and can save pedal rod, mitigates this patent weight, carry more convenient.
The quantity of described stay hook is two sets, is installed in the both sides of mobile jib respectively.Stay hook quantity is set to be installed in two sets of the mobile jib left and right sides, in the both direction of left and right, hook can be carried out to tower bar cross-arm, make mobile jib keep vertical state, attendant is so installed and is easier when climbing, stepping on bar operation to keep balancing, work is more laborsaving, security is also secure.
Mobile jib lower end is coaxially provided with the main screw 10 that Open Side Down, also include secondary bar 16, secondary bar left and right sides uniform intervals are provided with secondary pedal rod 17, and secondary bar upper end is coaxially installed with the secondary stud 18 with main screw threaded, and secondary bar lower end is installed with the secondary screw 19 with secondary stud threaded.Because the secondary bar left and right sides is also spaced is installed with secondary pedal rod, therefore, climbing can also be carried out by secondary bar and step on bar.By being installed in the secondary stud on secondary bar top and being arranged on the main screw of mobile jib lower end, secondary bar can be screwed together with mobile jib fixation.Again because secondary stud and main screw are all coaxially disposed with secondary bar and mobile jib respectively, so secondary bar be spirally connected with mobile jib after by affixed become an axially extending stock, thus with hand-held secondary bar, the stay hook on mobile jib can be hooked on higher tower bar cross-arm, also higher tower bar cross-arm can just be climbed, range of application is wider.Secondary bar bottom is provided with the secondary screw with secondary stud threaded, therefore can coaxially be spirally connected a secondary bar, namely the secondary bar of the requirement that highly can be spirally connected successively according to actual climbing in secondary bar lower end again, just can climb the tower bar cross-arm of arbitrary height in theory.
Also include quarter butt 11, quarter butt top both sides are installed with a horizon bar 12 respectively, horizon bar end is fixed together with quarter butt lower end by brace 13, quarter butt upper end is installed with the short stud 14 with main screw and secondary screw all threaded, and quarter butt lower end is installed with the short screw 15 with secondary stud threaded.Because the short stud of quarter butt upper end coaxially can be spirally connected with any one in main screw and secondary screw, therefore quarter butt coaxially can be screwed to mobile jib or secondary bar lower end, and structure is integral therewith.The quarter butt left and right sides is installed with a horizon bar respectively, two horizon bars are generally aligned in the same plane interior and are coaxially disposed, so both feet can be pedaled and be installed on the horizon bar step down in quarter butt both sides or keep in repair by installation attendant, contour and left and right setting two horizon bars can provide balanced support power for both feet, more conform to human body natural's standing state, make more comfortable during installation and maintenance person works.Also can be spirally connected with secondary bar because quarter butt can be spirally connected with mobile jib, the position setting position that is spirally connected between mobile jib and secondary bar for the quarter butt of work of therefore can standing according to actual needs, not only practical but also general.The brace Main Function of horizon bar end setting is that horizon bar end is supported on quarter butt obliquely, so horizon bar can be made to be always maintained at horizontality with the support force of enhancing level bar.
On mobile jib, the side away from movable hook is provided with a main safety pole 20 be arrangeding in parallel with mobile jib, and it is corresponding with mobile jib two ends affixed that master connecting-rod 21 is passed through at main safety pole two ends.Safety pole two ends are fixed on mobile jib by master connecting-rod is parallel, strip gap forming a closing therefore between safety pole and mobile jib, extending up and down.The effect arranging this gap is, attendant is installed when stepping on bar, the seat belt hanger that can be bound itself is hooked on safety pole by gap it is possible to follow the climbing lifting installing attendant and automatic lifting, so it is ensured that installing attendant's being perfectly safe in climbing.
It is provided with a secondary safety pole 22 be arrangeding in parallel with secondary bar, it is corresponding with secondary bar two ends affixed that slave connecting rod 23 is passed through at secondary safety pole two ends on rear side of secondary bar 16.Secondary safety pole two ends are fixed in secondary bar by slave connecting rod is parallel, strip gap forming a closing between therefore secondary safety pole and secondary bar, extending up and down.The effect arranging this gap is, attendant is installed when stepping on bar, the seat belt hanger that can be bound itself is hooked on secondary safety pole by gap it is possible to follow the climbing lifting installing attendant and automatic lifting, so it is ensured that installing attendant's being perfectly safe in climbing.When installation and maintenance personnel climb mobile jib from secondary bar, or when secondary bar is dropped to by mobile jib, only seat belt hanger need to be switched between secondary safety pole and main safety pole, can guarantee that the whole safety climbed or decline process, operation is very simple.
Mobile jib lower end is provided with the main underport 24 extending transversely through main screw 10, it is fitted with bottom fastening bolt 29 in main underport, secondary stud is provided with the secondary apical pore 25 of lateral direction penetrating, secondary bar lower end is provided with the secondary bottom outlet 26 of lateral direction penetrating pair screw, it is fitted with secondary bolt 30 in secondary bottom outlet, short apical pore 27 has been extended transversely through on short stud, quarter butt lower end is provided with the short bottom outlet 28 extending transversely through short screw, it is fitted with lag bolt 31 in short bottom outlet, when secondary stud is fully screwed into main screw, secondary apical pore is perfectly aligned with main underport, when short stud is fully screwed into main screw, short apical pore is perfectly aligned with main underport, when secondary stud is fully screwed in short screw, secondary apical pore is perfectly aligned with short bottom outlet, when short stud is fully screwed into secondary screw, short apical pore is perfectly aligned with secondary bottom outlet.
In normal use, the connection of mobile jib and quarter butt is to be spirally connected realization by main screw and short stud, the connection of mobile jib and secondary bar is the realization that is spirally connected by main screw and secondary stud, and secondary bar is realized by secondary screw and the realization of short stud or by short screw and pair stud with the connection of quarter butt.But, after long-term use, the screw thread of threaded can wear and tear, and it is unreliable to lead to be spirally connected.Plug-in mounting bottom fastening bolt therefore in the main underport and short apical pore of mobile jib and quarter butt is it is ensured that the definitely reliability that connects of mobile jib and quarter butt and safety.In the same manner, in the main underport and secondary apical pore of mobile jib and secondary bar plug-in mounting bottom fastening bolt it is ensured that the definitely reliability that connects of mobile jib and secondary bar and safety;Plug-in mounting pair bolt in the secondary bottom outlet and short apical pore of secondary bar and quarter butt is it is ensured that the definitely reliability that connects of secondary bar and quarter butt and safety;Plug-in mounting lag bolt in the short bottom outlet and secondary apical pore of quarter butt and secondary bar is it is ensured that the definitely reliability that connects of quarter butt and secondary bar and safety.
Pedal rod end is provided with the main diagonal 32 extending obliquely, and main diagonal lower end is corresponding with mobile jib to be connected, and secondary pedal rod 17 end is provided with the subdiagonal 33 extending obliquely, and subdiagonal lower end is corresponding with secondary bar to be connected.Main diagonal is supported between pedal rod end and the mobile jib of lower section, can provide reliable support force for pedal rod it is ensured that still holding level when pedal rod is trampled.In the same manner, subdiagonal can also provide reliable support force it is ensured that still holding level when secondary pedal rod is trampled by secondary pedal rod.

Claims (8)

1. a kind of straight line pole insulator climbing tool, it is characterized in that: include mobile jib (1), mobile jib (1) left and right sides uniform intervals are provided with pedal rod (2), mobile jib (1) upper end is installed with reclinate stay hook (3), stay hook (3) end is hinged with movable hook (5) by hinge (4), movable hook (5) end is provided with movable span (6), it is installed with latch (7) corresponding with movable hook (5) outside mobile jib (1), latch (7) is provided with the locking hole (8) coordinating with movable span (6), it is fitted with clamping screw (9) in movable span (6) and locking hole (8).
2. straight line pole insulator climbing tool as claimed in claim 1, is characterized in that: the quantity of described stay hook (3) is two sets, is installed in the both sides of mobile jib (1) respectively.
3. straight line pole insulator climbing tool as claimed in claim 1 or 2, it is characterized in that: mobile jib lower end is coaxially provided with the main screw (10) that Open Side Down, also include secondary bar (16), secondary bar (16) left and right sides uniform intervals are provided with secondary pedal rod (17), secondary bar (16) upper end is coaxially installed with the secondary stud (18) with main screw (10) threaded, and secondary bar (16) lower end is installed with the secondary screw (19) with secondary stud (18) threaded.
4. straight line pole insulator climbing tool as claimed in claim 3, it is characterized in that: also include quarter butt (11), quarter butt (11) top both sides are installed with a horizon bar (12) respectively, horizon bar (12) end is fixed together with quarter butt (11) lower end by brace (13), quarter butt (11) upper end is installed with the short stud (14) with main screw (10) and secondary screw (19) all threaded, and quarter butt (11) lower end is installed with the short screw (15) with secondary stud (18) threaded.
5. straight line pole insulator climbing tool as claimed in claim 4, it is characterized in that: on mobile jib (1), the side away from movable hook (5) is provided with a main safety pole (20) be arrangeding in parallel with mobile jib (1), it is corresponding affixed with mobile jib (1) two ends that master connecting-rod (21) is passed through at main safety pole (20) two ends.
6. straight line pole insulator climbing tool as claimed in claim 5, it is characterized in that: be provided with a secondary safety pole (22) be arrangeding in parallel with secondary bar (16) on rear side of secondary bar (16), it is corresponding affixed with secondary bar (16) two ends that slave connecting rod (23) is passed through at secondary safety pole (22) two ends.
7. straight line pole insulator climbing tool as claimed in claim 6,It is characterized in that: mobile jib (1) lower end is provided with the main underport (24) extending transversely through main screw (10),It is fitted with bottom fastening bolt (29) in main underport (24),Secondary stud (18) is provided with the secondary apical pore (25) of lateral direction penetrating,Secondary bar (16) lower end is provided with the secondary bottom outlet (26) of lateral direction penetrating pair screw (19),It is fitted with secondary bolt (30) in secondary bottom outlet (26),Short apical pore (27) has been extended transversely through on short stud (14),Quarter butt (11) lower end is provided with the short bottom outlet (28) extending transversely through short screw (15),It is fitted with lag bolt (31) in short bottom outlet (28),When secondary stud (18) is fully screwed into main screw (10),Secondary apical pore (25) is perfectly aligned with main underport (24),When short stud (14) is fully screwed into main screw (10),Short apical pore (27) is perfectly aligned with main underport (24),When secondary stud (18) is fully screwed in short screw (15),Secondary apical pore (25) is perfectly aligned with short bottom outlet (28),When short stud (14) is fully screwed into secondary screw (19),Short apical pore (27) is perfectly aligned with secondary bottom outlet (26).
8. straight line pole insulator climbing tool as claimed in claim 7, it is characterized in that: pedal rod (2) end is installed with the main diagonal (32) extending obliquely, main diagonal (32) lower end is corresponding with mobile jib affixed, secondary pedal rod (17) end is installed with the subdiagonal (33) extending obliquely, and subdiagonal (33) lower end is corresponding with secondary bar affixed.
CN201510389748.XA 2015-07-06 2015-07-06 Suspension tower insulator climbing tool Pending CN106337648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510389748.XA CN106337648A (en) 2015-07-06 2015-07-06 Suspension tower insulator climbing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510389748.XA CN106337648A (en) 2015-07-06 2015-07-06 Suspension tower insulator climbing tool

Publications (1)

Publication Number Publication Date
CN106337648A true CN106337648A (en) 2017-01-18

Family

ID=57825921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510389748.XA Pending CN106337648A (en) 2015-07-06 2015-07-06 Suspension tower insulator climbing tool

Country Status (1)

Country Link
CN (1) CN106337648A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982463A (en) * 2021-10-18 2022-01-28 国网河北省电力有限公司曲周县供电分公司 Climbing device for electric power engineering

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201078181Y (en) * 2007-09-07 2008-06-25 钱俏 Assembled ladder of ascending a height
CN202117551U (en) * 2011-04-14 2012-01-18 云南电网公司楚雄供电局 Climbing aid
CN103560431A (en) * 2013-10-22 2014-02-05 国家电网公司 Electric power overhaul ladder

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201078181Y (en) * 2007-09-07 2008-06-25 钱俏 Assembled ladder of ascending a height
CN202117551U (en) * 2011-04-14 2012-01-18 云南电网公司楚雄供电局 Climbing aid
CN103560431A (en) * 2013-10-22 2014-02-05 国家电网公司 Electric power overhaul ladder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982463A (en) * 2021-10-18 2022-01-28 国网河北省电力有限公司曲周县供电分公司 Climbing device for electric power engineering

Similar Documents

Publication Publication Date Title
CN204230769U (en) Climb type steel cable ladder
CN106761363A (en) A kind of steel tube tower in electric transmission line aids in climbing tool
CN207245138U (en) Boat scaffold adjustable in pitch
CN103774855B (en) A kind of exterior wall hanging basket construction method
CN103594976B (en) Combination stringing instrument for line conductor stringing
CN106334294A (en) Electric power maintenance safety climbing assistor
CN106337648A (en) Suspension tower insulator climbing tool
CN203808815U (en) Cat ladder subassembly and engineering machine tool that has this cat ladder subassembly
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN2882685Y (en) Prismatic verticle tube anti-dropping device
CN209082950U (en) A kind of construction security platform
CN103956679B (en) Steel tube tower upkeep operation platform and using method thereof
CN206319825U (en) Steel tube tower in electric transmission line aids in climbing tool
CN110080083A (en) The method for installing basket type steel truss arch main chord
CN110219452A (en) Protective frame and its lift structure
CN102570351A (en) Lead lifting tool
CN208516850U (en) A kind of cement rod-type power transmission line overhead ground wire auxiliary device
CN208749208U (en) Communicate shaft tower
CN209434738U (en) Tangent tower electrified conduction wire riser
CN209568537U (en) A kind of suspension type floor structure
CN208814490U (en) A kind of novel drainage ditch cover plate hanging apparatus
CN207245139U (en) Boat scaffold mounting structure
CN205829059U (en) A kind of locking device and cable termination tower operating platform
CN206051226U (en) A kind of wall-attaching equipment of construction elevator
CN108639989A (en) A kind of cement rod-type power transmission line overhead ground wire auxiliary device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170118