CN103579952B - Bulb fixing-line device for overhead transmission line stringing - Google Patents

Bulb fixing-line device for overhead transmission line stringing Download PDF

Info

Publication number
CN103579952B
CN103579952B CN201310601870.XA CN201310601870A CN103579952B CN 103579952 B CN103579952 B CN 103579952B CN 201310601870 A CN201310601870 A CN 201310601870A CN 103579952 B CN103579952 B CN 103579952B
Authority
CN
China
Prior art keywords
plate
straight
screw hole
tightening
straight plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310601870.XA
Other languages
Chinese (zh)
Other versions
CN103579952A (en
Inventor
王捷
金霖
傅冬生
吴迪
徐擒彪
王军龙
李永祥
李道文
金晓马
程兰芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310601870.XA priority Critical patent/CN103579952B/en
Publication of CN103579952A publication Critical patent/CN103579952A/en
Application granted granted Critical
Publication of CN103579952B publication Critical patent/CN103579952B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种用于架空线路紧线的球头卡线器,包括L形板、方板、三个带有拉环的螺钉和顶板,L形板包括第一直板和第二直板;第一直板上远离第二直板的一端设置有一个长方形开口槽;第一直板上,在长方形开口槽的两侧各开设有一个第一螺孔;方板上开设有两个第四通孔;顶板固定设置于第二直板上远离第一直板的一侧的板面上,顶板上设置有第二螺孔;第二直板上设置有沿着第二直板的厚度方向穿透第二直板的第三螺孔;第二螺孔的轴线和第三螺孔的轴线在一条直线上。本发明的用于架空线路紧线的球头卡线器,具有能使得牵引绳与单串瓷瓶之间可靠连接、可提高输电线路导线紧线工作的安全可靠性、提高紧线的工作效率等优点。

The invention discloses a ball head cable gripper for overhead line tightening, which comprises an L-shaped plate, a square plate, three screws with pull rings and a top plate, and the L-shaped plate includes a first straight plate and a second straight plate ; The end of the first straight plate away from the second straight plate is provided with a rectangular opening slot; the first straight plate is provided with a first screw hole on both sides of the rectangular opening slot; the square plate is provided with two fourth through holes; the top plate is fixedly arranged on the plate surface of the second straight plate away from the first straight plate, and the top plate is provided with a second screw hole; The third screw hole of the two straight plates; the axis of the second screw hole and the axis of the third screw hole are on a straight line. The ball head wire gripper used for wire tightening of overhead lines of the present invention has the functions of enabling reliable connection between the traction rope and the single string of porcelain bottles, improving the safety and reliability of the wire tightening work of the transmission line conductors, and improving the work efficiency of the wire tightening, etc. advantage.

Description

用于架空线路紧线的球头卡线器Ball clamp for overhead lines

技术领域technical field

本发明涉及一种用于架空线路紧线的球头卡线器,尤其是一种用于电力系统中的架空线路导线紧线的球头卡线器。The invention relates to a ball joint clamp used for wire tightening of overhead lines, in particular to a ball joint clamp used for wire tightening of overhead line conductors in a power system.

背景技术Background technique

目前,输电线路导线紧线方式主要是,将牵引绳固定在耐张线夹上。导线收紧后,由于重力作用,瓷瓶串在线路下,需人力将瓷瓶拧起与导线水平后安装在杆塔横担上,此方法不仅费时费力,且施工人员的安全上得不到很好的保障,线路紧线效率低,施工成本较高。At present, the main method of tightening the wires of transmission lines is to fix the traction rope on the tension clamp. After the wire is tightened, due to gravity, the porcelain bottle is strung under the line, and it needs manpower to twist the porcelain bottle up to the level of the wire and then install it on the cross arm of the pole tower. Guarantee, low line efficiency and high construction cost.

目前,在输电线路单串绝缘子串导线紧线时,一般是用一条钢丝绳绑扎在靠近横担的第二片瓷瓶下方(钢丝绳与绝缘子接触处垫麻袋)将牵引绳固定在耐张线夹上,导线收紧后,由于重力作用,瓷瓶串在线路下发生下坠,需人力将瓷瓶拧起与导线水平后安装在杆塔横担上,此方法不仅使杆上紧线费时费力,而且安全上得不到很好的保障。At present, when the wires of a single string of insulators in a transmission line are tightened, a steel wire rope is generally used to tie the traction rope under the second porcelain bottle near the cross arm (the contact between the steel wire rope and the insulator is padded with a sack) to fix the traction rope on the tension clamp. After the wire is tightened, due to gravity, the porcelain bottle string will fall under the line. It takes manpower to twist the porcelain bottle to be level with the wire and then install it on the cross arm of the pole tower. to a good guarantee.

发明内容Contents of the invention

本发明是为避免上述已有技术中存在的不足之处,提供一种用于架空线路紧线的球头卡线器,以解决单串瓷瓶易下坠、输电线路导线紧线安全性差、工作效率低等问题。The present invention is to avoid the disadvantages of the above-mentioned prior art, and provides a ball clamping device for tightening wires of overhead lines, so as to solve the problems of single string of porcelain bottles falling easily, poor safety of wire tightening of transmission lines, and poor work efficiency. Inferior question.

本发明为解决技术问题采用以下技术方案。The present invention adopts the following technical solutions to solve the technical problems.

用于架空线路紧线的球头卡线器,其结构特点是,所述球头卡线器包括一个L形板、一个方板、三个带有拉环的螺钉和一个顶板,所述L形板包括第一直板和与所述第一直板相固定连接的第二直板;所述第一直板上远离所述第二直板的一端设置有一个沿着所述第一直板的厚度方向贯穿所述第一直板的长方形开口槽;所述第一直板上,在长方形开口槽的两侧各开设有一个第一螺孔;所述方板上开设有两个第四通孔;The ball joint wire clamp used for overhead line tightening, its structural feature is that the ball joint clamp includes an L-shaped plate, a square plate, three screws with pull rings and a top plate, the L The shaped plate includes a first straight plate and a second straight plate fixedly connected with the first straight plate; an end of the first straight plate away from the second straight plate is provided with a The thickness direction runs through the rectangular opening groove of the first straight plate; on the first straight plate, a first screw hole is opened on both sides of the rectangular opening groove; two fourth through holes are opened on the square plate. hole;

所述顶板固定设置于所述第二直板上远离所述第一直板的一侧的板面上,所述顶板上设置有沿着所述顶板的厚度方向穿透所述顶板的第二螺孔;所述第二直板上设置有沿着所述第二直板的厚度方向穿透所述第二直板的第三螺孔;所述第二螺孔的轴线和所述第三螺孔的轴线在一条直线上。The top plate is fixedly arranged on the plate surface of the second straight plate away from the first straight plate, and the top plate is provided with a second screw penetrating through the top plate along the thickness direction of the top plate. hole; the second straight plate is provided with a third screw hole penetrating the second straight plate along the thickness direction of the second straight plate; the axis of the second screw hole and the axis of the third screw hole in a straight line.

本发明的用于架空线路紧线的球头卡线器的结构特点也在于:The structural features of the ball head wire gripper for overhead line tightening of the present invention also lie in:

所述顶板为倒U形板,顶板两侧的支撑板固定于所述第二直板的板面上。The top plate is an inverted U-shaped plate, and the support plates on both sides of the top plate are fixed on the surface of the second straight plate.

所述L形板、方板和顶板均为钢制件。The L-shaped plate, the square plate and the top plate are all steel parts.

与已有技术相比,本发明有益效果体现在:Compared with the prior art, the beneficial effects of the present invention are reflected in:

本发明的用于架空线路紧线的球头卡线器,通过球头卡线器连接单串瓷瓶和牵引绳,通过绞磨拉动牵引绳紧线紧线,整体结构简单、方便实用,提高线路紧线效率,充分保障施工安全,降低施工成本。经过4吨拉力静态15分钟试验,证明本发明的用于架空线路紧线的球头卡线器安全可靠。The ball clamping device for overhead line tightening of the present invention connects a single string of porcelain bottles and a traction rope through the ball clamping device, and pulls the traction rope through a twisting mill to tighten the wires. The overall structure is simple, convenient and practical, and the line Tight line efficiency fully guarantees construction safety and reduces construction costs. A 15-minute static test with a tensile force of 4 tons proves that the ball head wire gripper for overhead line tensioning of the present invention is safe and reliable.

本发明的用于架空线路紧线的球头卡线器,具有以下优点:The ball head wire gripper for overhead line tightening of the present invention has the following advantages:

1)紧线过程中不过牵引,减少过牵引对杆塔横担的不平衡受力;1) No traction in the process of tightening the line, reducing the unbalanced force on the cross-arm of the tower due to over-traction;

2)紧线时瓷瓶串不下坠,平行受力,极易连接横担挂点。2) When the line is tightened, the porcelain bottle string will not fall, and the force will be parallel, so it is very easy to connect the hanging point of the cross arm.

本发明的用于架空线路紧线的球头卡线器,具有能够可靠地连接牵引绳和单串瓷瓶、可提高输电线路导线紧线工作的安全可靠性、提高紧线的工作效率等优点。The ball head wire gripper used for wire tightening of overhead lines of the present invention has the advantages of being able to reliably connect a traction rope and a single string of porcelain bottles, improving the safety and reliability of wire tightening work of transmission lines, and improving the work efficiency of wire tightening.

附图说明Description of drawings

图1为本发明的用于架空线路紧线的球头卡线器的主视图。Fig. 1 is a front view of the ball head wire gripper used for tightening wires of overhead lines according to the present invention.

图2为本发明的用于架空线路紧线的球头卡线器的左视图。Fig. 2 is a left side view of the ball head wire gripper for overhead line tightening according to the present invention.

图3为本发明的用于架空线路紧线的球头卡线器的方板主视图。Fig. 3 is a front view of a square plate of the ball head wire gripper used for tightening wires of overhead lines according to the present invention.

图4为采用本发明的用于架空线路紧线的球头卡线器的施工时状态示意图。Fig. 4 is a schematic diagram of the construction state of the ball head wire gripper for overhead line tightening according to the present invention.

图5为图4中的局部放大图。FIG. 5 is a partially enlarged view of FIG. 4 .

图6为本发明的滑车固定板的主视图。Fig. 6 is a front view of the tackle fixing plate of the present invention.

图7为本发明的滑车固定板的俯视图。Fig. 7 is a top view of the tackle fixing plate of the present invention.

图8为本发明的滑车固定板的靠板的主视图。Fig. 8 is a front view of the backing plate of the tackle fixing plate of the present invention.

图9为本发明的联板紧线器的主视图。Fig. 9 is a front view of the connecting plate tensioner of the present invention.

图10为本发明的联板紧线器的左视图。Fig. 10 is a left view of the connecting plate tensioner of the present invention.

附图1~附图10中标号:1定滑轮,2第一紧线滑车,3第二紧线滑车,4绞磨,5牵引绳,6滑车固定板,601板状本体,6011U形通槽,6012第一通孔,602滑车固定结构,6021立板,60211第三通孔,603靠板,6031第二通孔,7球头卡线器,701L形板,7011第一直板,70111长方形开口槽,70112第一螺孔,7012第二直板,702方板,7021第四通孔,703顶板,7031支撑板,8联板紧线器,801V形本体,8011第一支腿,8012第二支腿,802挂钩,803固定板,8031第五通孔,9电线杆,10横担,11单串瓷瓶,1101挂环,1102连接柱,12双串瓷瓶,1201连接板,13导线,14螺栓,15螺钉,1501拉环。Labels in attached drawings 1 to 10: 1 fixed pulley, 2 first tightening block, 3 second tightening block, 4 twisting mill, 5 traction rope, 6 block fixing plate, 601 plate-like body, 6011 U-shaped through groove , 6012 first through hole, 602 pulley fixing structure, 6021 vertical plate, 60211 third through hole, 603 backing plate, 6031 second through hole, 7 ball end clamp, 701 L-shaped plate, 7011 first straight plate, 70111 Rectangular open slot, 70112 first screw hole, 7012 second straight plate, 702 square plate, 7021 fourth through hole, 703 top plate, 7031 support plate, 8-plate wire tensioner, 801 V-shaped body, 8011 first leg, 8012 The second leg, 802 hook, 803 fixed plate, 8031 fifth through hole, 9 utility poles, 10 cross arm, 11 single string porcelain bottle, 1101 hanging ring, 1102 connecting column, 12 double string porcelain bottle, 1201 connecting plate, 13 wire , 14 bolts, 15 screws, 1501 pull ring.

以下通过具体实施方式,并结合附图对本发明作进一步说明。The present invention will be further described below through specific embodiments and in conjunction with the accompanying drawings.

具体实施方式detailed description

参见图1~图10,用于架空线路紧线的球头卡线器7包括一个L形板701、一个方板702、三个带有拉环1501的螺钉15和一个顶板703,所述L形板701包括第一直板7011和与所述第一直板7011相固定连接的第二直板7012;所述第一直板7011上远离所述第二直板7012的一端设置有一个沿着所述第一直板7011的厚度方向贯穿所述第一直板7011的长方形开口槽70111;所述第一直板7011上,在长方形开口槽70111的两侧各开设有一个第一螺孔70112;所述方板702上开设有两个第四通孔7021;Referring to Figures 1 to 10, the ball clamp 7 used for overhead line tightening includes an L-shaped plate 701, a square plate 702, three screws 15 with pull rings 1501 and a top plate 703, the L The shaped plate 701 includes a first straight plate 7011 and a second straight plate 7012 fixedly connected with the first straight plate 7011; one end of the first straight plate 7011 away from the second straight plate 7012 is provided with a The thickness direction of the first straight plate 7011 runs through the rectangular opening groove 70111 of the first straight plate 7011; on the first straight plate 7011, a first screw hole 70112 is opened on both sides of the rectangular opening groove 70111; Two fourth through holes 7021 are opened on the square plate 702;

所述顶板703固定设置于所述第二直板7012上远离所述第一直板7011的一侧的板面上,所述顶板703上设置有沿着所述顶板703的厚度方向穿透所述顶板703的第二螺孔;所述第二直板7012上设置有沿着所述第二直板7012的厚度方向穿透所述第二直板7012的第三螺孔;所述第二螺孔的轴线和所述第三螺孔的轴线在一条直线上。The top board 703 is fixedly arranged on the board surface of the second straight board 7012 away from the first straight board 7011, and the top board 703 is provided with a The second screw hole of the top plate 703; the second straight plate 7012 is provided with a third screw hole penetrating the second straight plate 7012 along the thickness direction of the second straight plate 7012; the axis of the second screw hole and the axis of the third screw hole are on a straight line.

所述第一直板的板面和第二直板的板面相互垂直,二者以相互垂直的方式相互固定。第一直板的两个第一螺孔之间的间距和方板上的两个第四通孔之间的间距相等,第一螺孔和第四通孔的直径也是相同的。通过依次旋入第四通孔和第一螺孔内的螺钉15,可将方板固定在所述第一直板上,螺钉15的螺纹与第一螺孔的螺纹之间相配合。The board surfaces of the first straight board and the second straight board are perpendicular to each other, and they are fixed to each other in a mutually perpendicular manner. The distance between the two first screw holes of the first straight plate is equal to the distance between the two fourth through holes on the square plate, and the diameters of the first screw holes and the fourth through holes are also the same. The square plate can be fixed on the first straight plate by screwing into the fourth through hole and the screw 15 in the first screw hole in turn, and the thread of the screw 15 cooperates with the thread of the first screw hole.

所述球头卡线器用于连接单串瓷瓶11。单串瓷瓶11的端部设置有挂环1101,所述挂环与瓷瓶之间通过连接柱1102相连接。紧线操作时,将球头卡线器设置在所述连接柱1102上,所述连接柱1102位于所述长方形开口槽内。然后通过带有拉环的螺钉15将方板固定在所述第一直板上,从而将单串瓷瓶的连接柱1102锁紧在所述长方形开口槽内,这样就可以避免球头卡线器从单串瓷瓶上脱落,提高紧线工作的安全可靠性,同时保障了现场工作人员的人身安全。然后将牵引绳拴紧于所述球头卡线器上,然后开动机动绞磨,通过绞磨拉紧牵引绳,从而对对输电线路导线进行紧线。The ball clamp is used to connect single strings of porcelain bottles 11 . A hanging ring 1101 is provided at the end of the single-string porcelain bottle 11 , and the hanging ring and the porcelain bottle are connected through a connecting column 1102 . During the thread tightening operation, the ball joint clamp is arranged on the connecting post 1102, and the connecting post 1102 is located in the rectangular opening groove. Then the square plate is fixed on the first straight plate by the screw 15 with the pull ring, so that the connecting column 1102 of the single string of porcelain bottles is locked in the rectangular opening groove, so that the ball joint clamp can be avoided It falls off from the single-string porcelain bottle, which improves the safety and reliability of the tight line work, and at the same time ensures the personal safety of the on-site staff. Then the traction rope is fastened on the ball clamp, and then the dynamic winch is started, and the traction rope is tightened through the winch, so as to tighten the wires of the transmission line.

带拉环的螺钉15依次旋入第二螺孔和第三螺孔,将螺钉固定在顶板和第二直板上。Screws 15 with pull rings are screwed into the second screw hole and the third screw hole in turn, and the screws are fixed on the top board and the second straight board.

所述顶板703为倒U形板,顶板703两侧的支撑板7031固定于所述第二直板7012的板面上。The top plate 703 is an inverted U-shaped plate, and the supporting plates 7031 on both sides of the top plate 703 are fixed on the surface of the second straight plate 7012 .

所述L形板701、方板702和顶板703均为钢制件。The L-shaped plate 701, the square plate 702 and the top plate 703 are all made of steel.

本发明的球头卡线器在使用时,与定滑轮1、第一紧线滑车2、第二紧线滑车3、绞磨4、牵引绳5、用于固定第二紧线滑车3的滑车固定板6、联板紧线器8等一同构成组合式紧线工具,对架空线路的导线进行紧线操作。When the ball end clamping device of the present invention is in use, it is used to fix the second pulley 3 with the fixed pulley 1, the first tightening tackle 2, the second tightening tackle 3, the twisting mill 4, the traction rope 5, and the second tightening tackle 3. The fixed plate 6, the connecting plate wire tightener 8 etc. together constitute a combined wire tightening tool, which is used for wire tightening operations on the wires of the overhead line.

所述定滑轮1固定于电线杆9的顶端;所述滑车固定板6固定于电线杆9的横担10上,所述第二紧线滑车3固定于所述滑车固定板6之上;所述第一紧线滑车2固定于电线杆9的底端;所述绞磨4固定于地面上;所述牵引绳5缠绕于所述绞磨4上,绞磨4上所引出的牵引绳5依次绕过第一紧线滑车2、定滑轮1和第二紧线滑车3,然后拴紧在所述球头卡线器7上;紧线时,只需转动绞磨4拉动牵引绳5,即可实现线路导线13的紧线。The fixed pulley 1 is fixed on the top of the utility pole 9; the tackle fixing plate 6 is fixed on the cross arm 10 of the utility pole 9, and the second tightening tackle 3 is fixed on the tackle fixing plate 6; The first wire tightening block 2 is fixed on the bottom of the utility pole 9; the winch 4 is fixed on the ground; Go around the first wire tightening block 2, the fixed pulley 1 and the second wire tightening block 3 in turn, and then fasten them on the ball head clamp 7; Can realize the tight line of circuit conductor 13.

当需要对输电线路导线13进行紧线时,在电线杆9(杆塔或砼杆)顶端安装定滑轮,电线杆的底端紧挨地面的位置处固定第一紧线滑车,地面上设置机动绞磨。滑车固定板固定于所述电线杆的横担10上,将第二紧线滑车固定于滑车固定板上。将球头卡线器卡接在单串瓷瓶11上,或者将联板紧线器安装在双串瓷瓶12的两串瓷瓶之间的连接板1201上。绞磨上引出的牵引绳依次绕过第一紧线滑车、定滑轮和第二紧线滑车后拴紧在球头卡线器或者联板紧线器上,然后开动机动绞磨,通过绞磨拉紧牵引绳,从而对对输电线路导线13进行紧线。When it is necessary to tighten the wire 13 of the transmission line, a fixed pulley is installed on the top of the utility pole 9 (pole tower or concrete pole), the bottom end of the utility pole is fixed at the position close to the ground, and the first tightening pulley is fixed, and a motorized winch is set on the ground. grind. The tackle fixing plate is fixed on the cross arm 10 of the utility pole, and the second tensioning tackle is fixed on the tackle fixing plate. The ball joint clamp is clamped on the single-string porcelain bottle 11, or the connecting plate wire tightener is installed on the connecting plate 1201 between the two strings of porcelain bottles of the double-string porcelain bottle 12. The traction rope drawn from the winch bypasses the first wire tightening block, the fixed pulley and the second wire tightening block in turn, and then is fastened to the ball head clamp or the joint plate tensioner, and then the motorized winch is started to pass through the winch. Tighten the traction rope, thereby carrying out tight line to transmission line conductor 13.

牵引绳一端固定在球头卡线器上,牵引绳通过紧线滑轮、杆塔上方的定滑轮后另一端固定在机动绞磨上进行紧线。这种紧线方式,瓷瓶与牵引绳之间比较牢固,而且紧线滑车固定在横担上,不会掉落,因而可提高线路紧线效率,也能充分保障工作人员的施工安全,不会发生掉落物砸伤工作人员的现象,降低了施工成本。One end of the traction rope is fixed on the ball joint clamp, and the other end of the traction rope is fixed on the motor winch to tighten the line after passing through the tensioning pulley and the fixed pulley above the pole tower. In this line tightening method, the connection between the porcelain bottle and the traction rope is relatively firm, and the line tightening block is fixed on the cross arm without falling, so it can improve the line tightening efficiency and fully guarantee the construction safety of the staff. The phenomenon that the falling objects hurt the staff occurs, and the construction cost is reduced.

所述滑车固定板6包括板状本体601、用于与所述第二紧线滑车3相连接的滑车固定结构602、用于将所述板状本体601固定于所述电线杆9的横担10上的靠板603;所述板状本体601上设置有沿着所述板状本体601的厚度方向穿透所述板状本体601的U形通槽6011;所述板状本体601上,所述U形通槽6011的两侧各有一个沿着所述板状本体601的厚度方向穿透所述板状本体601的第一通孔6012;所述靠板603上也设置有两个第二通孔6031;所述两个第二通孔6031与所述两个第一通孔6012的位置相对应;所述靠板603通过两个螺栓14固定于所述所述板状本体601上;所述滑车固定结构602设置于所述板状本体601的顶端,所述滑车固定结构602包括两个立板6021,两个立板6021相互平行设置,两个立板6021中的每一个立板6021上设有一个第三通孔60211;一个螺栓14依次穿过两个立板6021的第三通孔60211并固定于所述所述两个第三通孔60211之内。The tackle fixing plate 6 includes a plate-shaped body 601, a tackle fixing structure 602 for connecting with the second wire tightening tackle 3, and a cross arm for fixing the plate-like body 601 to the utility pole 9 10 on the back plate 603; the plate-shaped body 601 is provided with a U-shaped through groove 6011 penetrating the plate-shaped body 601 along the thickness direction of the plate-shaped body 601; on the plate-shaped body 601, Both sides of the U-shaped through groove 6011 have a first through hole 6012 penetrating through the plate-shaped body 601 along the thickness direction of the plate-shaped body 601; the backing plate 603 is also provided with two The second through hole 6031; the two second through holes 6031 correspond to the positions of the two first through holes 6012; the backing plate 603 is fixed to the plate body 601 by two bolts 14 Above; the tackle fixing structure 602 is arranged on the top of the plate body 601, the tackle fixing structure 602 includes two vertical boards 6021, the two vertical boards 6021 are arranged parallel to each other, each of the two vertical boards 6021 A third through hole 60211 is provided on the vertical plate 6021; a bolt 14 passes through the third through holes 60211 of the two vertical plates 6021 in turn and is fixed in the two third through holes 60211.

滑车固定板由三部分构成:板状本体、滑车固定结构和靠板。板状本体上设置有U形通槽,在U形通槽的开口处设置两个第一通孔,靠板上也对应设置两个第二通孔,两个第一通孔和两个第二通孔在尺寸上基本相同,而且两个第一通孔之间的距离和两个第二通孔之间的距离相等,使得靠板贴在板状本体上时,第一通孔与第二通孔的轴线能够在一条直线上,以便于一根螺栓能够插入两个通孔从而将靠板和板状本体固定在一起。靠板位于板状本体的左端。滑车固定结构设置在板状本体的中间处,位于板状本体的顶端。两个立板分别位于板状本体的两侧,相对平行设置。两个立板上各设有一个第三通孔,两个第三通孔是同轴线的。一个螺栓依次穿过两个立板的第三通孔,旋紧螺母后可将螺栓紧固。通过螺栓来固定第二紧线滑车,以避免第二紧线滑车掉落到地面上而砸伤工作人员,或者掉落在地面上影响紧线的工作效率。The tackle fixing plate is composed of three parts: a plate body, a tackle fixing structure and a backing plate. A U-shaped through-slot is arranged on the plate-like body, and two first through-holes are set at the opening of the U-shaped through-slot, and two second through-holes are correspondingly set on the backing plate, two first through-holes and two second through-holes. The two through holes are basically the same in size, and the distance between the two first through holes is equal to the distance between the two second through holes, so that when the backing plate is attached to the plate-shaped body, the first through hole and the second through hole The axes of the two through holes can be on a straight line, so that a bolt can be inserted into the two through holes so as to fix the backing plate and the plate-like body together. The leaning plate is located at the left end of the plate-shaped body. The tackle fixing structure is arranged in the middle of the plate-shaped body and is located at the top of the plate-shaped body. The two vertical plates are respectively located on both sides of the plate-shaped body and arranged relatively parallel. Each of the two vertical plates is provided with a third through hole, and the two third through holes are coaxial. A bolt passes through the third through holes of the two vertical plates in turn, and the bolt can be tightened after the nut is tightened. The second tightening tackle is fixed by bolts to prevent the second tightening tackle from falling on the ground and injuring the staff, or falling on the ground to affect the working efficiency of the tightening.

具体操作时,先将第一螺孔内的螺栓卸下,拿掉靠板,然后将板状本体的U形通槽开口的一侧贴近所述电线杆的横担上,将横担夹持在靠板和板状本体之间,然后将两个螺栓分别插入两个第一螺孔和两个第二螺孔,旋紧螺母,将靠板、横担和板状本体紧紧地固定在一起,从而将滑车固定板牢固地锁紧在电线杆的横担上。然后,将第二紧线滑车固定于所述滑车固定结构上,从而牢固地将第二紧线滑车固定在横担上,避免第二紧线滑车在紧线工作过程中掉落而误伤工作人员,提高了现场工作的安全可靠性,充分保障施工安全。During the specific operation, the bolts in the first screw holes are first unloaded, the backing plate is removed, and then the side of the U-shaped through groove opening of the plate-shaped body is close to the cross arm of the utility pole, and the cross arm is clamped. Between the backing plate and the plate-like body, insert two bolts into the two first screw holes and the two second screw holes respectively, tighten the nuts, and tightly fix the backing plate, the cross arm and the plate-like body on the Together, the tackle fixing plate is firmly locked on the cross arm of the utility pole. Then, the second wire tightening block is fixed on the block fixing structure, thereby firmly fixing the second wire tightening block on the cross arm, preventing the second wire tightening block from falling during the wire tightening work process and accidentally injuring the staff , Improve the safety and reliability of on-site work, and fully guarantee the construction safety.

第二紧线滑车的轴上固定有一个长杆,该长杆的下端设有一个圆环,该圆环套在穿过两个第三通孔的螺栓上,且圆环卡在两个立板之间的位置上。A long rod is fixed on the shaft of the second wire tightening block, and the lower end of the long rod is provided with a ring, and the ring is sleeved on the bolts passing through the two third through holes, and the ring is clamped on the two vertical holes. between the boards.

所述板状本体601为弧形板,所述滑车固定结构602位于所述板状本体601的弧顶处。The plate-shaped body 601 is an arc-shaped plate, and the trolley fixing structure 602 is located at the top of the arc of the plate-shaped body 601 .

所述联板紧线器8包括V形本体801,所述V形本体801包括两个支腿,所述两个支腿中的每个支腿上设置有一个挂钩802;所述支腿包括第一支腿8011和第二支腿8012,所述第一支腿8011上设置有一个固定板803,所述固定板803上设置有一个沿着所述固定板803的厚度方向穿透所述固定板803的第五通孔8031。The connecting board wire tightener 8 includes a V-shaped body 801, and the V-shaped body 801 includes two legs, and each leg in the two legs is provided with a hook 802; the legs include The first leg 8011 and the second leg 8012, the first leg 8011 is provided with a fixing plate 803, and the fixing plate 803 is provided with a The fifth through hole 8031 of the fixing plate 803 .

所述联板紧线器的两个支腿是由一根钢条制成,钢条弯折呈V字形,弯折部位为弧形。每个支腿上设有一个挂钩。紧线操作时,联板紧线器用于连接双串瓷瓶,双串瓷瓶的两串瓷瓶12之间设置有一个连接板1201,连接板1201上设置有多个通孔。将联板紧线器的两个挂钩挂在所述双串瓷瓶12的连接板1201上,然后通过一个螺栓14依次穿过固定板上的第五通孔和连接板1201上的通孔,将固定板803和连接板1201固定在一起,从而避免联板紧线器从双串瓷瓶上脱落,提高紧线工作的安全可靠性,同时保障了现场工作人员的人身安全。提高了线路紧线效率,充分保障施工安全,降低施工成本。The two supporting legs of the connecting plate tensioner are made of a steel bar, the steel bar is bent in a V shape, and the bending part is arc-shaped. There is a hook on each leg. During the wire tightening operation, the connecting board wire tightening device is used to connect the double-string porcelain bottles. A connecting plate 1201 is arranged between the two strings of porcelain bottles 12 of the double-stringing porcelain bottles. The connecting plate 1201 is provided with a plurality of through holes. Hang the two hooks of the connecting plate tightener on the connecting plate 1201 of the double-string porcelain bottle 12, then pass through the fifth through hole on the fixing plate and the through hole on the connecting plate 1201 successively through a bolt 14, and The fixing plate 803 and the connecting plate 1201 are fixed together, thereby preventing the connecting plate wire tightening device from falling off from the double-string porcelain bottle, improving the safety and reliability of the wire tightening work, and at the same time ensuring the personal safety of the on-site staff. The efficiency of line tightening is improved, construction safety is fully guaranteed, and construction cost is reduced.

需要紧线时,将牵引绳拴紧在所述联板紧线器V形本体的两个支腿的相交部位,然后开动机动绞磨,通过绞磨拉紧牵引绳,从而对对输电线路导线进行紧线。When the line needs to be tightened, fasten the traction rope to the intersecting part of the two legs of the V-shaped body of the connecting plate tensioner, and then start the dynamic winch, and tighten the traction rope through the winch, so as to align the transmission line conductors. Make a tight line.

所述V形本体801的两个支腿相交处为弧形。The intersection of the two legs of the V-shaped body 801 is arc-shaped.

Claims (1)

1.用于架空线路紧线的球头卡线器,其特征是,所述球头卡线器(7)包括一个L形板(701)、一个方板(702)、三个带有拉环(1501)的螺钉(15)和一个顶板(703),所述L形板(701)包括第一直板(7011)和与所述第一直板(7011)相固定连接的第二直板(7012);所述第一直板(7011)上远离所述第二直板(7012)的一端设置有一个沿着所述第一直板(7011)的厚度方向贯穿所述第一直板(7011)的长方形开口槽(70111);所述第一直板(7011)上,在长方形开口槽(70111)的两侧各开设有一个第一螺孔(70112);所述方板(702)上开设有两个第四通孔(7021);1. The ball joint clamp used for overhead line tightening is characterized in that the ball joint clamp (7) includes an L-shaped plate (701), a square plate (702), and three The screws (15) of the ring (1501) and a top plate (703), the L-shaped plate (701) includes a first straight plate (7011) and a second straight plate fixedly connected to the first straight plate (7011) (7012); one end of the first straight plate (7011) away from the second straight plate (7012) is provided with a device that runs through the first straight plate (7011) along the thickness direction of the first straight plate ( 7011) of the rectangular opening slot (70111); on the first straight plate (7011), a first screw hole (70112) is provided on both sides of the rectangular opening slot (70111); the square plate (702) Two fourth through holes (7021) are opened on the top; 所述顶板(703)固定设置于所述第二直板(7012)上远离所述第一直板(7011)的一侧的板面上,所述顶板(703)上设置有沿着所述顶板(703)的厚度方向穿透所述顶板(703)的第二螺孔;所述第二直板(7012)上设置有沿着所述第二直板(7012)的厚度方向穿透所述第二直板(7012)的第三螺孔;所述第二螺孔的轴线和所述第三螺孔的轴线在一条直线上;The top board (703) is fixedly arranged on the board surface of the second straight board (7012) away from the side of the first straight board (7011), and the top board (703) is provided with (703) penetrates the second screw hole of the top plate (703) in the thickness direction; the second straight plate (7012) is provided with a second screw hole penetrating the second straight plate (7012) in the thickness direction. The third screw hole of the straight plate (7012); the axis of the second screw hole and the axis of the third screw hole are on a straight line; 所述顶板(703)为倒U形板,顶板(703)两侧的支撑板(7031)固定于所述第二直板(7012)的板面上;The top plate (703) is an inverted U-shaped plate, and the support plates (7031) on both sides of the top plate (703) are fixed on the surface of the second straight plate (7012); 所述L形板(701)、方板(702)和顶板(703)均为钢制件。The L-shaped plate (701), square plate (702) and top plate (703) are all made of steel.
CN201310601870.XA 2013-11-25 2013-11-25 Bulb fixing-line device for overhead transmission line stringing Active CN103579952B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310601870.XA CN103579952B (en) 2013-11-25 2013-11-25 Bulb fixing-line device for overhead transmission line stringing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310601870.XA CN103579952B (en) 2013-11-25 2013-11-25 Bulb fixing-line device for overhead transmission line stringing

Publications (2)

Publication Number Publication Date
CN103579952A CN103579952A (en) 2014-02-12
CN103579952B true CN103579952B (en) 2016-06-22

Family

ID=50051171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310601870.XA Active CN103579952B (en) 2013-11-25 2013-11-25 Bulb fixing-line device for overhead transmission line stringing

Country Status (1)

Country Link
CN (1) CN103579952B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106410685B (en) * 2016-11-28 2017-12-08 浙江恒胜消防设备有限公司 A kind of porcelain insulator changes special end gripping mechanism
CN108879486B (en) * 2018-07-25 2019-06-21 珠海市中力电力设备有限公司 a wire tensioner

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201398032Y (en) * 2008-11-11 2010-02-03 河南省电力公司平顶山供电公司 Hanging ring fixing device for iron tower angle steel pulley suspension
CN102738737A (en) * 2012-07-26 2012-10-17 辽宁省电力有限公司辽阳供电公司 Straight line clamp universal for steel tube rod tower heads
CN203553770U (en) * 2013-11-25 2014-04-16 国家电网公司 Ball head wire clamping device applied to overhead line stringing

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008167591A (en) * 2006-12-28 2008-07-17 Tokyo Electric Power Co Inc:The Implement for holding electric wire
JP2012175876A (en) * 2011-02-24 2012-09-10 Chugoku Electric Power Co Inc:The Temporary coupling metal fitting for strain clamp

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201398032Y (en) * 2008-11-11 2010-02-03 河南省电力公司平顶山供电公司 Hanging ring fixing device for iron tower angle steel pulley suspension
CN102738737A (en) * 2012-07-26 2012-10-17 辽宁省电力有限公司辽阳供电公司 Straight line clamp universal for steel tube rod tower heads
CN203553770U (en) * 2013-11-25 2014-04-16 国家电网公司 Ball head wire clamping device applied to overhead line stringing

Also Published As

Publication number Publication date
CN103579952A (en) 2014-02-12

Similar Documents

Publication Publication Date Title
CN103594976B (en) Combination stringing instrument for line conductor stringing
CN202817611U (en) Bidirectional wire tightener
CN104201614B (en) Far-end operation changes the device of two division circuit two strings of strain insulators
CN202127205U (en) Rapidly-fixing clamp for cables
CN203967713U (en) For the terminal clamping device of crane cable
CN103579952B (en) Bulb fixing-line device for overhead transmission line stringing
CN203895839U (en) Bolt fastening device for live-line drainage parallel groove clamp
CN103594974B (en) Combined tightener for overhead line stringing
CN203553770U (en) Ball head wire clamping device applied to overhead line stringing
CN203553772U (en) Yoke plate line tightening device used for tightening overhead lines
CN203251021U (en) Pay-off trolley clamping device
CN203553771U (en) Pulley fixing plate applied to overhead line stringing
CN103594975B (en) Coaster fixed plate for overhead transmission line stringing
CN202978115U (en) Pedestal type/hanging type dual-mode pay-off pulley apparatus
CN105137309B (en) It is a kind of quickly to test the pressure-resistant device of suspension insulator and method of testing
CN203536865U (en) Combined wire-tightening tool for tightening line wire
CN203813330U (en) Tool for live replacement of 500kV tension insulator string
CN106639498A (en) Portable fixing auxiliary device of stranded steel wire pulling wire
CN212411702U (en) Porcelain bottle with holding and fixing wire
CN104332897A (en) Two-end wire fastening device for construction of power lines
CN204651789U (en) The special hanger of hot-line insulator string replacement
CN210956301U (en) Insulator string suspension device for salt density test
CN206023136U (en) A kind of bypass lead-up cable fixing device
CN204945317U (en) A kind ofly can test the withstand voltage device of suspended insulator fast
CN103219670B (en) A kind of tune strain insulator-string automatic aligning fixture

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210512

Address after: 242000 NO.160 Baocheng Road, Xuanzhou District, Xuancheng City, Anhui Province

Patentee after: STATE GRID ANHUI ELECTRIC POWER CO., LTD. XUANCHENG POWER SUPPLY Co.

Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District

Patentee before: State Grid Corporation of China

Patentee before: XUANCHENG POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Co.