CN103594976B - Combination stringing instrument for line conductor stringing - Google Patents
Combination stringing instrument for line conductor stringing Download PDFInfo
- Publication number
- CN103594976B CN103594976B CN201310601964.7A CN201310601964A CN103594976B CN 103594976 B CN103594976 B CN 103594976B CN 201310601964 A CN201310601964 A CN 201310601964A CN 103594976 B CN103594976 B CN 103594976B
- Authority
- CN
- China
- Prior art keywords
- plate
- tightening
- fixed
- wire tightening
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004020 conductor Substances 0.000 title abstract description 8
- 229910052573 porcelain Inorganic materials 0.000 claims description 29
- 230000000149 penetrating effect Effects 0.000 claims description 14
- 230000005540 biological transmission Effects 0.000 abstract description 11
- 238000010276 construction Methods 0.000 description 12
- 238000000034 method Methods 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 239000012212 insulator Substances 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Landscapes
- Clamps And Clips (AREA)
Abstract
本发明公开了一种用于线路导线紧线的组合紧线工具,包括定滑轮、第一紧线滑车、第二紧线滑车、绞磨、牵引绳、滑车固定板和球头卡线器;定滑轮固定于杆塔顶端;滑车固定板固定于杆塔的横担上,第二紧线滑车固定于滑车固定板之上;第一紧线滑车轮固定于杆塔底端;绞磨固定于地面上;牵引绳缠绕于绞磨上,绞磨上所引出的牵引绳依次绕过第一紧线滑车、定滑轮和第二紧线滑车,然后拴紧在球头卡线器上;紧线时,只需转动绞磨拉动牵引绳,即可实现线路导线的紧线。本发明的组合紧线工具,具有可提高输电线路导线紧线工作的安全可靠性、提高紧线的工作效率、降低杆塔上劳动强度,减少工人数量、施工难度小等优点。
The invention discloses a combined wire tightening tool for line wire tightening, which comprises a fixed pulley, a first wire tightening tackle, a second wire tightening tackle, a winch, a traction rope, a pulley fixing plate and a ball end clamp; The fixed pulley is fixed on the top of the tower; the block fixing plate is fixed on the cross arm of the tower; the second tightening block is fixed on the block fixing plate; the first tightening block is fixed on the bottom of the tower; the winch is fixed on the ground; The traction rope is wound on the winch, and the traction rope drawn from the winch goes around the first tightening block, the fixed pulley and the second tightening block in turn, and then is fastened to the ball clamp; when tightening, only It is necessary to turn the winch and pull the traction rope to realize the tightness of the line conductor. The combined wire tightening tool of the present invention has the advantages of improving the safety and reliability of the wire tightening work of the transmission line, improving the work efficiency of the wire tightening, reducing the labor intensity on the tower, reducing the number of workers, and less difficult to construct.
Description
技术领域technical field
本发明涉及一种用于线路导线紧线的组合紧线工具,尤其是一种用于电力系统中的架空线路导线紧线的组合紧线工具。The invention relates to a combined wire tightening tool for line wire tightening, in particular to a combined wire tightening tool for overhead line wire tightening in a power system.
背景技术Background technique
目前,输电线路导线紧线方式主要是,将牵引绳固定在耐张线夹上。导线收紧后,由于重力作用,瓷瓶串在线路下,需人力将瓷瓶拧起与导线水平后安装在杆塔横担上,此方法不仅费时费力,且施工人员的安全上得不到很好的保障,线路紧线效率低,施工成本较高。At present, the main method of tightening the wires of transmission lines is to fix the traction rope on the tension clamp. After the wire is tightened, due to gravity, the porcelain bottle is strung under the line, and it needs manpower to twist the porcelain bottle up to the level of the wire and then install it on the cross arm of the pole tower. Guarantee, low line efficiency and high construction cost.
目前,输电线路导线紧线时一般是将滑车用8号铁丝或细钢丝绳固定在杆塔或砼杆上,经常会受到紧线忽大忽小的拉力,滑车会发生跳跃,严重时会滑落至地面,对紧线人员和地面人员造成很大的安全隐患。At present, when the wires of the transmission line are tightened, the pulley is usually fixed on the pole tower or concrete pole with No. 8 iron wire or thin steel wire rope. Often, the pulley will jump and fall to the ground under the tension of the tight wire. , causing great safety hazards to tight-line personnel and ground personnel.
输电线路单串绝缘子串导线紧线时,一般是用一条钢丝绳绑扎在靠近横担的第二片瓷瓶下方(钢丝绳与绝缘子接触处垫麻袋)将牵引绳固定在耐张线夹上,导线收紧后,由于重力作用,瓷瓶串在线路下发生下坠,需人力将瓷瓶拧起与导线水平后安装在杆塔横担上,此方法不仅使杆上紧线费时费力,而且安全上得不到很好的保障。When the single-string insulator string wires of the transmission line are tightened, a steel wire rope is generally used to tie the wire rope under the second porcelain bottle near the cross arm (the contact between the steel wire rope and the insulator is padded with a sack), and the traction rope is fixed on the tension clamp, and the wire is tightened. Finally, due to the effect of gravity, the porcelain bottle string will fall under the line. It is necessary to twist the porcelain bottle up to the level of the wire and install it on the cross arm of the pole tower. protection.
输电线路双串绝缘子串导线紧线时,一般是用一条钢丝绳绑扎在二个滑车上提升绝缘子和导线,导线收紧后,由于重力作用,双瓷瓶串在线路下发生下坠,需用滑车将瓷瓶拧起与导线水平后安装在杆塔横担上,双瓷瓶串左右不平衡,要过牵引紧线,非常难将此瓷瓶挂在横担挂点上,方法不仅使杆上紧线费时费力,而且安全上得不到很好的保障。When the double-string insulator string conductors of the transmission line are tightened, a steel wire rope is generally used to tie the insulators and conductors on two pulleys to lift the insulators and conductors. Screw it up to the level of the wire and install it on the cross-arm of the pole tower. The double porcelain bottle string is unbalanced left and right. It is very difficult to hang the porcelain bottle on the cross-arm hanging point by pulling the wire tightly. This method not only makes the pole tightening time-consuming and laborious, but also Safety is not well guaranteed.
发明内容Contents of the invention
本发明是为避免上述已有技术中存在的不足之处,提供一种用于线路导线紧线的组合紧线工具,以解决输电线路导线紧线安全性差、工作效率低、施工难度大等问题。The present invention is to avoid the shortcomings in the above-mentioned prior art, and provides a combined wire tightening tool for line wire tightening to solve the problems of poor safety, low work efficiency, and difficult construction of transmission line wire wires .
本发明为解决技术问题采用以下技术方案。The present invention adopts the following technical solutions to solve the technical problems.
用于线路导线紧线的组合紧线工具,其结构特点是,包括定滑轮、第一紧线滑车、第二紧线滑车、绞磨、牵引绳、用于固定第二紧线滑车的滑车固定板和用于卡紧单串瓷瓶的球头卡线器;所述定滑轮固定于电线杆的顶端;所述滑车固定板固定于电线杆的横担上,所述第二紧线滑车固定于所述滑车固定板之上;所述第一紧线滑车固定于电线杆的底端;所述绞磨固定于地面上;所述牵引绳缠绕于所述绞磨上,绞磨上所引出的牵引绳依次绕过第一紧线滑车、定滑轮和第二紧线滑车,然后拴紧在所述球头卡线器上;紧线时,只需转动绞磨拉动牵引绳,即可实现线路导线的紧线。The combined wire tightening tool used for wire tightening of line wires is characterized in that it includes a fixed pulley, a first wire tightening block, a second wire tightening block, a winch, a traction rope, and a block fixing block for fixing the second wire tightening block plate and a ball clamp for clamping a single string of porcelain bottles; the fixed pulley is fixed on the top of the utility pole; the tackle fixing plate is fixed on the cross arm of the utility pole, and the second tightening tackle is fixed on above the block fixed plate; the first tightening block is fixed on the bottom end of the utility pole; the winch is fixed on the ground; the traction rope is wound on the winch, and the The traction rope bypasses the first line tightening block, the fixed pulley and the second line tensioning block in turn, and then is fastened to the ball clamp; when tightening the line, just turn the winch and pull the traction rope to complete the line. Tight wires for wires.
本发明的用于线路导线紧线的组合紧线工具的结构特点也在于:The structural features of the combined wire tightening tool for line wire tightening of the present invention also lie in:
所述滑车固定板包括板状本体、用于与所述第二紧线滑车相连接的滑车固定结构、用于将所述板状本体固定于所述电线杆的横担上的靠板;所述板状本体上设置有沿着所述板状本体的厚度方向穿透所述板状本体的U形通槽;所述板状本体上,所述U形通槽的两侧各有一个沿着所述板状本体的厚度方向穿透所述板状本体的第一通孔;所述靠板上也设置有两个第二通孔;所述两个第二通孔与所述两个第一通孔的位置相对应;所述靠板通过两个螺栓固定于所述所述板状本体上;所述滑车固定结构设置于所述板状本体的顶端,所述滑车固定结构包括两个立板,两个立板相互平行设置,两个立板中的每一个立板上设有一个第三通孔;一个螺栓依次穿过两个立板的第三通孔并固定于所述所述两个第三通孔之内。The pulley fixing plate includes a plate-shaped body, a pulley fixing structure for connecting with the second wire tightening block, and a backing plate for fixing the plate-shaped body to the cross arm of the utility pole; The plate-shaped body is provided with a U-shaped through groove that penetrates the plate-shaped body along the thickness direction of the plate-shaped body; The thickness direction of the plate-shaped body penetrates the first through hole of the plate-shaped body; the backing plate is also provided with two second through-holes; the two second through-holes are connected with the two The positions of the first through holes are corresponding; the backing plate is fixed on the plate-shaped body by two bolts; the pulley fixing structure is arranged on the top of the plate-like body, and the pulley fixing structure includes two Two vertical plates are arranged parallel to each other, and each vertical plate in the two vertical plates is provided with a third through hole; a bolt passes through the third through hole of the two vertical plates in turn and is fixed on the within the two third through holes.
所述板状本体为弧形板,所述滑车固定结构位于所述板状本体的弧顶处。The plate-shaped body is an arc-shaped plate, and the trolley fixing structure is located at the top of the arc of the plate-shaped body.
所述球头卡线器包括一个L形板、一个方板、三个带有拉环的螺钉和一个顶板,所述L形板包括第一直板和与所述第一直板相固定连接的第二直板;所述第一直板上远离所述第二直板的一端设置有一个沿着所述第一直板的厚度方向贯穿所述第一直板的长方形开口槽;所述第一直板上,在长方形开口槽的两侧各开设有一个第一螺孔;所述方板上开设有两个第四通孔;The ball clamp includes an L-shaped plate, a square plate, three screws with pull rings and a top plate, the L-shaped plate includes a first straight plate and is fixedly connected to the first straight plate the second straight plate; the end of the first straight plate far away from the second straight plate is provided with a rectangular opening slot penetrating the first straight plate along the thickness direction of the first straight plate; the first straight plate On the straight plate, a first screw hole is opened on both sides of the rectangular opening groove; two fourth through holes are opened on the square plate;
所述顶板固定设置于所述第二直板上远离所述第一直板的一侧的板面上,所述顶板上设置有沿着所述顶板的厚度方向穿透所述顶板的第二螺孔;所述第二直板上设置有沿着所述第二直板的厚度方向穿透所述第二直板的第三螺孔;所述第二螺孔的轴线和所述第三螺孔的轴线在一条直线上。The top plate is fixedly arranged on the plate surface of the second straight plate away from the first straight plate, and the top plate is provided with a second screw penetrating through the top plate along the thickness direction of the top plate. hole; the second straight plate is provided with a third screw hole penetrating the second straight plate along the thickness direction of the second straight plate; the axis of the second screw hole and the axis of the third screw hole in a straight line.
所述顶板为倒U形板,顶板两侧的支撑板固定于所述第二直板的板面上。The top plate is an inverted U-shaped plate, and the support plates on both sides of the top plate are fixed on the surface of the second straight plate.
所述的用于线路导线紧线的组合紧线工具还包括联板紧线器;所述联板紧线器包括V形本体,所述V形本体包括两个支腿,所述两个支腿中的每个支腿上设置有一个挂钩;所述支腿包括第一支腿和第二支腿,所述第一支腿上设置有一个固定板,所述固定板上设置有一个沿着所述固定板的厚度方向穿透所述固定板的第五通孔。The combined wire tightening tool for line wire tightening also includes a board wire tightener; the board wire tightener includes a V-shaped body, and the V-shaped body includes two legs, and the two legs Each leg in the legs is provided with a hook; the legs include a first leg and a second leg, a fixing plate is arranged on the first leg, and a fixing plate is arranged on the fixing plate The fifth through hole penetrating through the fixing plate along the thickness direction of the fixing plate.
所述V形本体的两个支腿相交处为弧形。The intersection of the two legs of the V-shaped body is arc-shaped.
与已有技术相比,本发明有益效果体现在:Compared with the prior art, the beneficial effects of the present invention are reflected in:
本发明的用于线路导线紧线的组合紧线工具,采用滑车固定板来固定位于空中的紧线滑车,使得滑车能够通过滑车固定板固定在电线杆的横担上,避免发生紧线滑车从空中掉落的现象。通过球头卡线器和联板紧线器分别连接单串瓷瓶和双串瓷瓶,通过绞磨拉动牵引绳紧线紧线,整体结构简单、方便实用,提高线路紧线效率,充分保障施工安全,降低施工成本,具有降低杆塔上劳动强度,减少工人数量等优点。经过4吨拉力静态15分钟试验,证明本发明的用于线路导线紧线的组合紧线工具安全可靠。The combined wire tightening tool used for line wire tightening of the present invention uses a pulley fixing plate to fix the wire tightening block in the air, so that the pulley can be fixed on the cross arm of the utility pole through the pulley fixing plate to avoid the occurrence of the wire tightening block from The phenomenon of falling in the air. The single-string porcelain vase and the double-string porcelain vase are respectively connected by the ball head clamp and the joint plate tensioner, and the traction rope is pulled by the winch to tighten the line. The overall structure is simple, convenient and practical, which improves the efficiency of line tightening and fully guarantees construction safety. , reduce construction costs, have the advantages of reducing labor intensity on the tower and reducing the number of workers. The static 15-minute test of 4 tons of tension proves that the combined wire tightening tool used for line wire tightening of the present invention is safe and reliable.
较传统用吊点绳下挂滑车,远距离紧线方式比,本发明的用于线路导线紧线的组合紧线工具,具有以下优点:Compared with the traditional way of hanging the pulley under the hanging point rope and the long-distance tightening method, the combined tightening tool for line wire tightening of the present invention has the following advantages:
1)不受地形、地貌影响,紧线占地面积小,民事协调、青苗赔偿费用少,减少人为阻挠对施工的影响;1) It is not affected by terrain and landform, the tight line occupies a small area, and the civil coordination and young crop compensation costs are small, reducing the impact of human obstruction on construction;
2)减轻杆塔上工人劳动强度,原杆塔上工作量改由地面完成,缓解了杆塔上工作人员的风险;2) Reduce the labor intensity of workers on the tower, and the workload on the original tower is changed to the ground, which alleviates the risk of workers on the tower;
3)减少杆塔上工作人员,原由2~3人操作,现1人即可完成全部工作;3) Reduce the number of staff on the tower, which was originally operated by 2 to 3 people, and now one person can complete all the work;
4)紧线指挥人员、杆塔上工作人员、地面操作人员都在一个视线区域,利于安全保障;4) The tight-line command personnel, the staff on the tower, and the ground operators are all in the same sight area, which is conducive to safety protection;
5)紧线过程中不过牵引,减少过牵引对杆塔横担的不平衡受力;5) No traction in the process of tightening the line, reducing the unbalanced force on the cross-arm of the tower due to over-traction;
6)紧线时瓷瓶串不下坠,平行受力,极易连接横担挂点。6) When the line is tightened, the porcelain bottle string will not fall, and the force will be parallel, so it is easy to connect the hanging point of the cross arm.
本发明的用于线路导线紧线的组合紧线工具,具有可提高输电线路导线紧线工作的安全可靠性、提高紧线的工作效率、降低杆塔上劳动强度,减少工人数量、施工难度小等优点。The combined wire tightening tool for line wire tightening of the present invention can improve the safety and reliability of wire tightening work of transmission lines, improve the work efficiency of wire tightening, reduce the labor intensity on poles and towers, reduce the number of workers, and reduce construction difficulty, etc. advantage.
附图说明Description of drawings
图1为本发明的用于线路导线紧线的组合紧线工具的施工状态示意图。Fig. 1 is a schematic diagram of the construction state of the combined wire tightening tool for line wire tightening of the present invention.
图2为图1中的局部放大图。FIG. 2 is a partially enlarged view of FIG. 1 .
图3为本发明的用于线路导线紧线的组合紧线工具的滑车固定板的主视图。Fig. 3 is a front view of the pulley fixing plate of the combined wire tightening tool used for line wire tightening according to the present invention.
图4为本发明的用于线路导线紧线的组合紧线工具的滑车固定板的俯视图。Fig. 4 is a top view of the pulley fixing plate of the combined wire tightening tool used for line wire tightening according to the present invention.
图5为本发明的用于线路导线紧线的组合紧线工具的滑车固定板的靠板的主视图。Fig. 5 is a front view of the backing plate of the pulley fixing plate of the combined wire tightening tool used for line wire tightening according to the present invention.
图6为本发明的用于线路导线紧线的组合紧线工具的球头卡线器的主视图。Fig. 6 is a front view of the ball clamp of the combined wire tightening tool used for wire tightening of circuit wires according to the present invention.
图7为本发明的用于线路导线紧线的组合紧线工具的球头卡线器的左视图。Fig. 7 is a left side view of the ball clamp of the combined wire tightening tool used for wire tightening of circuit wires according to the present invention.
图8为本发明的用于线路导线紧线的组合紧线工具的球头卡线器的方板主视图。Fig. 8 is a front view of the square plate of the ball-tip wire gripper of the combined wire tightening tool for wire tightening of the present invention.
图9为本发明的用于线路导线紧线的组合紧线工具的联板紧线器的主视图。Fig. 9 is a front view of the connecting board wire tensioner of the combined wire tightening tool used for line wire tightening according to the present invention.
图10为本发明的用于线路导线紧线的组合紧线工具的联板紧线器的左视图。Fig. 10 is a left view of the connecting board wire tensioner of the combined wire tightening tool used for line wire tightening according to the present invention.
附图1~附图10中标号:1定滑轮,2第一紧线滑车,3第二紧线滑车,4绞磨,5牵引绳,6滑车固定板,601板状本体,6011U形通槽,6012第一通孔,602滑车固定结构,6021立板,60211第三通孔,603靠板,6031第二通孔,7球头卡线器,701L形板,7011第一直板,70111长方形开口槽,70112第一螺孔,7012第二直板,702方板,7021第四通孔,703顶板,7031支撑板,8联板紧线器,801V形本体,8011第一支腿,8012第二支腿,802挂钩,803固定板,8031第五通孔,9电线杆,10横担,11单串瓷瓶,1101挂环,1102连接柱,12双串瓷瓶,1201连接板,13导线,14螺栓,15螺钉,1501拉环。Labels in attached drawings 1 to 10: 1 fixed pulley, 2 first tightening block, 3 second tightening block, 4 twisting mill, 5 traction rope, 6 block fixing plate, 601 plate-like body, 6011 U-shaped through groove , 6012 first through hole, 602 pulley fixing structure, 6021 vertical plate, 60211 third through hole, 603 backing plate, 6031 second through hole, 7 ball end clamp, 701 L-shaped plate, 7011 first straight plate, 70111 Rectangular open slot, 70112 first screw hole, 7012 second straight plate, 702 square plate, 7021 fourth through hole, 703 top plate, 7031 support plate, 8-plate wire tensioner, 801 V-shaped body, 8011 first leg, 8012 The second leg, 802 hook, 803 fixed plate, 8031 fifth through hole, 9 utility poles, 10 cross arm, 11 single string porcelain bottle, 1101 hanging ring, 1102 connecting column, 12 double string porcelain bottle, 1201 connecting plate, 13 wire , 14 bolts, 15 screws, 1501 pull ring.
以下通过具体实施方式,并结合附图对本发明作进一步说明。The present invention will be further described below through specific embodiments and in conjunction with the accompanying drawings.
具体实施方式detailed description
参见图1~图10,用于线路导线紧线的组合紧线工具,其包括定滑轮1、第一紧线滑车2、第二紧线滑车3、绞磨4、牵引绳5、用于固定第二紧线滑车3的滑车固定板6和用于卡紧单串瓷瓶11的球头卡线器7;所述定滑轮1固定于电线杆9的顶端;所述滑车固定板6固定于电线杆9的横担10上,所述第二紧线滑车3固定于所述滑车固定板6之上;所述第一紧线滑车2固定于电线杆9的底端;所述绞磨4固定于地面上;所述牵引绳5缠绕于所述绞磨4上,绞磨4上所引出的牵引绳5依次绕过第一紧线滑车2、定滑轮1和第二紧线滑车3,然后拴紧在所述球头卡线器7上;紧线时,只需转动绞磨4拉动牵引绳5,即可实现线路导线13的紧线。Referring to Figures 1 to 10, the combined wire tightening tool used for line wire tightening includes a fixed pulley 1, a first wire tightening block 2, a second wire tightening block 3, a winch 4, a traction rope 5, and is used for fixing The tackle fixing plate 6 of the second tightening tackle 3 and the ball head clamp 7 for clamping the single string porcelain bottle 11; the fixed pulley 1 is fixed on the top of the utility pole 9; the tackle fixing plate 6 is fixed on the electric wire On the cross arm 10 of the bar 9, the second tightening tackle 3 is fixed on the tackle fixing plate 6; the first tightening tackle 2 is fixed on the bottom end of the utility pole 9; the winch 4 is fixed on the ground; the traction rope 5 is wound on the winch 4, and the traction rope 5 drawn from the winch 4 is passed around the first tight-line tackle 2, the fixed pulley 1 and the second tight-line tackle 3 in turn, and then Tighten on the ball head clamp 7; when tightening the wire, only need to rotate the winch 4 to pull the traction rope 5 to realize the tightening of the line conductor 13.
当需要对输电线路导线13进行紧线时,在电线杆9(杆塔或砼杆)顶端安装定滑轮,电线杆的底端紧挨地面的位置处固定第一紧线滑车,地面上设置机动绞磨。滑车固定板固定于所述电线杆的横担10上,将第二紧线滑车固定于滑车固定板上。将球头卡线器卡接在单串瓷瓶11上,或者将联板紧线器安装在双串瓷瓶12的两串瓷瓶之间的连接板1201上。绞磨上引出的牵引绳依次绕过第一紧线滑车、定滑轮和第二紧线滑车后拴紧在球头卡线器或者联板紧线器上,然后开动机动绞磨,通过绞磨拉紧牵引绳,从而对对输电线路导线13进行紧线。When it is necessary to tighten the wire 13 of the transmission line, a fixed pulley is installed on the top of the utility pole 9 (pole tower or concrete pole), the bottom end of the utility pole is fixed at the position close to the ground, and the first tightening pulley is fixed, and a motorized winch is set on the ground. grind. The tackle fixing plate is fixed on the cross arm 10 of the utility pole, and the second tensioning tackle is fixed on the tackle fixing plate. The ball joint clamp is clamped on the single-string porcelain bottle 11, or the connecting plate wire tightener is installed on the connecting plate 1201 between the two strings of porcelain bottles of the double-string porcelain bottle 12. The traction rope drawn from the winch bypasses the first wire tightening block, the fixed pulley and the second wire tightening block in turn, and then is fastened to the ball head clamp or the joint plate tensioner, and then the motorized winch is started to pass through the winch. Tighten the traction rope, thereby carrying out tight line to transmission line conductor 13.
牵引绳一端固定在球头卡线器上,牵引绳通过紧线滑轮、杆塔上方的定滑轮后另一端固定在机动绞磨上进行紧线。紧线操作完成后,将这些设备拆下,可继续使用。这种紧线方式,瓷瓶与牵引绳之间比较牢固,而且紧线滑车固定在横担上,不会掉落,因而可提高线路紧线效率,也能充分保障工作人员的施工安全,不会发生掉落物砸伤工作人员的现象,降低了施工成本。One end of the traction rope is fixed on the ball joint clamp, and the other end of the traction rope is fixed on the motor winch to tighten the line after passing through the tensioning pulley and the fixed pulley above the pole tower. After the tightening operation is completed, these devices are removed and can be used again. In this line tightening method, the connection between the porcelain bottle and the traction rope is relatively firm, and the line tightening block is fixed on the cross arm without falling, so it can improve the line tightening efficiency and fully guarantee the construction safety of the staff. The phenomenon that the falling objects hurt the staff occurs, and the construction cost is reduced.
所述滑车固定板6包括板状本体601、用于与所述第二紧线滑车3相连接的滑车固定结构602、用于将所述板状本体601固定于所述电线杆9的横担10上的靠板603;所述板状本体601上设置有沿着所述板状本体601的厚度方向穿透所述板状本体601的U形通槽6011;所述板状本体601上,所述U形通槽6011的两侧各有一个沿着所述板状本体601的厚度方向穿透所述板状本体601的第一通孔6012;所述靠板603上也设置有两个第二通孔6031;所述两个第二通孔6031与所述两个第一通孔6012的位置相对应;所述靠板603通过两个螺栓14固定于所述所述板状本体601上;所述滑车固定结构602设置于所述板状本体601的顶端,所述滑车固定结构602包括两个立板6021,两个立板6021相互平行设置,两个立板6021中的每一个立板6021上设有一个第三通孔60211;一个螺栓14依次穿过两个立板6021的第三通孔60211并固定于所述所述两个第三通孔60211之内。The tackle fixing plate 6 includes a plate-shaped body 601, a tackle fixing structure 602 for connecting with the second wire tightening tackle 3, and a cross arm for fixing the plate-like body 601 to the utility pole 9 10 on the back plate 603; the plate-shaped body 601 is provided with a U-shaped through groove 6011 penetrating the plate-shaped body 601 along the thickness direction of the plate-shaped body 601; on the plate-shaped body 601, Both sides of the U-shaped through groove 6011 have a first through hole 6012 penetrating through the plate-shaped body 601 along the thickness direction of the plate-shaped body 601; the backing plate 603 is also provided with two The second through hole 6031; the two second through holes 6031 correspond to the positions of the two first through holes 6012; the backing plate 603 is fixed to the plate body 601 by two bolts 14 Above; the tackle fixing structure 602 is arranged on the top of the plate body 601, the tackle fixing structure 602 includes two vertical boards 6021, the two vertical boards 6021 are arranged parallel to each other, each of the two vertical boards 6021 A third through hole 60211 is provided on the vertical plate 6021; a bolt 14 passes through the third through holes 60211 of the two vertical plates 6021 in turn and is fixed in the two third through holes 60211.
滑车固定板由三部分构成:板状本体、滑车固定结构和靠板。板状本体上设置有U形通槽,在U形通槽的开口处设置两个第一通孔,靠板上也对应设置两个第二通孔,两个第一通孔和两个第二通孔在尺寸上基本相同,而且两个第一通孔之间的距离和两个第二通孔之间的距离相等,使得靠板贴在板状本体上时,第一通孔与第二通孔的轴线能够在一条直线上,以便于一根螺栓能够插入两个通孔从而将靠板和板状本体固定在一起。靠板位于板状本体的左端。滑车固定结构设置在板状本体的中间处,位于板状本体的顶端。两个立板分别位于板状本体的两侧,相对平行设置。两个立板上各设有一个第三通孔,两个第三通孔是同轴线的。一个螺栓依次穿过两个立板的第三通孔,旋紧螺母后可将螺栓紧固。通过螺栓来固定第二紧线滑车,以避免第二紧线滑车掉落到地面上而砸伤工作人员,或者掉落在地面上影响紧线的工作效率。The tackle fixing plate is composed of three parts: a plate body, a tackle fixing structure and a backing plate. A U-shaped through-slot is arranged on the plate-like body, and two first through-holes are set at the opening of the U-shaped through-slot, and two second through-holes are correspondingly set on the backing plate, two first through-holes and two second through-holes. The two through holes are basically the same in size, and the distance between the two first through holes is equal to the distance between the two second through holes, so that when the backing plate is attached to the plate-shaped body, the first through hole and the second through hole The axes of the two through holes can be on a straight line, so that a bolt can be inserted into the two through holes so as to fix the backing plate and the plate-like body together. The leaning plate is located at the left end of the plate-shaped body. The tackle fixing structure is arranged in the middle of the plate-shaped body and is located at the top of the plate-shaped body. The two vertical plates are respectively located on both sides of the plate-shaped body and arranged relatively parallel. Each of the two vertical plates is provided with a third through hole, and the two third through holes are coaxial. A bolt passes through the third through holes of the two vertical plates in turn, and the bolt can be tightened after the nut is tightened. The second tightening tackle is fixed by bolts to prevent the second tightening tackle from falling on the ground and injuring the staff, or falling on the ground to affect the working efficiency of the tightening.
具体操作时,先将第一螺孔内的螺栓卸下,拿掉靠板,然后将板状本体的U形通槽开口的一侧贴近所述电线杆的横担上,将横担夹持在靠板和板状本体之间,然后将两个螺栓分别插入两个第一螺孔和两个第二螺孔,旋紧螺母,将靠板、横担和板状本体紧紧地固定在一起,从而将滑车固定板牢固地锁紧在电线杆的横担上。然后,将第二紧线滑车固定于所述滑车固定结构上,从而牢固地将第二紧线滑车固定在横担上,避免第二紧线滑车在紧线工作过程中掉落而误伤工作人员,提高了现场工作的安全可靠性,充分保障施工安全。During the specific operation, the bolts in the first screw holes are first unloaded, the backing plate is removed, and then the side of the U-shaped through groove opening of the plate-shaped body is close to the cross arm of the utility pole, and the cross arm is clamped. Between the backing plate and the plate-like body, insert two bolts into the two first screw holes and the two second screw holes respectively, tighten the nuts, and tightly fix the backing plate, the cross arm and the plate-like body on the Together, the tackle fixing plate is firmly locked on the cross arm of the utility pole. Then, the second wire tightening block is fixed on the block fixing structure, thereby firmly fixing the second wire tightening block on the cross arm, preventing the second wire tightening block from falling during the wire tightening work process and accidentally injuring the staff , Improve the safety and reliability of on-site work, and fully guarantee the construction safety.
第二紧线滑车的轴上固定有一个长杆,该长杆的下端设有一个圆环,该圆环套在穿过两个第三通孔的螺栓上,且圆环卡在两个立板之间的位置上。A long rod is fixed on the shaft of the second wire tightening block, and the lower end of the long rod is provided with a ring, and the ring is sleeved on the bolts passing through the two third through holes, and the ring is clamped on the two vertical holes. between the boards.
所述板状本体601为弧形板,所述滑车固定结构602位于所述板状本体601的弧顶处。弧形的板状本体,能够使得滑车固定板6更为方便地固定于横担上。The plate-shaped body 601 is an arc-shaped plate, and the trolley fixing structure 602 is located at the top of the arc of the plate-shaped body 601 . The arc-shaped plate-shaped body can make the tackle fixing plate 6 more conveniently fixed on the cross arm.
所述球头卡线器7包括一个L形板701、一个方板702、三个带有拉环1501的螺钉15和一个顶板703,所述L形板701包括第一直板7011和与所述第一直板7011相固定连接的第二直板7012;所述第一直板7011上远离所述第二直板7012的一端设置有一个沿着所述第一直板7011的厚度方向贯穿所述第一直板7011的长方形开口槽70111;所述第一直板7011上,在长方形开口槽70111的两侧各开设有一个第一螺孔70112;所述方板702上开设有两个第四通孔7021;The ball clamp 7 includes an L-shaped plate 701, a square plate 702, three screws 15 with pull rings 1501 and a top plate 703, and the L-shaped plate 701 includes a first straight plate 7011 and the same A second straight plate 7012 fixedly connected to the first straight plate 7011; one end of the first straight plate 7011 away from the second straight plate 7012 is provided with a The rectangular opening slot 70111 of the first straight plate 7011; on the first straight plate 7011, a first screw hole 70112 is opened on both sides of the rectangular opening slot 70111; two fourth screw holes are opened on the square plate 702. Through hole 7021;
所述顶板703固定设置于所述第二直板7012上远离所述第一直板7011的一侧的板面上,所述顶板703上设置有沿着所述顶板703的厚度方向穿透所述顶板703的第二螺孔;所述第二直板7012上设置有沿着所述第二直板7012的厚度方向穿透所述第二直板7012的第三螺孔;所述第二螺孔的轴线和所述第三螺孔的轴线在一条直线上。The top board 703 is fixedly arranged on the board surface of the second straight board 7012 away from the first straight board 7011, and the top board 703 is provided with a The second screw hole of the top plate 703; the second straight plate 7012 is provided with a third screw hole penetrating the second straight plate 7012 along the thickness direction of the second straight plate 7012; the axis of the second screw hole and the axis of the third screw hole are on a straight line.
所述第一直板的板面和第二直板的板面相互垂直,二者以相互垂直的方式相互固定。第一直板的两个第一螺孔之间的间距和方板上的两个第四通孔之间的间距相等,第一螺孔和第四通孔的直径也是相同的。通过依次旋入第四通孔和第一螺孔内的螺钉15,可将方板固定在所述第一直板上,螺钉15的螺纹与第一螺孔的螺纹之间相配合。The board surfaces of the first straight board and the second straight board are perpendicular to each other, and they are fixed to each other in a mutually perpendicular manner. The distance between the two first screw holes of the first straight plate is equal to the distance between the two fourth through holes on the square plate, and the diameters of the first screw holes and the fourth through holes are also the same. The square plate can be fixed on the first straight plate by screwing into the fourth through hole and the screw 15 in the first screw hole in turn, and the thread of the screw 15 cooperates with the thread of the first screw hole.
所述球头卡线器用于连接单串瓷瓶11。单串瓷瓶11的端部设置有挂环1101,所述挂环与瓷瓶之间通过连接柱1102相连接。紧线操作时,将球头卡线器设置在所述连接柱1102上,所述连接柱1102位于所述长方形开口槽内。然后通过带有拉环的螺钉15将方板固定在所述第一直板上,从而将单串瓷瓶的连接柱1102锁紧在所述长方形开口槽内,这样就可以避免球头卡线器从单串瓷瓶上脱落,提高紧线工作的安全可靠性,同时保障了现场工作人员的人身安全。然后将牵引绳拴紧于所述球头卡线器上,然后开动机动绞磨,通过绞磨拉紧牵引绳,从而对对输电线路导线进行紧线。The ball clamp is used to connect single strings of porcelain bottles 11 . A hanging ring 1101 is provided at the end of the single-string porcelain bottle 11 , and the hanging ring and the porcelain bottle are connected through a connecting column 1102 . During the thread tightening operation, the ball joint clamp is arranged on the connecting post 1102, and the connecting post 1102 is located in the rectangular opening groove. Then the square plate is fixed on the first straight plate by the screw 15 with the pull ring, so that the connecting column 1102 of the single string of porcelain bottles is locked in the rectangular opening groove, so that the ball joint clamp can be avoided It falls off from the single-string porcelain bottle, which improves the safety and reliability of the tight line work, and at the same time ensures the personal safety of the on-site staff. Then the traction rope is fastened on the ball clamp, and then the dynamic winch is started, and the traction rope is tightened through the winch, so as to tighten the wires of the transmission line.
带拉环的螺钉15依次旋入第二螺孔和第三螺孔,将螺钉固定在顶板和第二直板上。Screws 15 with pull rings are screwed into the second screw hole and the third screw hole in turn, and the screws are fixed on the top board and the second straight board.
所述顶板703为倒U形板,顶板703两侧的支撑板7031固定于所述第二直板7012的板面上。The top plate 703 is an inverted U-shaped plate, and the supporting plates 7031 on both sides of the top plate 703 are fixed on the surface of the second straight plate 7012 .
所述的用于线路导线紧线的组合紧线工具还包括联板紧线器8;所述联板紧线器8包括V形本体801,所述V形本体801包括两个支腿,所述两个支腿中的每个支腿上设置有一个挂钩802;所述支腿包括第一支腿8011和第二支腿8012,所述第一支腿8011上设置有一个固定板803,所述固定板803上设置有一个沿着所述固定板803的厚度方向穿透所述固定板803的第五通孔8031。The combined wire tightening tool for line wire tightening also includes a board wire tightener 8; the board wire tightener 8 includes a V-shaped body 801, and the V-shaped body 801 includes two legs. Each of the two legs is provided with a hook 802; the legs include a first leg 8011 and a second leg 8012, and a fixing plate 803 is provided on the first leg 8011, The fixing plate 803 is provided with a fifth through hole 8031 penetrating through the fixing plate 803 along the thickness direction of the fixing plate 803 .
所述联板紧线器的两个支腿是由一根钢条制成,钢条弯折呈V字形,弯折部位为弧形。每个支腿上设有一个挂钩。紧线操作时,联板紧线器用于连接双串瓷瓶,双串瓷瓶的两串瓷瓶12之间设置有一个连接板1201,连接板1201上设置有多个通孔。将联板紧线器的两个挂钩挂在所述双串瓷瓶12的连接板1201上,然后通过一个螺栓14依次穿过固定板上的第五通孔和连接板1201上的通孔,将固定板803和连接板1201固定在一起,从而避免联板紧线器从双串瓷瓶上脱落,提高紧线工作的安全可靠性,同时保障了现场工作人员的人身安全。提高了线路紧线效率,充分保障施工安全,降低施工成本。The two supporting legs of the connecting plate tensioner are made of a steel bar, the steel bar is bent in a V shape, and the bending part is arc-shaped. There is a hook on each leg. During the wire tightening operation, the connecting board wire tightening device is used to connect the double-string porcelain bottles. A connecting plate 1201 is arranged between the two strings of porcelain bottles 12 of the double-stringing porcelain bottles. The connecting plate 1201 is provided with a plurality of through holes. Hang the two hooks of the connecting plate tightener on the connecting plate 1201 of the double-string porcelain bottle 12, then pass through the fifth through hole on the fixing plate and the through hole on the connecting plate 1201 successively through a bolt 14, and The fixing plate 803 and the connecting plate 1201 are fixed together, thereby preventing the connecting plate wire tightening device from falling off from the double-string porcelain bottle, improving the safety and reliability of the wire tightening work, and at the same time ensuring the personal safety of the on-site staff. The efficiency of line tightening is improved, construction safety is fully guaranteed, and construction cost is reduced.
需要紧线时,将牵引绳拴紧在所述联板紧线器V形本体的两个支腿的相交部位,然后开动机动绞磨,通过绞磨拉紧牵引绳,从而对对输电线路导线进行紧线。When the line needs to be tightened, fasten the traction rope to the intersecting part of the two legs of the V-shaped body of the connecting plate tensioner, and then start the dynamic winch, and tighten the traction rope through the winch, so as to align the transmission line conductors. Make a tight line.
所述V形本体801的两个支腿相交处为弧形。The intersection of the two legs of the V-shaped body 801 is arc-shaped.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310601964.7A CN103594976B (en) | 2013-11-25 | 2013-11-25 | Combination stringing instrument for line conductor stringing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310601964.7A CN103594976B (en) | 2013-11-25 | 2013-11-25 | Combination stringing instrument for line conductor stringing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103594976A CN103594976A (en) | 2014-02-19 |
CN103594976B true CN103594976B (en) | 2016-06-29 |
Family
ID=50085011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310601964.7A Active CN103594976B (en) | 2013-11-25 | 2013-11-25 | Combination stringing instrument for line conductor stringing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103594976B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103928864B (en) * | 2014-04-09 | 2016-08-31 | 国家电网公司 | 220kV-66kV electric transmission line hot-line adjusts the method for multiple wire linear slit |
CN105262003A (en) * | 2015-09-21 | 2016-01-20 | 国网辽宁省电力有限公司锦州供电公司 | Wire tension method for high-voltage wire in power transmission circuit |
CN106429614B (en) * | 2016-10-10 | 2022-09-23 | 国家电网有限公司 | A tool for protecting the conductors of newly built lines |
CN107448053A (en) * | 2017-08-04 | 2017-12-08 | 国网江苏省电力公司盐城供电公司 | A kind of tower bar tilts monitoring bracing means |
CN108336691A (en) * | 2018-05-14 | 2018-07-27 | 国网黑龙江省电力有限公司牡丹江供电公司 | A kind of tight hanging wire clamp device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201260052Y (en) * | 2008-07-30 | 2009-06-17 | 南京线路器材厂 | On-tower hydraulic line tightening system |
KR20090129249A (en) * | 2008-06-12 | 2009-12-16 | (자)자유이엔씨 | Long wire method using portable electric winch |
CN201369521Y (en) * | 2009-02-11 | 2009-12-23 | 重庆市电力公司沙坪坝供电局 | Bottom-upward pulley |
CN201750091U (en) * | 2010-08-15 | 2011-02-16 | 山东电力集团公司临沂供电公司 | Special tools for elastic wires of transmission lines |
CN203536865U (en) * | 2013-11-25 | 2014-04-09 | 国家电网公司 | Combined wire-tightening tool for tightening line wire |
-
2013
- 2013-11-25 CN CN201310601964.7A patent/CN103594976B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090129249A (en) * | 2008-06-12 | 2009-12-16 | (자)자유이엔씨 | Long wire method using portable electric winch |
CN201260052Y (en) * | 2008-07-30 | 2009-06-17 | 南京线路器材厂 | On-tower hydraulic line tightening system |
CN201369521Y (en) * | 2009-02-11 | 2009-12-23 | 重庆市电力公司沙坪坝供电局 | Bottom-upward pulley |
CN201750091U (en) * | 2010-08-15 | 2011-02-16 | 山东电力集团公司临沂供电公司 | Special tools for elastic wires of transmission lines |
CN203536865U (en) * | 2013-11-25 | 2014-04-09 | 国家电网公司 | Combined wire-tightening tool for tightening line wire |
Non-Patent Citations (1)
Title |
---|
220kV输电线路紧线施工技术的改进措施;余诗俊;《江西电力》;20100131;第34卷(第1期);第29页1.1节第7-10行,图1 * |
Also Published As
Publication number | Publication date |
---|---|
CN103594976A (en) | 2014-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103594976B (en) | Combination stringing instrument for line conductor stringing | |
CN202817611U (en) | Bidirectional wire tightener | |
CN203352049U (en) | Overhead line pulling-up assisting device | |
CN203967713U (en) | For the terminal clamping device of crane cable | |
CN103594974B (en) | Combined tightener for overhead line stringing | |
CN103579952B (en) | Bulb fixing-line device for overhead transmission line stringing | |
CN206738322U (en) | The attachment structure of cable holder stand column and cable bearer cross-arm | |
CN203871745U (en) | Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line | |
CN203536865U (en) | Combined wire-tightening tool for tightening line wire | |
CN203553772U (en) | Yoke plate line tightening device used for tightening overhead lines | |
CN202039638U (en) | Lead screw lifting type insulating cross arm | |
CN203553771U (en) | Pulley fixing plate applied to overhead line stringing | |
CN106639498B (en) | A kind of portable guy strand fixing-aid device | |
CN203553770U (en) | Ball head wire clamping device applied to overhead line stringing | |
CN103594975B (en) | Coaster fixed plate for overhead transmission line stringing | |
CN105137309B (en) | It is a kind of quickly to test the pressure-resistant device of suspension insulator and method of testing | |
CN203233106U (en) | High-voltage transmission line wiring pull device | |
CN202917892U (en) | Replacing tool for supporting insulator of tubular busbar | |
CN205791244U (en) | Overhead transmission line take-up device | |
CN104332897A (en) | Two-end wire fastening device for construction of power lines | |
CN206302092U (en) | Pulling tools for overhead transmission line cables | |
CN205692652U (en) | A kind of combination type distribution transformer stand | |
CN206023136U (en) | A kind of bypass lead-up cable fixing device | |
CN206323110U (en) | A kind of cement pole ground wire resetting means | |
CN204559000U (en) | Ground anchor type cross-line coaster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 242000 NO.160 Baocheng Road, Xuanzhou District, Xuancheng City, Anhui Province Patentee after: STATE GRID ANHUI ELECTRIC POWER CO., LTD. XUANCHENG POWER SUPPLY Co. Address before: 242000 Xuancheng Power Supply Company at the intersection of Shuiyangjiang road and Baocheng Road, Xuanzhou District, Xuancheng City, Anhui Province Patentee before: XUANCHENG POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Corp. |
|
CP03 | Change of name, title or address | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210818 Address after: 242000 Xuancheng Power Supply Company at the intersection of Shuiyangjiang road and Baocheng Road, Xuanzhou District, Xuancheng City, Anhui Province Patentee after: XUANCHENG POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Corp. Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee before: State Grid Corporation of China Patentee before: XUANCHENG POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Corp. |
|
TR01 | Transfer of patent right |