CN201528158U - Connecting tool for balanced mount points of dual-string insulators - Google Patents

Connecting tool for balanced mount points of dual-string insulators Download PDF

Info

Publication number
CN201528158U
CN201528158U CN2009202580557U CN200920258055U CN201528158U CN 201528158 U CN201528158 U CN 201528158U CN 2009202580557 U CN2009202580557 U CN 2009202580557U CN 200920258055 U CN200920258055 U CN 200920258055U CN 201528158 U CN201528158 U CN 201528158U
Authority
CN
China
Prior art keywords
shackle
plate
hole
plates
hanging point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202580557U
Other languages
Chinese (zh)
Inventor
史宏伟
邓建波
安庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN2009202580557U priority Critical patent/CN201528158U/en
Application granted granted Critical
Publication of CN201528158U publication Critical patent/CN201528158U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Insulators (AREA)

Abstract

The utility model discloses a connecting tool for balanced mount points of dual-string insulators. The connecting tool comprises two connection plates which are arranged up and down in parallel in a superimposed manner; one end of each of the two connection plates is open, and the other ends thereof are connected together; connection holes are formed in the positions corresponding to the surfaces of the two connection plates at the open ends and used for being connected with external connecting plates; and shackles are fixedly connected with the connection plates at the connection ends and used for being in clasp joint with external bearing tools. The utility model has the advantages of simple structure, convenient use, small volume, light weight, low cost, convenient installation, replacement and connection, wide application and the like. The connecting tool is adopted to replace double-string tension insulators without excess devices, so that the construction efficiency is higher, and the operating utilization ratio of a transmission line can be improved.

Description

Two insulator string balance hanging point fastening meanss
Technical field
The utility model relates to the special-purpose gold utensil of mechanical traction field, particularly the balance hanging point fastening means of the two insulator strings of power line tension tower.
Background technology
Traditional 220kV power line tension iron tower, two string porcelains or composite insulator are all adopted in the external insulation configuration, for the anti-soil that improves transmission line dodges ability, now progressively be replaced by composite insulator by porcelain insulator, in work progress, cause the problem of insulator string knockdown owing to the change of tractive effort direction, the big iron tower of the strain tower actual rotational angle number of degrees particularly, because the increase of two tension force extended line angles, oblique more serious of the outside angle lapping of its bunch of insulator.The common cause that general insulator string tilts is that hitch point and towing point are not on the center line of wire tension: the hanging point of the hanging point of cross-arm side, load instrument, lead side, be that any reason all can cause strain insulator iron tower tension imbalance, bunch of insulator tilts.Not only can not normal running after this problem occurs, also can bring out bunch of insulator upset, lead twisting when serious, cause device damage, the workmen falls in the high-altitude.When changing the two insulator string of strain insulator in the past, mostly the measure of taking is to hang the 3T chain block again in main drafting tool both sides, in the traction lead, adjust chain block in the lump then, the level that keeps insulator string in order to continuous adjustment unbalanced tensile force, though this method is effective, but the operating time, long security and stability was poor, and it is low to drop into manpower multiple-effect rate, when abnormal problem and conversion work position occurring, because using appliance is more, cause the construction period to prolong, reduced the operation utilance of transmission line, cause the serious waste of resource again.
The utility model content
The purpose of this utility model is to provide a kind of pair of insulator string balance hanging point fastening means, and this fastening means makes the two insulator strings of replacing strain insulator need not adopt too much utensil, and efficiency of construction is higher, can promote the operation utilance of transmission line.
For achieving the above object, the of the present utility model pair of insulator string balance hanging point fastening means comprises two connecting plates that up and down parallel stack is provided with, and two connecting plate one end openings and the other end link together; Two connecting plate surface correspondence positions of open end are provided with connecting hole, and connecting hole is used for being connected with external yoke plate; The connecting plate at link place is fixed with shackle, and shackle is used for and external load instrument clasp joint mutually.
Described connecting plate is the high density aluminium alloy plate, and described connecting hole is a screw; Described shackle is the high strength shackle, this high strength shackle comprises U-shaped bar and shackle bolt, the body of rod of U-shaped bar openend both sides is provided with through hole, and the shackle bolt is located in the through hole and is used for and external load instrument clasp joint mutually, and the closing end of U-shaped bar is connected on the connecting plate.
Described connecting hole is a fixed bolt hole.
Gap between two connecting plates that parallel up and down stack is provided with is greater than the plate body thickness of external yoke plate.
Gap between all thick 10 millimeters of described two connecting plates, two connecting plates is 15 millimeters.
The utlity model has following advantage:
1. the utility model is simple in structure, and is easy to use, and it is little, in light weight to have volume simultaneously, and cost is low, be convenient to install with change be connected, advantage such as applied range.Adopt the utility model to change the two insulator strings of strain insulator and need not adopt too much utensil, efficiency of construction is higher, can promote the operation utilance of transmission line.
Connecting plate and shackle specifically be provided with simple and conveniently, be easy to connect and use.
3. connecting hole is a fixed bolt hole, and bolt easy to use connects external yoke plate and connecting plate.
4. the gap between two connecting plates is convenient to external yoke plate is inserted between two connecting plates greater than the plate body thickness of external yoke plate.
5. two connecting plates are all thick 10 millimeters, can guarantee the intensity of connecting plate, exceed consume material simultaneously; Gap between two connecting plates is 15 millimeters, is convenient to external yoke plate is inserted this gap.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation that the utility model is connected with external yoke plate and load instrument.
Embodiment
As depicted in figs. 1 and 2, of the present utility model pair of insulator string balance hanging point fastening means comprises two high density aluminium alloy plates 1 that up and down parallel stack is provided with, two high density aluminium alloy plate 1 one end openings and the corresponding fixed bolt hole 2 that is provided with, fixed bolt hole 2 is used for being connected with external yoke plate (comprising three yoke plates 8 and tetrad plate 9 as shown in Figure 2), two high density aluminium alloy plate 1 other ends link together and are fixed with the high strength shackle, this high strength shackle comprises U-shaped bar 5 and shackle bolt 6, nut 4, and the body of rod of U-shaped bar 5 openend both sides is provided with through hole 5A.Shackle bolt 6 is located in the through hole 5A during use, and its right part is passed the through hole 5A on right side and by nut 4 it is locked in the through hole 5A, and fastening nut 4 will make nut 4 compress the body of rod 5 of U-shaped bar.Shackle bolt 6 is used for and external load instrument 7 clasp joint mutually, and the closing end of U-shaped bar 5 is connected on the high density aluminium alloy plate 1.Wherein, the gap between all thick 10 millimeters of two the high density aluminium alloy plates 1, two high density aluminium alloy plates 1 is 15 millimeters; The maximal destruction power of high strength shackle is 50KN, and the diameter of U-shaped bar 5 is 18 millimeters.
As shown in Figure 2, external yoke plate comprises three yoke plates 8 on top and the tetrad plate 9 of bottom.The utility model needs to use in pairs when changing insulator string, one of them is fixedlyed connected with three yoke plates 8 that are plugged between two high density aluminium alloy plate 1 by the nut bolt pin 11 that is located in its fixed bolt hole 2, another is fixedlyed connected with the tetrad plate 9 that is plugged between two high density aluminium alloy plate 1 by the nut bolt pin 11 that is located in its fixed bolt hole 2, with load instrument 7 two link up with 12 difference clasp joints on the shackle bolt 6 of two two insulator string balance hanging point fastening meanss then, make this pair insulator string balance hanging point instrument in two bunch of insulator centers like this, exist together on the straight line with wire tension, play the stressed balanced action of strain insulator shaft tower cross-arm during traction.Insulator string is lax when tightening up load instrument 7, just can take off and change insulator, need not use too much utensil, and efficiency of construction is higher, can promote the operation utilance of transmission line.
Certainly, the utility model includes but not limited to present embodiment, not necessarily will be 15 millimeters as the gap between two high density aluminium alloy plates 1, needs only the plate body thickness greater than external yoke plate; Concrete numerical value such as the diameter of other U-shaped bars 5 also can be set to other concrete numerical value under the condition of satisfying the demand, this type of conversion all drops within the protection range of the present utility model.

Claims (5)

1. two insulator string balance hanging point fastening meanss is characterized in that: comprise two connecting plates that parallel up and down stack is provided with, two connecting plate one end openings and the other end link together; Two connecting plate surface correspondence positions of open end are provided with connecting hole, and connecting hole is used for being connected with external yoke plate; The connecting plate at link place is fixed with shackle, and shackle is used for and external load instrument clasp joint mutually.
2. according to claim 1 pair of insulator string balance hanging point fastening means, it is characterized in that: described connecting plate is the high density aluminium alloy plate, described connecting hole is a screw; Described shackle is the high strength shackle, this high strength shackle comprises U-shaped bar and shackle bolt, the body of rod of U-shaped bar openend both sides is provided with through hole, and the shackle bolt is located in the through hole and is used for and external load instrument clasp joint mutually, and the closing end of U-shaped bar is connected on the connecting plate.
3. according to claim 1 and 2 pair of insulator string balance hanging point fastening means, it is characterized in that: described connecting hole is a fixed bolt hole.
4. according to claim 3 pair of insulator string balance hanging point fastening means is characterized in that: the gap between two connecting plates that parallel up and down stack is provided with is greater than the plate body thickness of external yoke plate.
5. according to claim 4 pair of insulator string balance hanging point fastening means is characterized in that: the gap between all thick 10 millimeters of described two connecting plates, two connecting plates is 15 millimeters.
CN2009202580557U 2009-11-12 2009-11-12 Connecting tool for balanced mount points of dual-string insulators Expired - Fee Related CN201528158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202580557U CN201528158U (en) 2009-11-12 2009-11-12 Connecting tool for balanced mount points of dual-string insulators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202580557U CN201528158U (en) 2009-11-12 2009-11-12 Connecting tool for balanced mount points of dual-string insulators

Publications (1)

Publication Number Publication Date
CN201528158U true CN201528158U (en) 2010-07-14

Family

ID=42519440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202580557U Expired - Fee Related CN201528158U (en) 2009-11-12 2009-11-12 Connecting tool for balanced mount points of dual-string insulators

Country Status (1)

Country Link
CN (1) CN201528158U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208776A (en) * 2011-03-22 2011-10-05 福建省电力有限公司厦门电业局 Working tool for live-line replacement of insulator chain of triangle link plate hanging point type and working method thereof
CN104167688A (en) * 2014-07-31 2014-11-26 河南省电力公司济源供电公司 Power transmission line traction tool used in cooperation with yoke plate and using method thereof
CN104377598A (en) * 2014-12-08 2015-02-25 国家电网公司 Straightening device for double-insulator-suspended yoke plates on electric transmission line
CN104810747A (en) * 2015-04-14 2015-07-29 国网河南省电力公司济源供电公司 Multi-purpose electric power overhaul tool
CN108306218A (en) * 2018-04-04 2018-07-20 国网安徽省电力有限公司亳州供电公司 Counterweight draft gear adjustable in pitch

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208776A (en) * 2011-03-22 2011-10-05 福建省电力有限公司厦门电业局 Working tool for live-line replacement of insulator chain of triangle link plate hanging point type and working method thereof
CN102208776B (en) * 2011-03-22 2013-05-01 国家电网公司 Working tool for live-line replacement of insulator chain of triangle link plate hanging point type and working method thereof
CN104167688A (en) * 2014-07-31 2014-11-26 河南省电力公司济源供电公司 Power transmission line traction tool used in cooperation with yoke plate and using method thereof
CN104377598A (en) * 2014-12-08 2015-02-25 国家电网公司 Straightening device for double-insulator-suspended yoke plates on electric transmission line
CN104810747A (en) * 2015-04-14 2015-07-29 国网河南省电力公司济源供电公司 Multi-purpose electric power overhaul tool
CN108306218A (en) * 2018-04-04 2018-07-20 国网安徽省电力有限公司亳州供电公司 Counterweight draft gear adjustable in pitch
CN108306218B (en) * 2018-04-04 2024-01-26 国网安徽省电力有限公司亳州供电公司 Interval adjustable balance weight traction device

Similar Documents

Publication Publication Date Title
CN201528158U (en) Connecting tool for balanced mount points of dual-string insulators
CN101651308B (en) Tension resistant four-serial string whole composite insulator replacing device
CN202084351U (en) Windproof composite pin-type insulator
CN103594976B (en) Combination stringing instrument for line conductor stringing
CN101814707B (en) Tool for live replacement of 220kV line 'V' string insulator and method
CN2404241Y (en) Apparatus capable of changing strain insulator-chain electrical insulator
CN204516500U (en) A kind of two suspended compound insulator string
CN102704828A (en) Multifunctional hook ladder
CN201509027U (en) Entire quadruple string type strain composite insulator replacement device
CN203135324U (en) Frapping tool used for power transmission line maintenance
CN207362700U (en) Spatial Coupling hoist cable
CN2914431Y (en) Cross connection plate for hanging string for extra high voltage transmission line
CN216197040U (en) Strain-resistant wine glass crossing tower for power transmission line
CN201541108U (en) Combined type link plate
CN204516503U (en) A kind of wind-deviation suspension insulator
CN103579952B (en) Bulb fixing-line device for overhead transmission line stringing
CN209642259U (en) Straight pull strain clamp
CN207490436U (en) The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex
CN207977708U (en) A kind of power transmission and transformation wire clamp
CN207905992U (en) A kind of tower cylinder connecting structure of wind generating set
CN202925981U (en) 750kV composite material cross arm
CN201690183U (en) Serial yoke plate for 1150-kilovolt compact type 12-bundle leads
CN207117123U (en) A kind of wedge-shaped insulating tension clamp
CN202358820U (en) Lifting tool for steel truss structure
CN202068149U (en) Continuously adjustable connection hardware fitting used for power transmission line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100714

Termination date: 20121112