CN102570351A - Lead lifting tool - Google Patents

Lead lifting tool Download PDF

Info

Publication number
CN102570351A
CN102570351A CN2012100413274A CN201210041327A CN102570351A CN 102570351 A CN102570351 A CN 102570351A CN 2012100413274 A CN2012100413274 A CN 2012100413274A CN 201210041327 A CN201210041327 A CN 201210041327A CN 102570351 A CN102570351 A CN 102570351A
Authority
CN
China
Prior art keywords
lifting
lifting rod
lead
tool
leading screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100413274A
Other languages
Chinese (zh)
Inventor
陈红卫
陈战朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN ELECTRIC POWER Co LUOHE POWER SUPPLY BRANCH
Original Assignee
HENAN ELECTRIC POWER Co LUOHE POWER SUPPLY BRANCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN ELECTRIC POWER Co LUOHE POWER SUPPLY BRANCH filed Critical HENAN ELECTRIC POWER Co LUOHE POWER SUPPLY BRANCH
Priority to CN2012100413274A priority Critical patent/CN102570351A/en
Publication of CN102570351A publication Critical patent/CN102570351A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a lead lifting tool. The lead lifting tool comprises a screw rod, two lifting rods and two cross supports, wherein an adjusting spanner with a steering device is arranged in the middle of the screw rod; the upper end of the screw rod is connected with a cross arm through a U-shaped tool ring and a rope loop, and the lower end of the screw rod is connected with a pull rod; the cross supports are arranged on the lifting rods; an adjusting hole is formed in the side of each lifting rod; the two lifting rods are connected in a staggering way through the adjusting holes and can be used for adjusting the vertical distance required for arranging an insulator; the cross supports are respectively arranged between the lifting rods; and the two ends of the cross supports have upwards warping structures, and the cross supports can be used for preventing a safety belt from falling off or feet from sliding during pedaling. The lead lifting tool is applied to high-place operation on a transmission line, radically overcomes the limitation of the traditional operation method, and is compact in structure, light in weight, convenient to transfer up and down, simple in assembly and disassembly and convenient to use; the working efficiency can be improved; and the operation safety factor is improved. The tool is simple and convenient to machine and assemble, so the tool is easy to popularize and apply in power construction and the economic and social benefits are obvious.

Description

A kind of lead promotes instrument
Technical field
The present invention relates to a kind of transmission line high-rise working instrument, particularly a kind of transmission line straight line pole operation lead promotes instrument.
Background technology
In the transmission line operation process, the operating personnel usually can carry out work down to lead on the shaft tower from cross-arm.During operation, the way that the lower wire process is traditional is on straight line pole: the staff earlier between lead and cross-arm frame one save 2 meters rope ladders how long, then along rope ladder on lead.
Change insulator if change suspension clamp or have a power failure, all will raise up lead.Traditional method is: the operating personnel is behind lead, and another person matches with him on cross-arm, is loaded on Lever Blocks between lead and the cross-arm, tightens up the Lever Blocks chain, and lead is mentioned.
In the entire job process, which position no matter operating personnel's safety belt be contained on the lead, no matter be on the lead, on the Lever Blocks or on the insulator, certain danger arranged all, can only rely on two pipe protections rope as main protection, hides some dangers for to job safety.
In sum, in present transmission line straight line pole rolls off the production line operation process,, use heavy instruments such as rope ladder, Lever Blocks, and have potential safety hazard because the entire job process is loaded down with trivial details.If can the lifting instrument be carried out integrated repacking, will improve operating efficiency.
Summary of the invention
[0003] the present invention is directed to present transmission line straight line pole deficiency and the defective that operation process exists that roll off the production line; Provide a kind of lead to promote instrument; This lead promotes rope ladder and the Lever Blocks that the alternative traditional work of instrument is used; Link to each other implementation tool integrated and oversimplifying, not only convenient construction but also can guarantee on-line operation personnel's safety with adjustable lifting rod with leading screw.
The technical scheme that the present invention adopts is following:
This lead lifting instrument comprises leading screw, lifting rod and stull.The adjusting spanner of band conversion direction device is housed in the middle of the said leading screw, and the leading screw upper end is connected with cross-arm through U type tool links and rope sling, and the lower end is connected with lifting rod, and stull is housed on the lifting rod.
Said lifting rod is generally two.According to the insulator voltage grade and the different of material of insulating, required installation of insulator or adjustable range are also different.In view of the above; The side of every lifting rod is provided with several adjustment holes; Two lifting rods can be in order to increase the distance up and down of its adjusting through adjustment hole dislocation connection one, and the upper end lifting rod links to each other with leading screw, and the lower end lifting rod connects also installs thread-lifting hook in order to the hook guide line.
Said stull is two, is loaded on respectively between two lifting rods, and the two ends place of each stull chooses the formula structure on being, and is available to prevent that safety belt from falling down and slippage when stepping on is pedaled in foot.
The present invention adopts leading screw to link to each other with lifting rod, and during operation, the operating personnel on the cross-arm is connected in this instrument between lead and the cross-arm earlier, suitably tightens up.Rolling off the production line the operating personnel can be along the stull of installing on the lifting rod of this instrument on lead, safety belt around hanging in the stull.When promoting lead like need, the operating personnel can tighten up leading screw on the cross-arm, makes on the lifting rod that is connected on the leading screw to move, thereby raises up lead.
The present invention is applied in the transmission line high-rise working, has fundamentally solved the limitation of traditional work method, the solid tool compact conformation; In light weight, to be convenient to transmit up and down, loading and unloading are simple; Easy to use, can increase work efficiency, and the coefficient of safety when having improved operation greatly.Because this lead promotes tool processes and simple and convenient assembly, is easy in power construction, apply, economic and social benefits are obvious.
Description of drawings
Fig. 1 is a structural front view of the present invention;
Fig. 2 is a structure left view of the present invention.
Embodiment
Further introduce embodiments of the invention below in conjunction with accompanying drawing.
Like Fig. 1, shown in Figure 2, the present invention mainly is made up of leading screw 2, lifting rod 5, stull 4 etc.
Leading screw 2 is processed for the all-metal alloy steel material, and the adjusting spanner 3 of band conversion direction device is equipped with in the centre, and leading screw 2 upper/lower terminals respectively have one of perforation, and lower end perforation 7 is connected with lifting rod 5, bores a hole and 1 can be connected with cross-arm through U type tool links and rope sling in the upper end.
Lifting rod 5 is processed for the high strength epoxy resin material, and anti-twist resistance to tension is stronger, has two.Every lifting rod 5 sides are provided with five adjustment holes 6; Because the insulator voltage grade is different with the insulation material; The distance of required installation of insulator or adjusting is also different; Suitably regulate the link position and the mode of above-mentioned five adjustment holes 6 between the lifting rod 5, its distance up and down of scalable is to remedy the deficiency of leading screw 2 regulating powers.
Stull 4 also is an epoxide resin material, and the spacing distance that actual needs is looked in two stulls 4 is loaded on respectively on two lifting rods 5, and 4 two ends of stull are chooses the formula structure, and is available to prevent that safety belt from falling down and slippage when stepping on is pedaled in foot.
During concrete construction, adopt bolt and nut to be fixed together leading screw 2 and lifting rod 5 upper ends, lifting rod 5 is according to field operation shaft tower insulator length, selects the adjustment hole 6 of two lifting rod 5 required correspondences and with bolt the two is fixed together.The below lifting rod penetrates U type screw and connects the hook that lifts lead in the perforation 7 down.Promptly accomplish the ground assembly working that this lead promotes instrument.
After the operating personnel puts in place on the shaft tower; Be passed to the cross-arm place to entire tool through transmitting rope; Operating personnel on the cross-arm penetrates U type screw, and utilizes rope sling to be fixed in leading screw 2 upper ends on the cross-arm after hooking lead to this instrument below hook earlier in last perforation 1; The adjusting spanner 3 of operation leading screw 2 suitably tightens up entire tool.The operating personnel can be along the stull 4 of installing on the lifting rod 5 of this instrument on lead; Install around safety belt in stull 4, make operating personnel's safety have the relatively fixed position of safety, if occur unexpected; Stull 4 also can tangle safety belt, and the people is unlikely to from high falling.During like need lifting and whereabouts lead, the leading screw that the operating personnel can operate on the leading screw 2 on the cross-arm is regulated spanner 3, and the lifting rod 5 that is connected on the leading screw 2 is moved up and down, thereby lead is promoted and the whereabouts.Accomplish the entire job process.

Claims (3)

1. transmission line straight line pole operation promotes instrument with lead; It is characterized in that: this lifting instrument comprises leading screw, lifting rod, stull; The adjusting spanner of band conversion direction device is housed in the middle of the said leading screw; The leading screw upper end is connected with the shaft tower cross-arm through U type tool links and rope sling, and the lower end is connected with lifting rod, and stull is housed on the lifting rod.
2. lead according to claim 1 promotes instrument; It is characterized in that: said lifting rod is two; The side of every lifting rod is equipped with several adjustment holes; Two lifting rods can be in order to increase the distance up and down of its adjusting through adjustment hole dislocation connection one, and the upper end lifting rod links to each other with leading screw, and the lower end lifting rod connects also installs thread-lifting hook in order to the hook guide line.
3. lead according to claim 1 promotes instrument, and it is characterized in that: said stull is two, is loaded on respectively on two lifting rods, and the two ends place of each stull chooses the formula structure on being, and is available to prevent that safety belt from falling down and slippage when stepping on is pedaled in foot.
CN2012100413274A 2012-02-22 2012-02-22 Lead lifting tool Pending CN102570351A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100413274A CN102570351A (en) 2012-02-22 2012-02-22 Lead lifting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100413274A CN102570351A (en) 2012-02-22 2012-02-22 Lead lifting tool

Publications (1)

Publication Number Publication Date
CN102570351A true CN102570351A (en) 2012-07-11

Family

ID=46415096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100413274A Pending CN102570351A (en) 2012-02-22 2012-02-22 Lead lifting tool

Country Status (1)

Country Link
CN (1) CN102570351A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842865A (en) * 2012-08-28 2012-12-26 邯郸供电公司 Overhead ground wire lifting mechanism
CN102975169A (en) * 2012-12-05 2013-03-20 上虞市电力公司 Tool for pulling and lifting cover and plate clamp
CN103928865A (en) * 2014-04-10 2014-07-16 国家电网公司 Manual wire lifting device for stringing construction
CN107425466A (en) * 2017-06-05 2017-12-01 国网辽宁省电力有限公司营口供电公司 Wire lifts insulating support and its application method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06153343A (en) * 1991-03-19 1994-05-31 Tokyo Electric Power Co Inc:The Lifting temporary arm
CN101409434A (en) * 2008-12-02 2009-04-15 河南省电力公司南阳供电公司 Ground wire raiser
CN101752815A (en) * 2010-02-02 2010-06-23 安徽省电力公司超高压公司 Ultra-high-voltage large-tonnage wire lifting device
CN201682213U (en) * 2010-05-19 2010-12-22 辽宁省电力有限公司营口供电公司 220kv conductor riser
CN201813108U (en) * 2010-10-12 2011-04-27 金华电业局 500kV power transmission line overhead ground wire lifting device
CN202424020U (en) * 2012-02-22 2012-09-05 河南省电力公司漯河供电公司 Wire lifting tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06153343A (en) * 1991-03-19 1994-05-31 Tokyo Electric Power Co Inc:The Lifting temporary arm
CN101409434A (en) * 2008-12-02 2009-04-15 河南省电力公司南阳供电公司 Ground wire raiser
CN101752815A (en) * 2010-02-02 2010-06-23 安徽省电力公司超高压公司 Ultra-high-voltage large-tonnage wire lifting device
CN201682213U (en) * 2010-05-19 2010-12-22 辽宁省电力有限公司营口供电公司 220kv conductor riser
CN201813108U (en) * 2010-10-12 2011-04-27 金华电业局 500kV power transmission line overhead ground wire lifting device
CN202424020U (en) * 2012-02-22 2012-09-05 河南省电力公司漯河供电公司 Wire lifting tool

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842865A (en) * 2012-08-28 2012-12-26 邯郸供电公司 Overhead ground wire lifting mechanism
CN102975169A (en) * 2012-12-05 2013-03-20 上虞市电力公司 Tool for pulling and lifting cover and plate clamp
CN103928865A (en) * 2014-04-10 2014-07-16 国家电网公司 Manual wire lifting device for stringing construction
CN107425466A (en) * 2017-06-05 2017-12-01 国网辽宁省电力有限公司营口供电公司 Wire lifts insulating support and its application method

Similar Documents

Publication Publication Date Title
CN104953507A (en) Device and method for lifting wire during distribution line construction
CN204760890U (en) Wire hoisting device in distribution lines construction
CN102570351A (en) Lead lifting tool
CN104538887B (en) A kind of lightning conducter lifts converter
CN202424020U (en) Wire lifting tool
CN107069562A (en) Replacing insulator under electrified method and load transfer device
CN207632407U (en) A kind of thermal power plant's maintenance boom hoisting
CN103618258B (en) A kind of electric transmission line erection tightener
CN103928868A (en) Iron tower overhead ground wire lifter
CN202564866U (en) Supporting frame used for high-voltage cable pothead manufacture
CN201435594Y (en) Elevator of lightning wire
CN102856839A (en) Wire lifting machine for wiring construction
CN204368924U (en) A kind of indoor car formula weight tensioning arrangement
CN201152141Y (en) Dedicated rope ladder for replacing synthetic electrical insulator
CN104201606B (en) A kind of 800KV strain insulator strings disengaging fixture
CN201181558Y (en) Flexible adjustable automatic banner elevating gear
CN205092508U (en) Special use of suspension type composite insulator is rolled off production line and is hung ladder
CN203787859U (en) Portable derrick applied to transmission line overhauling
CN104201602B (en) A kind of UHV transmission line bunch of insulator charged for replacement method and gold utensil thereof
CN104332884B (en) A kind of conduction wire riser for changing straight line insulator string
CN204720888U (en) Portable power distribution less important work platform
CN204150957U (en) A kind of load balancing mechanism of flexible riser
CN107009134A (en) Large-scale ac synchronous motor magnetic pole winding tool specially for attaching and detaching
CN201252363Y (en) Combined tool for replacing a linear insulator of an electric transmission line
CN203423430U (en) Insulator maintenance device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120711