CN201252363Y - Combined tool for replacing a linear insulator of an electric transmission line - Google Patents

Combined tool for replacing a linear insulator of an electric transmission line Download PDF

Info

Publication number
CN201252363Y
CN201252363Y CNU2008200272133U CN200820027213U CN201252363Y CN 201252363 Y CN201252363 Y CN 201252363Y CN U2008200272133 U CNU2008200272133 U CN U2008200272133U CN 200820027213 U CN200820027213 U CN 200820027213U CN 201252363 Y CN201252363 Y CN 201252363Y
Authority
CN
China
Prior art keywords
wire
ladder
rope
hand
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200272133U
Other languages
Chinese (zh)
Inventor
杨春雷
于景岳
孙铭
蒋磊
盛得琪
李宋林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
ZIBO POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZIBO POWER SUPPLY Co filed Critical ZIBO POWER SUPPLY Co
Priority to CNU2008200272133U priority Critical patent/CN201252363Y/en
Application granted granted Critical
Publication of CN201252363Y publication Critical patent/CN201252363Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型输电线路更换直线绝缘子的组合工具,其特征在于包括高强度纤维绳、手扳紧线器和软梯,高强度纤维绳一端带有连接件,另一端与紧线器连接,紧线器的另一端与软梯连接,软梯的另一端连接挂钩。当作业人员检修线路需要下到导线上或提升导线时,先将高强度纤维绳缠挂在导线横担上,使软梯下端的挂钩钩住导线,再使用棘轮扳手收紧软梯提升导线,作业人员系好安全保险绳,在安全带的保护下,下到导线即可作业。本实用新型减小了工具重量,降了作业难度,提高了劳动效率。

Figure 200820027213

The utility model combined tool for replacing linear insulators for transmission lines is characterized in that it includes a high-strength fiber rope, a hand tensioner and a soft ladder, one end of the high-strength fiber rope is provided with a connector, and the other end is connected with the wire tensioner The other end of the soft ladder is connected with the soft ladder, and the other end of the soft ladder is connected with the hook. When the operator needs to go down to the wire or lift the wire for inspection and maintenance, first wrap the high-strength fiber rope on the cross arm of the wire, make the hook at the lower end of the ladder hook the wire, and then use the ratchet wrench to tighten the ladder to lift the wire. Fasten the safety safety rope, and under the protection of the safety belt, you can work when you get down to the wire. The utility model reduces the weight of the tool, lowers the difficulty of operation, and improves the labor efficiency.

Figure 200820027213

Description

输电线路更换直线绝缘子的组合工具 Combined Tool for Replacing Linear Insulators on Transmission Lines

技术领域 technical field

本实用新型属于输电线路维护检修工具,特别涉及一种110KV输电线路更换直线绝缘子的工具。The utility model belongs to maintenance tools for transmission lines, in particular to a tool for replacing linear insulators in 110KV transmission lines.

背景技术 Background technique

现在输电线路中绝缘子普遍应用的为瓷式和复合材料质。由于线路中使用的绝缘子,一方面要承受相应电压等级电气参数的电器耐压作用,另一方面又要承受线路杆塔金具、导线、垂直和纵向力的荷载,以及有外部自然引起的风荷载、导线履冰、导线由于风引起的震动、舞动给绝缘子带来各种疲劳和劳损、老化等。按照规程和国际例行的推荐方法,需要对长期运行,老化严重、长期折旧,各种性能指标下降,达到退役标准,以及线路大修、改造、新建和各种事故引发的输电线路绝缘子的更换工作。线路中直线杆塔占整个线路杆塔的80%,而且更换直线杆绝缘子以往所采用的方法和工具相对落后。根据电网作业的检修工艺技术规程规定:更换绝缘子的例行方法主要3种方法,一是带电作业法,二是间接带电作业法,三是线路停电作业法。Porcelain and composite materials are commonly used in insulators in transmission lines. As the insulators used in the line, on the one hand, they must bear the electrical withstand voltage of the electrical parameters of the corresponding voltage level, on the other hand, they must bear the load of the line pole tower fittings, wires, vertical and longitudinal forces, as well as external natural wind loads, Conductors walking on ice, vibration and galloping of conductors caused by wind bring various fatigue, strain and aging to insulators. According to the regulations and recommended methods of international routines, long-term operation, severe aging, long-term depreciation, decline in various performance indicators, reaching decommissioning standards, and replacement of transmission line insulators caused by line overhaul, transformation, new construction and various accidents are required. . The straight pole towers in the line account for 80% of the entire line pole towers, and the methods and tools used to replace the straight pole insulators are relatively backward. According to the technical regulations of maintenance technology for power grid operations: there are three main routine methods for replacing insulators, one is the live work method, the other is the indirect live work method, and the third is the line power outage work method.

按照工作量、天气等技术要求、整个电网检修规划和具体实施作业标准要求,从安全、可靠和作业风险系数平衡,现在推广得主要更换方法是选取第三种方法。通常是根据计划和统一停电调度安排。作业单位和人员等待整条线路停好电后;发出工作命令;工作人员履行工作手续,办理工作票,交待安全措施和危险点;作业人员验电、做好安全措施,保护段两侧做好接地措施后;方可开始进行登杆进行更换绝缘子的工作。更换绝缘子从作业环境技术上讲属于高空作业;由于所带的设备较多,加上使用的工具多为倒链葫芦、备用钢丝套、滑轮组等作业条件属于高危状态;更换工作一般为杆上两人作业,作业和监护两人在杆下的现场围绕杆上的保障服务工作。整个杆上工作的人员从准备到更换,需要反反复复上下人员要在紧松导线上作业两次,而且,中间需要调解各部尺寸距离,杆上、杆下人员很难有效配合调到正好合适的距离。According to the technical requirements such as workload and weather, the maintenance plan of the entire power grid, and the requirements of specific implementation operation standards, from the balance of safety, reliability and operation risk coefficient, the main replacement method that is currently promoted is to choose the third method. It is usually arranged according to the plan and unified power outage scheduling. The operating unit and personnel wait for the entire line to be powered off; issue a work order; the staff perform work procedures, handle work tickets, and explain safety measures and dangerous points; After the grounding measures are taken, the work of boarding the pole to replace the insulator can be started. Replacing insulators is technically a high-altitude operation in terms of the working environment; due to the large amount of equipment involved, and the tools used are mostly inverted chain hoists, spare wire sleeves, pulley blocks and other operating conditions, it is a high-risk state; the replacement work generally requires two Two people work, work and supervise two people on the site under the pole to work around the security service on the pole. From preparation to replacement, the personnel working on the entire pole need to go up and down repeatedly. The personnel have to work twice on the tight and loose wires. Moreover, the size and distance of each part need to be adjusted in the middle. distance.

现有更换绝缘子所使用的工具主要包括倒链葫芦、滑轮组、保险绳、硬梯、传递绳等,总重量达到20Kg,工序复杂,所需要的时间长。在作业过程中杆上与杆下人员劳动强度高,容易造成肌肉疲劳发生危险。特别是杆上人员,在空间狭小的杆塔上作业,极易发生高空坠物等事故。Existing tools used to replace insulators mainly include chain hoists, pulley blocks, safety ropes, hard ladders, transfer ropes, etc., with a total weight of 20Kg. The process is complicated and the required time is long. During the operation process, the labor intensity of the personnel on and off the pole is high, which may easily cause muscle fatigue and cause danger. Especially the personnel on the pole, working on the pole tower with narrow space, are very prone to accidents such as falling objects from high altitude.

发明内容 Contents of the invention

本实用新型所要解决的技术问题是提供一种输电线路更换直线绝缘子的组合工具,减小工具重量,降低作业难度,提高劳动效率。The technical problem to be solved by the utility model is to provide a combined tool for replacing linear insulators on transmission lines, which reduces the weight of the tool, reduces the difficulty of operation, and improves labor efficiency.

本实用新型输电线路更换直线绝缘子的组合工具,其特征在于包括高强度纤维绳、手扳紧线器和软梯,高强度纤维绳一端带有连接件,另一端与手扳紧线器连接,手扳紧线器的另一端与软梯连接,软梯的另一端连接挂钩。The utility model combined tool for replacing linear insulators for transmission lines is characterized in that it includes a high-strength fiber rope, a hand tightener and a soft ladder, one end of the high-strength fiber rope is provided with a connector, and the other end is connected with the hand tightener. The other end of the tensioner is connected with the ladder, and the other end of the ladder is connected with the hook.

所述手扳紧线器可以是市售各种适合结构的产品,本实用新型优选采用棘轮手扳紧线器,两端分别带有滑轮钩。紧线器作为起吊工具,采用负荷大于2吨的棘轮手板紧线器,通过调整棘轮转动方向调整收紧和放松。承重材料选择高强度纤维绳(如直径10mm),既能保证强度,又减轻了重量。如果选用钢丝绳,达不到减重的目的。原有更换工具采用老式硬梯,检修人员下线过程中容易发生危险,本实用新型采用长度可调节的软梯,可以保证安全。The hand tensioner can be various commercially available products with suitable structures, and the utility model preferably adopts a ratchet hand tensioner with pulley hooks at both ends. As a lifting tool, the wire tensioner adopts a ratchet hand plate wire tensioner with a load greater than 2 tons, and adjusts tightening and loosening by adjusting the rotation direction of the ratchet. The load-bearing material chooses high-strength fiber rope (such as 10mm in diameter), which can not only ensure the strength, but also reduce the weight. If steel wire rope is selected for use, the purpose of weight reduction cannot be achieved. The old-fashioned hard ladder is used for the original replacement tools, and dangers are likely to occur when the maintenance personnel go off the assembly line. The utility model adopts a soft ladder with adjustable length, which can ensure safety.

本实用新型的优点:Advantage of the utility model:

(1)减小了工具重量。采用直径10mm的高强度纤维绳作为主要材料;选择采用负荷大于2吨的棘轮手板紧线器。工具总重量小于10Kg,这样既能保证强度,又减轻了重量。(1) Reduced tool weight. Use high-strength fiber rope with a diameter of 10mm as the main material; choose a ratchet hand plate tensioner with a load greater than 2 tons. The total weight of the tool is less than 10Kg, which can not only ensure the strength, but also reduce the weight.

(2)减少了工作人员,降低了作业难度。原作业杆上需要2人,本实用新型杆上需要1人作业即可,人员能在杆上简单地将要更换的绝缘子所需受力距离,调整做到最优化,实现省力、省时,减小因作业距离过大引起的各种不平衡力的扩延,保证了杆上作业人员的作业力中心稳定,做到安全、可靠的作业。(2) Reduce the number of staff and reduce the difficulty of operation. Two people are needed on the original work pole, but only one person is needed to work on the pole of the utility model. The personnel can simply adjust the required force distance of the insulator to be replaced on the pole, and adjust it to the optimum, so as to save labor, time and reduce the cost. Minimize the expansion of various unbalanced forces caused by excessive working distance, which ensures the stability of the working force center of the operator on the pole, and achieves safe and reliable work.

(3)与传统工具相比,本实用新型重量大大减轻,减小了工作人员的劳动强度,间接保证了安全生产。杆上人员由2~3人减少到1人,更换时间平均减少17分钟,提高了劳动效率。(3) Compared with traditional tools, the utility model is greatly reduced in weight, reduces the labor intensity of staff, and indirectly ensures safe production. The number of people on the pole is reduced from 2 to 3 to 1, and the replacement time is reduced by an average of 17 minutes, which improves labor efficiency.

附图说明 Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为棘轮手扳紧线器结构示意图。Fig. 2 is a structural schematic diagram of the ratchet hand tightener.

图中:1连接件  2高强度纤维绳  3棘轮手扳紧线器  4软梯  5挂钩  6滑轮钩  7滑轮绳  8棘轮  9滑轮钩  10扳手In the figure: 1 connector 2 high-strength fiber rope 3 ratchet handle tensioner 4 ladder 5 hook 6 pulley hook 7 pulley rope 8 ratchet 9 pulley hook 10 wrench

具体实施方式 Detailed ways

图1、图2为本实用新型的实施例结构示意图。以下结合附图说明本实用新型。Fig. 1, Fig. 2 are the structural representations of the embodiment of the utility model. Illustrate the utility model below in conjunction with accompanying drawing.

110KV输电线路更换直线绝缘子的组合工具,包括承重元件高强度纤维绳2、起吊工具棘轮手扳紧线器3和软梯4,高强度纤维绳2一端带有连接件1,另一端与棘轮手扳紧线器3连接,棘轮手扳紧线器的另一端与软梯4连接,软梯4的另一端连接挂钩5。如图2为一种公知结构方式的棘轮手扳紧线器,只是将滑轮绳7由原来的钢丝绳换成高强度纤维绳。该棘轮手扳紧线器两端带有滑轮钩,方便与承重元件和软梯的连接。A combined tool for replacing linear insulators for 110KV transmission lines, including high-strength fiber rope 2 for load-bearing components, lifting tools, ratchet handle tensioner 3 and soft ladder 4, high-strength fiber rope 2 has a connector 1 at one end, and a ratchet handle at the other end The wire tensioner 3 is connected, and the other end of the ratchet hand pulling the wire tensioner is connected with the soft ladder 4, and the other end of the soft ladder 4 is connected with the hook 5. Fig. 2 is a kind of ratchet hand puller of known structural mode, just changes pulley rope 7 into high-strength fiber rope by original wire rope. The ratchet wrench has pulley hooks at both ends for easy connection to load-bearing elements and ladders.

软梯4长0.9米,收紧范围0.5米,负荷大于2.0吨,全套自重6Kg。高强度纤维绳2直径为10cm,棘轮手扳紧线器3的负荷大于2吨。当作业人员检修线路需要下到导线上或提升导线时,先将高强度纤维绳2缠挂在导线横担上,使软梯下端的挂钩钩住导线,再使用棘轮扳手收紧软梯提升导线,作业人员系好安全保险绳,在安全带的保护下,下到导线即可作业。先将绝缘子与导线的连接端摘下,再摘下连在导线横担的一端,然后换上新的绝缘子。工作完毕后解除保险绳,放松紧线器,撤回全套装置放入背包即可。The length of the soft ladder 4 is 0.9 meters, the tightening range is 0.5 meters, the load is greater than 2.0 tons, and the whole set has a self-weight of 6Kg. The high-strength fiber rope 2 has a diameter of 10cm, and the load of the ratchet hand tightener 3 is greater than 2 tons. When the operator needs to go down to the wire or lift the wire for maintenance, first wrap the high-strength fiber rope 2 on the cross arm of the wire, make the hook at the lower end of the ladder hook the wire, and then use the ratchet wrench to tighten the ladder to lift the wire. The personnel fasten the safety safety rope, and under the protection of the safety belt, they can work when they get down to the wire. First remove the connecting end of the insulator and the wire, then remove the end connected to the cross arm of the wire, and then replace with a new insulator. After the work is finished, release the safety rope, loosen the tensioner, withdraw the whole set of equipment and put it into the backpack.

Claims (2)

1, a kind of transmission line is changed the combination tool of straight line insulator, it is characterized in that comprising that high strength fibre rope (2), hand pull wire grip and rope ladder (4), high strength fibre rope (2) one ends have connector (1), the other end is pulled wire grip with hand and is connected, the other end that hand is pulled wire grip is connected with rope ladder (4), the other end coupling hook (5) of rope ladder (4).
2, combination tool according to claim 1 is characterized in that described hand pulls wire grip and pull wire grip (3) for the ratchet hand, and two ends have the pulley hook respectively.
CNU2008200272133U 2008-08-25 2008-08-25 Combined tool for replacing a linear insulator of an electric transmission line Expired - Lifetime CN201252363Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200272133U CN201252363Y (en) 2008-08-25 2008-08-25 Combined tool for replacing a linear insulator of an electric transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200272133U CN201252363Y (en) 2008-08-25 2008-08-25 Combined tool for replacing a linear insulator of an electric transmission line

Publications (1)

Publication Number Publication Date
CN201252363Y true CN201252363Y (en) 2009-06-03

Family

ID=40748026

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200272133U Expired - Lifetime CN201252363Y (en) 2008-08-25 2008-08-25 Combined tool for replacing a linear insulator of an electric transmission line

Country Status (1)

Country Link
CN (1) CN201252363Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879477A (en) * 2018-07-27 2018-11-23 国网山东省电力公司烟台供电公司 Replace transmission line of electricity linear insulator specific purpose tool
CN109038362A (en) * 2018-07-27 2018-12-18 国网山东省电力公司烟台供电公司 A kind of replacement transmission line of electricity linear insulator specific purpose tool
CN118610941A (en) * 2024-08-08 2024-09-06 国网山东省电力公司荣成市供电公司 A transmission line insulator string maintenance transfer pulley

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879477A (en) * 2018-07-27 2018-11-23 国网山东省电力公司烟台供电公司 Replace transmission line of electricity linear insulator specific purpose tool
CN109038362A (en) * 2018-07-27 2018-12-18 国网山东省电力公司烟台供电公司 A kind of replacement transmission line of electricity linear insulator specific purpose tool
CN118610941A (en) * 2024-08-08 2024-09-06 国网山东省电力公司荣成市供电公司 A transmission line insulator string maintenance transfer pulley

Similar Documents

Publication Publication Date Title
CN100464474C (en) Method and device for live replacement of tension insulator strings for high-voltage transmission lines
CN204760890U (en) Wire hoisting device in distribution lines construction
CN105162039A (en) Portable grounding wire transmitter and using method
CN201323398Y (en) Small-sized electric power equipment landing gear
CN203352053U (en) Chain-type ladder used for maintenance of straight line tower of power transmission line
CN201785175U (en) Hoisting basket for high-voltage steel tower
CN107546644A (en) Universal tangent tower ground wire lifting device
CN202488034U (en) Lifting device for electric transmission line of angle iron tower
CN101908739A (en) Pulley for maintenance of overhead power transmission lines
CN201898295U (en) Lifting device for grounding downlead of concrete pole
CN110854734B (en) Method for replacing large yoke plate of strain insulator string of extra-high voltage direct current transmission line
CN201152141Y (en) Dedicated rope ladder for replacing synthetic electrical insulator
CN203976254U (en) A kind of emergency first-aid repair nacelle device
CN203119386U (en) Concrete rod lightning conductor lifting device
CN201705193U (en) Dedicated flexible ladder used for replacing insulators
CN210003199U (en) general type steelframe cat ladder climbing equipment
CN104836160B (en) A kind of transmission circuit insulator string maintenance transmission coaster
CN103840396A (en) Method for replacing lightning conductor on high-voltage iron towers
CN201285999Y (en) Soft ladder for high voltage line maintenance
CN101567529A (en) Lifting ladder hook for insulated pulling materials
CN201611741U (en) Lifting device used for power equipment
CN102290738B (en) Construction method for replacing 35kV line tension pole cross arm
CN215989995U (en) Auxiliary device is changed to extra-high voltage strain insulator tower tip vase
CN209805246U (en) A Lifting System Based on Insulator Strings
CN205092508U (en) Special use of suspension type composite insulator is rolled off production line and is hung ladder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POW

Effective date: 20130812

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POWER CORPORATION

Effective date: 20130812

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POW

Free format text: FORMER NAME: ZIBO POWER SUPPLY COMPANY

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 255032 ZIBO, SHANDONG PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID ZIBO POWER SUPPLY COMPANY OF SHANDONG PROVINCE

Address before: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee before: State Grid Corporation of China

Patentee before: Zibo Power Supply Company of Shandong Electric Power Corp.

Address after: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo

Patentee after: Zibo Power Supply Company of Shandong Electric Power Corp.

Address before: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo

Patentee before: Zibo Power Supply Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20130812

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: Zibo Power Supply Company of Shandong Electric Power Corp.

Address before: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo

Patentee before: Zibo Power Supply Company of Shandong Electric Power Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090603